| Title | Document Description | Submitted Date/Time | Approved Date |
|
B1-1
| (Part 1 of 2) British Columbia Transmission Corporation letter dated July 7, 2005 and Certificate of Public Convenience and Necessity Application for the Vancouver Island Transmission Reinforcement Project -
( NOTE: Due to the size of this file, Exhibit B-1 is being posted in two parts ) | 2005/07/07 01:12:00 PM | 2005/07/08 |
|
B1-1
| (part 2 of 2) | 2005/07/07 03:00:00 PM | 2005/07/08 |
|
B1-2
| Letter dated July 12, 2005 providing amendments to the July 7, 2005 CPCN application for the Vancouver Island Transmission Reinforcement Project | 2005/07/12 03:51:00 PM | 2005/07/13 |
|
B1-3
| Letter dated July 26, 2005 responding to the TRAHVOL letter of July 23, 2005 (Exhibit C3-4) | 2005/07/26 11:07:00 AM | 2005/07/26 |
|
B1-4
| Letter dated July 29, 2005 advising that BCTC will address the Salt Spring Regional District’s Transmission System Capital Plan (VITR Exhibits C2-2 and C2-3) during the VITR proceeding | 2005/08/03 03:45:00 PM | 2005/08/03 |
|
B1-5
| Letter dated August 18, 2005 to Neil Atchinson and Cecil Dunn, TRAHVOL, regarding Minister Neufeld's letter of July 29 and responding to questions raised by TRAHVOL regarding the Vancouver Island Transmission Reinforcement Project | 2005/08/22 04:04:00 PM | 2005/08/22 |
|
B1-6
| Letter dated August 29, 2005 filing Responses (Volumes 1, 2 and 3) to Commission Information Request No. 1 | 2005/08/26 04:15:00 PM | 2005/08/29 |
|
B1-6A
| Excel Spreadsheets pertaining to BCUC IR-1, Question 1.19.5 (5MB zipped file) | 2005/08/30 09:05:00 AM | 2005/08/30 |
|
B1-7
| Letter dated August 31, 2005 filing amendments to the July 7, 2005 Certificate of Public Convenience and Necessity Application for the Vancouver Island Transmission Reinforcement Project | 2005/08/31 02:59:00 PM | 2005/08/31 |
|
B1-8
| Letter dated September 13, 2005 response regarding proposed inspection | 2005/09/13 11:00:00 AM | 2005/09/13 |
|
B1-9
| Response dated September 22, 2005 regarding Karsten Holmsen’s late Information Request | 2005/09/22 11:52:00 AM | 2005/09/22 |
|
B1-10
| Letter dated September 27, 2005 unable to file IR Responses today | 2005/09/27 09:08:00 AM | 2005/09/27 |
|
B1-11
| Letter dated September 27, 2005 – Partial set of Responses to BCUC IR No. 2 and Intervenor IR No. 1 | 2005/09/27 07:58:00 PM | 2005/09/28 |
|
B1-12
| Letter dated September 28, 2005 – Revised response to BCUC IR No. 1.110.1 | 2005/09/28 09:34:00 AM | 2005/09/28 |
|
B1-13
| Letter dated September 28, 2005 – Revised Tables in IR’s | 2005/09/28 12:06:00 PM | 2005/09/28 |
|
B1-14
| Letter dated September 30, 2005 – Information Request Extension Clarification | 2005/09/30 03:16:00 PM | 2005/09/30 |
|
B1-15
| E-mail dated October 4, 2005 to Karsten Holmsen regarding the distribution of the IR-2 resonses | 2005/10/05 11:52:00 AM | 2005/10/05 |
|
B1-16
| Letter dated October 7, 2005 responding to Exhibits A-6, A-11 and B-15 | 2005/10/07 02:16:00 PM | 2005/10/12 |
|
B1-17
| Letter dated October 11, 2005 filing second installment of Information Responses to Commission IR-2 and Intervenor IRs-1 | 2005/10/12 11:10:00 AM | 2005/10/12 |
|
B1-18
| Letter dated October 14, 2005 filing the final installment of Information Responses to Commission IR-2 and Intervenor IRs-1 | 2005/10/14 04:55:00 PM | 2005/10/16 |
|
B1-19
| Letter dated October 21, 2005 filing responses to Late Information Requests from Maureen Broadfoot; Glen Page; and Karsten Holmsen | 2005/10/24 03:58:00 PM | 2005/10/24 |
