Documents of Note

Utilities Commission Act

BCUC 2013 Generic Cost of Capital ~ Stage 1

British Columbia Utilities Commission Generic Cost of Capital Proceeding (GCOC) Stage 1 ~ Project No.3698660


Timetable

SubjectDate
  


Hearing Location

SubjectLocationDateTimeAddress
     

 

Hearing and Other Documents

TitleDocument DescriptionSubmitted Date/TimeApproved Date
*_Exhibit List Stage 1 Updated: March 22, 2013 @ 9:40 am2012/02/29 09:31:00 AM2012/02/29
*_Email Fax List Updated: October 30, 2012 @ 2:59 pm2012/03/19 10:02:00 AM2012/03/19
*_Distribution List Updated: October 30, 2012 @ 2:59 pm2012/03/19 10:03:00 AM2012/03/19
Link to BCUC Generic Cost of Capital Stage 2 http://www.bcuc.com/ApplicationView.aspx?ApplicationId=3882013/03/22 09:49:00 AM2013/03/22
*_Decision Stage 1 Decision May 10, 20132013/05/10 02:26:00 PM2013/05/10
BCUC June 27, 2013 Requests for Written Submissions on AAM 2013/06/27 11:19:00 AM2013/06/27
BCUC July 2, 2013 Response to FBCU Request for Variance of the Regulatory Timetable2013/07/02 03:52:00 PM2013/07/02
*_Order L-53-13 Implementation of the Automatic Adjustment Mechanism Formula September 16, 20132013/09/18 08:37:00 AM2013/09/18
    

Arguments

TitleDocument DescriptionSubmitted Date/TimeApproved Date
PNG Final Submission PNG Final Submission January 31, 20132013/01/31 04:09:00 PM2013/01/31
FBCU Final Submission FBCU Final Submission January 31, 20132013/01/31 04:15:00 PM2013/01/31
Corix Final Submission Corix Final Submission January 31, 20132013/01/31 04:39:00 PM2013/01/31
ICG Final Submission ICG Final Submission dated February 14, 20132013/02/15 10:57:00 AM2013/02/15
BCPSO Final Submission BCPSO Final Submission February 15, 20132013/02/18 09:11:00 AM2013/02/18
AMPC-CEC Final Submission AMPC-CEC Final Submission February 15, 20132013/02/18 09:12:00 AM2013/02/18
FBCU Reply Submission FBCU Reply Submission February 26, 20132013/02/26 03:57:00 PM2013/02/26
ICG AAM Submission ICG AAM Submission July 26, 20132013/07/26 02:03:00 PM2013/07/26
AMPC, BCPSO and CEC AAM Submissions AMPC, BCPSO, CEC AAM Submissions July 26, 20132013/07/26 03:03:00 PM2013/07/26
PNG AAM Submission PNG AAM Submission July 26, 20132013/07/26 04:25:00 PM2013/07/26
FBCU AAM Submission FBCU AAM Submission July 26, 20132013/07/26 05:11:00 PM2013/07/26
AMPC BCPSO CEC Reply Submission AMPC, BCPSO and CEC Reply Submission August 12, 20132013/08/12 09:40:00 AM2013/08/12
FBCU AAM Reply Submission FBCU AAM Reply Submission August 12, 20132013/08/13 09:18:00 AM2013/08/13
    

