BC Hydro VICFT - Electricity Purchase Agreement

British Columbia Hydro and Power Authority Call for Tenders for Capacity on Vancouver Island - Review of Electricity Purchase Agreement ~ Project 3968354


Timetable

SubjectDate
  


Hearing Location

SubjectLocationDateTimeAddress
     

 

Hearing Documents

TitleDocument DescriptionSubmitted Date/TimeApproved Date
* Exhibit List Updated March 1, 2005 2004/11/25 11:15:00 AM2004/11/25
* Email/Fax/Mail List Updated January 5, 20052004/12/01 12:59:00 PM2004/12/01
* Distribution List Updated January 17, 20052004/12/01 01:06:00 PM2004/12/01
* BCTC Evaluation of NorskeCanada Demand Management proposal  2005/01/10 05:23:00 PM2005/01/10
* Oral Phase of Argument Letter dated February 9, 2005 from the Commission regarding Oral Phase of Argument2005/02/09 01:24:00 PM2005/02/09
* Letter No. L-10-05 Letter and Reasons for Decision dated February 9, 2005 regarding Reasons for the disqualification motion Decision (January 27, 2005 and Reasons for the disqualification motion (December 22, 2004)2005/02/09 04:14:00 PM2005/02/09
* Order No. E-1-05 Call for Tenders for Capacity on Vancouver Island - Review of Electricity Purchase Agreement ~ Order No. E-1-05 (Reasons for Decision to follow) 2005/02/17 02:15:00 PM2005/02/17
* News Release  2005/02/17 02:43:00 PM2005/02/17
* Notice of intention BC Hydro correspondence dated February 28, 2005 regarding 2(a) of Order E-1-05 and notice of intention to proceed with the EPA with Duke Point Power Limited Partnership2005/02/28 03:55:00 PM2005/02/28
* Reasons for Decision Order No. E-1-05 and Reasons for Decision2005/03/09 03:58:00 PM2005/03/09
* Letter of Notice  2005/04/05 09:59:00 AM2005/04/05
*_Notice to Terminate EPA June 17, 2005 Notice to Terminate the Electricity Purchase Agreement2005/06/17 11:22:00 AM2005/06/17
*_News Release - EPA Terminated June 17, 2005 News Release announcing the termination of the Electricity Purchase Agreement2005/06/17 02:03:00 PM2005/06/17
    

Arguments

TitleDocument DescriptionSubmitted Date/TimeApproved Date
BC Hydro BC Hydro Final Argument dated February 1, 2005, plus outstanding Undertakings that will also be entered as separate Exhibits2005/02/01 04:05:00 PM2005/02/01
Duke Point Power Limited Partnership  2005/02/02 09:09:00 AM2005/02/02
AD Fisher Final Argument of AD Fisher dated February 4, 20052005/02/04 11:18:00 AM2005/02/04
Erik Andersen Final Argument of Erik Andersen dated February 4, 20052005/02/04 11:19:00 AM2005/02/04
John Hague Final Argument of John Hague dated February 4, 20052005/02/04 11:20:00 AM2005/02/04
Vanport Sterilizers Vanport Sterilizers Inc. Final Argument dated February 4, 20052005/02/04 03:06:00 PM2005/02/04
BCOAPO BCOAPO et al. Final Argument dated February 4, 20052005/02/04 03:19:00 PM2005/02/04
TGVI Final Argument of Terasen Gas (Vancouver Island) Ltd. dated February 4, 20052005/02/04 03:47:00 PM2005/02/04
Keith Steeves Final Argument of Keith Steeves dated February 4, 20052005/02/04 04:55:00 PM2005/02/04
NorskeCanada Final Argument of NorskeCanada dated February 4, 20052005/02/04 04:59:00 PM2005/02/04
Village of Gold River Final Argument of the Village of Gold River dated February 4, 20052005/02/04 05:00:00 PM2005/02/04
BCTC Final Argument of British Columbia Transmission Corporation dated February 4, 20052005/02/04 05:02:00 PM2005/02/04
Green Island Energy Final Argument of the Green Island Energy Ltd. dated February 4, 20052005/02/04 05:04:00 PM2005/02/04
John Hill Final Argument of John A. Hill dated February 4, 20052005/02/04 05:05:00 PM2005/02/04
Joint Industry Electricity Steering Committee Final Argument of the Joint Industry Electricity Steering Committee dated February 4, 20052005/02/04 05:07:00 PM2005/02/04
GSXCCC et al. Final Argument of the Georgia Strait Crossing Concerned Citizens Coalition et al. dated February 4, 20052005/02/04 05:09:00 PM2005/02/04
Bob McKechnie Final Argument of Bob McKechnie dated February 4, 20052005/02/04 05:10:00 PM2005/02/04
Sea Breeze Final Argument of Sea Breeze Pacific Regional Transmission System, Inc. dated February 4, 20052005/02/04 05:11:00 PM2005/02/04
Randy Young Final Argument of Randy Young, Gabriola Ratepayers and Residents Association dated February 4, 20052005/02/04 05:13:00 PM2005/02/04
Shadybrook Farm Final Argument of Shadybrook Farm dated February 4, 20052005/02/04 05:15:00 PM2005/02/04
Sheila Malcolmson Final Argument of Sheila Malcolmson, Gabriola Island Local Trustee - Islands Trust dated February 4, 20052005/02/04 05:16:00 PM2005/02/04
Commercial Energy Consumers of British Columbia Final Argument of the Commercial Energy Consumers of British Columbia dated February 4, 20052005/02/04 05:39:00 PM2005/02/04
Mairi McLennan Final Argument of Mairi McLennan dated February 4, 20052005/02/04 05:50:00 PM2005/02/04
BC Hydro Reply Argument  2005/02/08 09:25:00 AM2005/02/08
Duke Point Power Reply Argument Duke Point Power Limited Partnership Reply Argument2005/02/08 09:26:00 AM2005/02/08
    

Exhibits

"A" Exhibits - Commission Documents

TitleDocument DescriptionSubmitted Date/TimeApproved Date
A-1 Order No. G-99-04 and Commission Letter dated November 10, 2004 establishing a Procedural Conference to hear submissions from Participants to determine the type of regulatory process for the review of BC Hydro’s Section 71 Application2004/11/23 03:46:00 PM2004/11/23
A-2 Letter dated November 24, 2004 to BC Hydro and Registered Intervenors providing information that may assist participants at the Procedural Conference2004/11/24 01:23:00 PM2004/11/24
A-3 BCUC Information Request No. 1 on the Call for Tenders Report to British Columbia Hydro and Power Authority2004/11/26 03:00:00 PM2004/11/26
A-4 BCUC Information Request No. 1 on BC Hydro’s Call for Tenders Report to British Columbia Transmission Corporation2004/11/26 03:01:00 PM2004/11/26
A-5 Re-Issued BCUC Information Request No. 1 on the Call for Tenders Report and the review of the Electricity Purchase Agreement to British Columbia Hydro and Power Authority2004/12/01 02:42:00 PM2004/12/01
A-6 Re-Issued BCUC Information Request No. 1 on BC Hydro’s Call for Tenders and the review of the Electricity Purchase Agreement Report to British Columbia Transmission Corporation2004/12/01 02:43:00 PM2004/12/01
A-7 Letter dated December 3, 2004 and Order No. G-106-04 issuing the Notice of Pre-hearing Conference, Public Hearing and Town Hall Meeting2004/12/03 02:32:00 PM2004/12/03
A-8 Letter dated December 6, 2004 to British Columbia Hydro and Power Authority and Registered Intervenors confirming that the filing date for Information Requests as set out in Order No. G-106-04 (Exhibit A-7) has not changed2004/12/07 03:47:00 PM2004/12/07
A-9 Letter and Information Request No. 2 to BC Hydro dated December 8, 2004 2004/12/08 04:02:00 PM2004/12/08
A-10 CONFIDENTIAL – Letter and Information Reqeust No. 3 dated December 8, 2004 to BC Hydro (Confidential, for Panel and BCUC Staff, not for posting)2004/12/08 04:02:00 PM2004/12/08
A-11 CONFIDENTIAL – Letter dated December 10, 2004 to BC Hydro regarding Information Request No. 3 - Exhibit A-10 (Confidential, for Panel and BCUC Staff, not for posting)2004/12/13 11:12:00 AM2004/12/13
A-12 Letter No. L-62-04 dated December 15, 2004 establishing a Pre-hearing Conference to hear submissions on BC Hydro’s December 14, 2004 Letter identifying Information Requests that are outside the scope of the proceeding or that BC Hydro intends to decline to respond (Exhibit B-8)2004/12/15 09:18:00 AM2004/12/15
A-13 Letter No. L-63-04 dated December 20, 2004 approving BC Hydro’s application for relief of the information requests identified in Schedule A to Exhibit B-82004/12/20 09:36:00 AM2004/12/20
A-14 Letter No. L-64-04 dated December 20, 2004 issuing the Agenda for Pre-hearing Conference No. 2 regarding Exhibit B-82004/12/21 03:44:00 PM2004/12/21
A-15 Commission Staff position on relief sought by BC Hydro in Exhibit B-82004/12/23 04:56:00 PM2004/12/23
A-16 Order No. G-119-04 and Commission Letter dated December 24, 2004 establishing a Revised Regulatory Agenda and setting out a number of Commission Determinations resulting from the Pre-hearing Conference of December 22, 20042004/12/24 01:45:00 PM2004/12/24
A-17 Letter No. L-1-05 dated January 5, 2005 regarding the Georgia Straight Crossing Concerned Citizens’ Coalition Application for Admission of Evidence from the Vancouver Island Generation Project Proceeding (Exhibit C20-12)2005/01/06 12:29:00 PM2005/01/06
A-18 E-mail dated January 6, 2005 from Commission Counsel granting an extension to midnight January 6, 2005 to Mairi McLennan to file Intervenor Evidence2005/01/06 12:29:00 PM2005/01/06
A-19 Letter dated January 6, 2005 issuing Reasons for Decision for Order No. G-119-04 (Exhibit A-16)2005/01/06 12:30:00 PM2005/01/06
A-20 Letter dated January 6, 2005 and Order No. G-1-05 regarding Duke Point Power’s December 28, 2004 application for two Orders2005/01/06 12:30:00 PM2005/01/06
A-21 Letter dated January 6, 2005 approving an extension of the filing of Intervenor Evidence to midnight January 6, 20042005/01/06 12:33:00 PM2005/01/06
A-22 Letter dated January 7, 2005 providing Participants with information on the public hearing process2005/01/07 12:50:00 PM2005/01/07
A-23 Letter dated January 10, 2005 requesting participants to advise the Commission whether they intend to rely on the British Columbia Transmission Corporation December 23, 2004 filing of its Evaluation of the NorskeCanada Demand Management proposal2005/01/10 03:14:00 PM2005/01/10
A-24 Letter dated January 11, 2005 requesting comments from participants on the procedural matters raised in BC Hydro’s January 10, 2005 letter (Exhibit B-40)2005/01/11 08:40:00 AM2005/01/11
A-25 Letter dated January 11, 2005 denying GSXCC-BCSEA request to order BC Hydro to provide details regarding the peak load of 2250 MW in advance of the hearing2005/01/11 02:07:00 PM2005/01/11
A-26 Letter dated January 11, 2005 adopting the three headings set forth in BC Hydro’s January 10, 2005 response (Exhibit B-41) to JIESC’s letter of January 7, 2004 (Exhibit C19-3)2005/01/11 02:07:00 PM2005/01/11
A-27 Letter and Information Request dated January 11, 2005 to Green Island Energy Ltd.2005/01/11 03:58:00 PM2005/01/11
A-28 Letter and Information Request dated January 11, 2005 to Duke Point Power Limited Partnership2005/01/11 04:02:00 PM2005/01/11
A-29 Letter and Information Request No. 1 dated January 11, 2005 to the Georgia Straight Crossing Concerned Citizens’ Coalition2005/01/11 04:02:00 PM2005/01/11
A-30 Letter and Information Request No. 1 dated January 11, 2005 to NorskeCanada Ltd.2005/01/11 04:02:00 PM2005/01/11
A-31 Letter and Information Request No. 1 dated January 11, 2005 to Sea Breeze Power Corp.2005/01/11 04:03:00 PM2005/01/11
A-32 Letter and Information Request No. 1 dated January 11, 2005 to the Joint Industry Electricity Steering Committee2005/01/11 04:05:00 PM2005/01/11
A-33 Letter and Information Request No. 1 dated January 11, 2005 to the Commercial Energy Consumers2005/01/11 04:07:00 PM2005/01/11
A-34 Letter dated January 12, 2005 requesting BCTC to provide a witness panel for cross-examination of its December 23, 2004 Evaluation of the NorskeCanada Demand Management proposal2005/01/12 10:36:00 AM2005/01/12
A-35 Letter No. L-2-05 dated January 12, 2005 to Vanport Sterilizers Inc. regarding request for Reconsideration of Commission Order No. G-119-042005/01/13 10:04:00 AM2005/01/13
A-36 Letter No. L-3-05 dated January 12, 2005 and Reasons for Decision regarding the December 16, 2004 Joint Industry Electricity Steering Committee reconsideration application2005/01/13 10:53:00 AM2005/01/13
A-37 Letter dated January 12, 2005 clarifying the status of the compact disc that Willis Energy Services Ltd. filed on January 7, 2005 (Exhibit C9-13)2005/01/13 03:43:00 PM2005/01/13
A-38 Letter dated January 13, 2005 regarding participant comments on procedural matters and the proposed time line for witness panels attached as a schedule to this letter2005/01/13 05:38:00 PM2005/01/13
A-39 Pages from Terasen Gas (Vancouver Island) Inc. Argument dated December 21, 2004 2005/01/19 04:05:00 PM2005/01/19
A-40 Part 4 - Fuel Supply Certainty Guidelines Issued January 6, 2004 (Revised June 30, 2004)2005/01/19 04:12:00 PM2005/01/19
A-41 CONFIDENTIAL – BCUC staff questions for Panel 2 (Confidential, for Panel and BCUC Staff, not for posting)2005/01/19 04:18:00 PM2005/01/19
A-42 Table – Appendix E: Rated Outputs and Efficiencies of GE CCGTS2005/01/19 04:18:00 PM2005/01/19
A-43 British Columbia Transmission Corporation December 23, 2004 letter filing its evaluation of the NorskeCanada Demand Management proposal in response to Commission directive on page 34 of the Commission’s November 19, 2004 Decision into BCTC’s Capital Plan Application2005/01/21 11:54:00 AM2005/01/21
A-44 BC Hydro Information – Questions & Answers on the following topics: • Interconnection and Cost Allocation • Use of Generation Shedding to Avoid Cut-Plane Upgrades • Transmission system Upgrade for Capacity Projects North of Dunsmuir • Cut Plane D Capacity Deficiency for 2007/08 Only • VIGP Facilities Agreement and Interconnection Agreement 2005/01/22 09:41:00 AM2005/01/22
A-45 Letter No. L-8-05 dated January 27, 2005 issuing Reasons for Decision regarding the GSX Concerned Citizens Coalition, B.C., Sustainable Energy Association and Society Promoting Environmental Conservation (collectively “GSXCCC”) January 14, 2005 application for reconsideration of certain decisions made by the Commission Panel regarding the conduct of the proceedings2005/01/27 02:03:00 PM2005/01/27
    

