Due DateUtilities & ProceedingRegulatory ItemOrder/Letter
2016/02/10 FortisBC Midstream Inc. Aitken Creek Storage Facility Purchase
FortisBC Midstream Inc. Application for Approval of the Acquisition of the Shares of Aitken Creek Gas Storage ULC ~ Project No.3698861

Panel Chair: N. MacMurchy

Hearing Location:
Date & Time: @
Location: , ,

Intervener Written Final SubmissionsG-210-15
2016/02/11 ICBC 2015 Revenue Requirements
Insurance Corporation of British Columbia 2015 Revenue Requirements Application ~ Project No.3698849

Panel: B. Magnan Panel Chair, I. MacPhail and H. Harowitz

Hearing Location:
Date & Time: @
Location: , ,

IRs on Intervener EvidenceG-212-15
2016/02/11 Port Alice Gas Rate Review
Port Alice Gas Inc. Rate Review Application ~ Project No.3698862

Panel: B. Magnan

Hearing Location:
Date & Time: @
Location: , ,

Commission Information Request No. 1 to Port Alice GasG-4-16
2016/02/12 BC Hydro 2015 Rate Design Application
British Columbia Hydro and Power Authority 2015 Rate Design Application ~ Project No.3698781

Panel: D. Morton Panel Chair, K. Keilty, and D. Cote

Hearing Location:
Date & Time: @
Location: , ,

BC Hydro Reply ArgumentG-12-16
2016/02/12 BC Hydro 2015 Rate Design Application
British Columbia Hydro and Power Authority 2015 Rate Design Application ~ Project No.3698781

Panel: D. Morton Panel Chair, K. Keilty, and D. Cote

Hearing Location:
Date & Time: @
Location: , ,

BC Hydro files response to outstanding IRsG-12-16
2016/02/12 FEI 2015 Price Risk Management
FortisBC Energy Inc. 2015 Price Risk Management Application Project No.3698864

Panel: D. Cote Panel Chair, D. Magnan and R. Revel

Hearing Location:
Date & Time: @
Location: , ,

Scope A and Scope B Commission Information Request (IR) No. 1G-10-16
2016/02/15 ICBC 2015 Revenue Requirements
Insurance Corporation of British Columbia 2015 Revenue Requirements Application ~ Project No.3698849

Panel: B. Magnan Panel Chair, I. MacPhail and H. Harowitz

Hearing Location:
Date & Time: @
Location: , ,

ICBC Written Final Argument - if NO INTERVENER EVIDENCEG-212-15
2016/02/16 FEI BERC Rate Methodology
FortisBC Energy Inc. Application for Approval of Biomethane Recovery Charge (BERC) Rate Methodology ~ Project No.3698850

Panel: D. Morton Panel Chair, K. Keilty and H. Harowitz

Hearing Location:
Date & Time: @
Location: , ,

Intervener Final ArgumentG-181-15;Transcript
2016/02/17 FortisBC Midstream Inc. Aitken Creek Storage Facility Purchase
FortisBC Midstream Inc. Application for Approval of the Acquisition of the Shares of Aitken Creek Gas Storage ULC ~ Project No.3698861

Panel Chair: N. MacMurchy

Hearing Location:
Date & Time: @
Location: , ,

FMI Written Reply SubmissionsG-210-15
2016/02/17 FEI 2015 Price Risk Management
FortisBC Energy Inc. 2015 Price Risk Management Application Project No.3698864

Panel: D. Cote Panel Chair, D. Magnan and R. Revel

Hearing Location:
Date & Time: @
Location: , ,

Scope A and Scope B intervener IR No. 1G-10-16
2016/02/18 ICBC 2015 Revenue Requirements
Insurance Corporation of British Columbia 2015 Revenue Requirements Application ~ Project No.3698849

Panel: B. Magnan Panel Chair, I. MacPhail and H. Harowitz

Hearing Location:
Date & Time: @
Location: , ,

Intervener Response to IRsG-212-15
2016/02/18 BC Hydro 2015 Rate Design Application
British Columbia Hydro and Power Authority 2015 Rate Design Application ~ Project No.3698781

Panel: D. Morton Panel Chair, K. Keilty, and D. Cote

Hearing Location:
Date & Time: @
Location: , ,

BC Hydro Evidentiary Update on Load Resource Balance and Long-Run Marginal CostG-12-16
2016/02/18 FEI Common Equity Component and Return on Equity for 2016
FortisBC Energy Inc. Application for Common Equity Component and Return on Equity for 2016 ~ Project No.3698852