Exhibits

"A" Exhibits - Commission Documents

TitleDocument DescriptionSubmitted Date/TimeApproved Date
A-1 Letter Dated February 28, 2012 and Order G-20-12 – Establishing an initial Regulatory Timetable2012/02/28 03:45:00 PM2012/02/28
A-2 Letter Dated April 17, 2012 – Response clarifying Union Gas’s Intervener Status2012/04/17 12:16:00 PM2012/04/17
A-3 Letter dated April 18, 2012 and Order G-47-2012 – Reasons for Decision and Final Scoping Document2012/04/18 03:06:00 PM2012/04/18
A-4 Letter dated April 18, 2012 – Appointment of Panel2012/04/18 03:19:00 PM2012/04/18
A-5 Letter dated April 19, 2012 - Order G-50-12 List of Further Procedural Matters2012/04/19 04:53:00 PM2012/04/19
A-6 Letter dated June 1, 2012 - Order G-72-12 Issuing Preliminary Timetable, PACA costs, Final Minimum Filing Requirements for Affected Utilities2012/06/01 04:10:00 PM2012/06/01
A-7 Letter dated June 6, 2012- Request for Variance of Order G-72-122012/06/06 04:28:00 PM2012/06/06
A-8 Letter dated June 8, 2012 – Commission Consultant’s Survey Report 2012/06/08 09:55:00 AM2012/06/08
A-9 Letter dated June 20, 2012 –Order G-84-12 Amended Preliminary Regulatory Timetable 2012/06/20 10:29:00 AM2012/06/20
A-10 Letter dated July 27, 2012 – Request for comments on the addition of a panel member2012/07/27 03:08:00 PM2012/07/27
A-11 Letter dated August 22, 2012 – Appointment of Commissioner Mr. Giammarino2012/08/23 08:39:00 AM2012/08/23
A-12 Letter dated August 31, 2012 – Information Request No. 1 to FortisBC Utilities2012/08/31 03:16:00 PM2012/08/31
A-13 CONFIDENTIAL Letter dated August 31, 2012 – CONFIDENTIAL Information Request No. 1 to FortisBC Utilities2012/08/31 03:18:00 PM2012/08/31
A-14 Letter dated August 31, 2012 – Information Request No. 1 to PNG2012/08/31 03:20:00 PM2012/08/31
A-15 Letter dated August 31, 2012 – Information Request No. 1 to Corix 2012/08/31 03:22:00 PM2012/08/31
A-16 Letter dated September 13, 2012 – L-52-12 Amending Regulatory Timetable2012/09/13 09:36:00 AM2012/09/13
A-17 Letter dated September 27, 2012 – Agenda for Procedural Conference2012/09/27 03:07:00 PM2012/09/27
A-18 Letter dated October 9, 2012 – Information Request No. 2 to FortisBC Utilities2012/10/10 10:10:00 AM2012/10/10
A-19 CONFIDENTIAL Letter dated October 9, 2012 – CONFIDENTIAL Information Request No. 2 to FortisBC Utilities2012/10/10 10:14:00 AM2012/10/10
A-20 Letter dated October 9, 2012 –Information Request No. 2 to Corix2012/10/10 10:15:00 AM2012/10/10
A-21 Letter dated October 11, 2012 – Order G-148-12 and Reasons for Decision2012/10/11 12:28:00 PM2012/10/11
A-22 Letter dated October 24, 2012 –Request to Access Confidential Material 2012/10/24 03:35:00 PM2012/10/24
A-23 Letter dated October 31, 2012 - Access to Confidential Material Response2012/10/31 10:58:00 AM2012/10/31
A-24 Letter November 1, 2012 – Confidential Material Access to AMPC (Exhibit C6-11)2012/11/01 04:46:00 PM2012/11/01
A-25 Letter dated November 16, 2012– Information Request No. 1 to ICG on Intervener Evidence2012/11/16 04:31:00 PM2012/11/16
A-26 Letter dated November 16, 2012– Information Request No. 1 to AMPC on Intervener Evidence2012/11/16 04:32:00 PM2012/11/16
A-27 Letter dated November 20, 2012 – Request for submissions2012/11/20 02:59:00 PM2012/11/20
A-28 Letter dated December 3, 2012 – Oral Public Hearing Information2012/12/03 11:45:00 AM2012/12/03
A-29 Letter dated December 5, 2012 – Opening Statements Clarification2012/12/05 09:52:00 AM2012/12/05
A-30 Letter dated December 10, 2012 - Commission Order G-187-12 establishing the current ROE and capital structure2012/12/10 04:41:00 PM2012/12/10
A-31 Letter dated February 14, 2013 – Commission Response to request for extension 2013/02/14 03:56:00 PM2013/02/14
A2-1 Letter Dated February 28, 2012 Commission Staff filing British Columbia Utilities Commission letter dated November 28, 2011-Preliminary Notification of Initiation of Generic Cost of Capital Proceeding2012/02/28 05:00:00 PM2012/02/28
A2-2 Letter Dated February 28, 2012 Commission Staff filing The Terasen Utilities (December 8, 2010) – Automatic Adjustment Mechanism Review2012/02/28 05:01:00 PM2012/02/28
A2-3 Letter dated June 8, 2012 – Commission Staff filing The Brattle Group Survey of Cost of Capital Practices in Canada2012/06/08 09:58:00 AM2012/06/08
A2-4 Letter dated July 12, 2012 - Commission Staff filing Response to AMPC Information Request to Commission Consultants2012/07/12 10:08:00 AM2012/07/12
A2-5 Letter dated July 12, 2012 - Commission Staff filing Response to FEU Information Request on the Consultants Survey Report2012/07/12 10:09:00 AM2012/07/12
A2-6 Letter dated July 12, 2012 - Commission Staff filing Response to Industrial Customer Group Information Request on the Consultants Survey Report2012/07/12 10:10:00 AM2012/07/12
A2-7 Letter dated July 12, 2012 - Commission Staff filing Response to BCOAPO Information Request to Consultants Report2012/07/12 10:10:00 AM2012/07/12
A2-8 Letter dated July 12, 2012 - Commission Staff filing Response to CEC Information Request to Consultants Report2012/07/12 10:11:00 AM2012/07/12
A2-9 Letter dated July 13, 2012 – Commission Staff filing BCUC Request for Proposal for a Survey of Canadian Cost of Capital Practice Report2012/07/16 09:56:00 AM2012/07/16
A2-10 Letter dated August 31 2012 – Commission Staff filing Behavior of the Firm under Regulatory Constraint by Harvey Averch and Leland L. Johnson2012/08/31 10:49:00 AM2012/08/31
A2-11 Letter dated August 31 2012 – Commission Staff filing Extract from Terasen 2005 and 209 ROE CAP applications2012/08/31 11:00:00 AM2012/08/31
A2-12 Letter dated August 31 2012 – Commission Staff filing Extract from FEU 2012-13RR Decision2012/08/31 11:05:00 AM2012/08/31
A2-13 Letter dated August 31 2012 – Commission Staff filing extract from Bloomberg News (Report dated August 6, 2012)2012/08/31 11:08:00 AM2012/08/31
A2-14 Letter dated August 31 2012 – Commission Staff filing Capital Structure - A Comparison2012/08/31 11:09:00 AM2012/08/31
A2-15 Letter dated August 31 2012 – Commission Staff filing Summaries of Reports and Notes from Recent Credit Rating Agencies and Investment Banks on FEI’s Risk and Credit Metrics2012/08/31 11:11:00 AM2012/08/31
A2-16 Letter dated August 31 2012 – Commission Staff filing Extract from Washington Utilities and Transportation Commission Order 08 Decision2012/08/31 11:14:00 AM2012/08/31