"B" Exhibits - Applicant Documents

TitleDocument DescriptionSubmitted Date/TimeApproved Date
B-1 Call for Tenders for Capacity and Associated Energy Supply on Vancouver Island - Report on the Call for Tenders Process conducted by BC Hydro dated November 19, 20042004/11/20 09:31:00 AM2004/11/22
B-2 BC Hydro response dated November 25, 2004 to BCUC request of November 24, 2004 to provide key milestone dates for Duke Point Project.2004/11/25 03:36:00 PM2004/11/26
B-3 Facsimile dated November 28, 2004 providing a list of Information Requests BC Hydro believes should be considered within the scope of the Call for Tenders Review2004/11/30 03:46:00 PM2004/11/30
B-4 CONFIDENTIAL – Electricity Purchase Agreement (Capacity and Associated Energy) Vancouver Island and VIGP Transfer Agreement, filing dated November 19, 2004 (Confidential, for Panel and BCUC Staff, not for posting)2004/12/02 03:23:00 PM2004/12/02
B-5 CONFIDENTIAL – Letter dated December 2, 2004 filing the Evaluation Models and Input Data (Confidential, for Panel and BCUC Staff, not for posting)2004/12/02 03:24:00 PM2004/12/02
B-6 Letter dated December 3, 2004 enclosing redacted Electricity Purchase Agreement2004/12/03 02:58:00 PM2004/12/06
B-7 Letter dated December 6, 2004 regarding the established process for reconsideration applications 2004/12/06 03:39:00 PM2004/12/07
B-8 Letter dated December 14, 2004 identifying Information Requests that are outside the scope of the proceeding or that BC Hydro intends to decline to respond2004/12/14 10:40:00 AM2004/12/14
B-9 BC Hydro response dated December 17, 2004 to BCUC Information Request No. 1 2004/12/17 06:39:00 PM2004/12/17
B-10 CONFIDENTIAL – Response dated December 17, 2004 to BCUC Confidential Information Request No. 1 (Confidential, for Panel and BCUC Staff, not for posting)2004/12/17 11:26:00 PM2004/12/17
B-11 Letter dated December 20, 2004 from BC Hydro Counsel (Lawson Lundell) requesting confirmation whether the BCOAPO and the JIESC will be proceeding with their reconsideration applications2004/12/21 10:56:00 AM2004/12/21
B-12 Responses dated December 20, 2004 to Information Requests from The BC Old Age Pensioners Organization et al., Green Island Energy, the GSX Concerned Citizens Coalition and the Joint Industry Electricity Steering Committee2004/12/21 10:57:00 AM2004/12/22
B-13 Letter dated December 21, 2004 to Mr. William Andrews, Counsel for the GSX Concerned Citizens Coalition regarding the Commission’s confidentiality ruling on Exhibit B-82004/12/21 12:42:00 PM2004/12/21
B-14 Letter dated December 21, 2004 outlining BC Hydro’s approach for responding to outstanding Information Requests 2004/12/23 05:00:00 PM2004/12/23
B-15 CONFIDENTIAL – December 20, 2004 filing of responses to BCUC Information Request No. 2 (Exhibit A-9) (Confidential, for Panel and BCUC Staff, not for posting)2004/12/23 05:04:00 PM2004/12/23
B-16 Response dated December 20, 2004 to BCUC Information Request No. 2 and updates issued December 23, 20042004/12/24 10:39:00 AM2004/12/24
B-17 CONFIDENTIAL – December 23, 2004 filing of responses to outstanding BCUC Confidential Information Requests (Confidential, for Panel and BCUC Staff, not for posting) 2004/12/24 10:52:00 AM2004/12/24
B-18 Responses dated December 22, 2004 to Information Requests from Erik Andersen, BC Sustainable Energy Association, Gabriola Island Ratepayers and Residents Association; John Hill, Bob McKechnie, Mairi McLennan, Sea Breeze Power Corp, Keith Steeves and the Village of Gold River2004/12/24 01:55:00 PM2004/12/24
B-19 E-mail dated December 29, 2004 attaching Appendix 3 to the Electricity Purchase Agreement as per Commission Order No. G-119-042004/12/31 11:45:00 AM2004/12/31
B-20 Response issued December 23, 2004 to Information Requests from BCOAPO, Green Island Energy, GSX Concerned Citizens Coalition and JIESC2005/01/04 03:17:00 PM2005/01/05
B-21 Response issued December 23, 2004 to Information Requests from BC Sustainable Energy Association, Village of Gold River, Bob McKechnie, Mairi McLennan and Sea Breeze Pacific Regional Transmission System Inc.2005/01/04 03:18:00 PM2005/01/05
B-22 Letter dated January 4, 2005 regarding reconsideration application by the JIESC2005/01/04 03:19:00 PM2005/01/05
B-23 Letter dated January 4, 2005 responding to the two letters of December 24, 2004 from the JIESC2005/01/04 03:39:00 PM2005/01/05
B-24 CONFIDENTIAL - Response issued December 23, 2004 to Re-issued Commission Information Request No. 1.24.7 (Confidential, for Panel and BCUC Staff, not for posting)2005/01/04 03:40:00 PM2005/01/05
B-25 Letter dated January 4, 2005 responding to Weisberg Law Corporation's letters of December 24, and 30, 2004 2005/01/04 03:41:00 PM2005/01/05
B-26 Letter dated January 4, 2005 to William J. Andrews, counsel for the GSX Concerned Citizens Coalition, regarding his letters of December 23, 29 and 30, 20042005/01/04 03:42:00 PM2005/01/05
B-27 Letter dated January 5, 2005 regarding Mr. Andrews correspondence of December 28, 2004 relating to VIGP evidence2005/01/05 09:55:00 AM2005/01/05
B-28 Letter dated January 5, 2005 to William J. Andrews replying to his letter of January 4, 2005 2005/01/05 02:33:00 PM2005/01/05
B-29 Response issued December 17, 2004 to Re-issued Commission Information Request No. 1.14.3, 1.14.4 and 1.20.12005/01/05 02:34:00 PM2005/01/06
B-30 Revised responses dated January 5, 2005 to GSX Concerned Citizens Coalition Information Requests 1.16.2, 1.22.3.1 and 1.22.3.22005/01/05 02:35:00 PM2005/01/06
B-31 Second revised response issued January 6, 2005 to GSX Concerned Citizens Coalition Information Request No. 1.22.3.22005/01/05 02:36:00 PM2005/01/06
B-32 Letter dated January 5, 2005 with comments on various Intervenor requests for extension to the filing deadline for Intervenor evidence2005/01/05 05:13:00 PM2005/01/06
B-33 Letter dated January 6, 2005 regarding the JIESC's Information Request No. 2 2005/01/06 08:25:00 AM2005/01/06
B-34 Letter dated January 6, 2005 responding to Mairi McLennan's letter of January 3, 20052005/01/06 11:07:00 AM2005/01/06
B-35 Letter and direct evidence dated January 6, 20052005/01/06 05:36:00 PM2005/01/07
B-35A Resume of Kenneth H. Tiedemann2005/01/06 05:37:00 PM2005/01/20
B-36 Revised responses dated January 7, 2005 to Gold River Information Request Nos. 1.1.11 and 1.1.172005/01/07 11:07:00 AM2005/01/07
B-37 CONFIDENTIAL – Revised response issued January 6, 2005 to Commission Information Request No. 2.70.1, 2.73.1 and 2.73.2 (Confidential, for Panel and BCUC Staff, not for posting)2005/01/07 11:27:00 AM2005/01/07
B-38 Letter dated January 10, 2005 addressing Mr. Andrews’ letter of January 8, 2005 (Exhibit C20-22)2005/01/10 04:25:00 PM2005/01/11
B-39 Letter dated January 10, 2005 regarding Calpine’s letter of January 6, 2005 (Exhibit E-123)2005/01/10 04:27:00 PM2005/01/11
B-40 Letter dated January 10, 2005 regarding Commission letter dated January 7, 2005 (Exhibit A-22) and requesting that the Commission consider additional steps in this proceeding2005/01/10 04:28:00 PM2005/01/11
B-41 Letter dated January 10, 2005 regarding the JIESC’s revised letter of January 7, 2005 (Exhibit C19-13)2005/01/10 04:35:00 PM2005/01/11
B-42 Letter dated January 11, 2005 regarding the BCOAPO et al.’s letter dated January 10, 2005 (Exhibit C3-6) 2005/01/11 08:22:00 AM2005/01/11
B-43 Information Request No. 1 to the JIESC dated January 11, 20052005/01/11 05:12:00 PM2005/01/12
B-44 Information Request No. 1 to Green Island Energy Ltd. dated January 11, 20052005/01/11 05:13:00 PM2005/01/12
B-45 Information Request No. 1 to the Commercial Energy Consumers of BC dated January 11, 20052005/01/11 05:15:00 PM2005/01/12
B-46 Information Request No. 1 to the GSX Concerned Citizens Coalition and the BC Sustainable Energy Association dated January 11, 20052005/01/11 05:16:00 PM2005/01/12
B-47 Letter dated January 11, 2005 regarding two letters of the same date from the BC Old Age Pensioners Organization et al. 2005/01/11 05:27:00 PM2005/01/12
B-48 Revised Response dated January 11, 2005 to Commission Information Request 2.55.12005/01/11 05:45:00 PM2005/01/12
B-49 Response dated January 12, 2005 to Intervenor submissions on process issues2005/01/12 05:15:00 PM2005/01/13
B-50 Letter dated January 12, 2005 regarding responses to Commission Information Request 1.33.2, 1.41.1 and 2.76.1, and confidential response to Information Request 2.70.1 2005/01/12 06:13:00 PM2005/01/13
B-51 CONFIDENTIAL – Response issued January 12, 2005 to Commission Information Request No. 2.70.1 (Confidential, for Panel and BCUC Staff, not for posting)2005/01/13 01:40:00 PM2005/01/13
B-52 Letter dated January 13, 2005 regarding the evidence of NorskeCanada2005/01/14 09:39:00 AM2005/01/14
B-53 Letter dated January 14, 2005 requesting admission of evidence from the VIGP proceeding 2005/01/14 05:21:00 PM2005/01/15
B-54 Letter dated January 14, 2005 providing evidence prepared in response to Exhibit A-13, responding to the JIESC Information Request No. 2.9.0 and advisement that the Direct Testimony of Mr. Steven Eckert will replace Mr. Lowry on BC Hydro Panel 22005/01/14 08:28:00 PM2005/01/15
