| Due Date | Utilities & Proceeding | Regulatory Item | Order/Letter |
| |
BC Hydro LGSRD
BC HYDRO Large General Service Rate Revision ~ Project No. 3698573
Panel: A. Rhodes
M. Harle
B.Milbourne
Lead Staff: E. Cheng
Staff: A. Richter
Hearing Location:
Date & Time:
@
Location:
,
,
| Oral Hearing, if required | G-31-10 |
| |
TGW 2010 and 2011 Revenue Requirements and Rate Application
Terasen Gas (Whistler) Inc. ~ 2010 and 2011 Revenue Requirements and Rate Design Application Project No. 3698579
Panel: Keith Anderson Panel Chair
Tony Pullman, Peter Vivian.
Lead Staff: K. Bienert
Staff:B. Brownell, S. Sue
Hearing Location:
Date & Time:
@
Location:
,
,
| TGW Written Final Submissions – All matters -To Be Determined | G-32-10 |
| |
TGW 2010 and 2011 Revenue Requirements and Rate Application
Terasen Gas (Whistler) Inc. ~ 2010 and 2011 Revenue Requirements and Rate Design Application Project No. 3698579
Panel: Keith Anderson Panel Chair
Tony Pullman, Peter Vivian.
Lead Staff: K. Bienert
Staff:B. Brownell, S. Sue
Hearing Location:
Date & Time:
@
Location:
,
,
| Intervener Written Final Submissions – All matters -To Be Determined | G-32-10 |
| |
TGW 2010 and 2011 Revenue Requirements and Rate Application
Terasen Gas (Whistler) Inc. ~ 2010 and 2011 Revenue Requirements and Rate Design Application Project No. 3698579
Panel: Keith Anderson Panel Chair
Tony Pullman, Peter Vivian.
Lead Staff: K. Bienert
Staff:B. Brownell, S. Sue
Hearing Location:
Date & Time:
@
Location:
,
,
| TGW Written Reply Submissions – All matters - To Be Determined | G-32-10 |
| 2010/03/04 |
BCTC VCCT Project CPCN
British Columbia Transmission Corporation
Application for a Certificate of Public Convenience and Necessity (CPCN)
for the Vancouver City Central Transmission Project (VCCT Project)
~ Project No. 3698571
Panel: Alison Rhodes Panel Chair,
Tony Pullman,
Liisa O’Hara
Lead Staff:Don Flintoff
Staff:Mark Thomas
Hearing Location:
Date & Time:
@
Location:
,
,
| Response to Information Requests on Intervenor Evidence | G-11-10 |
| 2010/03/04 |
BCTC F2011 Capital Plan Update
British Columbia Transmission Corporation F2011 Capital Plan Update Application ~ Project No. 3698590
Panel: D. Cote Panel Chair
L. O’Hara,
Lead Staff:
Staff:
Hearing Location:
Date & Time:
@
Location:
,
,
| BCTC Response to Commission and Intervenor Information Requests | G-9-10 |
| 2010/03/08 |
BC Hydro Reconsideration Request re BCTC TCE Complaint Decision
BC Hydro Reconsideration re BCTC-TransCanada Complaint Decision–Order No. G-103-09 and Letter L-95-09
Panel: A. Rhode Panel Chair, L. O'Hara, P. Vivian
Lead Staff: T. Roberts
Staff:
Hearing Location:
Date & Time:
@
Location:
,
,
| Reply Submissions | G-6-10 |
| 2010/03/09 |
BC Hydro Stave Falls Spillway Gates Project
BC Hydro Stave Falls Spillway Gates Replacement Project ~ Project No.3698588/Order G-7-10
Hearing Location:
Date & Time:
@
Location:
,
,
| BCUC IR No.2 and Intervenor Information Request (IR) No. 1 Submissions | G-7-10 |
| 2010/03/09 |
ICBC – Fleetplan Vehicles Tariff changes