A2-17 Letter dated August 31 2012 – Commission Staff filing Fitch Affirms National Fuel Gas’ IDR at ‘A’2012/08/31 11:28:00 AM2012/08/31
A2-18 Letter dated August 31 2012 – Commission Staff filing The City of Vancouver - District Energy Connectivity Standards Information for Developers2012/08/31 11:31:00 AM2012/08/31
A2-19 Letter dated August 31 2012 – Commission Staff filing City of Surrey – District Energy System By-law, 2012, No. 176672012/08/31 11:33:00 AM2012/08/31
A2-20 Letter dated August 31 2012 – Commission Staff filing Extract from BCUC Information Request No. 2 to River District Energy Limited Partnership2012/08/31 11:36:00 AM2012/08/31
A2-21 Letter dated August 31 2012 – Commission Staff Ontario Energy Board Report of the Board on the Cost of Capital for Ontario’s Regulated Utilities December 11, 20092012/08/31 11:50:00 AM2012/08/31
A2-22 Letter dated August 31 2012 – Commission Staff filing Ontario Energy Board Cost of Capital Parameter Updates for 2012 Cost of Service Applications for Rates Effective January 1, 20122012/08/31 11:51:00 AM2012/08/31
A2-23 Letter dated August 31 2012 – Commission Staff filing Summary of Reports from Recent Credit Rating Agencies and Investment Banks on PNG’s Risks and Credit Metrics2012/08/31 11:54:00 AM2012/08/31
A2-24 Letter dated October 9, 2012 – Commission Staff filing Bradshaw et al. - Playing Favorites2012/10/10 10:23:00 AM2012/10/10
A2-25 Letter dated October 9, 2012 –CTA-Risk-free rate determination2012/10/10 10:25:00 AM2012/10/10
A2-26 Letter dated October 9, 2012 – Commission Staff filing Exhibit A2-26 OEB Cost of Capital Parameter, May 1 20122012/10/10 10:26:00 AM2012/10/10
A2-27 Letter dated November 16, 2012 - Commission Staff Filing Cost of Capital by Sector_NYU_Value Line Database2012/11/16 04:36:00 PM2012/11/16
A2-28 Letter dated November 16, 2012 - Commission Staff Filing Gau, Thompson 2012 Capitalization Rate Study2012/11/16 04:37:00 PM2012/11/16
A2-29 Letter dated November 16, 2012 - Commission Staff Filing Schaeffler and Weber-The Cost of Equity of Network Operators2012/11/16 04:39:00 PM2012/11/16
A2-30 Letter dated November 16, 2012 - Commission Staff Filing TD-Long-Term Returns October 20122012/11/16 04:40:00 PM2012/11/16
A2-31 Letter dated November 16, 2012 - Commission Staff Filing Ashton et al- Analysts' Optimism in Earnings Forecasts 2012/11/16 04:40:00 PM2012/11/16
A2-32 Letter dated November 16, 2012 - Commission Staff Filing Understanding Corporate Bond Spreads Using Credit Default Swaps2012/11/16 04:41:00 PM2012/11/16
A2-33 Submitted at Oral Hearing December 12, 2012 – Commission Staff Filing FEU 2012-2013 Revenue Requirements G-44-12 Compliance Filing2012/12/12 11:37:00 AM2012/12/12
A2-33-1 Submitted at Oral Hearing December 13, 2012 – Commission Staff Filing PAGE 1 OF LETTER DATED MAY 1, 2012 TO BCUC FROM FORTISBC, WITH TWO PAGES ATTACHED2012/12/12 11:37:00 AM2013/01/09
A2-34 Submitted at Oral Hearing December 13, 2012 – Commission Staff Filing Vancouver Sun Article Natural gas seen as green fuel2012/12/13 11:33:00 AM2012/12/13
A2-35 Submitted at Oral Hearing December 13, 2012 – Commission Staff Filing Staff Witness Aid2012/12/13 11:34:00 AM2012/12/13
A2-36 Submitted at Oral Hearing December 14, 2012 – Commission Staff Filing PAGES 7 TO 10 FROM STANDARD & POORS REPORT2012/12/17 09:40:00 AM2012/12/17
A2-37 Submitted at Oral Hearing December 14, 2012 – Commission Staff Filing LONG-TERM ECONOMIC FORECAST, TD ECONOMICS,SEPTEMBER 18, 20122012/12/17 09:43:00 AM2012/12/17
A2-38 Submitted at Oral Hearing December 14, 2012 – Commission Staff Filing ATTACHMENT 8.2(A), PAGE 17 OF 18, RESULTS OF DIFFERENCES IN SYSTEMATIC RISK2012/12/17 09:43:00 AM2012/12/17
A2-39 Submitted at Oral Hearing December 14, 2012 – Commission Staff Filing EXTRACT FROM ORDER NO. 09-176 FROM PUBLIC UTILITY COMMISSION OF OREGON2012/12/17 09:45:00 AM2012/12/17
A2-40 Submitted at Oral Hearing December 14, 2012 – Commission Staff Filing RATING REPORT, FEBRUARY 29, 2012 FROM DBRS2012/12/17 09:47:00 AM2012/12/17
A2-41 Submitted at Oral Hearing December 14, 2012 – Commission Staff Filing DOCUMENT HEADED MOODY'S INVESTORS SERVICE, CREDIT OPINION: FORTISBC ENERGY INC. 2012/12/17 09:48:00 AM2012/12/17
A2-42 Submitted at Oral Hearing December 14, 2012 – Commission Staff Filing FIVE-PAGE DOCUMENT, FIRST PAGE HEADED RETURNS ON AVERAGE COMMON STOCK EQUITY FOR SAMPLE OF U.S. UTILITIES2012/12/17 09:49:00 AM2012/12/17
A2-43 Submitted at Oral Hearing December 17, 2012 – Commission Staff Filing Approaches to Estimating the Deemed Interest Rate for Long Term Debt2012/12/17 04:12:00 PM2012/12/17
A2-44 Submitted at Oral Hearing December 17, 2012 – Commission Staff Filing excerpt of FEI Kelowna DES CPCN Application 2012/12/17 04:13:00 PM2012/12/17
A2-45 Submitted at Oral Hearing December 17, 2012 – DOCUMENT HEADED CREDIT RATING AND EQUITY RISK PREMIUM2012/12/19 03:08:00 PM2012/12/19
A2-46 Submitted at Oral Hearing December 18, 2012 – Commission Staff Filing DOCUMENT HEADED WEATHERING THE HEADWINDS TO CANADA'S ECONOMIC GROWTH…21 NOVEMBER 20122012/12/19 03:17:00 PM2012/12/19
A2-47 Submitted at Oral Hearing December 18, 2012 – Commission Staff Filing DOCUMENT HEADED PUGET SOUND ENERGY INC.2012/12/19 03:21:00 PM2012/12/19
A2-48 Submitted at Oral Hearing December 18, 2012 – Commission Staff Filing DOCUMENT HEADED POWER & UTILITIES RESEARCH, THE ONE-TWO PUNCH: GROWTH COMBINED WITH ATTRACTIVE YIELD2012/12/19 03:22:00 PM2012/12/19
A2-48-1 Submitted at Oral Hearing December 18, 2012 – Commission Staff Filing EXTRACT FROM BMO CAPITAL MARKETS, PAGE 11, HEADED POWER & UTILITIES2012/12/19 03:23:00 PM2012/12/19
A2-49 Submitted at Oral Hearing December 19, 2012 – Commission Staff Filing EXTRACT FROM ONTARIO ENERGY BOARD, REPORT OF BOARD, DECEMBER 20, 20062012/12/20 09:31:00 AM2012/12/20
A2-50 Submitted at Oral Hearing December 19, 2012 – Commission Staff Filing EXTRACT FROM RENEWING ONTARIO'S ELECTRICITY DISTRIBUTION SECTOR: PUTTING THE CONSUMER FIRST2012/12/20 09:33:00 AM2012/12/20
A2-51 Submitted at Oral Hearing December 19, 2012 – Commission Staff Filing WITNESS AID PREPARED BY COMMISSION STAFF ENTITLED INFORMED EXPERT JUDGMENT2012/12/20 09:34:00 AM2012/12/20
    