|
B1-20
| Letter dated October 26, 2005 – Information Request to Corporation of the City of Delta | 2005/10/27 10:22:00 AM | 2005/10/27 |
|
B1-21
| Letter dated October 26, 2005 – Information Request to IRAHVOL | 2005/10/27 10:24:00 AM | 2005/10/27 |
|
B1-22
| Letter dated October 26, 2005 – Information Request to Karsten Holmsen | 2005/10/27 10:28:00 AM | 2005/10/27 |
|
B1-23
| Letter dated October 26, 2005 – Information Request to Pam Sutherland | 2005/10/27 10:31:00 AM | 2005/10/27 |
|
B1-24
| Letter dated October 26, 2005 – Information Request to SDSSPAC | 2005/10/27 10:33:00 AM | 2005/10/27 |
|
B1-25
| Letter dated October 26, 2005 – Information Request to Maracaibo Estates Ltd. | 2005/10/27 10:48:00 AM | 2005/10/27 |
|
B1-26
| Letter dated October 26, 2005 – Information Request to TRAHVOL | 2005/10/27 07:53:00 PM | 2005/10/27 |
|
B1-27
| Letter dated October 26, 2005 – Information Request to Sea Breeze | 2005/10/27 07:57:00 PM | 2005/10/27 |
|
B1-28
| Letter dated October 26, 2005 – Information Request to J. Truscott | 2005/10/27 07:58:00 PM | 2005/10/27 |
|
B1-29
| Letter dated October 26, 2005 – Information Request to Islands Trust | 2005/10/28 03:43:00 PM | 2005/10/28 |
|
B1-30
| Letter dated November 8, 2005 – Amendment to Application | 2005/11/08 01:02:00 PM | 2005/11/08 |
|
B1-31
| Letter dated November 15, 2005 – Response to Hul’qumi’num Treaty Group Information Request | 2005/11/17 12:10:00 PM | 2005/11/17 |
|
B1-32
| BRITISH COLUMBIA TRANSMISSION CORPORATION – Letter dated October 18, 2005 requesting Intervenor Status ~ Previously C9-1 in Sea Breeze VIC proceeding
| 2005/11/21 12:42:00 PM | 2005/11/21 |
|
B1-33
| Information Request No. 1 dated November 18, 2005 to Sea Breeze regarding the Vancouver Island Cable Project | 2005/11/21 12:43:00 PM | 2005/11/21 |
|
B1-34
| Revised Information Request Questions 45 & 46 dated November 21, 2005 to Sea Breeze regarding the Vancouver Island Cable Project | 2005/11/21 03:26:00 PM | 2005/11/21 |
|
B1-35
| Facsimile dated December 9, 2005 – Regarding filing of Intervenor Evidence | 2005/12/09 04:16:00 PM | 2005/12/09 |
|
B1-36
| Letter dated December 15, 2005 requesting a further extension to the filing of Intervenor Evidence | 2005/12/15 10:34:00 AM | 2005/12/15 |
|
B1-37
| Letter dated December 16, 2005 filing a report on the potential effect on property values of the VITR Project prepared by Larry Dybvig of Grover, Elliot & Co. Ltd. and the response of Dr. Linda Erdreich of Exponent to the evidence of Dr. Havas on the health effects associated with electromagnetic fields | 2005/12/16 04:45:00 PM | 2005/12/16 |
|
B1-38
| Letter dated December 20, 2005 commenting on the draft revised proceeding timetable | 2005/12/20 12:54:00 PM | 2005/12/20 |
|
B1-39
| Letter dated December 21, 2005 filing BCTC’s Intervenor Evidence regarding Sea Breeze’s VIC | 2005/12/21 07:28:00 PM | 2005/12/22 |
|
B1-40
| Letter dated January 3, 2006 filing supporting documentation to the Rebuttal Evidence of Linda Erdreich contained in Exhibit B1-37 (11.3 MB zipped files) | 2006/01/04 12:05:00 PM | 2006/01/04 |
|
B1-41
| Information Request No. 1 to the City of White Rock dated January 9, 2006 regarding the VIC | 2006/01/09 04:46:00 PM | 2006/01/10 |
|
B1-42
| Letter dated January 10, 2006 from the Environmental Assessment Office (on behalf of BCTC) filing a copy of the environmental assessment procedural order for the VITR project | 2006/01/11 03:24:00 PM | 2006/01/11 |