ICBC ~ Insurance Corporation of British Columbia Application for Changes to the Universal Compulsory Automobile Insurance
for Fleetplan Vehicles
Panel:
Lead Staff: T. Roberts
Staff: D. Chong
Hearing Location:
Date & Time:
@
Location:
,
,
| Intervenor and Interested Party Registration Deadline | G-20-10 |
| 2010/03/09 |
ICBC – Fleetplan Vehicles Tariff changes
ICBC ~ Insurance Corporation of British Columbia Application for Changes to the Universal Compulsory Automobile Insurance
for Fleetplan Vehicles
Panel:
Lead Staff: T. Roberts
Staff: D. Chong
Hearing Location:
Date & Time:
@
Location:
,
,
| Participant Assistance/Cost Award Budget Submissions | G-20-10 |
| 2010/03/11 |
BCTC VCCT Project CPCN
British Columbia Transmission Corporation
Application for a Certificate of Public Convenience and Necessity (CPCN)
for the Vancouver City Central Transmission Project (VCCT Project)
~ Project No. 3698571
Panel: Alison Rhodes Panel Chair,
Tony Pullman,
Liisa O’Hara
Lead Staff:Don Flintoff
Staff:Mark Thomas
Hearing Location:
Date & Time:
@
Location:
,
,
| BCTC Response to Intervenor Information Request No. 1, and Commission Information Request No. 2 | G-11-10 |
| 2010/03/11 |
Birds Eye Cove CPCN RRA Tariffs
Birds Eye Cove Estates Ltd.
Certificate of Public Convenience & Necessity, Revenue Requirements and Electric Tariff
Panel:
Lead Staff: D. Flintoff
Staff:
Hearing Location:
Date & Time:
@
Location:
,
,
| Responses to Information Request No. 1 by BC Hydro | G-3-10 |
| 2010/03/11 |
TGI - Tilbury Reconsideration
Terasen Gas Inc. - March 9, 2010 Application for Variance and Reconsideration of the Certificate of Public Convenience and Necessity for the Tilbury Property Purchase
Hearing Location:
Date & Time:
@
Location:
,
,
| Intervenor Submissions on Reconsideration Application | A-1 |
| 2010/03/12 |
BCTC CVT Project CPCN
British Columbia Transmission Corporation
Application for a Certificate of Public Convenience and Necessity (CPCN)
for the Columbia Valley Transmission Project (CVT Project)
Panel: Michael Harle Panel chair,
Liisa O’Hara,
Ross Ravelli
Lead Staff: R Bishop
Staff: D Flintoff, A Richter
Hearing Location:
Date & Time:
@
Location:
,
,
| BCTC Responses to Information Request No. 1 | G-18-10 |
| 2010/03/12 |
TGI - Tilbury Reconsideration
Terasen Gas Inc. - March 9, 2010 Application for Variance and Reconsideration of the Certificate of Public Convenience and Necessity for the Tilbury Property Purchase
Hearing Location:
Date & Time:
@
Location:
,
,
| Terasen Reply to Intervenor Submissions | A-1 |
| 2010/03/15 |
FortisBC 2009 Rate Design and Cost of Service
FortisBC Inc. - 2009 Rate Design and Cost of Service ~ Project No. 3698564
Panel: Tony Pullman Panel Chair,
Liisa O’Hara, Michael Harle
Lead Staff: T. Roberts
Staff:
Hearing Location:
Date & Time:
@
Location:
,
,
| Intervenor Evidence | G-166-09 |
| 2010/03/15 |
PNGW - PNGNE Capital Structure & Equity Risk Premium
Pacific Northern Gas Ltd. (PNG-West Division) and Pacific Northern Gas (N.E.) Ltd.