Panel: K. Keilty Panel Chair, D. Cote and N. MacMurchy

Hearing Location:
Date & Time: @
Location: , ,

Intervener Response to IRs on EvidenceG-177-15
2016/02/18 Port Alice Gas Rate Review
Port Alice Gas Inc. Rate Review Application ~ Project No.3698862

Panel: B. Magnan

Hearing Location:
Date & Time: @
Location: , ,

Intervener Information Request No. 1 to Port Alice GasG-4-16
2016/02/19 PNG 2016-17 Revenue Requirements
Pacific Northern Gas Ltd. 2016-2017 Revenue Requirements Application ~ Project No.3698859

Panel: K. Keitly Panel Chair, H. Harowitz and R. Revel

Hearing Location:
Date & Time: @
Location: , ,

Participant Assistance/Cost Award Budget DeadlineG-13-16
2016/02/19 PNGNE 2016-17 Revenue Requirements
Pacific Northern Gas (N.E.) Fort St. John/Dawson Creek Division and Tumbler Ridge Division 2016-2017 Revenue Requirements Application ~ Project No.3698860

Panel: K. Keitly Panel Chair, H. Harowitz and R. Revel

Hearing Location:
Date & Time: @
Location: , ,

Participant Assistance / Cost Award Budget DeadlineG-14-16
2016/02/19 BC Hydro Debt Management Regulatory Account
British Columbia Hydro and Power Authority Application for Approval of the Debt Management Regulatory Account ~ Project No.3698863

Panel: D. Morton

Hearing Location:
Date & Time: @
Location: , ,

BC Hydro Written Final SubmissionG-9-16
2016/02/19 BC Hydro Debt Management Regulatory Account
British Columbia Hydro and Power Authority Application for Approval of the Debt Management Regulatory Account ~ Project No.3698863

Panel: D. Morton

Hearing Location:
Date & Time: @
Location: , ,

BC Hydro Response to Commission and Intervener Information Request No. 1G-2-16;A-5;G-9-16
2016/02/22 ICBC 2015 Revenue Requirements
Insurance Corporation of British Columbia 2015 Revenue Requirements Application ~ Project No.3698849

Panel: B. Magnan Panel Chair, I. MacPhail and H. Harowitz

Hearing Location:
Date & Time: @
Location: , ,

ICBC Notice of Rebuttal EvidenceG-212-15
2016/02/23 FEI BERC Rate Methodology
FortisBC Energy Inc. Application for Approval of Biomethane Recovery Charge (BERC) Rate Methodology ~ Project No.3698850

Panel: D. Morton Panel Chair, K. Keilty and H. Harowitz

Hearing Location:
Date & Time: @
Location: , ,

FEI ReplyG-181-15
2016/02/25 ICBC 2015 Revenue Requirements
Insurance Corporation of British Columbia 2015 Revenue Requirements Application ~ Project No.3698849

Panel: B. Magnan Panel Chair, I. MacPhail and H. Harowitz

Hearing Location:
Date & Time: @
Location: , ,

ICBC Rebuttal EvidenceG-212-15
2016/02/26 BC Hydro Debt Management Regulatory Account
British Columbia Hydro and Power Authority Application for Approval of the Debt Management Regulatory Account ~ Project No.3698863

Panel: D. Morton

Hearing Location:
Date & Time: @
Location: , ,

Intervener Written Final SubmissionsG-9-16
2016/02/29 ICBC 2015 Revenue Requirements
Insurance Corporation of British Columbia 2015 Revenue Requirements Application ~ Project No.3698849

Panel: B. Magnan Panel Chair, I. MacPhail and H. Harowitz

Hearing Location:
Date & Time: @
Location: , ,

Intervener Written Final Argument - if NO INTERVENER EVIDENCEG-212-15
2016/02/29 FEI Common Equity Component and Return on Equity for 2016
FortisBC Energy Inc. Application for Common Equity Component and Return on Equity for 2016 ~ Project No.3698852

Panel: K. Keilty Panel Chair, D. Cote and N. MacMurchy

Hearing Location:
Date & Time: @
Location: , ,

Rebuttal Evidence (if any)G-177-15
2016/02/29 PNG 2016-17 Revenue Requirements
Pacific Northern Gas Ltd. 2016-2017 Revenue Requirements Application ~ Project No.3698859

Panel: K. Keitly Panel Chair, H. Harowitz and R. Revel

Hearing Location:
Date & Time: @
Location: , ,

PNG files Updated ApplicationG-207-15
2016/02/29 PNGNE 2016-17 Revenue Requirements
Pacific Northern Gas (N.E.) Fort St. John/Dawson Creek Division and Tumbler Ridge Division 2016-2017 Revenue Requirements Application ~ Project No.3698860