|
B1-43
| Letter dated January 18, 2006 from Marcel Reghelini filing BCTC’s witness panels | 2006/01/18 02:08:00 PM | 2006/01/19 |
|
B1-44
| Letter dated January 23, 2006 filing partial responses to information requests on Exhibit B1-39 (BCTC Intervenor Evidence on VIC) | 2006/01/23 06:46:00 PM | 2006/01/24 |
|
B1-45
| Letter dated January 24, 2006 responding to Maureen Broadfoot’s concerns regarding the project description document on BCTC’s website | 2006/01/25 10:45:00 AM | 2006/01/25 |
|
B1-46
| Letter dated January 26, 2006 responding to Karsten Holmsen’s request and BCTC’s decision that Mr. Gallagher will not appear as a witness | 2006/01/25 11:33:00 PM | 2006/01/26 |
|
B1-47
| Letter dated January 25, 2006 filing remainder of responses to information requests on Exhibit B1-39 (BCTC Intervenor Evidence on VIC) - Part 2 | 2006/01/26 08:28:00 AM | 2006/01/26 |
|
B1-48
| Letter dated January 26, 2006 advising that the EMF Witness Panel may not be able to proceed until later in the hearing due to the availability of Mr. Dybvig and Mr. Havas | 2006/01/26 03:36:00 PM | 2006/01/27 |
|
B1-49
| Letter dated January 29, 2006 filing remainder of responses to Information Requests on Exhibit B1-39 (BCTC Intervenor Evidence on VIC) – Part 3 | 2006/01/29 03:49:00 PM | 2006/01/31 |
|
B1-50
| Opening Statement of Mr. Carpenter. Document submitted at the Opening Oral Hearing. | 2006/01/31 11:34:00 AM | 2006/01/31 |
|
B1-51
| Letter dated January 27, 2006 responding to Karsten Holmsen’s request and BCTC’s decision that Ms. Peverett will not appear as a witness | 2006/01/31 11:35:00 AM | 2006/01/31 |
|
B1-52
| Letter dated January 31, 2006 filing BCTC’s Information Request to Karsten Holmsen’s regarding Exhibit C1-25 | 2006/01/31 11:55:00 AM | 2006/01/31 |
|
B1-53
| Letter dated February 1, 2006 filing BCTC’s consolidated issues list presented to the Commission Panel on February 1, 2006 | 2006/02/01 02:21:00 PM | 2006/02/02 |
|
B1-54
| Letter dated February 1, 2006 response to BCUC Information Request No. 4 plus a guideline that identifies the Exhibit in which each of the BCTC IR’s responses was filed | 2006/02/01 11:45:00 PM | 2006/02/02 |
|
B1-55
| Letter dated February 3, 2006 with Witness Panel Qualifications with correction to titles of witnesses attached re: Exhibit B1-43 | 2006/02/03 12:50:00 PM | 2006/02/03 |
|
B1-56
| Letter dated February 3, 2006 filing revisions to the following BCUC and Sea Breeze Information Responses
• BCUC IR 1.3.7
• BCUC IR 1.36.1
• BCUC IR 1.91.1
• BCUC IR 3.178.5
• BCUC IR 3.181.4
• BCUC IR 3.184.3
• BCUC IR 3.191.1
• Sea Breeze IR 2.4.1
• Sea Breeze IR 2.13.2
• Sea Breeze IR 2.65.1
| 2006/02/03 05:07:00 PM | 2006/02/04 |
|
B1-57
| British Columbia Transmission Corporation filing of Archaeological Assessments, Test Hole Data, and Transcript of Tsawwassen Information Session, dated February 6, 2006 | 2006/02/03 05:07:00 PM | 2006/02/15 |
|
B1-58
| Direct Evidence of Don Gamble | 2006/02/14 08:54:00 AM | 2006/02/15 |
|
B1-59
| Group of Revised Information Requests | 2006/02/14 08:54:00 AM | 2006/02/15 |
|
B1-60
| Response to Undertaking at Transcript Volume 8, Page 1162 Line 24 to Page 1163 Line 9 | 2006/02/14 08:55:00 AM | 2006/02/15 |
|
B1-61
| Response to BCUC’s Information Request No. 5.205.1, 5.205.2, 5.205.3 and 6.206.0 | 2006/02/14 12:35:00 PM | 2006/02/15 |
|
B1-62
| Transcript Errata for the Community Information Session on Tuesday, May 31, 2005 | 2006/02/14 01:06:00 PM | 2006/02/15 |
