British Columbia Hydro and Power Authority ~ F2017 to F2019 Revenue Requirements Application ~ Project No. 3698869

Timetable

Hearing Location

Hearing and Other Documents

Download a Document

TitleDocument Description
*_Exhibit List Updated: June 6, 2017 @ 4:38 pm
*_Key Findings - Load Forecast Dated August 25, 2017
  

Arguments

TitleDocument Description
BC Hydro Final Argument Final Argument May 23, 2017
McCandless Final Argument McCandless Final Argument June 8, 2017
Landale Final Argument Final Argument June 13, 2017
MoveUP Final Argument Final Argument June 13, 2017
Zone II Final Argument Final Argument June 13, 2017
BCSEA Final Argument Final Argument June 13, 2017
CEC Final Argument Final Argument June 13, 2017
BCOAPO Final Argument Final Argument June 13, 2017
AMPC Final Argument Final Argument June 13, 2017
CEBC Final Argument Final Argument June 13, 2017
NIARG Final Argument Final Argument June 13, 2017
CEBC Amended Final Argument Amended Final Argument June 15, 2017
SWF Final Argument Final Argument June 20, 2017
BC Hydro Reply Argument BC Hydro's Reply Argument - July 4, 2017
  

Exhibits

"A" Exhibits - Commission Documents

TitleDocument Description
A-1 Letter dated March 22, 2016 - Panel Appointment
A-2 Letter dated March 22, 2016 - Commission Order G-40-16 approving interim rates
A-3 Letter dated March 22, 2016 - Community input sessions
A-4 Removed from Web Only - Letter dated May 16, 2016 – Community Input Sessions Information
A-4-1 Letter dated May 27, 2016 – Revised Community Input Sessions Information
A-5 Letter dated August 9, 2016 – Commission Order G-130-16 establishing Regulatory Timetable and Public Notice
A-5-1 Letter dated August 9, 2016 – Commission Order G-130-16A establishing Regulatory Timetable and Public Notice
A-6 Letter dated August 17, 2017 – Procedural Conference Information
A-7 Letter dated September 7, 2016 – Commission Order G-144-16 with reasons and Regulatory Timetable
A-8 Letter dated September 28, 2016 – Request for Submissions on Mr. Bryenton’s Request to Intervene
A-9 Letter dated October 6, 2016 – Commission Information Request No. 1 to BC Hydro
A-10 CONFIDENTIAL letter dated October 6, 2016 – Confidential Commission Information Request No. 1 to BC Hydro (Web version Cover Letter only)
A-11 Letter dated October 25, 2016 – Commission response to Mr. Bryenton’s Request to Intervene
A-12 Letter dated November 16, 2016 – Procedural Conference Information
A-13 Letter dated December 2, 2016 – Further Written Submissions
A-14 Letter dated December 14, 2016 – Commission Information Request No. 2 to BC Hydro
A-15 CONFIDENTIAL letter dated December 14, 2016 – Confidential Commission Information Request No. 2 to BC Hydro (Web version Cover Letter only)
A-16 Letter dated January 6, 2017 – Supplemental Commission Information Request to IR No. 2
A-17 Letter dated January 20, 2017 – Commission Order G-7-17 with Regulatory Timetable and reasons to follow
A-18 Letter dated January 27, 2017 – Commission Order G-7-17 Reasons for Decision
A-19 Letter dated February 2, 2017 – Commission suspending Regulatory Timetable in response to AMPC request for an extension of the deadline for intervener evidence Exhibit C9-5
A-20 Letter dated February 3, 2017 – Commission extending Intervener Evidence Deadline
A-21 Letter dated February 9, 2017 – Commission request for regulatory timetable comments
A-22 Letter dated February 17, 2017 – Commission Order G-20-17 with Regulatory Timetable
A-23 Letter dated March 10, 2017 – Commission Information Request No. 1 to AMPC
A-24 Letter dated March 10, 2017 – Commission Information Request No. 1 to Zone II
A-25 Letter dated March 10, 2017 – Commission Information Request No. 1 to BCSEA
A-26 Letter dated March 16, 2017 – Commission Order G-39-17 regarding interim rates
A-27 Letter dated March 23, 2017 – Commission Order G-46-17 regarding interim OATT rates
A-28 Letter dated March 30, 2017 – Commission Order G-50-17 providing time in the regulatory timetable for information requests on new evidence
A-29 Letter dated April 24, 2017 – Commission Information Request No. 3 – Rebuttal Evidence and New Evidence
A-30 Letter dated April 25, 2017 – Commission response to Landale request in Intervener Evidence
A2-1 Letter dated June 23, 2016 – Commission staff filing BCUC Community Input Sessions Staff Presentation – Participating in BCUC Proceedings
A2-2 Letter dated June 23, 2016 – Commission staff filing BCUC Community Input Sessions Staff Presentation – Regulatory Process
  