(Fort St John/Dawson Creek and Tumbler Ridge Divisions), [collectively (“PNG”)] Application for Capital Structure and Equity Risk Premium ~ Project No. 3698566/
Panel: Liisa O’Hara Panel Chair,
Michael Harle
Lead Staff: E. Cheng
Staff:
Hearing Location:
Date & Time:
@
Location:
,
,
| Commission and Intervenor Information RequestsNo. 2 to PNG | G-13-10 |
| 2010/03/15 |
BCTC CVT Project CPCN
British Columbia Transmission Corporation
Application for a Certificate of Public Convenience and Necessity (CPCN)
for the Columbia Valley Transmission Project (CVT Project)
Panel: Michael Harle Panel chair,
Liisa O’Hara,
Ross Ravelli
Lead Staff: R Bishop
Staff: D Flintoff, A Richter
Hearing Location:
Date & Time:
@
Location:
,
,
| Registration of Intervenors and Interested Parties with the Commission | G-18-10 |
| 2010/03/16 |
BC Hydro Reconsideration Request re BCTC TCE Complaint Decision
BC Hydro Reconsideration re BCTC-TransCanada Complaint Decision–Order No. G-103-09 and Letter L-95-09
Panel: A. Rhode Panel Chair, L. O'Hara, P. Vivian
Lead Staff: T. Roberts
Staff:
Hearing Location:
Date & Time:
@
Location:
,
,
| Oral Argument Phase (If Required) | G-6-10 |
| 2010/03/16 |
ICBC – Fleetplan Vehicles Tariff changes
ICBC ~ Insurance Corporation of British Columbia Application for Changes to the Universal Compulsory Automobile Insurance
for Fleetplan Vehicles
Panel:
Lead Staff: T. Roberts
Staff: D. Chong
Hearing Location:
Date & Time:
@
Location:
,
,
| Commission and Intervenor Information Requests | G-20-10 |
| 2010/03/17 |
BCTC CVT Project CPCN
British Columbia Transmission Corporation
Application for a Certificate of Public Convenience and Necessity (CPCN)
for the Columbia Valley Transmission Project (CVT Project)
Panel: Michael Harle Panel chair,
Liisa O’Hara,
Ross Ravelli
Lead Staff: R Bishop
Staff: D Flintoff, A Richter
Hearing Location: Commission Hearing Room
Date & Time:
Mar 17, 2010 @
09:00 AM
Location:
Twelfth Floor, 1125 Howe Street,
Vancouver,
BC
| Procedural Conference (commencing at 9:00 a.m.) | G-18-10 |
| 2010/03/18 |
BCTC F2011 Capital Plan Update
British Columbia Transmission Corporation F2011 Capital Plan Update Application ~ Project No. 3698590
Panel: D. Cote Panel Chair
L. O’Hara,
Lead Staff:
Staff:
Hearing Location:
Date & Time:
@
Location:
,
,
| Commission and Intervenor Information Requests No. 2 | G-9-10 |
| 2010/03/19 |
BCTC VCCT Project CPCN
British Columbia Transmission Corporation
Application for a Certificate of Public Convenience and Necessity (CPCN)
for the Vancouver City Central Transmission Project (VCCT Project)
~ Project No. 3698571
Panel: Alison Rhodes Panel Chair,
Tony Pullman,
Liisa O’Hara
Lead Staff:Don Flintoff
Staff:Mark Thomas
Hearing Location:
Date & Time:
@
Location:
,
,
| Rebuttal Evidence (if required) | G-11-10 |
| 2010/03/19 |
BC Hydro LGSRD
BC HYDRO Large General Service Rate Revision ~ Project No. 3698573
Panel: A. Rhodes
M. Harle
B.Milbourne
Lead Staff: E. Cheng
Staff: A. Richter
Hearing Location:
Date & Time:
@
Location:
,
,
| Registration of intention to participate in the Negotiated Settlement Process | G-31-10 |
| 2010/03/24 |
TGW 2010 and 2011 Revenue Requirements and Rate Application
Terasen Gas (Whistler) Inc. ~ 2010 and 2011 Revenue Requirements and Rate Design Application Project No. 3698579
Panel: Keith Anderson Panel Chair
Tony Pullman, Peter Vivian.