|
B1-63
| “Vancouver Island 230 KV Transmission Reinforcement Project, Hwy #17 to English Bluff Area Restoration Cost Assessment” | 2006/02/15 02:04:00 PM | 2006/03/01 |
|
B1-64
| “VITR Incentive / Penalty Mechanism” | 2006/02/15 06:31:00 PM | 2006/02/16 |
|
B1-65
| Expected Energy Not Served (EENS) Study For Vancouver Island Transmission Reinforcement Project (Part IV) - Dated January 9, 2006 | 2006/02/15 06:32:00 PM | 2006/02/16 |
|
B1-66
| Revised “Non-Natural Marine Hazards Assessment – February 14, 2006 | 2006/02/15 06:33:00 PM | 2006/02/16 |
|
B1-67
| Submission at Public Hearing - Vancouver Island Transmission Reinforcement (VITR) Project, Comparison of Suggested Route Alternatives at Tsawwassen – Revised February 14, 2006 | 2006/02/22 02:06:00 PM | 2006/02/23 |
|
B1-68
| Submission at Public Hearing - “Non-Financial Ranking of Project Alternatives – Tsawwassen” BCUC Information Request 4.204.0, Revised Response Issued February 15, 2006 | 2006/02/22 02:10:00 PM | 2006/02/23 |
|
B1-69
| Submission at Public Hearing – Undertaking of Mr. Barrett, BCTC to Mr. Austin, IRAHVOL | 2006/02/22 02:10:00 PM | 2006/02/24 |
|
B1-70
| Submission at Public Hearing – Memorandum from Christopher Bystrom of Fasken Martineau | 2006/02/22 02:11:00 PM | 2006/02/24 |
|
B1-71
| Submission at Public Hearing – Response to Information Request, Volume 17, Pages 2895-2896 and 2898-2899 | 2006/02/22 02:11:00 PM | 2006/02/24 |
|
B1-72
| Submission at Public Hearing – VI Transmission Reinforcement Project team organization chart | 2006/02/22 02:15:00 PM | 2006/02/24 |
|
B1-73
| Submission at Public Hearing – Undertaking of Mr. Dunne, BCTC to Mr. Holmsen | 2006/02/22 06:01:00 PM | 2006/02/24 |
|
B1-74
| Submission at Public Hearing – Undertaking of Mr. MacPhail, BCTC, to Mr. Landy, Sea Breeze | 2006/02/22 06:02:00 PM | 2006/02/24 |
|
B1-74A
| Submission at Public Hearing – Transcript, Vol. 18, Page 3238, Line 12 to Page 3239, Line 9 | 2006/02/22 06:02:00 PM | 2006/02/28 |
|
B1-75
| Submission at Public Hearing – Draft Report on Geotechnical Stability Assessment | 2006/02/22 06:03:00 PM | 2006/02/24 |
|
B1-76
| Submission at Public Hearing – Documents received from Mr. Carpenter | 2006/02/22 06:04:00 PM | 2006/02/24 |
|
B1-77
| Submission at Public Hearing – Graph, EMF Levels measured at ground level | 2006/02/22 06:04:00 PM | 2006/02/24 |
|
B1-78
| Submission at Public Hearing – NERC Standard | 2006/02/22 06:05:00 PM | 2006/02/24 |
|
B1-79
| Submission at Public Hearing – Revised Monte Carlo Analysis Summary Table | 2006/02/22 06:06:00 PM | 2006/02/24 |
|
B1-80
| Submission at Public Hearing – Seismic Review of Galiano Island, Parker Island and Salt Spring Island Cable Terminal Sites | 2006/02/22 06:09:00 PM | 2006/02/24 |
|
B1-81
| Submission at Public Hearing – Official Community Plan of Salt Spring Island | 2006/02/24 03:50:00 PM | 2006/02/28 |
|
B1-82
| Submission at Public Hearing – Group of documents from the Corporation of Delta | 2006/02/27 11:56:00 AM | 2006/02/28 |
|
B1-83
| Submission at Public Hearing – Undertaking of BCTC to Ms. Kudzin | 2006/02/27 02:50:00 PM | 2006/02/28 |
|
B1-84
| Submission at Public Hearing – Undertaking of Mr. Barrett to Mr. Arvay | 2006/02/27 02:50:00 PM | 2006/02/28 |
|
B1-85
| Submission at Public Hearing – Probability distribution in figure-related conceptual form | 2006/02/27 02:50:00 PM | 2006/02/28 |
|
B1-86
| Submission at Public Hearing – 1958 aerial photograph of Delta | 2006/02/27 02:50:00 PM | 2006/03/01 |