"B" Exhibits - Applicant Documents

TitleDocument DescriptionSubmitted Date/TimeApproved Date
B1-1 BC UTILITIES OF FORTIS INC. COMPRISED OF FORTISBC ENERGY INC., FORTISBC ENERGY VANCOUVER ISLAND INC., FORTISBC ENERGY WHISTLER INC. AND FORTISBC INC. (FBCU) Letter Dated March 15, 2012 – Notice of Registration2012/03/16 08:45:00 AM2012/03/16
B1-2 Letter Dated March 21, 2012 – FBCU Submission on the Preliminary Scoping Document2012/03/21 04:16:00 PM2012/03/21
B1-3 Letter Dated May 3, 2012 – FBCU Submission on Minimum Filing Requirements2012/05/03 04:12:00 PM2012/05/03
B1-4 Letter Dated May 9, 2012 – FBCU Submission regarding Order G-50-12 Appendix A 2012/05/09 05:01:00 PM2012/05/09
B1-5 Letter Dated June 5, 2012 – FBCU Submitting Request for Variance of Preliminary Regulatory Timetable2012/06/05 01:12:00 PM2012/06/05
B1-6 Letter Dated June 5, 2012 – FBCU Reply Submissions regarding Request for Variance of Preliminary Regulatory Timetable2012/06/12 05:31:00 PM2012/06/13
B1-7 Letter Dated June 22, 2012 – FBCU Submitting Information Request regarding the Commission Consultant Survey Report2012/06/22 02:59:00 PM2012/06/22
B1-8 Letter Dated August 2, 2012 – FBCU Submitting comments regarding the addition of a panel member2012/08/03 11:18:00 AM2012/08/03
B1-9 Letter Dated August 3, 2012 – FBCU Submitting Evidence 2012/08/03 12:27:00 PM2012/08/03
B1-9-1 Letter Dated August 3, 2012 – FBCU Submitting Evidence Appendix A – Sections 1 to 22012/08/03 12:30:00 PM2012/08/03
B1-9-2 Letter Dated August 3, 2012 – FBCU Submitting Evidence Appendix A – Section 3A – Debt Investment Analyst Reports for FEI2012/08/03 12:33:00 PM2012/08/03
B1-9-3 Letter Dated August 3, 2012 – FBCU Submitting Evidence Appendix A – Section 3B – Equity Analyst Reports Beacon to Credit Suisse2012/08/03 12:37:00 PM2012/08/03
B1-9-4 Letter Dated August 3, 2012 – FBCU Submitting Evidence Appendix A – Section 3B – Equity Analyst Reports Macquarie to UBS2012/08/03 12:41:00 PM2012/08/03
B1-9-5 Letter Dated August 3, 2012 – FBCU Submitting Evidence Appendix A – Sections 4 to 112012/08/03 12:43:00 PM2012/08/03
B1-9-6 Letter Dated August 3, 2012 – FBCU Submitting Evidence Appendices B to J2012/08/03 12:44:00 PM2012/08/03
B1-9-7 CONFIDENTIAL Letter Dated August 3, 2012 – FBCU Submitting Evidence CONFIDENTIAL Appendices2012/08/03 02:57:00 PM2012/08/03
B1-10 Letter Dated September 24, 2012 – FBCU Submitting Response to BCPSO IR No. 12012/09/24 04:33:00 PM2012/09/24
B1-11 Letter Dated September 24, 2012 – FBCU Response to BC Utility Customers IR1 – FBCU2012/09/25 08:50:00 AM2012/09/25
B1-12 Letter Dated September 24, 2012 – FBCU Response to BC Utility Customers IR1 – AEngen2012/09/25 08:53:00 AM2012/09/25
B1-13 Letter Dated September 24, 2012 – FBCU Response to BC Utility Customers IR1 – Concentric2012/09/25 08:54:00 AM2012/09/25
B1-14 Letter Dated September 24, 2012 – FBCU Response to BC Utility Customers IR1 – Dr.VanderWeide2012/09/25 08:56:00 AM2012/09/25
B1-15 Letter Dated September 24, 2012 – FBCU Response to BC Utility Customers IR1 – KMcShane2012/09/25 08:58:00 AM2012/09/25
B1-16 Letter Dated September 24, 2012 – FBCU Response to ICG IR No.1 - AEngen2012/09/25 09:00:00 AM2012/09/25
B1-17 Letter Dated September 24, 2012 – FBCU Response to ICG IR No.1 - Concentric2012/09/25 09:01:00 AM2012/09/25
B1-18 Letter Dated September 24, 2012 – FBCU Response to ICG IR No.1 - Dr.VanderWeide2012/09/25 09:03:00 AM2012/09/25
B1-19 Letter Dated September 24, 2012 – FBCU Response to ICG IR No.1 - KMcShane2012/09/25 09:03:00 AM2012/09/25
B1-20 Letter Dated September 24, 2012 – FBCU Response to BCUC IR No.12012/09/25 09:04:00 AM2012/09/25
B1-20-1 CONFIDENTIAL Letter Dated September 24, 2012 – FBCU Confidential Response to BCUC IR No.12012/09/25 09:07:00 AM2012/09/25
B1-21 CONFIDENTIAL Letter Dated September 24, 2012 – FBCU Response to Confidential BCUC IR No.12012/09/25 09:07:00 AM2012/09/25
B1-22 Submitted at Procedural Conference Letter Dated October 3, 2012 – FBCU Counsel's Oral Submissions2012/10/12 11:17:00 AM2012/10/12
B1-23 Letter dated October 26, 2012 – FBCU Response to Confidentiality Request2012/10/26 04:23:00 PM2012/10/26
B1-24 Letter dated October 29, 2012 – FBCU Response to BCUC IR No. 22012/10/29 03:18:00 PM2012/10/30
B1-25 CONFIDENTIAL Letter dated October 29, 2012 – FBCU Response to BCUC Confidential IR No. 22012/10/29 03:18:00 PM2012/10/30
B1-26 Letter dated October 29, 2012 – FBCU Response to BCPSO IR No. 22012/10/29 03:21:00 PM2012/10/30
B1-27 Letter dated November 2, 2012 – FBCU Comments regarding Confidential Material Access 2012/11/02 02:42:00 PM2012/11/02
B1-28 Letter dated November 16, 2012 – FBCU Submitting IR No. 1 to AMPC/BC Utility Customers on the Evidence of Dr. Booth2012/11/16 03:30:00 PM2012/11/16
B1-29 Letter dated November 16, 2012 – FBCU Submitting IR No. 1 to ICG on the Evidence of Dr. Safir2012/11/16 03:31:00 PM2012/11/16
B1-30 Letter Dated November 23, 2012 – FBCU Submission on Interim Rates Jan 1, 20132012/11/23 12:49:00 PM2012/11/23
B1-31 Letter Dated November 30, 2012 – FBCU Submitting Witness Panels and Direct Testimony2012/11/30 01:40:00 PM2012/11/30
B1-32 Letter dated December 6, 2012 – FBCU Submitting Rebuttal Evidence2012/12/06 04:56:00 PM2012/12/07
B1-33 Letter dated December 10, 2012 – FBCU Submitting Opening Statement2012/12/10 04:25:00 PM2012/12/11
B1-34 Submitted at Oral Hearing December 12, 2012 – FBCU Written Opening Statement of Counsel2012/12/12 01:54:00 PM2012/12/12
B1-35 Submitted at Oral Hearing December 12, 2012 – FBCU Revised: Exhibit B1-9-6, Appendix H, page 51, Figure 342012/12/12 04:12:00 PM2012/12/12
B1-36 Submitted at Oral Hearing December 12, 2012 – FBCU Undertaking No. 12012/12/13 09:05:00 AM2012/12/13
B1-37 Submitted at Oral Hearing December 12, 2012 – FBCU Undertaking No. 22012/12/13 09:15:00 AM2012/12/13
B1-38 Submitted at Oral Hearing December 13, 2012 – FBCU Undertaking No. 32012/12/13 11:34:00 AM2012/12/13
B1-39 Submitted at Oral Hearing December 13, 2012 – FBCU Undertaking No. 42012/12/13 11:36:00 AM2012/12/13
B1-40 Submitted at Oral Hearing December 13, 2012 – FBCU Undertaking No. 52012/12/13 02:23:00 PM2012/12/13
B1-41 Submitted at Oral Hearing December 13, 2012 – FBCU Undertaking No. 62012/12/13 02:25:00 PM2012/12/13
B1-42 Submitted at Oral Hearing December 13, 2012 – FBCU Undertaking No. 72012/12/14 08:58:00 AM2012/12/14
B1-43 Submitted at Oral Hearing December 13, 2012 – FBCU Undertaking No. 82012/12/14 09:08:00 AM2012/12/14
B1-44 Submitted at Oral Hearing December 13, 2012 – FBCU Undertaking No. 92012/12/14 09:10:00 AM2012/12/14
B1-45 Submitted at Oral Hearing December 14, 2012 – FBCU Undertaking No. 102012/12/14 04:42:00 PM2012/12/14
B1-46 Submitted at Oral Hearing December 14, 2012 – FBCU Undertaking No. 112012/12/14 04:44:00 PM2012/12/14