B-54A 1-Page "Amendment to Direct Testimony of Steve Eckert - Question 9 - responsibility for responses to Information Requests"2005/01/14 08:29:00 PM2005/01/19
B-55 Letter and revised responses dated January 16, 2005 to Information Requests to BCOAPO 1.22.2(a), Gold River 1.2.11 and 1.2.13, Sea Breeze 1.6.0 and JIESC 1.5.0(a), 17.0 (c), 1.7.0 (b)(v) and the opening statement of Bev Van Ruyven2005/01/16 10:15:00 AM2005/01/17
B-56 Letter to R. Brian Wallace, Bull Housser & Tupper dated January 17, 2005 regarding advance notice of witness evidence CONFIDENTIAL –Attachment (not for posting) 2005/01/19 09:39:00 AM2005/01/19
B-57 Letter to William J. Andrews dated January 17, 2005 regarding advance notice of witness evidence CONFIDENTIAL –Attachment (not for posting) 2005/01/19 09:52:00 AM2005/01/19
B-58 Letter to Weisberg Law Corporation dated January 17, 2005 regarding advance notice of witness evidence CONFIDENTIAL –Attachment (not for posting) 2005/01/19 09:52:00 AM2005/01/19
B-59 Letter to Mairi McLennan dated January 17, 2005 regarding advance notice of witness evidence CONFIDENTIAL –Attachment (not for posting) 2005/01/19 09:53:00 AM2005/01/19
B-60 Vancouver Island Call For Tenders – Bidder’s Tender Workshop slides dated July 7, 20042005/01/19 09:53:00 AM2005/01/19
B-61 Document entitled: BC Hydro - Info – Q&As – Treatment of VIGP Asset Price versus Salvage Value – dated November 26, 20032005/01/19 09:53:00 AM2005/01/19
B-62 Data Tables – JIESC Supplementary Information Request 2.10.0(a) and 2.10.0(b) 2005/01/19 02:59:00 PM2005/01/19
B-63 Undertaking – Transcript Reference: Volume 7: Page 1406 and 1407 2005/01/20 04:21:00 PM2005/01/20
B-64 Undertaking – Transcript Reference: Volume 6: Page 1245, 12502005/01/20 04:21:00 PM2005/01/20
B-65 Undertaking – Transcript Reference: Volume 7: 14242005/01/20 04:21:00 PM2005/01/20
B-66 Letter dated January 19, 2005 responding to Mr. Andrews letter of January 14, 2005 seeking Reconsideration of certain orders2005/01/20 04:22:00 PM2005/01/20
B-67 Letter dated January 7, 2005 filing a Revised Electric Load Forecast, 2004/05 to 2024/25.2005/01/20 04:23:00 PM2005/01/21
B-68 Document entitled “Vancouver Island Daily Peak – January 1, 200t through January 15, 2005”2005/01/20 04:24:00 PM2005/01/21
B-69 Document entitled “VI CFT Tender Phase Completeness and Conformity Procedure”2005/01/20 04:24:00 PM2005/01/21
B-70 Revised Response dated Janaury 20, 2005 to Green Island Energy Ltd. Information Request No. 1.11.2 dated Decemer 8, 20042005/01/20 04:24:00 PM2005/01/21
B-71 Revised Response dated January 20, 2005 to GSX Concerned Citizens Coalition Information Request No. 1.28.1 dated December 8, 20042005/01/20 04:24:00 PM2005/01/21
B-72 Response to Undertaking dated January 18, 2005 to GSX Concerned Citizens Coalition (Transcript Reference: Volume 7, Pages 1621, 1622)2005/01/21 09:21:00 AM2005/01/21
B-73 Electricity Purchase Agreement and VIGP Transfer Agreement – Amending Agreement No. 1 dated January 20, 2005 between Duke Point Power Limited Partnership and British Columbia Hydro and Power Authority2005/01/21 09:22:00 AM2005/01/21
B-74 Response to Undertaking dated January 20, 2005 to the Joint Industry Electricity Steering Committee (Transcript Reference: Page 1949)2005/01/21 09:47:00 AM2005/01/21
B-75 Response to Undertaking dated January 20, 2005 to GSX Concerned Citizens Coalition (Transcript Reference: Volume 9, Page 2077)2005/01/21 09:47:00 AM2005/01/21
B-76 Response to Undertaking dated January 20, 2005 to GSX Concerned Citizens Coalition (Transcript Reference: Volume 9, Page 2045)2005/01/21 10:21:00 AM2005/01/21
B-77 Response to Undertaking dated January 20, 2005 to GSX Concerned Citizens Coalition (Transcript Reference: Volume 9, Page 2061)2005/01/21 10:21:00 AM2005/01/21
B-78 Response to Undertaking dated January 17, 2005 to the Joint Industry Electricity Steering Committee (Transcript Reference: Volume 6, Page 1237)2005/01/21 10:21:00 AM2005/01/21
B-79 Response to Undertaking dated January 18, 2005 to The BC Old Age Pensioners Organization et al. and Chairman Hobbs (Transcript Reference: Page 1596)2005/01/21 11:55:00 AM2005/01/21
B-80 Response to Undertaking dated January 18, 2005 to GSX Concerned Citizens Coalition (Transcript Reference: Volume 7, Pages 1616-1619)2005/01/21 11:55:00 AM2005/01/21
B-79A CONFIDENTIAL – Table outlining the progression of bidders and projects through the various phases of CFT (Confidential, for Panel and BCUC Staff, not for posting) 2005/01/21 11:56:00 AM2005/02/28
B-81 Response to Undertaking dated January 20, 2005 to Mr. Trent Berry, BCUC Consultant (Transcript Reference: Volume 8, Pages 1659-1663)2005/01/21 03:35:00 PM2005/01/21
B-81A Graphs – Market Heat Rate for Select Forecasts: Reproduction of Fulton Figure 1 – Figure 1b2005/01/24 03:36:00 PM2005/01/28
B-81B Graphs – Market Heat Rate for Select Forecasts: Reproduction of Fulton Figure 1 – Figure 1c2005/01/24 03:37:00 PM2005/01/28
B-82 Table 1 - January 2005 NYMEX Natural Gas, Source: Bloomberg2005/01/24 03:38:00 PM2005/01/24
B-83 The Electricity Market Module of the National Energy Modeling System – Model Documentation Report dated March 20042005/01/24 03:39:00 PM2005/01/24
B-84 Article from “The Desk” – Annual End of Year Issue December 20042005/01/24 03:39:00 PM2005/01/24
B-85 Table of outstanding BC Hydro Information Requests2005/01/25 08:58:00 AM2005/01/25
B-86 Response to NorskeCanada Information Request at Volume 7, Pages 1356 to 13582005/01/25 08:59:00 AM2005/01/25
B-87 Response to Green Island Energy Information Request at Volume 7, Page 14602005/01/25 08:59:00 AM2005/01/25
B-88 Response to Gold River Information Request at Volume 7, Page 15102005/01/25 08:59:00 AM2005/01/25
B-88A Revised response to Information Request at Volume 7, Page 15102005/01/25 08:59:00 AM2005/01/27
B-89 Response to NorskeCanada Information Request at Volume 9, Page 19962005/01/25 09:00:00 AM2005/01/25
B-90 Response to GSX Concerned Citizens Coalition Information Request at Volume 9, Page 20682005/01/25 09:00:00 AM2005/01/25
B-91 Response to Commission Information Request at Volume 9, Pages 2155 to 21562005/01/25 09:00:00 AM2005/01/25
B-92 Response to Màiri McLennan’s outstanding Information Requests2005/01/25 09:00:00 AM2005/01/25
B-93 CONFIDENTIAL – Response to question regarding Fuel Assumptions for temporary generators (Confidential, for Panel and BCUC Staff, not for posting)2005/01/25 11:42:00 AM2005/01/25
B-94 CONFIDENTIAL – Response to Information Request at Volume 9, Page 2156 Lines 23 to 26 (Confidential, for Panel and BCUC Staff, not for posting)2005/01/25 11:43:00 AM2005/01/25
B-95 CONFIDENTIAL – Response to Information Request regarding Network upgrade costs (Confidential, for Panel and BCUC Staff, not for posting)2005/01/25 11:44:00 AM2005/01/25
B-96 CONFIDENTIAL – Response to Information Request regarding definition of Tier 2 Issue (Confidential, for Panel and BCUC Staff, not for posting)2005/01/25 11:45:00 AM2005/01/25
B-97 Letter dated January 25, 2005 attaching rebuttal evidence and advising that BC Hydro will be calling such evidence and asking that it be circulated to the hearing panel2005/01/25 03:32:00 PM2005/01/25
B-97A Correction table to Page 8 of Mr. Pickel’s evidence2005/01/25 03:33:00 PM2005/01/28
B-98 Response to Information Request at Volume 10, Pages 2203 - 22052005/01/27 03:16:00 PM2005/01/27
B-100 Response to Information Request at Volume 10, Pages 2203 – 2205, Items 40 and 41 on Exhibit B-852005/01/27 03:34:00 PM2005/01/27
B-99 Revised attachment A to Appendix J of Exhibit B-1 based on December load forecast2005/01/27 03:34:00 PM2005/01/28
B-99A CONFIDENTIAL – Spreadsheets used to produce Exhibit B-99 (Confidential, for Panel and BCUC Staff, not for posting) 2005/01/27 03:34:00 PM2005/02/28
B-100A CONFIDENTIAL – Updated response to Information Request 1.14.2.3 (Confidential, for Panel and BCUC Staff, not for posting) 2005/01/27 03:34:00 PM2005/02/28
B-101 Updated to Commission Information Request 1.14.7.2 2005/01/27 03:35:00 PM2005/01/27
B-102 CONFIDENTIAL – Responses to Commission Information Request Nos. 1.15.5 and 2.73.12005/01/28 09:03:00 AM2005/01/28
B-103 CONFIDENTIAL - Responses to requests of Mayor Lewis2005/01/28 09:03:00 AM2005/01/28
B-104 Responses to GSX Concerned Citizens Coalition Undertakings - Reference: Exhibit C20-14, Exhibit B-57 and Andrews letter dated January 24, 20052005/01/28 09:04:00 AM2005/01/27
B-105 Letter dated November 18, 2004 from Mary Hemmingsen to Yakout Mansour 2005/01/28 09:05:00 AM2005/01/27
B-106 Undertaking – Transcript Reference: Volume 15: Pages 3113 and 3160 - 31622005/02/02 11:23:00 AM2005/02/02
B-107 Undertaking – Transcript Reference: Volume 15: Pages 31342005/02/02 11:24:00 AM2005/02/02
B-108 Undertaking – Transcript Reference: Volume 15: Pages 31962005/02/02 11:24:00 AM2005/02/02
    