"B" Exhibits - Applicant Documents

TitleDocument Description
B-1 Letter dated February 26, 2016 - BC Hydro application for approval of a interim refundable rate
B-1-1 Letter dated July 28, 2016 – BC Hydro Submitting Fiscal 2017 to Fiscal 2019 Revenue Requirements Application
B-1-1-1 CONFIDENTIAL Letter dated July 29, 2016 – BC Hydro Submitting Confidential Appendix J of the F2017-F2019 RRA Application
B-1-2 Letter dated August 18, 2016 - BC Hydro Submitting Errata No. 1 to the Application
B-1-3 Letter dated December 8, 2016 - BC Hydro Submitting Errata No. 2 to the Application
B-1-4 Letter dated December 21, 2016 - BC Hydro Submitting Appendix P Update - Smart Metering and Infrastructure Completion Report
B-1-5 Letter dated February 22, 2017 - BC Hydro Submitting Project Name Changes
B-2 Letter dated August 17, 2016 - BC Hydro Submitting Evidentiary Update
B-3 Letter dated August 25, 2016 - BC Hydro Submitting copies of Appendix B as published in news publications
B-4 Letter dated August 29, 2016 - BC Hydro Submitting Outline of Procedural Conference submission
B-5 Letter dated September 23, 2016 - BC Hydro Submitting Demand-Side Management Information Responses
B-6 Letter dated September 23, 2016 - BC Hydro Submitting Further Information on F2015 and F2016 Capital Additions and Forecast Capital Projects over Test Period
B-7 Letter dated October 4, 2016 - BC Hydro Submitting response on Mr. Bryenton’s Request to Intervene
B-8 CONFIDENTIAL Letter dated November 21, 2016 – BC Hydro Submitting Confidential Responses to BCUC Confidential Information Request No. 1 (Web version Cover Letter only)
B-9 Letter dated November 21, 2016 – BC Hydro Submitting Responses to BCUC Information Request No. 1
B-9-1 CONFIDENTIAL Letter dated November 21, 2016 – BC Hydro Submitting Confidential Responses to BCUC Information Requests No. 1 (Web version Cover Letter only)
B-9-1-1 CONFIDENTIAL Letter dated December 1, 2016 – BC Hydro Submitting Confidential Response to BCUC IR 1.5.1 Attachment 2 (Web version Cover Letter only)
B-9-2 Letter dated December 1, 2016 – BC Hydro Submitting Response to BCUC IR 1.5.1 Attachment 2 - Public Version
B-10 Letter dated November 21, 2016 – BC Hydro Submitting Responses to Interveners Information Request No. 1
B-10-1 CONFIDENTIAL Letter dated November 21, 2016 – BC Hydro Submitting Confidential Responses to Intervener Information Requests No. 1 (Web version Cover Letter only)
B-10-2 Letter dated December 1, 2016 – BC Hydro Submitting Response to AMPC IRs 1.4.2; 1.4.3; 1.4.7.2; 1.4.7.4; 1.4.7
B-11 Letter dated November 24, 2016 - BC Hydro Advanced Submission for Procedural Conference
B-12 Letter dated January 4, 2017 - BC Hydro Submitting Reply Submission
B-13 CONFIDENTIAL Letter dated January 23, 2017 - BC Hydro Submitting Response to Confidential Commission Information Request No. 2
B-14 Letter dated January 23, 2017 - BC Hydro Submitting Response to BCUC Information Request No. 2
B-14-1 CONFIDENTIAL Letter dated January 23, 2017 - BC Hydro Submitting Confidential Response to BCUC Information Request No. 2
B-14-1-1 CONFIDENTIAL Letter dated February 16, 2017 – BC Hydro Submitting Confidential Response to BCUC IR – Web cover letter
B-14-2 Letter dated February 16, 2017 – BC Hydro Submitting PUBLIC Response to BCUC IR
B-15 Letter dated January 23, 2017 - BC Hydro Submitting Responses to Intervener Information Request No. 2
B-15-1 CONFIDENTIAL Letter dated January 23, 2017 – BC Hydro Submitting Responses to Confidential Intervener Information Request No. 2
B-15-2 Letter dated February 16, 2017 – BC Hydro Submitting Responses to AMPC
B-15-3 Letter dated February 16, 2017 – BC Hydro Submitting Response to BCOAPO and CEA IR
B-15-4 Letter dated April 28, 2017 – BC Hydro Submitting revision to Attachment 1 to CEC IR 2.135.1
B-16 Letter dated February 14, 2017 – BC Hydro Submitting Regulatory Timetable Comments
B-17 Letter dated March 1, 2017 – BC Hydro Submission regarding Rate Schedules and updated Electric Tariff
B-18 Letter dated March 10, 2017 – BC Hydro Submission Providing notification of issuance of Order In Council No. 100 and 101
B-18-1 Letter dated March 13, 2017 – BC Hydro Correction of Submission Providing notification of issuance of Order In Council No. 100 and 101
B-19 Letter dated March 28, 2017 – BC Hydro Request for Confidential Information redacted in Zone II Responses to IRs
B-20 Letter dated April 5, 2017 –BC Hydro Submitting Rebuttal Evidence and information on the termination of Accenture contract
B-21 Letter dated May 11, 2017 –BC Hydro Submitting Responses to Commission IRs on Rebuttal Evidence
B-21-1 CONFIDENTIAL Letter dated May 11, 2017 –BC Hydro Submitting Confidential Responses to Commission IRs on Rebuttal Evidence
B-22 Letter dated May 11, 2017 –BC Hydro Submitting Responses to Intervener IRs on Rebuttal Evidence
B-22-1 CONFIDENTIAL Letter dated May 11, 2017 –BC Hydro Submitting Confidential Responses to Intervener IRs on Rebuttal Evidence
B-22-2 Letter dated May 11, 2017 –BC Hydro Submitting Revision to CEA IR No. 3.46.1
  