B1-47 Submitted at Oral Hearing December 14, 2012 – FBCU Filing Testimony of Kathleen C. McShane Tab 22012/12/14 04:44:00 PM2012/12/14
B1-48 Submitted at Oral Hearing December 17, 2012 – FBCU Undertaking No. 122012/12/17 03:55:00 PM2012/12/17
B1-49 Submitted at Oral Hearing December 18, 2012 – FBCU Filing Testimony Figures Update2012/12/18 10:01:00 AM2012/12/18
B1-50 Submitted at Oral Hearing December 19, 2012 – FBCU Filing 104 PAGE COLLECTION OF DOCUMENTS USED IN CROSS EXAMINATION OF DR. BOOTH2012/12/20 09:36:00 AM2012/12/20
B1-51 Submitted at Oral Hearing December 21, 2012 – FBCU Filing COMPENDIUM OF EXTRACTS, FIRST PAGE ENTITLED FAIR RETURN FOR TERASEN GAS INC (TGI) AUGUST 20092012/12/24 09:05:00 AM2012/12/24
B1-49-1 Letter received January 3, 2013 – FBCU Filing Remaining Chart Updates2013/01/03 03:53:00 PM2013/01/03
B1-52 Letter received January 3, 2013 – FBCU Undertaking No. 132013/01/03 04:00:00 PM2013/01/03
B1-53 Letter received January 3, 2013 – FBCU Undertaking No. 142013/01/03 04:01:00 PM2013/01/03
B1-54 Letter received January 3, 2013 – FBCU Undertaking No. 152013/01/03 04:15:00 PM2013/01/03
B1-55 Letter received January 3, 2013 – FBCU Undertaking No. 162013/01/03 04:17:00 PM2013/01/03
B1-56 Letter received January 3, 2013 – FBCU Undertaking No. 172013/01/03 04:27:00 PM2013/01/03
B1-57 Letter received January 3, 2013 – FBCU Undertaking No. 182013/01/03 04:28:00 PM2013/01/03
B1-58 Letter received January 3, 2013 – FBCU Undertaking No. 192013/01/03 04:29:00 PM2013/01/03
B1-59 Letter received January 3, 2013 – FBCU Undertaking No. 202013/01/03 04:57:00 PM2013/01/04
B1-60 Letter received January 29, 2013 – FBCU Undertaking No. 212013/01/29 04:14:00 PM2013/01/29
B1-61 Letter received January 29, 2013 – FBCU Undertaking No. 222013/01/29 04:25:00 PM2013/01/29
B1-62 Letter received January 29, 2013 – FBCU Undertaking No. 232013/01/29 04:27:00 PM2013/01/29
B1-63 Letter received January 29, 2013 – FBCU Undertaking No. 242013/01/29 04:28:00 PM2013/01/29
B1-64 Letter received January 29, 2013 – FBCU Undertaking No. 252013/01/29 04:30:00 PM2013/01/29
B1-65 Letter received January 29, 2013 – FBCU Undertaking No. 262013/01/29 04:31:00 PM2013/01/29
B1-66 Letter received January 29, 2013 – FBCU Undertaking No. 272013/01/29 04:32:00 PM2013/01/29
B1-67 Letter received January 29, 2013 – FBCU Undertaking No. 282013/01/29 04:33:00 PM2013/01/29
B1-68 Letter received January 29, 2013 – FBCU Undertaking No. 292013/01/29 04:34:00 PM2013/01/29
B2-1 CORIX MULTI-UTILITY SERVICES INC. (CORIX) Letter Dated March 14, 2012 – Notice of Registration2012/03/16 08:50:00 AM2012/03/16
B2-2 Letter Dated March 21, 2012 – Corix Submission on the Preliminary Scoping Document2012/03/22 11:51:00 AM2012/03/22
B2-3 Letter Dated May 3, 2012 – Corix Submission on Minimum Filing Requirements2012/05/03 05:28:00 PM2012/05/04
B2-4 Letter Dated May 9, 2012 – Corix Submission regarding Order G-50-12 Appendix A2012/05/10 09:38:00 AM2012/05/10
B2-5 Letter Dated June 8, 2012 – Corix Submission on FBCU Request for Variance2012/06/11 10:05:00 AM2012/06/11
B2-6 Letter Dated August 3, 2012 – Corix Submitting comments regarding the addition of a panel member2012/08/03 03:02:00 PM2012/08/03
B2-7 Letter Dated August 3, 2012 – Corix Submitting Evidence2012/08/03 03:56:00 PM2012/08/03
B2-8 Letter Dated September 24, 2012 – Corix Submitting Response to BCPSO IR No. 12012/09/24 12:38:00 PM2012/09/24
B2-9 Letter Dated September 24, 2012 – Corix Submitting Response to BCUC IR No. 12012/09/24 12:41:00 PM2012/09/24
B2-10 Letter Dated October 18, 2012 – Corix Submitting Response to BCUC IR No. 22012/10/18 12:22:00 PM2012/10/18
B2-11 Letter Dated November 23, 2012 – Corix Submission regarding A-272012/11/23 02:14:00 PM2012/11/23
B2-12 PENDING - Submitted at Oral Hearing December 18, 2012 – Corix Filing OPENING REMARKS OF COUNSEL FOR CORIX MULTIUTILITY SERVICES INC., DECEMBER 12, 20122012/12/19 04:19:00 PM2012/12/19
B2-13 Submitted December 24, 2012 – Corix Filing Undertaking Document titled BEFORE THE FLORIDA PUBLIC SERVICE COMMISSION2012/12/24 11:58:00 AM2012/12/24
B2-14 Submitted December 24, 2012 – Corix Filing Undertaking Document titled Comparison of Business Risk Adjustments in Cost of Capital Testimony Filed by Ms. Pauline M. Ahern2012/12/24 12:00:00 PM2012/12/24
B2-15 Letter received January 3, 2013 - Corix Filing response to undertaking2013/01/03 02:01:00 PM2013/01/03
B3-1 PACIFIC NORTHERN GAS LTD. AND PACIFIC NORTHERN GAS N.E. LTD. (PNG) Online Registration Dated March 16, 2012 – Notice of Registration2012/03/19 09:55:00 AM2012/03/19
B3-2 Letter Dated March 21, 2012 – PNG Submission on the Preliminary Scoping Document2012/03/21 04:04:00 PM2012/03/21
B3-3 Letter Dated May 3, 2012 – PNG Submission on Minimum Filing Requirements2012/05/03 04:08:00 PM2012/05/03
B3-4 Letter Dated May 9, 2012 – PNG Submission regarding Order G-50-12 Appendix A2012/05/09 04:54:00 PM2012/05/09
B3-5 Letter Dated June 8, 2012 – PNG Submission regarding variance of the Regulatory Timetable2012/06/08 12:28:00 PM2012/06/08
B3-6 Letter Dated August 3, 2012 – PNG Submitting comments regarding the addition of a panel member2012/08/03 10:15:00 AM2012/08/03
B3-7 Letter Dated August 3, 2012 – PNG Submitting Evidence2012/08/03 03:22:00 PM2012/08/03
B3-8 Letter Dated September 24, 2012 – PNG Submitting Response to BCUC IR No. 12012/09/24 03:44:00 PM2012/09/24
B3-9 Letter Dated September 24, 2012 – PNG Submitting Response to BCPSO2012/09/24 03:46:00 PM2012/09/24
B3-10 Letter Dated September 24, 2012 – PNG Submitting Response to AMPC, BCPSO and CEC2012/09/24 03:47:00 PM2012/09/24
B3-11 Letter Dated November 23, 2012 – PNG Submission regarding A-272012/11/23 01:55:00 PM2012/11/23
B3-12 Letter Dated November 30, 2012 – PNG Submitting Comments regarding Witness Panels 2012/11/30 03:29:00 PM2012/11/30
B4-1 BRITISH COLUMBIA HYDRO AND POWER AUTHORITY (BCH) Letter Dated March 12, 2012 – Notice of Registration2012/03/16 08:52:00 AM2012/03/16
B4-2 Letter Dated March 21, 2012 – BCH Submission on the Preliminary Scoping Document2012/03/21 03:00:00 PM2012/03/21
B4-3 Letter Dated May 3, 2012 – BCH Submission on Minimum Filing Requirements2012/05/03 02:59:00 PM2012/05/03
B4-4 Letter Dated May 9, 2012 – BCH Submission regarding Order G-50-12 Appendix A2012/05/09 02:18:00 PM2012/05/09
B4-5 Letter Dated June 8, 2012 – BCH Submission regarding variance of the Regulatory Timetable2012/06/08 01:43:00 PM2012/06/08
B4-6 Letter Dated August 3, 2012 – BCH Submitting comments regarding the addition of a panel member2012/08/03 11:14:00 AM2012/08/03
B4-7 Letter Dated November 23, 2012 - BCH Submission regarding A-272012/11/23 03:29:00 PM2012/11/23
B4-8 Letter Dated November 30, 2012 – BCH Submitting Comments regarding Witness Panels 2012/11/30 02:22:00 PM2012/11/30
B5-1 RIVER DISTRICT ENERGY (RDE ) Letter Dated March 12, 2012 – Notice of Registration2012/03/16 08:56:00 AM2012/03/16
    