Lead Staff: K. Bienert
Staff:B. Brownell, S. Sue
Hearing Location: Hearing Room, 12th Floor
Date & Time:
Mar 24, 2010 @
09:00 AM
Location:
1125 Howe Street,
Vancouver,
BC
| Oral Hearing Commences | G-32-10 |
| 2010/03/26 |
BCTC VCCT Project CPCN
British Columbia Transmission Corporation
Application for a Certificate of Public Convenience and Necessity (CPCN)
for the Vancouver City Central Transmission Project (VCCT Project)
~ Project No. 3698571
Panel: Alison Rhodes Panel Chair,
Tony Pullman,
Liisa O’Hara
Lead Staff:Don Flintoff
Staff:Mark Thomas
Hearing Location:
Date & Time:
@
Location:
,
,
| BCTC written Final Submissions | G-11-10 |
| 2010/03/26 |
Birds Eye Cove CPCN RRA Tariffs
Birds Eye Cove Estates Ltd.
Certificate of Public Convenience & Necessity, Revenue Requirements and Electric Tariff
Panel:
Lead Staff: D. Flintoff
Staff:
Hearing Location:
Date & Time:
@
Location:
,
,
| Responses to Information Request No. 1 by BECP | L-19-10 |
| 2010/03/29 |
BC Hydro LGSRD
BC HYDRO Large General Service Rate Revision ~ Project No. 3698573
Panel: A. Rhodes
M. Harle
B.Milbourne
Lead Staff: E. Cheng
Staff: A. Richter
Hearing Location:
Date & Time:
@
Location:
,
,
| Negotiated Settlement Process commences | G-31-10 |
| 2010/03/29 |
FortisBC 2009 Rate Design and Cost of Service
FortisBC Inc. - 2009 Rate Design and Cost of Service ~ Project No. 3698564
Panel: Tony Pullman Panel Chair,
Liisa O’Hara, Michael Harle
Lead Staff: T. Roberts
Staff:
Hearing Location:
Date & Time:
@
Location:
,
,
| Information Requests on Intervenor Evidence | G-166-09 |
| 2010/03/29 |
PNGW - PNGNE Capital Structure & Equity Risk Premium
Pacific Northern Gas Ltd. (PNG-West Division) and Pacific Northern Gas (N.E.) Ltd.
(Fort St John/Dawson Creek and Tumbler Ridge Divisions), [collectively (“PNG”)] Application for Capital Structure and Equity Risk Premium ~ Project No. 3698566/
Panel: Liisa O’Hara Panel Chair,
Michael Harle
Lead Staff: E. Cheng
Staff:
Hearing Location:
Date & Time:
@
Location:
,
,
| PNG’s Responses to Information RequestsNo. 2 | G-13-10 |
| 2010/03/29 |
BCTC F2011 Capital Plan Update
British Columbia Transmission Corporation F2011 Capital Plan Update Application ~ Project No. 3698590
Panel: D. Cote Panel Chair
L. O’Hara,
Lead Staff:
Staff:
Hearing Location:
Date & Time:
@
Location:
,
,
| BCTC Response to Commission and Intervenor Information Requests | G-9-10 |
| 2010/04/01 |
BC Hydro Stave Falls Spillway Gates Project
BC Hydro Stave Falls Spillway Gates Replacement Project ~ Project No.3698588/Order G-7-10
Hearing Location:
Date & Time:
@
Location:
,
,
| BC Hydro Response to BCUC IR No. 2 and Intervenor IR No. 1 | G-7-10 |
| 2010/04/06 |
BCTC F2011 Capital Plan Update
British Columbia Transmission Corporation F2011 Capital Plan Update Application ~ Project No. 3698590
Panel: D. Cote Panel Chair
L. O’Hara,
Lead Staff:
Staff:
Hearing Location:
Date & Time:
@
Location:
,
,
| BCTC Final Submission | G-9-10 |
| 2010/04/06 |
BCTC MRS Report No. 2
BCTC Mandatory Reliability Standards Assessment Report No. 2
Staff: D. Flintoff, B. Williston
Hearing Location:
Date & Time:
@
Location:
,
,
| Written Comments of Public to Commission and BCTC | G-36-10 |
| 2010/04/08 |
BCTC VCCT Project CPCN
British Columbia Transmission Corporation
Application for a Certificate of Public Convenience and Necessity (CPCN)
for the Vancouver City Central Transmission Project (VCCT Project)
~ Project No. 3698571
Panel: Alison Rhodes Panel Chair,
Tony Pullman,
Liisa O’Hara
Lead Staff:Don Flintoff
Staff:Mark Thomas
Hearing Location:
Date & Time:
@
Location:
,
,
| Intervenors written Final Submissions | G-11-10 |
| 2010/04/08 |
PNGW - PNGNE Capital Structure & Equity Risk Premium
Pacific Northern Gas Ltd. (PNG-West Division) and Pacific Northern Gas (N.E.) Ltd.