"C" Exhibits - Intervener Documents

TitleDocument Description
C1-1 BC SUSTAINABLE ENERGY ASSOCIATION AND SIERRA CLUB BC (BCSEA) Letter dated August 19, 2016 Request to Intervene by Thomas Hackney and William J. Andrews
C1-2 Letter dated October 1, 2016 - BCSEA Submission on Mr. Bryenton’s Request to Intervene
C1-3 Letter dated October 19, 2016 – BCSEA Submitting IR No. 1 to BC Hydro
C1-4 Letter dated December 14, 2016 - BCSEA Submitting Comments on Process
C1-5 Letter dated December 14, 2016 - BCSEA Submitting IR No. 2 to BC Hydro
C1-6 Letter dated January 24, 2017 - BCSEA Submitting Confidentiality Declaration and Undertaking for Thomas Hackney, James Grevatt and William Andrews
C1-7 Letter dated February 2, 2017 - BCSEA Submitting Comments regarding AMPC request for an extension of the deadline for intervener evidence Exhibit C9-5
C1-8 Letter dated February 9, 2017 – BCSEA Submitting Intervener Evidence
C1-9 Letter dated February 10, 2017 – BCSEA Submitting Regulatory Timetable Comments
C1-10 Letter dated February 20, 2017 – BCSEA Submitting Request to Withdraw Confidential Access
C1-11 Letter dated March 10, 2017 – BCSEA Information Request No. 1 to AMPC
C1-12 Letter dated March 10, 2017 – BCSEA Information Request No. 1 to Zone II
C1-13 Letter dated March 10, 2017 – BCSEA Information Request No. 1 to Landale
C1-14 Letter dated March 10, 2017 – BCSEA Information Request No. 1 to Clean Energy BC
C1-15 Letter dated March 27, 2017 – BCSEA response to BCUC A-25
C1-16 Letter dated March 27, 2017 – BCSEA response to CEABC C4-7
C1-17 Letter dated March 27, 2017 – BCSEA response to CEC C10-9
C1-18 Letter dated March 27, 2017 – BCSEA response to NIARG C11-9
C1-19 Letter dated April 24, 2017 – BCSEA Submitting IR No. 3 to BC Hydro
C2-1 CANADIAN OFFICE AND PROFESSIONAL EMPLOYEES UNION, LOCAL 378 ( MOVEUP) Letter dated August 17, 2016 Request to Intervene by Iain Reeve, Leigha Worth and Jim Quail
C2-2 Letter dated October 19, 2016 – MoveUp Submitting IR No. 1 to BC Hydro
C2-3 Letter dated December 13, 2016 – MoveUp Submitting Confidentiality Undertaking for A. Pullman
C2-4 Letter dated December 13, 2016 – MoveUp Submitting Confidentiality Undertaking for L. Worth
C2-5 Letter dated December 16, 2016 - MoveUp Submitting IR No. 2 to BC Hydro
C2-5-1 Letter dated January 6, 2017 – MoveUp Supplemental IR No. 2.1
C2-6 Letter dated December 22, 2016 – MoveUp Submitting Comments on Need for Oral Hearing
C2-7 Letter dated February 14, 2017 – MoveUp Submitting Regulatory Timetable Comments
C3-1 THE BRITISH COLUMBIA OLD AGE PENSIONERS ORGANIZATION ET AL. (BCOAPO) Letter dated August 25, 2016 Request to Intervene by Erin Pritchard
C3-2 Letter dated September 29, 2016 - BCOAPO Submission on Mr. Bryenton’s Request to Intervene
C3-3 Letter dated October 19, 2016 – BCOAPO Submitting IR No. 1 to BC Hydro
C3-4 Letter dated December 16, 2016 - BCOAPO Submitting IR No. 2 to BC Hydro
C3-5 Letter dated December 22, 2016 – BCOAPO Submitting Comments on Need for Oral Hearing
C3-6 Letter dated December 22, 2016 – BCOAPO Submitting Confidential Undertakings
C3-7 Letter dated December 23, 2016 – BCOAPO Submitting Confidential Undertakings
C3-8 Letter dated February 14, 2017 – BCOAPO Submitting Regulatory Timetable Comments
C4-1 CLEAN ENERGY ASSOCIATION OF BC (CEABC) Letter dated July 28, 2016 Request to Intervene by Paul Kariya and David Austin
C4-2 Letter dated October 19, 2016 – CEABC Submitting IR No. 1 to BC Hydro
C4-3 Letter dated December 16, 2016 - CEABC submitting IR No. 2 to BC Hydro
C4-4 Letter dated December 22, 2016 – CEABC Submitting Comments on Need for Oral Hearing