"C" Exhibits - Intervenor Documents

TitleDocument DescriptionSubmitted Date/TimeApproved Date
C1-1 STEEVES, KEITH – Notice of Intervention dated November 12, 20042004/11/24 03:18:00 PM2004/11/24
C1-2 Information Reqeusts – Round 1 dated December 7, 20042004/12/08 03:44:00 PM2004/12/08
C1-3 Letter and evidence submission dated December 24, 2004 2005/01/06 01:39:00 PM2005/01/06
C2-1 NORKSECANADA LTD. – Notice of Intervention dated November 15, 2004 from Dennis Fitzgerald2004/11/24 03:19:00 PM2004/11/24
C2-2 Letter from Miller Thompson LLP dated December 21, 2004 regarding their retention as counsel by NorskeCanada Ltd.2004/12/23 05:12:00 PM2004/12/23
C2-3 Letter from Miller Thompson LLP dated December 21, 2004, filing as part of NorskeCanada’s Evidence their Demand Management Proposal dated September 2, 20042004/12/23 05:24:00 PM2004/12/23
C2-4 Letter from Miller Thompson LLP dated January 5, 2005 regarding the Phase 1 reconsideration process2005/01/07 01:30:00 PM2005/01/07
C2-5 Letter dated January 11, 2005 regarding the intent of NorskeCanada to rely on the British Columbia Transmission Corporation December 23, 2004 filing of its Evaluation of the NorskeCanada Demand Management proposal and that its witness panel will be prepared to answer questions regarding the Evaluation Report2005/01/12 12:40:00 PM2005/01/12
C2-6 Letter dated January 12, 2005 commenting on the procedural process 2005/01/13 11:13:00 AM2005/01/13
C2-7 Letter dated January 13, 2005 informing the Commission that the witness panel for NorskeCanada will be Mr. Robert H. Lindstrom and Mr. Dennis Fitzgerald and requesting that the NorskeCanada panel be scheduled to follow the BCTC panel 2005/01/14 11:56:00 AM2005/01/14
C2-8 Letter dated January 14, 2005 confirming NorskeCanada evidence is NorskeCanada Demand Management Proposal2005/01/19 04:23:00 PM2005/01/19
C2-9 Letter and response dated January 17, 2005 to GSX Concerned Citizens Coalition Information Request2005/01/19 04:24:00 PM2005/01/19
C2-10 Letter and response dated January 17, 2005 to Commission Information Request No. 12005/01/19 04:25:00 PM2005/01/19
C2-11 Letter and responses dated January 17, 2005 to Duke Point Power Limited Partnership Information Request2005/01/19 04:25:00 PM2005/01/19
C2-12 Letter dated January 20, 2005 regarding response to GSX Concerned Citizens Coalition request for review and reconsideration of certain decisions2005/01/20 10:06:00 AM2005/01/20
C2-13 Document entitled “Exploring Vancouver Island's Energy Future: A Workshop with Be Hydro & Rocky Mountain Institute (Final report dated September 29, 2003, Prepared by the Rocky Mountain Institute, Joel N. Swisher, PhD, PE, Project Manager)2005/01/20 04:25:00 PM2005/01/21
C2-14 Letter dated January 20, 2005 filing the opening statement of Mr. Robert Lindstrom, Vice President, Strategy, NorskeCanada.2005/01/22 12:05:00 PM2005/01/22
C3-1 BC OLD AGE PENSIONERS ORGANIZATION ET AL. – Notice of Intervention dated November 15, 2004 from the British Columbia Public Interest Advocacy Centre on behalf of its clients2004/11/24 03:20:00 PM2004/11/24
C3-2 Letter dated December 3, 2004 commenting on the following issues raised at the Procedural Conference: • Confidentiality • the principal issue defined by the Commission • in-camera review with BC Hydro and Duke Point2004/12/08 03:45:00 PM2004/12/08
C3-3 Information Requests – Round 1 dated December 7, 20042004/12/08 03:46:00 PM2004/12/08
C3-4 Letter dated December 15, 2004 requesting that the Confidentiality issue ruled on by the Commission on November 30, 2004 be placed on the Agenda for the December 17, 2004 Pre-hearing Conference established to review Exhibit B-82004/12/16 08:42:00 AM2004/12/16
C3-5 Letter dated December 21, 2004 responding to BC Hydro Counsel’s letter of December 20, 2004 (Exhibit B-11)2004/12/21 02:25:00 PM2004/12/21
C3-6 Letter dated January 10, 2005 regarding BC Hydro’s non-compliance with Commission Order No. G-119-04 and BCOAPO et al. Information Requests2005/01/11 10:26:00 AM2005/01/11
C3-7 Letter dated January 10, 2005 withdrawing the first Order requested regarding Part 1 and continuing to seek the second Order (Exhibit C3-6) 2005/01/12 09:12:00 AM2005/01/12
C3-8 Letter dated January 11, 2005 replying to BC Hydro’s letter of the same date regarding the BCOAPO et al. application for an Order for Information Request responses2005/01/12 10:44:00 AM2005/01/12
C3-9 E-mail dated January 11, 2005 regarding the intent of BCOAPO et al. to rely on the British Columbia Transmission Corporation December 23, 2004 filing of its Evaluation of the NorskeCanada Demand Management proposal2005/01/12 12:44:00 PM2005/01/12
C3-10 Letter dated January 11, 2005 in response to Exhibit B-40 concerning BC Hydro’s procedural proposals in this matter2005/01/12 12:53:00 PM2005/01/12
C3-11 Letter dated January 12, 2005 regarding BC Hydro’s evidentiary panels 2005/01/13 12:26:00 PM2005/01/13
C3-12 Table entitled “BC Hydro CFT Projects”2005/01/19 04:28:00 PM2005/01/19
C4-1 BC CITIZENS FOR PUBLIC POWER SOCIETY – Notice of Intervention dated November 17, 2004 from Mark Veerkamp2004/11/24 03:20:00 PM2004/11/24
C5-1 VILLAGE OF GOLD RIVER – Notice of Intervention dated November 17, 2004 2004/11/24 03:22:00 PM2004/11/24
C5-2 Submission commenting on the Vancouver Island Call for Tenders review process from Mayor David Lewis2004/11/30 03:48:00 PM2004/11/30
C5-3 Information Request No. 1 dated December 8, 2004 to British Columbia Hydro and Power Authority2004/12/08 05:28:00 PM2004/12/08
C5-4 Two letters dated December 21, 2004 regarding Gold River’s attendance at the Pre-Hearing Conference of December 22, 2004 and comments2004/12/23 05:31:00 PM2004/12/23
C5-5 E-mail dated December 24, 2004 with concerns regarding the December 22, 2004 meeting held in Vancouver2004/12/29 04:28:00 PM2004/12/29
C5-6 Letter and written evidence dated January 6, 2005 2005/01/07 01:48:00 PM2005/01/07
C5-7 E-mail dated January 4, 2005 regarding panel determinations relative to BC Hydro’s objections to Gold River Information Request No. 12005/01/10 01:43:00 PM2005/01/10
C5-8 Letter dated January 11, 2005 regarding the BC Hydro letter dated January 10, 2005 providing direction on procedural process (Exhibit B-40)2005/01/12 04:53:00 PM2005/01/12
C5-9 Letter dated January 12, 2005 with comments on Exhibit E-1402005/01/19 04:30:00 PM2005/01/19
C5-10 Panel Opening Statement dated January 26, 2005 of David Lewis, Mayor, Village of Gold River2005/01/28 09:40:00 AM2005/01/28
C6-1 BRITISH COLUMBIA TRANSMISSION CORPORATION – Notice of Intervention dated November 17, 2004 from Cameron Lusztig2004/11/24 03:22:00 PM2004/11/24
C6-2 Response dated December 17, 2004 to Commission Information Request No. 1 to British Columbia Transmission Corporation2004/12/17 02:18:00 PM2004/12/17
C6-3 Letter to BCUC dated December 29, 2004 in response to Duke Point Power Limited Partnership’s letter of December 28, 20042004/12/29 04:19:00 PM2004/12/29
C6-4 Letter dated January 13, 2005 responding to Commission letter dated January 12, 2005 requesting that BCTC provide a witness panel (Exhibit A-34)2005/01/13 01:52:00 PM2005/01/13
C6-5 Letter and response dated January 17, 2005 to GSX Concerned Citizens Coalition/BC Sustainable Energy Association Information Request2005/01/19 04:30:00 PM2005/01/19
C6-6 Letter and response dated January 17, 2005 to Duke Point Power Limited Partnership Information Request2005/01/19 04:31:00 PM2005/01/19
C6-7 Response to Information Request at Volume 10, Page 23982005/01/28 02:12:00 PM2005/01/28
C6-8 Response to Information Request at Volume 10, Page 24002005/01/28 02:13:00 PM2005/01/28
C7-1 PARR, JIM – Notice of Intervention dated November 18, 20042004/11/24 03:23:00 PM2004/11/24
C8-1 ELLIOTT ENERGY SERVICES LTD. – Notice of Intervention dated November 19, 2004 from John Elliott2004/11/24 03:24:00 PM2004/11/24
C9-1 GREEN ISLAND ENERGY LTD. – Notice of Intervention dated November 19, 2004 from Sean Ebnet2004/11/24 03:24:00 PM2004/11/24
C9-2 Letter dated November 26, 2004 from Weisberg Law Corporation regarding their retention as counsel for Green Island Energy and a Submission listing the Principal Issues Green Island Energy would like the Commission to examine during the review 2004/11/30 03:50:00 PM2004/11/30
C9-3 Term Sheet dated November 18, 20042004/11/30 03:52:00 PM2004/11/30
C9-4 Information Request No. 1 dated December 8, 2004 to British Columbia Hydro and Power Authority2004/12/09 10:36:00 AM2004/12/09
C9-5 Letter dated December 16, 2004 responding to BC Hydro’s December 14, 2004 letter (Exhibit B-8)2004/12/17 10:55:00 AM2004/12/17
C9-6 Letter dated December 24, 2004 from Weisberg Law Corporation requesting that BC Hydro provide Appendix 3 with additional information disclosed as directed by the Commission, that they provide copies of all Response to Information Requests to which confidentiality no longer applies, and expressing concerns regarding BC Hydro’s Response to Green Island Energy Ltd. Information Requests No. 1.13.1 and 1.13.22004/12/29 03:11:00 PM2004/12/29
C9-7 Letter to BCUC dated December 30, 2004 from Weisberg Law Corporation regarding the Duke Point Power Limited Partnership letter dated December 28, 2004 2004/12/31 12:33:00 PM2004/12/31
C9-8 Letter dated December 31, 2004 regarding clarification by BC Hydro to responses to certain Green Island Energy Ltd. Information Requests2005/01/01 06:01:00 PM2005/01/01
C9-9 Letter dated January 4, 2004 (5) regarding the Phase 1 reconsideration process for the JIESC reconsideration application 2005/01/06 02:15:00 PM2005/01/06
C9-10 Evidence of Green Island Energy Ltd. dated January 6, 20052005/01/10 01:46:00 PM2005/01/10
C9-11 Letter dated January 11, 2005 responding to Mr. Sanderson’s letter to the Commission dated January 10, 20052005/01/12 10:22:00 AM2005/01/12
C9-12 E-mail dated January 11, 2005 regarding the intent of Green Island Energy Ltd. to rely on the British Columbia Transmission Corporation December 23, 2004 filing of its Evaluation of the NorskeCanada Demand Management proposal2005/01/12 12:59:00 PM2005/01/12
C9-13 CONFIDENTIAL – Compact Disc filed on January 7, 2005 by Willis Energy Services Ltd. on behalf of Green Island Energy (Confidential, for Panel and BCUC Staff, not for posting)2005/01/13 02:33:00 PM2005/01/13
C9-14 Letter dated January 13, 2004 (5) regarding the price information for the Green Island Energy Ltd. bid in the Call For Tenders CONFIDENTIAL – Price Information Form (Confidential, for Panel and BCUC Staff, not for posting) 2005/01/14 03:37:00 PM2005/01/14
C9-15 Letter dated January 17, 2005 regarding response to Duke Point Power Limited Partnership Information Request 2005/01/19 04:33:00 PM2005/01/19
C9-16 Response dated January 17, 2005 to Duke Point Power Limited Partnership Information Request2005/01/19 04:34:00 PM2005/01/19
C9-17 Letter and response dated January 17, 2005 to BC Hydro Information Request No. 12005/01/19 04:36:00 PM2005/01/19
C9-18 Letter and response dated January 17, 2005 to Commission Information Request No. 12005/01/19 04:37:00 PM2005/01/19
C9-19 Letter dated January 17, 2005 regarding back up information referenced in BCUC Information Request No. 1.3 CONFIDENTIAL – Appendix A - back up to BCUC IR 1.3 (Confidential, for Panel and BCUC Staff, not for posting) 2005/01/19 04:37:00 PM2005/01/19
C9-20 Response to Undertaking at Volume 11, Page 6 - Tables reflecting amendment of firm gas transportation adder2005/01/26 07:52:00 AM2005/01/26
C10-1 WESTCOAST ENERGY INC. – Notice of Intervention dated November 23, 2004 from Greg Staple2004/11/25 02:55:00 PM2004/11/25
C11-1 RAINBOTH, ANN – Notice of Intervention dated November 23, 20042004/11/25 02:54:00 PM2004/11/25
C12-1 ENCO POWER COMPANY – Notice of Intervention dated November 24, 2004 from Charles E. Martin2004/11/26 09:39:00 AM2004/11/26
C13-1 HILL, JOHN A. – Notice of Intervention dated November 24, 20042004/11/26 09:41:00 AM2004/11/26
C13-2 Letter of Comment dated November 28, 20042004/11/30 03:53:00 PM2004/11/30
C13-3 Information Request No. 1 dated December 8, 20042004/12/08 05:10:00 PM2004/12/08
C13-4 Letter dated January 4, 2005 regarding the reconsideration process for the JIESC reconsideration application 2005/01/06 02:19:00 PM2005/01/06
C13-5 Evidence of John A Hill dated January 6, 2005 2005/01/10 01:55:00 PM2005/01/10
C13-6 Letter dated January 25, 2005 regarding C20-352005/01/26 10:29:00 AM2005/01/26
C14-1 WILLIAMS GAS PIPELINE COMPANY – Notice of Intervention dated November 23, 2004 from Steven W. Snarr2004/11/26 09:42:00 AM2004/11/26
C14-2 Intervenor Withdrawal Request dated December 10, 20042004/12/14 09:56:00 AM2004/12/14
C15-1 GRIGNON, PAUL – Notice of Intervention dated November 24, 20042004/11/26 11:48:00 AM2004/11/26
C16-1 BC SUSTAINABLE ENERGY ASSOCIATION – Notice of Intervention dated November 24, 2004 from Guy Dauncey2004/11/25 10:54:00 AM2004/11/26
C16-2 Information Request No. 1 dated December 8, 2004 to British Columbia Hydro and Power Authority2004/12/09 10:37:00 AM2004/12/09
C16-3 Letter dated December 20, 2004 advising that it would be joining its intervention with the GSX Concerned Citizens Coalition2004/12/21 10:54:00 AM2004/12/21
C16-4 Letter dated December 14, 2004 regarding joining the GSX Concerned Citizens Coalition intervention, and the BC Sustainable Energy Association’s purpose and concerns in this process2004/12/24 01:27:00 PM2004/12/24