(Fort St John/Dawson Creek and Tumbler Ridge Divisions), [collectively (“PNG”)] Application for Capital Structure and Equity Risk Premium ~ Project No. 3698566/
Panel: Liisa O’Hara Panel Chair,
Michael Harle
Lead Staff: E. Cheng
Staff:
Hearing Location:
Date & Time:
@
Location:
,
,
| Negotiated Settlement Process, if required - Thursday-Friday, April 8-9 | G-13-10 |
| 2010/04/08 |
Birds Eye Cove CPCN RRA Tariffs
Birds Eye Cove Estates Ltd.
Certificate of Public Convenience & Necessity, Revenue Requirements and Electric Tariff
Panel:
Lead Staff: D. Flintoff
Staff:
Hearing Location:
Date & Time:
@
Location:
,
,
| Commission and Intervenor Information Request No. 2 to BECP | L-19-10 |
| 2010/04/13 |
BCTC F2011 Capital Plan Update
British Columbia Transmission Corporation F2011 Capital Plan Update Application ~ Project No. 3698590
Panel: D. Cote Panel Chair
L. O’Hara,
Lead Staff:
Staff:
Hearing Location:
Date & Time:
@
Location:
,
,
| Intervenor Final Submission | G-9-10 |
| 2010/04/14 |
ICBC – Fleetplan Vehicles Tariff changes
ICBC ~ Insurance Corporation of British Columbia Application for Changes to the Universal Compulsory Automobile Insurance
for Fleetplan Vehicles
Panel:
Lead Staff: T. Roberts
Staff: D. Chong
Hearing Location:
Date & Time:
@
Location:
,
,
| ICBC Response to Commission and Intervenor Information Requests | G-20-10 |
| 2010/04/15 |
BCTC VCCT Project CPCN
British Columbia Transmission Corporation
Application for a Certificate of Public Convenience and Necessity (CPCN)
for the Vancouver City Central Transmission Project (VCCT Project)
~ Project No. 3698571
Panel: Alison Rhodes Panel Chair,
Tony Pullman,
Liisa O’Hara
Lead Staff:Don Flintoff
Staff:Mark Thomas
Hearing Location:
Date & Time:
@
Location:
,
,
| BCTC written Reply Submissions | G-11-10 |
| 2010/04/15 |
FortisBC 2009 Rate Design and Cost of Service
FortisBC Inc. - 2009 Rate Design and Cost of Service ~ Project No. 3698564
Panel: Tony Pullman Panel Chair,
Liisa O’Hara, Michael Harle
Lead Staff: T. Roberts
Staff:
Hearing Location:
Date & Time:
@
Location:
,
,
| Intervenor Responses to Information Requests | G-166-09 |
| 2010/04/15 |
BC Hydro Stave Falls Spillway Gates Project
BC Hydro Stave Falls Spillway Gates Replacement Project ~ Project No.3698588/Order G-7-10
Hearing Location:
Date & Time:
@
Location:
,
,
| BC Hydro Final Written Submission | G-7-10 |
| 2010/04/16 |
PNGW - PNGNE Capital Structure & Equity Risk Premium
Pacific Northern Gas Ltd. (PNG-West Division) and Pacific Northern Gas (N.E.) Ltd.