C4-5 Letter dated February 14, 2017 – CEABC Submitting Regulatory Timetable Comments
C4-6 Letter dated February 27, 2017 – CEABC Submitting Evidence
C4-7 Letter dated March 10, 2017 – CEABC submitting Information Request No. 1 to BCSEA
C4-8 Letter dated March 27, 2017 – CEABC Submitting Responses to NIARG IRs on Intervener Evidence
C4-9 Letter dated March 27, 2017 – CEABC Submitting Responses to BCSEA IRs on Intervener Evidence
C4-10 Letter dated April 24, 2017 – CEABC Submitting IR No. 3 to BC Hydro
C5-1 MCCANDLESS, RICHARD (MCCANDLESS) Letter dated August 15, 2016 Request to Intervene
C5-2 Letter dated October 17, 2016 – McCandless Submitting Information Request No. 1 to BC Hydro
C5-3 Letter dated December 15, 2016 - McCandless Submitting IR No. 2 to BC Hydro
C5-4 Letter dated February 14, 2017 – McCandless Submitting Regulatory Timetable Comments
C6-1 PEACE RIVER REGIONAL DISTRICT (PRRD) Letter dated August 23, 2016 Request to Intervene by Karen Goodings
C7-1 TRANSCANADA ENERGY LTD. (TCE) Letter dated August 25, 2016 Request to Intervene by Mark Thompson and Steven Kley
C7-2 Letter dated October 19, 2016 – TCE Late Submission of IR No. 1 to BC Hydro
C8-1 FORTISBC ENERGY INC./FORTISBC INC. (FORTISBC) Letter dated August 23, 2016 Request to Intervene by Diane Roy
C8-2 Letter dated October 19, 2016 – FortisBC Submitting IR No. 1 to BC Hydro
C8-3 Letter dated April 24, 2017 – FortisBC Submitting IR No. 3 to BC Hydro
C9-1 ASSOCIATION OF MAJOR POWER CUSTOMERS OF BRITISH COLUMBIA (AMPC) Letter dated August 25, 2016 Request to Intervene by Richard Stout and Matthew Keen
C9-2 Letter dated October 19, 2016 – AMPC Submitting IR No. 1 to BC Hydro
C9-3 Letter dated December 16, 2016 – AMPC Submitting IR No. 2 to BC Hydro
C9-4 Letter dated December 22, 2016 – AMPC Submitting Comments on Need for Oral Hearing
C9-5 Letter dated February 1, 2017 – AMPC requesting extension of intervener evidence deadline
C9-6 Letter dated February 14, 2017 – AMPC Submitting Regulatory Timetable Comments
C9-7 Letter dated February 27, 2017 – AMPC Submitting Evidence
C9-8 Letter dated March 27, 2017 – AMPC response to BCUC
C9-9 Letter dated March 27, 2017 – AMPC response to BCSEA
C9-11 Letter dated March 27, 2017 – AMPC response to NIARG
C9-10 Letter dated March 27, 2017 – AMPC response to CEC
C10-1 COMMERCIAL ENERGY CONSUMERS ASSOCIATION OF BRITISH COLUMBIA (CEC) Letter dated August 25, 2016 Request to Intervene by David Craig and Chris Weafer
C10-2 Letter dated October 19, 2016 – CEC Submitting IR No. 1 to BC Hydro
C10-3 Letter dated November 24, 2016 - CEC Submitting response to Exhibit A-12
C10-3-1 Letter dated November 24, 2016 - CEC Submitting Revised response to Exhibit A-12
C10-4 Letter dated December 16, 2016 - CEC Submitting IR No. 2 to BC Hydro
C10-5 Letter dated December 22, 2016 – CEC Submitting Confidential Undertakings
C10-6 Letter dated December 22, 2016 – CEC Submitting Comments on Need for Oral Hearing
C10-7 Letter dated February 14, 2017 – CEC Submitting Regulatory Timetable Comments
C10-8 Letter dated March 10, 2017 – CEC Information Request No. 1 to AMPC
C10-9 Letter dated March 10, 2017 – CEC Information Request No. 1 to BCSEA
C10-10 Letter dated April 24, 2017 – CEC Submitting IR No. 3 to BC Hydro
C11-1 NON-INTEGRATED AREAS RATEPAYERS GROUP (NIARG) Letter dated August 25, 2016 Request to Intervene by Fred Weisberg
C11-2 Letter dated October 19, 2016 – NIARG Submitting IR No. 1 to BC Hydro
C11-3 Letter dated November 24, 2016 - NIARG Submitting response to Exhibit A-12
C11-4 Letter dated December 16, 2016 – NIARG Submitting IR No. 2 to BC Hydro