"C" Exhibits - Intervener Documents

TitleDocument DescriptionSubmitted Date/TimeApproved Date
C1-1 UNION GAS LIMITED (UG) Letter dated March 5, 2012 – Request for Intervener Status by Patrick McMahon2012/03/09 04:54:00 PM2012/03/09
C2-1 CANADIAN OFFICE AND PROFESSIONAL EMPLOYEES’ UNION, LOCAL 378 (COPE 378) Letter dated March 15, 2012 – Request for Intervener Status by James Quail2012/03/19 09:58:00 AM2012/03/19
C2-1-1 Letter dated March 20, 2012 – COPE 378 Submitting Intervention Supplementary Comments2012/03/21 11:46:00 AM2012/03/21
C2-2 Letter dated April 19, 2012 - COPE 378 Submitting Updating Consultant details2012/04/20 10:32:00 AM2012/04/20
C2-3 Letter dated June 26, 2012 - COPE 378 Submitting Updating Consultant information2012/06/27 03:26:00 PM2012/06/27
C3-1 SENTINEL ENERGY MANAGEMENT (SEM) Online Registration dated March 20, 2012 – Request for Intervener Status by Jim Langley2012/03/21 11:18:00 AM2012/03/21
C4-1 INDUSTRIAL CUSTOMERS GROUP (ICG) Letter dated March 20, 2012 Via Email – Request for Intervener Status by Robert Hobbs and Brian Merwin2012/03/21 11:23:00 AM2012/03/21
C4-2 Letter Dated March 21, 2012 – ICG Submission on the Preliminary Scoping Document2012/03/23 12:35:00 PM2012/03/23
C4-3 Letter Dated May 3, 2012 – ICG Submission regarding the Preliminary Minimum Filing Requirements for Affected Utilities2012/05/03 02:35:00 PM2012/05/03
C4-4 Letter Dated May 9, 2012 – ICG Submission regarding Order G-50-12 Appendix A2012/05/09 01:43:00 PM2012/05/09
C4-5 Letter Dated June 8, 2012 – ICG Submission regarding variance of the Regulatory Timetable2012/06/08 01:51:00 PM2012/06/08
C4-6 Letter Dated June 21, 2012 – ICG Submitting Information Request regarding the Commission Consultant Survey Report2012/06/21 02:34:00 PM2012/06/21
C4-7 Letter Dated August 31, 2012 – ICG Submitting Information Request No. 12012/09/04 05:18:00 PM2012/09/04
C4-8 Letter Dated October 24, 2012 - ICG Submitting Comments regarding Request for Confidential Information2012/10/24 03:43:00 PM2012/10/24
C4-9 Letter dated November 5, 2012 – ICG Submitting Evidence2012/11/06 09:00:00 AM2012/11/06
C4-10 Letter dated November 6, 2012 – ICG Submitting Confidential Undertakings2012/11/27 09:56:00 AM2012/11/27
C4-11 Letter dated November 30, 2012 – ICG Submitting Responses to Information Request No. 12012/12/03 02:00:00 PM2012/12/03
C4-12 Letter dated November 30, 2012 – ICG Submission regarding Exhibit A-272012/12/04 03:03:00 PM2012/12/04
C4-13 Submitted at Oral Hearing December 12, 2012 – ICG Opening Comments2012/12/13 09:19:00 AM2012/12/13
C4-14 Submitted at Oral Hearing December 14, 2012 – ICG Filing Tab 2 Testimony of Kathleen C. McShane2012/12/14 11:42:00 AM2012/12/14
C4-15 Submitted at Oral Hearing December 17, 2012 – ICG Filing OPENING STATEMENT OF DR. ANDREW SAFIR2012/12/18 10:02:00 AM2012/12/18
C4-16 Letter dated January 14, 2013 – ICG Submitting Undertakings2013/01/15 09:37:00 AM2013/01/15
C4-17 Letter dated January 25, 2013 – ICG Submitting Dr. Lawrence Booth Undertaking No. 22013/01/25 04:14:00 PM2013/01/25
C5-1 BRITISH COLUMBIA OLD AGE PENSIONERS’ ORGANIZATION (BCOAPO) VIA EMAIL Letter Dated March 20, 2012 – Request for Intervener Status by Leigha Worth, Tannis Braithwaite and Bill Harper2012/03/21 11:27:00 AM2012/03/21
C5-2 Letter Dated March 21, 2012 – BCOAPO Submission on the Preliminary Scoping Document2012/03/23 12:36:00 PM2012/03/23
C5-3 Letter Dated May 3, 2012 – BCOAPO Submission on Minimum Filing Requirements 2012/05/07 09:58:00 AM2012/05/07
C5-4 Letter Dated May 9, 2012 – BCOAPO Submission regarding Order G-50-12 Appendix A 2012/05/10 09:39:00 AM2012/05/10
C5-5 Letter Dated June 8, 2012 – BCOAPO Submission regarding variance of the Regulatory Timetable2012/06/08 03:47:00 PM2012/06/08
C5-6 Letter Dated June 22, 2012 – BCOAPO Submitting Information Request regarding the Commission Consultant Survey Report2012/06/22 03:57:00 PM2012/06/22
C5-7 Letter dated July 23, 2012 – BCOAPO Submitting notice of Name Change to British Columbia Pensioners’ and Seniors’ Organization (BCPSO) 2012/07/23 03:05:00 PM2012/07/23
C5-8 Letter Dated August 3, 2012 – BCPSO Submitting comments regarding the addition of a panel member2012/08/03 03:05:00 PM2012/08/03
C5-9 Letter Dated August 31, 2012 – BCPSO Submitting Information Request No. 1 to Corix2012/08/31 03:29:00 PM2012/08/31
C5-10 Letter Dated August 31, 2012 – BCPSO Submitting Information Request No. 1 to FBCU2012/08/31 03:30:00 PM2012/08/31
C5-11 Letter Dated August 31, 2012 – BCPSO Submitting Information Request No. 1 to PNG2012/08/31 03:31:00 PM2012/08/31
C5-12 Letter Dated October 9, 2012 - BCPSO Submitting Information Request No. 2 to FBCU2012/10/11 08:45:00 AM2012/10/11