(Fort St John/Dawson Creek and Tumbler Ridge Divisions), [collectively (“PNG”)] Application for Capital Structure and Equity Risk Premium ~ Project No. 3698566/
Panel: Liisa O’Hara Panel Chair,
Michael Harle
Lead Staff: E. Cheng
Staff:
Hearing Location:
Date & Time:
@
Location:
,
,
| PNG Final Argument | G-13-10 |
| 2010/04/20 |
BCTC F2011 Capital Plan Update
British Columbia Transmission Corporation F2011 Capital Plan Update Application ~ Project No. 3698590
Panel: D. Cote Panel Chair
L. O’Hara,
Lead Staff:
Staff:
Hearing Location:
Date & Time:
@
Location:
,
,
| BCTC Reply Submission | G-9-10 |
| 2010/04/22 |
Birds Eye Cove CPCN RRA Tariffs
Birds Eye Cove Estates Ltd.
Certificate of Public Convenience & Necessity, Revenue Requirements and Electric Tariff
Panel:
Lead Staff: D. Flintoff
Staff:
Hearing Location:
Date & Time:
@
Location:
,
,
| Filing of Intervenor written Evidence | L-19-10 |
| 2010/04/22 |
BC Hydro Stave Falls Spillway Gates Project
BC Hydro Stave Falls Spillway Gates Replacement Project ~ Project No.3698588/Order G-7-10
Hearing Location:
Date & Time:
@
Location:
,
,
| Intervenor Final Written Submissions | G-7-10 |
| 2010/04/22 |
ICBC – Fleetplan Vehicles Tariff changes
ICBC ~ Insurance Corporation of British Columbia Application for Changes to the Universal Compulsory Automobile Insurance
for Fleetplan Vehicles
Panel:
Lead Staff: T. Roberts
Staff: D. Chong
Hearing Location:
Date & Time:
@
Location:
,
,
| Letters of Comment and Intervenor Submissions | G-20-10 |
| 2010/04/23 |
BCTC MRS Report No. 2
BCTC Mandatory Reliability Standards Assessment Report No. 2
Staff: D. Flintoff, B. Williston
Hearing Location:
Date & Time:
@
Location:
,
,
| BCTC Reply Comments | G-36-10 |
| 2010/04/26 |
PNGW - PNGNE Capital Structure & Equity Risk Premium
Pacific Northern Gas Ltd. (PNG-West Division) and Pacific Northern Gas (N.E.) Ltd.
(Fort St John/Dawson Creek and Tumbler Ridge Divisions), [collectively (“PNG”)] Application for Capital Structure and Equity Risk Premium ~ Project No. 3698566/
Panel: Liisa O’Hara Panel Chair,
Michael Harle
Lead Staff: E. Cheng
Staff:
Hearing Location:
Date & Time:
@
Location:
,
,
| Intervenor Arguments | G-13-10 |
| 2010/04/29 |
BC Hydro Stave Falls Spillway Gates Project
BC Hydro Stave Falls Spillway Gates Replacement Project ~ Project No.3698588/Order G-7-10
Hearing Location:
Date & Time:
@
Location:
,
,
| BC Hydro Written Reply Submission | G-7-10 |
| 2010/04/30 |
ICBC – Fleetplan Vehicles Tariff changes
ICBC ~ Insurance Corporation of British Columbia Application for Changes to the Universal Compulsory Automobile Insurance
for Fleetplan Vehicles
Panel:
Lead Staff: T. Roberts
Staff: D. Chong
Hearing Location:
Date & Time:
@
Location:
,
,
| ICBC Reply Submission | G-20-10 |
| 2010/05/03 |
FortisBC 2009 Rate Design and Cost of Service
FortisBC Inc. - 2009 Rate Design and Cost of Service ~ Project No. 3698564
Panel: Tony Pullman Panel Chair,
Liisa O’Hara, Michael Harle
Lead Staff: T. Roberts
Staff:
Hearing Location: Holiday Inn Express
Date & Time:
May 03, 2010 @
08:30 AM
Location:
2429 Hwy 97 North,
Kelowna,
BC
| Oral Hearing Commences | G-166-09 - G-22-10 |
| 2010/05/03 |
PNGW - PNGNE Capital Structure & Equity Risk Premium
Pacific Northern Gas Ltd. (PNG-West Division) and Pacific Northern Gas (N.E.) Ltd.