C11-5 Letter dated December 22, 2016 – NIARG Submitting Comments on Need for Oral Hearing
C11-6 Letter dated February 14, 2017 – NIARG Submitting Regulatory Timetable Comments
C11-7 Letter dated March 10, 2017 – NIARG Information Request No. 1 to AMPC
C11-8 Letter dated March 10, 2017 – NIARG Information Request No. 1 to CEABC
C11-9 Letter dated March 10, 2017 – NIARG Information Request No. 1 to BCSEA
C11-10 Letter dated April 24, 2017 – NIARG Submitting IR No. 3 to BC Hydro
C12-1 SKYWIND FOUNDATION (SWF) Letter dated August 9, 2016 Request to Intervene by Terry Vulcano
C12-2 Letter dated September 28, 2016 – SWF Submitting Information Request No. 1 to BC Hydro
C12-2-1 Letter dated September 29, 2016 – SWF submitting additional question to Information Request No. 1 to BC Hydro
C12-3 Letter dated December 1, 2016 - SWF submitting Information Request No. 2 to BC Hydro
C12-4 Letter dated February 14, 2017 – SWF submitting Comments
C13-1 JOHANSSON, GWEN (JOHANSSON) Letter dated August 25, 2016 Request to Intervene
C14-1 SAVE OUR NORTHERN SENIORS (SONS) Letter dated August 29, 2016 Request to Intervene by Jean Leahy
C15-1 LANDALE, RICHARD (LANDALE) Letter dated August 9, 2016 Request to Intervene by Richard Landale
C15-2 Submitted at Procedural Conference September 1, 2016 - WRITTEN SUBMISSIONS FROM MR. LANDALE
C15-3 Letter dated September 30, 2016 - Landale Submission on Mr. Bryenton’s Request to Intervene
C15-4 Letter dated October 3, 2016 – Landale Submitting Information Request No. 1
C15-5 Letter dated August 9, 2016 - Landale Submitting Undertaking of Confidentiality
C15-6 Letter dated November 24, 2016 - Landale Submitting response to Exhibit A-12
C15-7 Submitted at Procedural Conference November 28, 2016 – PRESENTATION FROM MR. LANDALE
C15-8 Letter dated December 14, 2016 - Landale Submitting Comments regarding Oral Hearing Components
C15-9 Letter dated December 14, 2016 - Landale Submitting IR No. 2 to BC Hydro
C15-10 Letter dated February 14, 2017 – Landale Submitting Regulatory Timetable Comments
C15-11 Letter dated February 27, 2017 – Landale Submitting Evidence
C15-12 Letter dated March 27, 2017 – Landale Submitting Responses to IRs on Intervener Evidence
C15-13 Letter dated April 24, 2017 – Landale Submitting IR No. 3 to BC Hydro
C16-1 LITTLE, MARGARET AND JAMES (LITTLE) Letter dated August 9, 2016 Request to Intervene by Margaret and James Little
C17-1 ZONE II RATEPAYERS GROUP (ZONE II) Letter dated August 29, 2016 Request to Intervene by Dawn Bursey and Linda Dong
C17-2 Letter dated October 19, 2016 – Zone II Submitting IR No. 1 to BC Hydro
C17-3 Letter dated November 25, 2016 – Zone II Submitting Intervener Information
C17-4 Letter dated December 16, 2016 - Zone II Submitting IR No. 2 to BC Hydro
C17-5 Letter dated December 22, 2016 – Zone II Submitting Comments on Need for Oral Hearing
C17-6 Letter dated February 2, 2017 - Zone II Submitting Comments regarding AMPC request for an extension of the deadline for intervener evidence Exhibit C9-5
C17-7 Letter dated February 14, 2017 – Zone II Submitting Regulatory Timetable Comments
C17-8 Letter dated February 27, 2017 – Zone II Submitting Evidence
C17-9 Letter dated March 27, 2017 – Zone II Submitting Responses to IRs on Intervener Evidence
C17-9-1 CONFIDENTIAL Letter dated March 27, 2017 – Zone II Submitting Confidential non-redacted Responses to IRs on Intervener Evidence
C17-10 Letter dated April 24, 2017 – Zone II Submitting IR No. 3 to BC Hydro
C17-10-1 Letter dated April 24, 2017 – Zone II Submitting IR No. 3 to BC Hydro –Replacement
  