C5-13 Letter Dated October 9, 2012 - BCPSO Submitting Contact Update2012/10/11 08:46:00 AM2012/10/11
C5-14 Letter Dated November 30, 2012 - BCPSO Submission regarding Exhibit A-272012/11/30 03:06:00 PM2012/11/30
C5-15 Submitted at Oral Hearing December 17, 2012 – BCPSO filing BUSINESS SPECTATOR DOCUMENT2012/12/18 10:03:00 AM2012/12/18
C6-1 ASSOCIATION OF MAJOR POWER CUSTOMERS OF BC (AMPC) Letter Dated March 20, 2012 – Request for Intervener Status by Richard Stout and Lloyd Guenther2012/03/21 11:34:00 AM2012/03/21
C6-2 Letter Dated May 2, 2012 – AMPC Submitting Contact Update2012/05/03 02:37:00 PM2012/05/03
C6-3 Letter Dated May 3, 2012 – AMPC Submission on Minimum Filing Requirement2012/05/07 10:00:00 AM2012/05/07
C6-4 Letter Dated May 9, 2012 – AMPC Submission regarding Order G-50-12 Appendix A2012/05/10 09:40:00 AM2012/05/10
C6-5 Letter Dated June 8, 2012 – AMPC Submission regarding variance of the Regulatory Timetable2012/06/08 03:49:00 PM2012/06/08
C6-6 Letter Dated June 22, 2012 – AMPC Submitting Information Request regarding the Commission Consultant Survey Report2012/06/22 03:58:00 PM2012/06/22
C6-7 Letter Dated August 3, 2012 – AMPC Submitting comments regarding the addition of a panel member2012/08/03 03:10:00 PM2012/08/03
C6-8 Letter Dated August 31, 2012 – Filing on behalf of BCUC Utility Customers AMPC/BCPSO/CEC Information Request No. 1 to FBCU2012/09/05 08:54:00 AM2012/09/05
C6-9 Letter Dated August 31, 2012 – Filing on behalf of BCUC Utility Customers AMPC/BCPSO/CEC Information Request No. 1 to FBCU on Mr. Engen’s Evidence2012/09/05 08:55:00 AM2012/09/05
C6-9-1 Letter Dated September 23, 2012 – Filing on behalf of BCUC Utility Customers AMPC/BCPSO/CEC CORRECTED Information Request No. 1 to FBCU on Mr. Engen’s Evidence2012/09/24 02:22:00 PM2012/09/24
C6-10 Letter Dated October 22, 2012 - AMPC Filing a Request for Confidential Information2012/10/23 04:44:00 PM2012/10/23
C6-11 Letter Dated October 31, 2012 - AMPC Submitting Comments regarding Access to Confidential Information2012/11/01 09:41:00 AM2012/11/01
C6-12 Letter dated November 5, 2012 – AMPC Submitting Evidence2012/11/06 09:08:00 AM2012/11/06
C6-13 Letter dated November 5, 2012 – AMPC Submitting Confidential Undertakings 2012/11/06 09:09:00 AM2012/11/06
C6-14 Letter dated November 30, 2012 – AMPC Submission regarding Exhibit A-272012/12/03 09:53:00 AM2012/12/03
C6-15 Letter dated November 30, 2012 – AMPC Submitting Responses to Information Request No. 1 to BCUC2012/12/04 12:30:00 PM2012/12/04
C6-16 Letter dated November 30, 2012 – AMPC Submitting Responses to Information Request No. 1 to FBCU2012/12/04 12:34:00 PM2012/12/04
C6-17 Submitted at Oral Hearing December 12, 2012 – AMPC filing BC Natural Gas Strategy Fueling BC’s Economy for the Next Decade and Beyond2012/12/13 09:20:00 AM2012/12/13
C6-18 Submitted at Oral Hearing December 14, 2012 – AMPC filing AUC 2011 GCOC IR Responses CAPP McShane ROE Attach 17d2012/12/14 11:43:00 AM2012/12/14
C6-19 Submitted at Oral Hearing December 14, 2012 – AMPC filing AUC 2011 GCOC IR Responses CAPP McShane ROE Attach 21 i2012/12/14 11:44:00 AM2012/12/14
C6-20 Submitted at Oral Hearing December 17, 2012 – AMPC filing ALBERTA UTILITIES COMMISSION 2009 GENERIC COST OF CAPITAL PROCEEDING DIRECT TESTIMONY OF JAMES M. COYNE 2012/12/17 04:17:00 PM2012/12/17
C6-21 Submitted at Oral Hearing December 18, 2012 – AMPC filing WITNESS AID PREPARED BY BC UTILITIES CUSTOMERS2012/12/19 03:25:00 PM2012/12/19
C6-22 Submitted at Oral Hearing December 19, 2012 – AMPC filing DR. BOOTH'S OPENING STATEMENT2012/12/20 09:40:00 AM2012/12/20
C6-23 Letter dated January 18, 2013 – AMPC Submitting Dr. Booth Undertaking No. 12013/01/22 01:02:00 PM2013/01/22
C6-24 Letter Dated February 14, 2013 – AMPC Submitting Extension Request2013/02/14 02:22:00 PM2013/02/14
C7-1 COMMERCIAL ENERGY CONSUMERS ASSOCIATION OF BRITISH COLUMBIA (CEC) Letter Dated March 20, 2012 – Request for Intervener Status by Christopher Weafer2012/03/21 11:42:00 AM2012/03/21
C7-2 Letter Dated May 9, 2012 – CEC Submission regarding Order G-50-12 Appendix A2012/05/10 09:42:00 AM2012/05/10
C7-3 Letter Dated June 8, 2012 – CEC Submission regarding variance of the Regulatory Timetable2012/06/08 03:50:00 PM2012/06/08
C7-4 Letter dated June 25, 2012 – CEC Submitting Information Request regarding the Commission Consultant Survey Report2012/06/25 04:22:00 PM2012/06/25
C7-5 Letter Dated August 3, 2012 – CEC Submitting comments regarding the addition of a panel member2012/08/03 03:13:00 PM2012/08/03
C7-6 Letter dated November 9, 2012 – CEC Submitting Confidential Undertakings2012/11/13 08:42:00 AM2012/11/13
    