C17-1 DUKE POINT POWER LIMITED– Notice of Intervention dated November 25, 2004 from Loyola Keough2004/11/26 01:21:00 PM2004/11/26
C17-2 Letter dated December 28, 2004 seeking two additional Orders and to confirm that the Commission intends that BC Hydro provide a witness to speak to the Evidence on record in response to Information Requests2004/12/29 04:17:00 PM2004/12/29
C17-3 Letter dated January 3, 2005 providing comments in regard to the JIESC reconsideration application2005/01/06 11:17:00 AM2005/01/06
C17-4 Letter dated January 3, 2005 responding to points raised in the British Columbia Transmission Corporation letter dated December 29, 2004 and the Green Island Energy Ltd. letter of December 30, 2004 2005/01/06 11:18:00 AM2005/01/06
C17-5 Letter dated January 4, 2005 responding to the JIESC letter of December 28, 20042005/01/06 01:22:00 PM2005/01/06
C17-6 Letter and evidence dated January 6, 20052005/01/07 03:02:00 PM2005/01/07
C17-7 Letter dated January 11, 2005 regarding procedural matters2005/01/13 11:31:00 AM2005/01/13
C17-8 Letter dated January 11, 2005 regarding the disclosure of confidential sections of the Electricity Purchase Agreement Appendix 32005/01/13 11:41:00 AM2005/01/13
C17-9 Letter and Information Request dated January 11, 2005 to British Columbia Transmission Corporation 2005/01/13 11:46:00 AM2005/01/13
C17-10 Letter and Information Request dated January 11, 2005 to Green Island Energy Ltd.2005/01/13 11:51:00 AM2005/01/13
C17-11 Letter and Information Request dated January 11, 2005 to NorskeCanada2005/01/13 11:53:00 AM2005/01/13
C17-12 Letter and response dated January 17, 2005 to GSX Concerned Citizens Coalition Information Request2005/01/19 04:39:00 PM2005/01/19
C17-13 Letter and response dated January 17, 2005 to Commission Information Request2005/01/19 04:40:00 PM2005/01/19
C17-14 Letter dated January 19, 2005 advising that the witness panel for Duke Point Power Limited Partnership will be Jeffry Myers, Harvie Campbell and Ken Spinner2005/01/20 10:06:00 AM2005/01/20
C17-15 Letter dated January 19, 2005 responding to the request for Reconsideration filed on behalf of the GSX Concerned Citizens Coalition 2005/01/20 10:07:00 AM2005/01/20
C17-16 VIGP Hearing Day 5 – June 20, 2003 – Response to Undertaking Volume 5, Transcript Reference Pages 1031-10352005/01/22 09:42:00 AM2005/01/22
C17-17 British Columbia Utilities Commission Staff Information Request No. 1.21.2 dated 21 March 2003 - Vancouver Island Energy Response Issued April 14, 2003 - Vancouver Island Energy Corporation Application to the British Columbia Utilities Commission for a Certificate of Public Convenience & Necessity for the Vancouver Island Generation Project2005/01/22 09:42:00 AM2005/01/22
C17-18 Appendix A from the Commission’s Reasons for Decision on the British Columbia Transmission Corporation’s Transmission System Capital Plan2005/01/22 09:42:00 AM2005/01/22
C17-19 BCTC Letter dated December 20, 2004 filing responses to the Commission's questions provided in the its November 19,2004 Reasons for Decision (pages 27-28) on BCTC's Capital Plan Application2005/01/22 09:43:00 AM2005/01/22
C17-20 Response to Undertakings at Volume 10, Page 2231; Volume 10, Page 2235; Volume 10, Page 2235-22362005/01/27 02:19:00 PM2005/01/27
C18-1 TERASEN GAS (VANCOUVER ISLAND) INC. – Notice of Intervention dated November 25, 20042004/11/30 02:27:00 PM2004/11/30
C18-2 Letter dated November 25, 2004 filing the LNG Project Milestone Schedule in response to Commission’s letter dated November 24, 2004 (Exhibit A-2)2004/12/01 09:10:00 AM2004/12/01
C19-1 JOINT INDUSTRY ELECTRICITY STEERING COMMITTEE – Notice of Intervention dated November 26, 2004 from R. Brian Wallace, Bull Housser & Tupper2004/11/30 02:28:00 PM2004/11/30
C19-2 Letter dated December 2, 2004 commenting on issues arising out of the November 29, 2004 Procedural Conference2004/12/08 03:46:00 PM2004/12/08
C19-3 Information Request No. 1 dated December 8, 2004 to British Columbia Transmission Corporation 2004/12/08 05:27:00 PM2004/12/08
C19-4 Information Request No. 1 dated December 8, 2004 to British Columbia Hydro and Power Authority 2004/12/08 05:27:00 PM2004/12/08
C19-5 Letter dated December 16, 2004 requesting the Commission to reconsider and rescind the November 30, 2004 ruling regarding some of the significant terms of the Electricity Purchase Agreement2004/12/17 09:37:00 AM2004/12/17
C19-6 Letter dated December 21, 2004 responding to BC Hydro Counsel’s letter of December 20, 2004 (Exhibit B-11)2004/12/21 02:26:00 PM2004/12/21
C19-7 Letter to BC Hydro dated December 24, 2004 requesting a copy of Appendix 3 of the Electricity Purchase Agreement and copies of all Information Requests which should no longer be held confidential as per the Commission’s Decision2004/12/29 03:53:00 PM2004/12/29
C19-8 Letter to BC Hydro dated December 24, 2004 regarding the Joint Industry Electricity Steering Committee Information Request No. 1.1.0(1)2004/12/29 04:01:00 PM2004/12/29
C19-9 Letter dated January 3, 2005 responding to the Duke Point Limited Partnership letter dated December 28, 2004 2005/01/06 02:29:00 PM2005/01/06
C19-10 Information Request No. 2 dated January 3, 20052005/01/06 02:29:00 PM2005/01/06
C19-11 Letter dated January 6, 2005 regarding evidence from S. Fulton and L. Guenther 2005/01/07 01:19:00 PM2005/01/07
C19-12 Letter dated January 6 regarding the JIESC Submissions on Review and Variation of Scope Decision2005/01/10 03:37:00 PM2005/01/10
C19-13 Letter dated January 6, 2005 and revision to same dated January 7, 2004 (5) regarding BC Hydro’s failure to provide required information2005/01/10 03:43:00 PM2005/01/10
C19-14 Letter dated January 11, 2005 regarding the intent of the JIESC to rely on the British Columbia Transmission Corporation December 23, 2004 filing of its Evaluation of the NorskeCanada Demand Management proposal2005/01/12 01:02:00 PM2005/01/12
C19-15 Letter dated January 12, 2005 regarding procedural matters and the submissions of BCPIAC and Green Island Energy2005/01/13 12:17:00 PM2005/01/13
C19-16 Letter dated January 14, 2005 requesting VIGP Hearing Record be incorporated into this Hearing2005/01/20 04:08:00 PM2005/01/20
C19-17 Four Pages of Spreadsheet2005/01/20 04:09:00 PM2005/01/20
C19-18 Graph entitled "QEM Model Heat Rates"2005/01/20 04:09:00 PM2005/01/20
C19-19 Responses dated January 16, 2005 to BC Hydro and Commission Information Requests2005/01/20 04:11:00 PM2005/01/20
C19-20 Witness Aid dated January 18, 2005 prepared for the JIESC entitled “Summary Table - Cost Effectiveness Analysis- Appendix J to CFT Report (Ex. 81)2005/01/20 04:12:00 PM2005/01/21
C19-21 Excerpt from the 2004 Integrated Electricity Plan entitled “Summary of Available Resource Options”2005/01/20 04:26:00 PM2005/01/21
C19-22 Letter dated January 19, 2005 responding to the GSX Concerned Citizens Coalition request for reconsideration of certain decisions2005/01/20 04:27:00 PM2005/01/20
C19-23 JIESC Witness Aid entitled “Cost of Duke Point Power Generation”2005/01/21 03:30:00 PM2005/01/21
C19-24 Letter dated January 19, 2005 filing supplementary evidence of Sheldon Fulton2005/01/21 03:31:00 PM2005/01/21
C19-25 Opening statement dated January 2005 of Lloyd G. Guenther on behalf of the Joint Industry Electricity Steering Committee 2005/01/24 02:33:00 PM2005/01/24
C19-26 The Western Energy Market : Inherent Risks and Market Solutions2005/01/28 03:05:00 PM2005/01/28
C19-27 Prepared Testimony dated March 3, 2003 of Dr. Frederick H. Pickel before the (USA) Federal Energy Regulatory Commission 2005/01/28 03:09:00 PM2005/01/28
C20-1 GSX CONCERNED CITIZENS COALITION – Notice of Intervention dated November 25, 2004 from William J. Andrews2004/11/30 02:30:00 PM2004/11/30
C20-2 Letter dated December 2, 2004 requesting clarification regarding the four matters addressed in the Panel’s November 30, 2004 decision: 1. public disclosure of the Electricity Purchase Agreement (EPA) and the VIGP Transfer Agreement (VTA), 2. B.C. Hydro’s compliance with the Call for Tenders (CFT) not being an issue in the review, 3. the meaning of “next resource addition,” and 4. the meaning of “accepted.” 2004/12/07 09:41:00 AM2004/12/07
C20-3 Letter dated December 3, 2004 providing additional information in support of the December 2, 2004 request for clarification (Exhibit C20-2)2004/12/08 03:45:00 PM2004/12/08
C20-4 Letter dated December 6, 2004 commenting on BC Hydro’s December 6th letter responding to the GSX’s December 2nd request for clarification regarding the four matters addressed in the Panel’s November 30, 2004 decision2004/12/08 03:47:00 PM2004/12/08
C20-5 Information Request No. 1 dated December 8, 2004 to British Columbia Hydro and Power Authority2004/12/09 10:17:00 AM2004/12/09
C20-6 Letter dated December 14, 2004 commenting on BC Hydro’s December 14, 2004 letter (Exhibit B-8)2004/12/16 08:50:00 AM2004/12/16
C20-7 Letter dated December 15, 2004 requesting BC Hydro provide a table specifying the grounds for each challenged Information Request and requesting the Intervenor Evidence deadline be amended if BC Hydro does not respond to all Information Requests submitted2004/12/16 08:51:00 AM2004/12/16
C20-8 Letter dated December 20, 2004 updating information provided in Exhibit C20-1 and advising that the BC Sustainable Energy Association (BC Sea) has joined its intervention with the GSX Concerned Citizens Coalition2004/12/21 10:49:00 AM2004/12/21
C20-9 Letter dated December 20, 2004 concerning the procedure for the Commission’s determination of BC Hydro’s request for confidentiality of the Redacted portions of the Electricity Purchase Agreement2004/12/21 10:52:00 AM2004/12/21
C20-10 Package of print-outs from Internet websites, including a table of contents, which identifies the items - (Posting to follow)2004/12/23 05:51:00 PM2004/12/23
C20-11 Letter dated December 23, 2004 from William J. Andrews on behalf of the GSX Concerned Citizens Coalition and the BC Sustainable Energy Association regarding BC Hydro’s response to GSX Concerned Citizens Coalition Information Request No. 1.22.3.1 and No. 1.22.3.22004/12/24 01:34:00 PM2004/12/24
C20-12 Letter dated December 28, 2004 regarding load forecast evidence from the Vancouver Island Energy Corporation2004/12/29 05:55:00 PM2004/12/29
C20-13 Letter dated December 29, 2004 requesting an Order requiring BC Hydro to answer GSXCCC Information Request Nos. 1.22.3.1, 1.22.3.2 and 1.16.22004/12/31 11:59:00 AM2004/12/31
C20-14 Information Request No. 2 dated December 30, 2004 from William J. Andrews on behalf of the GSX Concerned Citizens Coalition and the BC Sustainable Energy Association2004/12/31 12:43:00 PM2004/12/31
C20-15 Letter dated January 4, 2005 requesting extension of the deadline for GSX Concerned Citizens Coalition and BC Sustainable Energy Association to file Intervenor evidence2005/01/05 04:13:00 PM2005/01/05
C20-16 Letter dated January 4, 2005 regarding the JIESC’s December 16, 2004 application for reconsideration 2005/01/06 09:35:00 AM2005/01/06
C20-17 Letter dated January 4, 2005 responding to BC Hydro's response to the GSX Concerned Citizens Coalition and the BC Sustainable Energy Association's letters of December 23, 29 and 30, 20042005/01/06 09:40:00 AM2005/01/06
C20-18 Letter dated January 5, 2005 regarding the application for an Order (Exhibit C20-13) and the application for filing extension (Exhibit C20-15)2005/01/06 02:03:00 PM2005/01/06
C20-19 Letter dated January 6, 2005 withdrawing application for an Order2005/01/06 02:04:00 PM2005/01/06
C20-20 Letter dated January 6, 2005 providing the resumé and evidence of Dr. Mark Jaccard2005/01/06 02:08:00 PM2005/01/06
C20-21 Evidence and Resume of Mr. Steve Miller dated January 6, 20052005/01/07 01:54:00 PM2005/01/07
C20-22 Letter dated January 8, 2005 regarding January 6, 2005 decision letter (Exhibit A-21)2005/01/11 09:22:00 AM2005/01/11
C20-23 Information Request to NorskeCanada dated January 10, 2005 2005/01/11 09:48:00 AM2005/01/11
C20-24 Information Request to Duke Point Power Limited Partnership dated January 10, 20052005/01/11 10:02:00 AM2005/01/11
C20-25 Information Request to British Columbia Transmission Corporation dated January 10, 20052005/01/12 01:04:00 PM2005/01/12
C20-26 Letter dated January 11, 2005 regarding the intent of GSX Concerned Citizens Coalition to rely on the British Columbia Transmission Corporation December 23, 2004 filing of its Evaluation of the NorskeCanada Demand Management proposal2005/01/12 01:05:00 PM2005/01/12
C20-27 Letter dated January 12, 2005 advising that the Society Promoting Environmental Conservation has joined its intervention with the GSX Concerned Citizens Coalition and BC Sustainable Energy Association (BC Sea) 2005/01/12 04:40:00 PM2005/01/12
C20-28 Letter dated January 12, 2005 regarding procedural matters2005/01/13 12:00:00 PM2005/01/13
C20-29 Letter dated January 14, 2005 request for reconsideration on behalf of the GSX Concerned Citizens Coalition2005/01/14 03:55:00 PM2005/01/14
C20-30 Letter dated January 14, 2005 requesting admission of evidence from the VIGP proceeding2005/01/15 12:07:00 PM2005/01/15
C20-31 Response dated January 17, 2005 to BC Hydro Information Request No. 12005/01/19 04:58:00 PM2005/01/19
C20-32 Response dated January 17, 2005 to Commission Information Request No. 12005/01/19 04:58:00 PM2005/01/19