"D" Exhibits - Interested Party Documents

TitleDocument Description
D-1 Bryenton, Roger (Bryenton) Letter dated June 9, 2016 – Request for Interested Party Status
D-1-1 Letter dated October 11, 2016 – Bryenton Submitting Comments
D-1-2 Letter dated October 11, 2016 – Bryenton Submitting Further Comments
D-2 HARBOURGREENE CONSULTING INC. (HARBOURGREENE) Letter dated July 27, 2016 – Request for Interested Party Status by Christine Gustafson
D-3 SURPLUS ENERGY MATCH INC. (SURPLUS ENERGY) Letter dated September 8, 2016 – Request for Interested Party Status
D-4 ACCENTURE BUSINESS SERVICES OF BRITISH COLUMBIA LIMITED PARTNERSHIP (ACCENTURE) Letter dated May 10, 2017 - Request for Interested Party Status by Janet Clark
D-5 MINISTRY OF ENERGY AND MINES (MEM) Letter dated June 5, 2017 – Request for Interested Party Status by Jack Buchanan
  

"E" Exhibits - Letters of Comment

TitleDocument Description
E-1 Grogan, John Letter of Comment dated June 16, 2016
E-2 Wenman, Joan Letter of Comment dated August 23, 2016
E-3 Lewko, J Letter of Comment dated April 28, 2017
  

Transcripts

TitleDocument Description
Transcript Volume 1 Community Input Session Victoria June 10, 2016
Transcript Volume 2 Community Input Session Nanaimo June 11, 2016
Transcript Volume 3 Community Input Session Prince George June 13, 2016
Transcript Volume 4 Community Input Session Fort St John June 14, 2016
Transcript Volume 5 Community Input Session Vancouver June 16, 2016
Transcript Volume 6 Transcript Volume 6 Procedural Conference September 1, 2016
Transcript Volume 7 Transcript Volume 7 Procedural Conference November 28, 2016