"D" Exhibits - Interested Party Documents

TitleDocument DescriptionSubmitted Date/TimeApproved Date
D-1 AT BUSINESS CONSULTING (ATB) Online Registration dated May 9, 2012 – Request for Interested Party Status by Anastasios Tsalamandris2012/05/09 01:41:00 PM2012/05/09
    

"E" Exhibits - Letters of Comment

TitleDocument DescriptionSubmitted Date/TimeApproved Date
    

Transcripts

TitleDocument DescriptionSubmitted Date/TimeApproved Date
Transcript Volume 1 Procedural Conference October 4, 20122012/10/04 02:19:00 PM2012/10/04
Transcript Volume 2 Oral Hearing December 12, 20122012/12/12 06:31:00 PM2012/12/13
Transcript Volume 3 Oral Hearing December 13, 20122012/12/13 05:44:00 PM2012/12/14
Transcript Volume 4 Oral Hearing December 14, 20122012/12/14 05:28:00 PM2012/12/17
Transcript Volume 5 Oral Hearing December 17, 20122012/12/17 07:06:00 PM2012/12/18
Transcript Volume 6 Oral Hearing December 18, 20122012/12/18 06:16:00 PM2012/12/19
Transcript Volume 7 Oral Hearing December 19, 20122012/12/19 06:38:00 PM2012/12/20
Transcript Volume 8 Oral Hearing December 21, 20122012/12/21 05:49:00 PM2012/12/24
    