C20-33 Vancouver Island Energy Corporation Revised Response dated June 12, 2003 to British Columbia Utilities Commission Staff Information Request No. 2.26.6 dated May 2, 2003 filed in the Commission proceeding on the Vancouver Island Energy Corporation Application for a Certificate of Public Convenience and Necessity for the Vancouver Island Generation Project2005/01/20 04:26:00 PM2005/01/21
C20-34 Letter dated January 21, 2005 replying to submission from counsel for BC Hydro (Exhibit B-66) and counsel for Duke Point Power (Exhibit C17-15)2005/01/24 11:58:00 AM2005/01/24
C20-35 Letter dated January 23, 2005 making application for an order that the Commission Panel disqualify itself from this proceeding 2005/01/24 11:58:00 AM2005/01/24
C20-36 “Consistency of Population and Employment Forecasts in the BC Hydro December 2004 Load Forecast, Steve Miller and Associates, January 24, 2005”2005/01/28 09:40:00 AM2005/01/28
C20-37 “Revised Load and Supply Gap Forecast, Steve Miller and Associates, January 24, 2005”2005/01/28 09:40:00 AM2005/01/28
C21-1 ELK VALLEY COAL CORPORATION – Notice of Intervention dated November 26, 2004 from J.D.V. Newlands2004/11/30 02:35:00 PM2004/11/30
C22-1 MCKECHNIE, BOB – Notice of Intervention dated November 25, 20042004/11/30 02:36:00 PM2004/11/30
C22-2 Information Request No. 1 dated December 8, 2004 to British Columbia Hydro and Power Authority2004/12/09 10:14:00 AM2004/12/09
C22-3 Letter dated December 17, 2004 providing Mr. McKechnie’s comments for the Pre-hearing Conference on Exhibit B-82004/12/17 01:30:00 PM2004/12/17
C22-4 E-mail dated December 22, 2004 regarding Mr. McKechnie’s submission to the Pre-hearing Conference of December 22, 20042004/12/23 05:59:00 PM2004/12/23
C22-5 Letter dated January 4, 2004 (5) regarding the reconsideration issues2005/01/06 02:34:00 PM2005/01/06
C22-6 Letter dated January 6, 2005 regarding inability to submit evidence2005/01/07 01:16:00 PM2005/01/07
C22-7 Letter dated January 19, 2005 commenting on the direction of the Commission’s hearing process2005/01/21 01:14:00 PM2005/01/21
C22-8 Letter dated January 25, 2005 regarding Exhibit C20-352005/01/26 10:29:00 AM2005/01/26
C23-1 SEA BREEZE POWER CORP. – Notice of Intervention dated November 25, 2004 from Tony Duggleby2004/11/30 02:37:00 PM2004/11/30
C23-2 Letter dated December 1, 2004 filing documents in support of Mr. Duggleby’s oral presentation at the November 29, 2004 Procedural Conference2004/12/07 09:39:00 AM2004/12/07
C23-3 Information Request No. 1 dated December 8, 20042004/12/09 10:16:00 AM2004/12/09
C23-4 Letter dated December 17, 2004 commenting on BC Hydro’s December 14, 2004 letter (Exhibit B-8)2004/12/17 01:39:00 PM2004/12/17
C23-5 Letter dated January 4, 2005 regarding the reconsideration application2005/01/06 02:36:00 PM2005/01/06
C23-6 Evidence dated January 6, 2005 from Sea Breeze Pacific Regional Transmission System Inc.2005/01/10 02:37:00 PM2005/01/10
C23-7 Letter and evidence dated January 17, 2004 (5)2005/01/20 01:40:00 PM2005/01/20
C24-1 HOWE SOUND PULP AND PAPER LIMITED PARTNERSHIP – Notice of Intervention dated November 23, 2004 from Pierre G. Lamarche2004/11/30 02:37:00 PM2004/11/30
C25-1 POST CARBON INSTITUTE – Notice of Intervention dated November 26, 2004 from Julian Darley2004/11/30 02:39:00 PM2004/11/30
C26-1 HAGUE, JOHN – Notice of Intervention dated November 26, 20042004/11/30 02:42:00 PM2004/11/30
C26-2 E-mail dated December 6, 2004 commenting on the Commission’s proposed public hearing process2004/12/08 03:48:00 PM2004/12/08
C26-3 E-mail dated December 14, 2004 commenting on the Call for Tenders process2004/12/17 11:00:00 AM2004/12/17
C26-4 E-mail dated January 11, 2005 regarding quote from Dr. Mark Jaccard2005/01/14 11:44:00 AM2005/01/14
C26-5 E-mail dated January 15, 2005 with comments on Town Hall Meeting evidence2005/01/19 04:59:00 PM2005/01/19
C26-6 Letter dated January 19, 2005 agreeing with Mr. McKechnie and providing further comment on Bill Andrews' Reconsideration Motion (Exhibit C20-29) 2005/01/21 03:24:00 PM2005/01/21
C26-7 E-mail dated January 22, 2005 forwarding a Letter of Comment dated January 18, 2005 from Adrian Carr, Leader of the Green Party of BC (Exhibit E-273)2005/01/24 02:34:00 PM2005/01/24
C26-8 Letter dated January 25, 2005 regarding Exhibit C20-352005/01/26 10:29:00 AM2005/01/26
C26-9 E-mail dated January 27, 2005 commenting on Commission Letter No. L 8 052005/01/28 10:54:00 AM2005/01/28
C27-1 CONSTANTINE, TEXAS JOE – Notice of Intervention dated November 25, 20042004/11/30 02:43:00 PM2004/11/30
C27-2 Withdrawal of Intervention dated December 10, 20042004/12/13 03:11:00 PM2004/12/13
C28-1 HUNTER, M. - MLA – Notice of Intervention dated November 26, 20042004/11/30 02:49:00 PM2004/11/30
C29-1 GROOT, KEES DR. – Notice of Intervention dated November 26, 20042004/11/30 02:50:00 PM2004/11/30
C30-1 GABRIOLA ISLAND RATEPAYERS AND RESIDENTS ASSOCIATION – Notice of Intervention dated November 25, 2004 from J. Randy Young, President2004/11/30 02:51:00 PM2004/12/01
C30-2 Information Requests – Round 1 dated December 7, 20042004/12/08 03:49:00 PM2004/12/08
C30-3 Letter dated December 19, 2004 commenting on the December 17, 2004 Pre-hearing Conference on Exhibit B-82004/12/21 10:53:00 AM2004/12/21
C30-4 Letter dated December 24, 2004 regarding filing of written evidence after public meeting of January 14, 20042004/12/29 06:04:00 PM2004/12/29
C30-5 Letter dated December 19, 2004 supporting the JIESC reconsideration application 2005/01/06 02:41:00 PM2005/01/06
C30-6 Letter dated January 6, 2005 regarding written evidence2005/01/07 02:53:00 PM2005/01/07
C30-7 E-mail dated January 11, 2005 with comments from Randy Young, President of the Gabriola Island Ratepayers and Residents Association 2005/01/12 10:17:00 AM2005/01/12
C30-8 Written Arguments dated January 16, 20052005/01/19 05:00:00 PM2005/01/19
C30-9 Letter dated January 19, 2005 providing written comments addressing the cost/benefit of the Duke Point Power Plant to the ratepayers of Gabriola Island and other rural residents2005/01/21 01:11:00 PM2005/01/21
C30-10 Email dated January 19, 2005 regarding missed cross-examination opportunities and oral final argument procedures2005/01/21 01:13:00 PM2005/01/21
C31-1 REGIONAL DISTRICT OF MOUNT WADDINGTON – Notice of Intervention dated November 26, 2004 from Bill Shephard, Chair2004/11/30 02:53:00 PM2004/11/30
C31-2 Briefing Note dated November 29, 20042004/11/30 03:54:00 PM2004/11/30
C32-1 COMMERCIAL ENERGY CONSUMERS – Notice of Intervention dated November 26, 2004 from Penny Cochrane, Willis Energy Services Ltd.2004/11/30 02:54:00 PM2004/11/30
C32-2 Letter dated January 4, 2005 supporting the JIESC’s reconsideration application2005/01/06 02:45:00 PM2005/01/06
C32-3 Letter and evidence dated January 6, 2005 from the Commercial Energy Consumers of BC2005/01/10 02:44:00 PM2005/01/10
C32-4 Letter dated January 12, 2005 commenting on procedural matters 2005/01/13 05:47:00 PM2005/01/13
C32-5 Letter and responses dated January 18, 2005 to Commission Information Request No. 12005/01/20 01:41:00 PM2005/01/20
C32-6 Letter and responses dated January 18, 2005 to BC Hydro Information Request No. 12005/01/20 01:41:00 PM2005/01/20
C32-7 Letter dated January 19, 2005 supporting the GSXCCC et. al request for a reconsideration of the limitation set on intervenors regarding their cross-examination of the applicant's witnesses and others in these proceedings2005/01/21 01:15:00 PM2005/01/21
C32-8 Commercial Energy Consumers’ Addendum to Testimony2005/01/26 07:52:00 AM2005/01/26
C33-1 SHADYBROOK FARM – Notice of Intervention dated November 28, 2004 from Steve Miller2004/11/30 02:57:00 PM2004/11/30
C33-2 E-mail dated December 14, 2004 providing comments on BC Hydro’s December 14, 2004 letter (Exhibit B-8)2004/12/16 08:53:00 AM2004/12/16
C33-3 Letter dated December 15, 2004 requesting the deadline for Intervenor Evidence be amended2004/12/16 08:54:00 AM2004/12/16
C33-4 E-mail dated December 17, 2004 commenting on BC Hydro’s December 14, 2004 letter (Exhibit B-8)2004/12/17 11:02:00 AM2004/12/17
C33-5 Letter of Comment dated December 17, 2004 regarding BC Hydro's request for relief from the obligation of answering many of the IR's posed by BCUC staff and Intervenors2004/12/17 01:32:00 PM2004/12/17
C33-6 E-mail dated December 21, 2004 regarding the Pre-Hearing Conference on December 22, 20042004/12/23 06:02:00 PM2004/12/23
C33-7 E-mail dated January 11, 2005 regarding the intent of Shadybrook Farm to rely on the British Columbia Transmission Corporation December 23, 2004 filing of its Evaluation of the NorskeCanada Demand Management proposal2005/01/12 01:11:00 PM2005/01/12
C33-8 Letter dated January 12, 2005 regarding procedural issues2005/01/13 05:49:00 PM2005/01/13
C33-9 Letter dated January 19, 2005 endorsing the GSXCCC et. al request for a reconsideration of the limitation set on intervenors regarding their cross-examination of the applicant's witnesses and others in these proceedings2005/01/21 01:15:00 PM2005/01/21
C34-1 SOCIETY PROMOTING ENVIRONMENTAL CONSERVATION – Notice of Intervention dated November 26, 2004 from Norman Abbey2004/11/30 02:59:00 PM2004/11/30
C34-2 Letter dated January 10, 2005 advising that they are joining with the GSX Concerned Citizens Coalition and will be represented by the same counsel2005/01/20 01:41:00 PM2005/01/20
C35-1 ERKILETIAN, JIM – Notice of Intervention received November 29, 2004 2004/11/30 03:00:00 PM2004/11/30
C36-1 MCLENNAN, MÀIRI – Notice of Intervention dated November 25, 20042004/11/30 03:01:00 PM2004/11/30
C36-2 Information Request No. 1 dated December 8, 2004 to British Columbia Hydro and Power Authority2004/12/09 10:35:00 AM2004/12/09
C36-3 Letter dated December 17, 2004 commenting on the Pre-hearing Conference process regarding Exhibit B-8 (BC Hydro’s December 14, 2004 letter)2004/12/17 11:04:00 AM2004/12/17
C36-4 Letter dated December 22, 2004 regarding EPA Review Process and Pre-Hearing Conference of December 22, 20042004/12/23 06:04:00 PM2004/12/23
C36-5 Letter dated January 3, 2005 requesting clarification from BC Hydro regarding their response to Intervenor’s Information Request No. 1 (attached second Information Request referenced in letter is Exhibit C36-6)2005/01/06 10:28:00 AM2005/01/06
C36-6 Information Request No. 2 dated January 3, 2005 2005/01/06 10:28:00 AM2005/01/06
C36-7 Letter dated January 4, 2005 supporting the application made on behalf of the JIESC for reconsideration2005/01/06 10:30:00 AM2005/01/06
C36-8 Letter dated January 5, 2005 requesting extension for filing2005/01/06 10:32:00 AM2005/01/06
C36-9 Letter dated January 5, 2005 expressing concerns regarding the review process2005/01/06 10:39:00 AM2005/01/06
C36-10 Letter and evidence dated January 6, 2005 from Màiri McLennan2005/01/10 02:47:00 PM2005/01/10
C36-11 Letter dated January 11, 2005 regarding the intent of Màiri McLennan to rely on the British Columbia Transmission Corporation December 23, 2004 filing of its Evaluation of the NorskeCanada Demand Management proposal2005/01/12 01:33:00 PM2005/01/12
C36-12 Letter dated January 12, 2005 regarding procedural issues2005/01/13 12:05:00 PM2005/01/13
C36-13 Letter and submission dated January 19, 2005 2005/01/20 01:42:00 PM2005/01/20
C36-14 Letter dated January 19, 2005 to Mr. Chris Sanderson, BC Hydro Counsel, regarding Information Request Supplementary Responses2005/01/21 01:15:00 PM2005/01/21
C36-15 Letter dated January 25, 2005 regarding Exhibit C20-352005/01/26 10:30:00 AM2005/01/26
C37-1 ANDERSEN, ERIK – Notice of Intervention dated November 26, 20042004/12/07 10:16:00 AM2004/12/07
C37-2 E-mail dated December 6, 2004 requesting assistance in locating additional information and reports regarding BC Hydro2004/12/08 03:49:00 PM2004/12/08
C37-3 E-mail dated December 22, 2004 regarding Mr. Andersen’s written evidence2004/12/23 06:06:00 PM2004/12/23
C37-4 E-mail dated January 12, 2005 regarding final argument by this Intervenor2005/01/13 01:07:00 PM2005/01/13
C37-5 Email dated January 20, 2005 replying to John Hague’s comments on Bill Andrews' Reconsideration Motion (Exhibit C20-29)2005/01/21 01:16:00 PM2005/01/21
C37-6 E-mail dated January 22, 2005 regarding time limiting of witnesses2005/01/24 02:34:00 PM2005/01/24
C37-7 E-mail dated January 24, 2005 joining in support of an action of Mr. Andrews (Exhibit C20-35)2005/01/24 02:34:00 PM2005/01/24
C37-8 Letter dated January 24, 2005 regarding Exhibit No. C20-352005/01/26 10:30:00 AM2005/01/26
C38-1 MALCOLMSON, SHEILA, GABRIOLA ISLAND LOCAL TRUSTEE – Notice of Intervention dated November 26, 20042004/12/07 10:16:00 AM2004/12/07
C38-2 Letter dated January 25, 2005 regarding Exhibit No. C20-352005/01/26 10:30:00 AM2005/01/26
C39-1 VANPORT STERILIZERS INC. – Notice of Intervention dated December 8, 2004 from Richard Tennant2004/12/09 10:15:00 AM2004/12/09
C39-2 Letter dated December 17, 2004 commenting on BC Hydro’s December 14, 2004 letter (Exhibit B-8)2004/12/17 11:13:00 AM2004/12/17
C39-3 Letter dated December 22, 2004 requesting that the Commission order BC Hydro to formally acknowledge their exhibit and to respond to their Information Request2004/12/23 06:12:00 PM2004/12/23
C39-4 Letter dated January 7, 2005 appealing Commission Order No. G-119-042005/01/10 03:54:00 PM2005/01/10
C39-5 Letter dated January 21, 2005 regarding reply to Exhibit A-35 for reconsideration of Commission Order No. G-119-042005/01/24 02:35:00 PM2005/01/24
    