|
B1-89
| Submission at Public Hearing – Tsawwassen First Nation Agreement in principle | 2006/02/28 04:48:00 PM | 2006/03/01 |
|
B1-90
| Submission at Public Hearing – Corporation of Delta, Minutes of Regular Meeting of July 10, 2001 | 2006/03/01 10:22:00 AM | 2006/03/01 |
|
B1-91
| Submission at Public Hearing – Document headed “May 16, 2001 – Risk of Undersea Slides Threaten Delta’s Foreshore”, to Mayor and Council from the Environmental Advisory Committee | 2006/03/01 10:23:00 AM | 2006/03/01 |
|
B1-92
| Submission at Public Hearing – “Volume 15, No. 2, 2004, Documents of the NRPB, Advise on Limiting Exposure to Electromagnetic Fields (0-300 GHZ) | 2006/03/01 10:23:00 AM | 2006/03/01 |
|
B1-93
| Submission at Public Hearing – Printout from World Health Organization website, “Electromagnetic Fields (EMF)” | 2006/03/01 10:24:00 AM | 2006/03/01 |
|
B1-94
| Submission at Public Hearing – Response to Information Request at Volume 20, Page 3849 | 2006/03/01 10:24:00 AM | 2006/03/14 |
|
B1-95
| Submission at Public Hearing – Response to Information Request at Volume 20, Page 3634 | 2006/03/01 10:26:00 AM | 2006/03/01 |
|
B1-96
| Submission at Public Hearing – Material from TRAHVOL’s website | 2006/03/01 02:42:00 PM | 2006/03/01 |
|
B1-97
| Submission at Public Hearing – Undertaking of BCTC to Mr. Herbert, Sea Breeze | 2006/03/01 02:42:00 PM | 2006/03/01 |
|
B1-98
| Undertaking of BCTC to Commissioner Hobbs at Transcipt Volume 21, Page 3856, Lines 14 to 19 | 2006/03/03 10:38:00 AM | 2006/03/03 |
|
B1-99
| Undertaking of Mr. Barrett, BCTC to Commissioner Nicholls at Transcipt Volume 19, Page 3477. Line 22, to Page 3478, line 2 | 2006/03/03 10:39:00 AM | 2006/03/03 |
|
B1-100
| Undertaking of Mr. McPhail, BCTC to Mr. Fulton, BCUC Counsel at Transcipt Volume 19, Page 3429, Lines 10 to 17 | 2006/03/03 10:40:00 AM | 2006/03/03 |
|
B1-101
| Submission at Public Hearing – Undertaking of BCTC to Commissioner O’Hara | 2006/03/06 05:19:00 PM | 2006/03/07 |
|
B1-102
| Submission at Public Hearing – Letter from Chair of Manitoba Clean Environment Commission dated September 21, 2001 | 2006/03/06 05:19:00 PM | 2006/03/07 |
|
B1-103
| Submission at Public Hearing – National Energy Board’s Environmental Screening Report on the Sumas 2 Hearing, with the Boards’ comments on the EMF issue | 2006/03/06 05:19:00 PM | 2006/03/21 |
|
B1-104
| Submission at Public Hearing – Letter from United States Environmental Protection Agency dated January 29th, 1992 with respect to potential carcinogenicity of Electromagnetic Fields | 2006/03/06 05:20:00 PM | 2006/03/07 |
|
B1-105
| Submission at Public Hearing – Article entitled “Electromagnetic Hypersensitivity, A Systematic Review of Provocation Studies” by Dr. James Rubin and two co-authors | 2006/03/06 05:21:00 PM | 2006/03/07 |
|
B1-106
| Submission at Public Hearing – World Health Organization Fact Sheet dated December 2005, headed “Electromagnetic Fields and Public Health, Electromagnetic Hypersensitivity” | 2006/03/06 05:21:00 PM | 2006/03/07 |
|
B1-107
| Submission at Public Hearing – Study from UK Health Protection Agency Entitled “Power Frequency Electromagnetic Fields, Melatonin and the risk of Breast Cancer, Report of an Independent Advisory Group on Non-ionizing Radiation” | 2006/03/06 05:22:00 PM | 2006/03/07 |
|
B1-108
| Submission at Public Hearing – Paper entitled “Childhood Cancer in Relation to Distance from High Voltage Power Lines in England and Wales: A Case-Controlled Study” by Draper et al | 2006/03/06 06:11:00 PM | 2006/03/21 |