(Fort St John/Dawson Creek and Tumbler Ridge Divisions), [collectively (“PNG”)] Application for Capital Structure and Equity Risk Premium ~ Project No. 3698566/
Panel: Liisa O’Hara Panel Chair,
Michael Harle
Lead Staff: E. Cheng
Staff:
Hearing Location:
Date & Time:
@
Location:
,
,
| PNG Reply Argument | G-13-10 |
| 2010/05/06 |
Birds Eye Cove CPCN RRA Tariffs
Birds Eye Cove Estates Ltd.
Certificate of Public Convenience & Necessity, Revenue Requirements and Electric Tariff
Panel:
Lead Staff: D. Flintoff
Staff:
Hearing Location:
Date & Time:
@
Location:
,
,
| Information Requests to Intervenors | L-19-10 |
| 2010/05/07 |
BCTC MRS Report No. 2
BCTC Mandatory Reliability Standards Assessment Report No. 2
Staff: D. Flintoff, B. Williston
Hearing Location:
Date & Time:
@
Location:
,
,
| Commission Information Requests, if necessary | G-36-10 |
| 2010/05/20 |
Birds Eye Cove CPCN RRA Tariffs
Birds Eye Cove Estates Ltd.
Certificate of Public Convenience & Necessity, Revenue Requirements and Electric Tariff
Panel:
Lead Staff: D. Flintoff
Staff:
Hearing Location:
Date & Time:
@
Location:
,
,
| Intervenor Responses to Information Requests | L-19-10 |
| 2010/05/21 |
BCTC MRS Report No. 2
BCTC Mandatory Reliability Standards Assessment Report No. 2
Staff: D. Flintoff, B. Williston
Hearing Location:
Date & Time:
@
Location:
,
,
| Responses to Information Requests | G-36-10 |
| 2010/06/03 |
Birds Eye Cove CPCN RRA Tariffs
Birds Eye Cove Estates Ltd.
Certificate of Public Convenience & Necessity, Revenue Requirements and Electric Tariff
Panel:
Lead Staff: D. Flintoff
Staff:
Hearing Location:
Date & Time:
@
Location:
,
,
| Submissions by BECP and Intervenor on whether to hold a Negotiated Settlement Process | L-19-10 |
| 2010/06/10 |
Birds Eye Cove CPCN RRA Tariffs
Birds Eye Cove Estates Ltd.
Certificate of Public Convenience & Necessity, Revenue Requirements and Electric Tariff
Panel:
Lead Staff: D. Flintoff
Staff:
Hearing Location:
Date & Time:
@
Location:
,
,
| Commission Decision on holding a Negotiated Settlement Process | L-19-10 |
| 2010/06/17 |
Birds Eye Cove CPCN RRA Tariffs
Birds Eye Cove Estates Ltd.
Certificate of Public Convenience & Necessity, Revenue Requirements and Electric Tariff
Panel:
Lead Staff: D. Flintoff
Staff:
Hearing Location:
Date & Time:
@
Location:
,
,
| EITHER - Negotiated Settlement Process | L-19-10 |
| 2010/06/24 |
Birds Eye Cove CPCN RRA Tariffs
Birds Eye Cove Estates Ltd.
Certificate of Public Convenience & Necessity, Revenue Requirements and Electric Tariff
Panel:
Lead Staff: D. Flintoff
Staff:
Hearing Location:
Date & Time:
@
Location:
,
,
| OR - BECP Written Final Submission | L-19-10 |
| 2010/07/05 |
Birds Eye Cove CPCN RRA Tariffs
Birds Eye Cove Estates Ltd.
Certificate of Public Convenience & Necessity, Revenue Requirements and Electric Tariff
Panel:
Lead Staff: D. Flintoff
Staff:
Hearing Location:
Date & Time:
@
Location:
,
,
| OR - Intervenor Written Final Submissions | L-19-10 |
| 2010/07/16 |
Birds Eye Cove CPCN RRA Tariffs
Birds Eye Cove Estates Ltd.
Certificate of Public Convenience & Necessity, Revenue Requirements and Electric Tariff
Panel:
Lead Staff: D. Flintoff
Staff:
Hearing Location:
Date & Time:
@
Location:
,
,
| OR - BECP Written Reply Submission | L-19-10 |