"D" Exhibits - Interested Party Documents

TitleDocument DescriptionSubmitted Date/TimeApproved Date
D-1 Letter dated November 20, 2004 from N. Moysa requesting Interested Party status2004/11/25 11:00:00 AM2004/11/25
D-2 Letter dated November 23, 2004 from Carol and Stewart Boyce requesting Interested Party status2004/11/25 11:02:00 AM2004/11/25
D-3 E-mail dated November 23, 2004 from Emily Carrington requesting Interested Party status2004/11/26 09:31:00 AM2004/11/26
D-4 E-mail dated November 22, 2004 from Roger McLaughlin requesting Interested Party status2004/11/26 09:48:00 AM2004/11/26
D-4A Email dated November 26, 2004 responding to Mr. Mike Hunter’s (MLA Nanaimo) e-mail dated November 26, 2004 (Exhibit C28-1)2004/11/26 01:45:00 PM2004/12/01
D-5 Web Registration dated November 24, 2004 from Ben Hyman requesting Interested Party status2004/11/26 01:46:00 PM2004/11/26
D-6 E-mail dated November 24, 2004 from Terrence R. Hanna requesting Interested Party status2004/11/26 02:03:00 PM2004/11/26
D-7 E-mail dated November 23, 2004 from Albert J. Reed, P.Eng., BASc, MASc, M.Eng. requesting Interested Party status2004/11/30 10:56:00 AM2004/11/30
D-8 E-mail dated November 25, 2004 from Howard Stiff requesting Interested Party status2004/11/30 10:59:00 AM2004/11/30
D-9 Letter received November 26, 2005 from Brenda Jager requesting Interested Party status2004/11/30 10:59:00 AM2004/11/30
D-10 Web Registration dated November 26, 2004 from Susanne Shaw requesting Interested Party status2004/12/02 11:35:00 AM2004/12/02
D-11 Letter received November 29, 2004 from Christy Wilson requesting Interested Party status2004/12/02 02:01:00 PM2004/12/02
D-12 E-mail dated November 26, 2004 from Diane Brown requesting Interested Party status2004/12/02 02:03:00 PM2004/12/02
D-13 E-mail dated November 26, 2004 from Nicki Westarp requesting Interested Party status2004/12/07 10:18:00 AM2004/12/07
D-14 E-mail dated November 26, 2004 from John Volkovskis requesting Interested Party status2004/12/07 10:18:00 AM2004/12/07
D-15 E-mail dated November 26, 2004 from Glenn Harris requesting Interested Party status2004/12/07 10:19:00 AM2004/12/07
D-16 E-mail dated November 26, 2004 from Judith Graham requesting Interested Party status2004/12/07 10:19:00 AM2004/12/07
D-17 E-mail dated November 26, 2004 from Neal Brown requesting Interested Party status2004/12/07 10:20:00 AM2004/12/07
D-18 E-mail dated November 26, 2004 from Jack and Joanne Schick requesting Interested Party status2004/12/07 10:20:00 AM2004/12/07
D-19 E-mail dated November 25, 2004 from Robert and Mary Jane Derksen requesting Interested Party status2004/12/07 10:21:00 AM2004/12/07
D-20 Web Registration received December 20, 2004 from Kristin Miller, Positive Energy Quilters requesting Interested Party status2004/12/22 04:05:00 PM2004/12/22
D-21 Letter dated December 16, 2004 from Betsy Nuse requesting Interested Party status2005/01/07 09:53:00 AM2005/01/07
D-22 Web Registration received December 22, 2004 from Don Skerik requesting Interested Party status2005/01/10 08:42:00 AM2005/01/10
D-23 Web Registration received January 10, 2005 from Miriam Trevis requesting Interested Party status2005/01/13 12:31:00 PM2005/01/13
D-24 Web Registration received January 10, 2005 from Cori Lynn Carlson, Greater Nanaimo Chamber of Commerce, requesting Interested Party status2005/01/13 12:32:00 PM2005/01/13
D-25 Web Registration received January 12, 2005 from Geza Vamos requesting Interested Party status2005/01/13 12:36:00 PM2005/01/13
    