|
B1-109
| Submission at Public Hearing – Document entitled “Framework Guiding Public Health Policy, Options and Areas of Scientific Uncertainty Dealing with EMF”, dated June 2005 | 2006/03/06 06:12:00 PM | 2006/03/07 |
|
B1-110
| Submission at Public Hearing – Undertaking of Mr. Gabel, BCTC, to Commissioner Hobbs | 2006/03/06 06:12:00 PM | 2006/03/21 |
|
B1-111
| Submission at Public Hearing – Undertaking of Mr. Barrett, BCTC to Commissioner O’Hara | 2006/03/06 06:12:00 PM | 2006/03/21 |
|
B1-112
| Submission at Public Hearing – Undertaking of Mr. Barrett, BCTC, to Mr. Yarley, Delta | 2006/03/09 02:17:00 PM | 2006/03/10 |
|
B1-113
| Submission at Public Hearing – Spreadsheet with planning level estimates highlighted | 2006/03/09 02:17:00 PM | 2006/03/10 |
|
B1-114
| Submission at Public Hearing – Undertaking of Mr. Gabel, BCTC, to Commissioner Hobbs | 2006/03/10 04:16:00 PM | 2006/03/14 |
|
B1-115
| Submission at Public Hearing – BCTC Sea Breeze Panel 1 documents | 2006/03/10 04:16:00 PM | 2006/03/14 |
|
B1-116
| Submission at Public Hearing – Sea Breeze’s responses to NEB’s first round of Information Requests in NEB Hearing | 2006/03/10 04:17:00 PM | 2006/03/14 |
|
B1-117R
| Submission at Public Hearing – Letter from Sea Breeze to Rob Pellatt of BCTC dated November 25, 2004 | 2006/03/10 04:18:00 PM | 2006/03/14 |
|
B1-118
| Submission at Public Hearing – Sea Breeze Power Corp. News Release dated September 16, 2005 | 2006/03/10 04:19:00 PM | 2006/03/14 |
|
B1-119
| Submission at Public Hearing – Undertaking of Mr. Gabel, BCTC to Commissioner Hobbs | 2006/03/10 04:19:00 PM | 2006/03/16 |
|
B1-120
| Submission at Public Hearing – Undertaking of BCTC to Mr. Austin, IRAHVOL | 2006/03/10 04:19:00 PM | 2006/03/16 |
|
B1-121
| Submission at Public Hearing – Undertaking of Mr. Barnett, BCTC to Mr. Landy, Sea Breeze | 2006/03/10 04:19:00 PM | 2006/04/13 |
|
B1-122
| Submission at Public Hearing – BCTC Transmission Corporation Results for VITR Voltage Studies | 2006/03/15 11:20:00 AM | 2006/03/15 |
|
B1-123
| Submission at Public Hearing – Letter identifying BCTC’s Witness Panel | 2006/03/15 11:20:00 AM | 2006/03/15 |
|
B1-124
| Submission at Public Hearing – Undertaking of BCTC to Mr. Herbert, Sea Breeze | 2006/03/15 11:21:00 AM | 2006/03/15 |
|
B1-125
| Submission at Public Hearing – Undertaking of BCTC to Karsten Holmsen | 2006/03/15 11:21:00 AM | 2006/03/15 |
|
B1-126
| Submission at Public Hearing – Undertaking of BCTC to Karsten Holmsen | 2006/03/15 03:18:00 PM | 2006/03/16 |
|
B1-127
| Submission at Public Hearing – Letter from Esquimalt First Nation to National Energy Board dated March 13, 2006 | 2006/03/15 03:18:00 PM | 2006/03/16 |
|
B1-128
| Submission at Public Hearing – Letter from MacLeod Dixon dated December 20, 2002, with attached Report from Jacques Whitford & Associates | 2006/03/16 11:15:00 AM | 2006/03/17 |
|
B1-129
| Submission at Public Hearing – Figure 4A, Boomer Seismic Profiles across the southern Roberts Bank Delta Front | 2006/03/17 01:50:00 PM | 2006/03/17 |
|
B1-130
| Submission at Public Hearing – Two pages re: BC Hydro 230 KV Corridor Southern Straight of Georgia, Stage 1 Marine Geologic Hazards | 2006/03/17 01:50:00 PM | 2006/03/17 |
|
B1-131
| Submission at Public Hearing – “The Columbia River Treaty Entity Agreement, Aspects of the Delivery of the Canadian Entitlement” | 2006/03/17 04:15:00 PM | 2006/03/20 |
|
|