"E" Exhibits - Letters of Comment

TitleDocument DescriptionSubmitted Date/TimeApproved Date
E-1 Form Letter of Comment #1 from the following: • Victor Villeneuve • Barbara LeBrasseur • Jurgen Goering2004/11/25 08:01:00 AM2004/11/25
E-2 Form Letter of Comment #2 received from the following: • John and Betty Frame • L. Pruthman • K. Kozlowski • Michelle Mcculloch • Marguerite Frame • Mildred Hofmann • M. Stevens • Valerie Varn • Union Bay Resident • Gordon Hodges • Diane Frame • Jeri-Lynn Davies • Sharon Gussey • Colleen Robson • Donald Robson • C. Sellers • Rob Watt 2004/11/25 08:02:00 AM2004/11/25
E-3 Form Letter of Comment #3 received from the following: • K. Lange • Brian Pitt • A. Guss • McPherson • Gord Guss • Richard Calen • K.M. Young • S. Rose • Pat Buzet 2004/11/25 08:05:00 AM2004/11/25
E-4 Form Letter of Comment #4 received from the following: • Ted Pinlait • Jim Penilott • Chelsey Penilott • Trudy Annand • Ina Thornton • Bryce Mann • Brendan Mann • Tim Wood • Chantal Smith • Kyla Marie • Bill Coyne • Terry Reeve • Monica Prosser • Wily Tochinski 2004/11/25 08:06:00 AM2004/11/25
E-5 Letter of Comment dated November 9, 2004 from Arlene Fehr2004/11/25 08:06:00 AM2004/11/25
E-6 Letter of Comment dated November 9, 2004 from Trudy Annand2004/11/25 08:07:00 AM2004/11/25
E-7 Letter of Comment received November 12, 2004 from Kathy Peace2004/11/25 08:08:00 AM2004/11/25
E-8 Letter of Comment received November 15, 2004 from John Rozen, The Ridge Neighbourhood Pub2004/11/25 08:08:00 AM2004/11/25
E-9 Letter of Comment dated November 15, 2004 from Wayne Bergquist2004/11/25 08:09:00 AM2004/11/25
E-10 Letter of Comment received November 15, 2004 from a Gold River Resident2004/11/25 08:09:00 AM2004/11/25
E-11 Letter of Comment dated November 19, 2004 from Valerie Walsh2004/11/25 08:10:00 AM2004/11/25
E-12 Letter of Comment dated November 19, 2004 from the Royal Canadian Legion (Branch 270) Gold River2004/11/25 08:10:00 AM2004/11/25
E-13 Letter of Comment dated November 6, 2004 from Mary Rose Letter of Comment dated November 25, 2004 from Mary Rose 2004/11/25 08:11:00 AM2004/11/25
E-14 Letter of Comment dated November 17, 2004 from Kristin Miller Letter of Comment No. 2 dated January 10, 2005 and CD from Kristin Miller – note that as the CD is a Powerpoint Presentation from The Positive Energy Quilts and cannot be posted to our website, a copy will be made available for viewing in the Resource Room at the Hearing 2004/11/25 08:12:00 AM2004/11/25
E-15 Letter of Comment received November 19, 2004 from John Ebell2004/11/25 08:13:00 AM2004/11/25
E-16 Form Letter of Comment received November 15, 2004 from the following: • Kelly Ballard • Craig Anderson 2004/11/25 08:14:00 AM2004/11/25
E-17 Letter of Comment received November 10, 2004 from Brian D. Tutty2004/11/25 08:14:00 AM2004/11/25
E-18 Letter of Comment received November 15, 2004 from Alison M. Pringle2004/11/25 10:25:00 AM2004/11/25
E-19 Letter of Comment received November 15, 2004 from Robert Cooper2004/11/25 10:26:00 AM2004/11/25
E-20 Letter of Comment dated November 16, 2004 from Ian Cuthbert2004/11/25 10:27:00 AM2004/11/25
E-21 Letter of Comment dated November 19, 2004 from Liz Fox2004/11/25 10:28:00 AM2004/11/25
E-22 Letter of Comment dated November 21, 2004 from Elizabeth Lorenz2004/11/25 10:30:00 AM2004/11/25
E-23 Letter of Comment dated November 22, 2004 from Valerie Hennell2004/11/25 10:31:00 AM2004/11/25
E-24 Letter of Comment dated November 22, 2004 from Trish Moon2004/11/25 10:31:00 AM2004/11/25
E-25 Letter of Comment dated November 22, 2004 from Terrence R. Hanna2004/11/25 10:35:00 AM2004/11/25
E-26 Letter of Comment dated November 23, 2004 from the Nanaimo Citizen’s Organizing Committee (Cathy Booler)2004/11/25 10:38:00 AM2004/11/25
E-27 Letter of Comment dated November 23, 2004 from the Georgia Strait Alliance (Christianne Wilhelmson)2004/11/25 10:38:00 AM2004/11/25
E-28 Letter of Comment dated November 23, 2004 from Hans Kratz, Chair, Parksville/Qualicum KAIROS2004/11/25 10:39:00 AM2004/11/25
E-29 Letter of Comment dated November 23, 2004 from Ken Capon2004/11/25 10:39:00 AM2004/11/25
E-30 Letter of Comment dated November 23, 3004 from Johan de Vaal, P. Eng.2004/11/25 10:40:00 AM2004/11/25
E-31 Letter of Comment dated November 23, 2004 from Jack Moss Letter of Comment dated December 17, 2004 from Jack Moss 2004/11/25 10:42:00 AM2004/11/25
E-32 Letter of Comment dated November 23, 2004 from Jacinthe B. Eastick2004/11/25 10:42:00 AM2004/11/25
E-33 Letter of Comment dated November 23, 2004 from Muriel Boulton2004/11/25 10:42:00 AM2004/11/25
E-34 Letter of Comment dated November 23, 2004 from Donalda2004/11/25 10:47:00 AM2004/11/25
E-35 Letter of Comment dated November 23, 2004 from Brenda Purcell2004/11/25 10:47:00 AM2004/11/25
E-36 Letter of Comment dated November 23, 2004 from John Gambrill2004/11/25 10:48:00 AM2004/11/25
E-37 Letter of Comment dated November 23, 2004 from Dianne Ackerman2004/11/25 10:48:00 AM2004/11/25
E-38 Letter of Comment dated November 23, 2004 from Chris Bowers2004/11/25 10:49:00 AM2004/11/25
E-39 Letter of Comment dated November 23, 2004 from Wayne Schneider2004/11/25 10:49:00 AM2004/11/25
E-40 Letter of Comment dated November 23, 2004 from Joan Greaves2004/11/25 10:50:00 AM2004/11/25
E-41 Letter of Comment dated November 23, 2004 from Hans van Kessel2004/11/25 10:50:00 AM2004/11/25
E-42 Letter of Comment dated November 23, 2004 from Oscar Reeves2004/11/25 10:51:00 AM2004/11/25
E-43 Letter of Comment dated November 23, 2004 from Earl St. Denis, Ph.D. P.Eng., Pearse Western Consultants Ltd.2004/11/25 10:51:00 AM2004/11/25
E-44 Letter of Comment dated November 23, 2004 from Emily Carrington2004/11/25 10:52:00 AM2004/11/25
E-45 Letter of Comment dated November 23, 2004 from Fred Apstein2004/11/25 10:52:00 AM2004/11/25
E-46 Letter of Comment dated November 22, 2004 from A.D. Fisher Letter of Comment dated December 16, 2004 from A.D. Fisher regarding BC Hydro’s December 14, 2004 letter (Exhibit B-8) 2004/11/25 03:58:00 PM2004/11/25
E-47 Letter of Comment dated November 24, 2004 from Pamela Ponic, Ph.D (C)2004/11/25 03:58:00 PM2004/11/25
E-48 Letter of Comment dated November 24, 2004 from Dawn & Joe Burnett2004/11/25 03:59:00 PM2004/11/25
E-49 Letter of Comment dated November 24, 2004 from Paul Grignon2004/11/25 03:59:00 PM2004/11/25
E-50 Letter of Comment dated November 16, 2004 from Kathy Peace2004/11/25 04:00:00 PM2004/11/25
E-51 Letter of Comment dated November 23, 2004 from Alan Wilson, Editor, WaveLength Magazine2004/11/25 04:01:00 PM2004/11/25
E-52 Letters of Comment dated November 23 and 25, 2004 from Ben Hyman2004/11/25 04:01:00 PM2004/11/25
E-53 Letter of Comment dated November 23, 2004 from Lynette Van Der Schoot2004/11/25 04:02:00 PM2004/11/25
E-54 Letter of Comment dated November 23, 2004 from Darlene Mace2004/11/25 04:02:00 PM2004/11/25
E-55 Letter of Comment dated November 23, 2004 from Bob Bossin2004/11/26 01:54:00 PM2004/11/26
E-56 Letter of Comment dated November 24, 2004 from Ian Talbot2004/11/26 01:55:00 PM2004/11/26
E-57 Letter of Comment dated November 24, 2004 from Patricia Knowles2004/11/26 01:55:00 PM2004/11/26
E-58 Letter of Comment dated November 24, 2004 from John McKay2004/11/26 01:56:00 PM2004/11/26
E-59 Letter of Comment dated November 23, 2004 from Roger Middleton2004/11/29 11:29:00 AM2004/11/29
E-60 Letter of Comment dated November 23, 2004 from Susan Sharp and George A. (Tony) Sharp2004/11/29 11:29:00 AM2004/11/29
E-61 Letter of Comment dated November 23, 2004 from Jennifer Nash2004/11/29 11:30:00 AM2004/11/29
E-62 Letter of Comment dated November 25, 2004 from François Cormier2004/11/29 11:30:00 AM2004/11/29
E-63 Letter of Comment dated November 25, 2004 from Geoff Yendole2004/11/29 11:31:00 AM2004/11/29
E-64 E-mail dated November 30, 2004 from Art Lee supporting the proposed project2004/12/02 02:05:00 PM2004/12/02
E-65 Letter of Comment dated November 28, 2004 from Mary Gillis2004/12/02 02:05:00 PM2004/12/02
E-66 Letter of Comment dated November 30, 2004 from Sue Wheeler2004/12/02 02:06:00 PM2004/12/02
E-67 Letter of Comment dated December 1, 2004 from Janice Lee Power2004/12/02 02:06:00 PM2004/12/02
E-68 November 29, 2004 response to Arlene Fehr from Premier Gordon Campbell2004/12/06 02:51:00 PM2004/12/06
E-69 November 29, 2004 response to Kathy Pearce from Premier Gordon Campbell2004/12/06 02:52:00 PM2004/12/06
E-70 Letter of Comment dated November 26, 2004 from Janice Johnson and Z. Dmytruk2004/12/06 02:52:00 PM2004/12/06
E-71 Letter of Comment dated November 25, 2004 from Constance Neaga Letter of Comment#2 dated November 26, 2004 from Constance Neaga 2004/12/06 02:53:00 PM2004/12/06
E-72 Letter of Comment dated November 25, 2004 from Odette Laramee2004/12/06 02:54:00 PM2004/12/06
E-73 Letter of Comment dated November 25, 2004 from Tim Gambrill2004/12/06 02:54:00 PM2004/12/06
E-74 Letter of Comment dated November 25, 2004 from Linnet Kartar2004/12/06 02:55:00 PM2004/12/06
E-75 Letter of Comment dated November 26, 2004 from Terry, Bob and Jeremy Tolmie2004/12/06 02:56:00 PM2004/12/06
E-76 Letter of Comment dated November 25, 2004 from Shirley Petersen2004/12/06 02:56:00 PM2004/12/06
E-77 Letter of Comment dated November 26, 2004 from Judith Roux Letter of Comment No. 2 dated January 14, 2005 from Judith Roux 2004/12/06 02:57:00 PM2004/12/06
E-78 Letter of Comment dated December 13, 2004 from Tamara Cowan & Kevin Smith2004/12/06 02:58:00 PM2004/12/06
E-79 Letter of Comment dated November 26, 2004 from Jacquie Howardson2004/12/06 02:59:00 PM2004/12/06
E-80 Letter of Comment dated November 26, 2004 from Kim LeDuc2004/12/06 02:59:00 PM2004/12/06
E-81 Letter of Comment dated November 26, 2004 from Susan McManus2004/12/06 03:00:00 PM2004/12/06
E-82 Letter of Comment dated November 22, 2004 from Rick Scott2004/12/06 03:01:00 PM2004/12/06
E-83 Letter of Comment received November 26, 2004 from Maya Carson2004/12/06 03:09:00 PM2004/12/06
E-84 Letter of Comment dated November 25, 2004 from Randy Ravel2004/12/06 03:10:00 PM2004/12/06
E-85 Letter of Comment dated November 20, 2004 from Dr. G.F. Hartman2004/12/07 10:51:00 AM2004/12/07
E-86 Letter of Comment received November 25, 2004 from Ann and Peter Kloosterboer2004/12/07 10:53:00 AM2004/12/07
E-87 Form Letter of Comment dated November 9, 2004 from the following: • Lee Smith • Phin Last • Alex Gineth • Marion Last • Angela Smith • Roslyn Yateman • Kodi Hutchinson • Miranda Last • Chris Hutchinson • Gold River Resident2004/12/09 01:33:00 PM2004/12/09
E-88 Form Letter of Comment dated November 24, 2004 from the following: • Joanne Martel • John Pepau • Shaina Pepau • Merissa Pepau • Branden Pepau • Cheryl Riddell • Doug Knowliss • Julie Wilson • Reily Wilson • Melissa Wilson • Grant Foster • Larry Rose • Nicole Baron • Robert Baron • Corrie Baron • Emily Woodruff • Patricia McDougall • Jane M. Lum • William Coyne • Janet Coyne • Carol Young • Phillip Loni • Anita Rose • Bonnie Wheatley • D. Goernert • Sandra Rose • Barrie McLennan • Todd Gedlaman • Grace Walker • Brooke White • Herman White • Linda Hooper • Chris Kuhn • Pat Cruickshank • Bonnie Beggs • Joanne White • John Rozek • Larry Rose • Harry Curts • Lori Wilson • Alex Gueth • Tim Woods • Brendan Mann • Bryce Mann • Patrick Baron • Laura Baron • V. Cruickshank • Donna Gedlaman • Judy McLean • William Woodruff • Allan Woodruff • Sharon Chomeczko • Logan Rose • Taylor Rose • Carli Rose • Sydni Rose • T. Robertson • Craig St2004/12/09 01:42:00 PM2004/12/09
E-89 Letter of Comment received December 8, 2004 from Jesse Hohert2004/12/09 01:47:00 PM2004/12/09
E-90 Letter of Comment received December 6, 2004 from John G. Smith2004/12/09 01:48:00 PM2004/12/09
E-91 Letter of Comment dated December 6, 2004 from Ria Bos2004/12/14 11:06:00 AM2004/12/14
E-92 Letter of Comment dated December 10, 2004 from Marion Waters2004/12/14 11:07:00 AM2004/12/14
E-93 December 10, 2004 response to Craig Anderson from the Honourable Richard Neufeld2004/12/14 11:07:00 AM2004/12/14
E-94 Letter of Comment dated December 9, 2004 from Mayor Lynn D. Nash, District of Campbell River2004/12/16 08:59:00 AM2004/12/16
E-95 Petition entitled “Duke Point Power: A Public Petition for a Procedural Conference in Nanaimo” received December 20, 20042004/12/24 01:37:00 PM2004/12/24
E-96 Letter of Comment dated December 9, 2004 from Mayor Gerry Furney, Town of Port McNeill Letter of Comment No. 2 dated January 5, 2005 from Mayor Gerry Furney, Town of Port McNeill Letter of Comment No. 3 dated March 24, 2004 to Pristine Power Inc. from Mayor Gerry Furney, Town of Port McNeill 2004/12/24 01:38:00 PM2004/12/24
E-97 Letter of Comment dated December 29, 2004 from John Volkovskis Letter of Comment No. 2 dated December 29, 2004 from John Volkovskis Letter of Comment No. 3 dated December 30, 2004 from John Volkovskis Letter of Comment No. 4 dated January 13, 2004 from John Volkovskis 2004/12/29 03:43:00 PM2004/12/29
E-98 Letter of Comment dated December 19, 2004 from Kathleen Woodley2004/12/29 06:17:00 PM2004/12/29
E-99 Letter of Comment dated December 31, 2004 from Jorden Leighton2005/01/07 10:50:00 AM2005/01/07
E-100 Letter of Comment dated January 1, 2005 from Hendrik de Pagter and Jennifer Sagar2005/01/07 10:50:00 AM2005/01/07
E-101 Letter of Comment dated January 1, 2005 from John Alton2005/01/07 10:51:00 AM2005/01/07
E-102 Letter of Comment dated January 1, 2005 from Eileen deVerteuil2005/01/07 10:52:00 AM2005/01/07
E-103 Letter of Comment dated January 2, 2005 from Michael Mundhenk2005/01/07 10:53:00 AM2005/01/07
E-104 Letter of Comment dated January 2, 2005 from John Scull2005/01/07 10:53:00 AM2005/01/07
E-105 Letter of Comment dated January 2, 2005 from Lee Larkin2005/01/07 10:54:00 AM2005/01/07
E-106 Letter of Comment dated January 2, 2005 from Alan Merson2005/01/07 10:54:00 AM2005/01/07
E-107 Letter of Comment dated January 3, 2005 from Frances Hill2005/01/07 10:55:00 AM2005/01/07
E-108 Letter of Comment dated January 3, 2005 from Glenn Buchanan2005/01/07 10:55:00 AM2005/01/07
E-109 Letter of Comment dated January 3, 2005 from Jennifer Nash2005/01/07 10:56:00 AM2005/01/07
E-110 Letter of Comment dated January 3, 2005 from John Bowers2005/01/07 10:56:00 AM2005/01/07
E-111 Letter of Comment dated January 3, 2005 from Ray Myrtle2005/01/07 10:57:00 AM2005/01/07
E-112 Letter of Comment dated January 3, 2005 from Beth Dunlop2005/01/07 10:57:00 AM2005/01/07
E-113 Letter of Comment dated January 4, 2005 from A concerned citizen, Roo2005/01/07 10:58:00 AM2005/01/07
E-114 Letter of Comment dated January 4, 2005 from Michael Crouteau2005/01/07 10:58:00 AM2005/01/07
E-115 Letter of Comment dated January 4, 2005 from Susan Gage2005/01/07 10:59:00 AM2005/01/07
E-116 Letter of Comment dated January 5, 2005 from Marcia Stewart2005/01/07 10:59:00 AM2005/01/07
E-117 Letter of Comment dated January 5, 2005 Tania Harrington2005/01/07 11:00:00 AM2005/01/07
E-118 Letter of Comment dated January 5, 2005 Richard Zwolinski2005/01/07 11:00:00 AM2005/01/07
E-119 Letter of Comment dated December 31, 2004 from Peter Spurr2005/01/07 11:01:00 AM2005/01/07
E-120 Letter of Comment dated January 5, 2005 from Donan R. Doyle2005/01/07 11:02:00 AM2005/01/07