Panel: K. Keitly Panel Chair, H. Harowitz and R. Revel

Hearing Location:
Date & Time: @
Location: , ,

PNG Files Updated ApplicationG-14-16
2016/03/01 FEI Common Equity Component and Return on Equity for 2016
FortisBC Energy Inc. Application for Common Equity Component and Return on Equity for 2016 ~ Project No.3698852

Panel: K. Keilty Panel Chair, D. Cote and N. MacMurchy

Hearing Location:
Date & Time: @
Location: , ,

Procedural Conference (if required)G-177-15
2016/03/03 Port Alice Gas Rate Review
Port Alice Gas Inc. Rate Review Application ~ Project No.3698862

Panel: B. Magnan

Hearing Location:
Date & Time: @
Location: , ,

Port Alice Gas Response to Commission and Intervener Information Request No. 1G-4-16
2016/03/03 FEI 2015 Price Risk Management
FortisBC Energy Inc. 2015 Price Risk Management Application Project No.3698864

Panel: D. Cote Panel Chair, D. Magnan and R. Revel

Hearing Location:
Date & Time: @
Location: , ,

Scope A and Scope B FEI responses to IR No. 1G-10-16
2016/03/04 BC Hydro Debt Management Regulatory Account
British Columbia Hydro and Power Authority Application for Approval of the Debt Management Regulatory Account ~ Project No.3698863

Panel: D. Morton

Hearing Location:
Date & Time: @
Location: , ,

BC Hydro Written Reply SubmissionG-9-16
2016/03/07 BC Hydro 2015 Rate Design Application
British Columbia Hydro and Power Authority 2015 Rate Design Application ~ Project No.3698781

Panel: D. Morton Panel Chair, K. Keilty, and D. Cote

Hearing Location:
Date & Time: @
Location: , ,

COSS Study NSP (incl. rate classes and street lighting) March 7–8G-12-16
2016/03/08 ICBC 2015 Revenue Requirements
Insurance Corporation of British Columbia 2015 Revenue Requirements Application ~ Project No.3698849

Panel: B. Magnan Panel Chair, I. MacPhail and H. Harowitz

Hearing Location:
Date & Time: @
Location: , ,

ICBC Written Reply Argument - if NO INTERVENER EVIDENCEG-212-15
2016/03/08 ICBC 2015 Revenue Requirements
Insurance Corporation of British Columbia 2015 Revenue Requirements Application ~ Project No.3698849

Panel: B. Magnan Panel Chair, I. MacPhail and H. Harowitz

Hearing Location:
Date & Time: @
Location: , ,

ICBC Written Final Argument - if INTERVENER EVIDENCEG-212-15
2016/03/08 BC Hydro 2015 Rate Design Application
British Columbia Hydro and Power Authority 2015 Rate Design Application ~ Project No.3698781

Panel: D. Morton Panel Chair, K. Keilty, and D. Cote

Hearing Location:
Date & Time: @
Location: , ,

BCUC and Intervener IR 2G-12-16
2016/03/09 FEI Common Equity Component and Return on Equity for 2016
FortisBC Energy Inc. Application for Common Equity Component and Return on Equity for 2016 ~ Project No.3698852

Panel: K. Keilty Panel Chair, D. Cote and N. MacMurchy

Hearing Location:
Date & Time: @
Location: , ,

Oral Evidence (limited scope Expert Evidence) Wednesday, Thursday and Friday, March 9 to 11G-177-15
2016/03/09 FEI 2015 Price Risk Management
FortisBC Energy Inc. 2015 Price Risk Management Application Project No.3698864

Panel: D. Cote Panel Chair, D. Magnan and R. Revel

Hearing Location:
Date & Time: @
Location: , ,

Scope A and Scope B written submissions from interveners regarding further regulatory processG-10-16
2016/03/11 FEI 2015 Price Risk Management
FortisBC Energy Inc. 2015 Price Risk Management Application Project No.3698864

Panel: D. Cote Panel Chair, D. Magnan and R. Revel

Hearing Location:
Date & Time: @
Location: , ,

Scope A and Scope B FEI reply submission regarding further regulatory processG-10-16
2016/03/22 ICBC 2015 Revenue Requirements
Insurance Corporation of British Columbia 2015 Revenue Requirements Application ~ Project No.3698849

Panel: B. Magnan Panel Chair, I. MacPhail and H. Harowitz

Hearing Location:
Date & Time: @
Location: , ,

Intervener Written Final Argument - if INTERVENER EVIDENCEG-212-15
2016/03/30 PNG 2016-17 Revenue Requirements
Pacific Northern Gas Ltd. 2016-2017 Revenue Requirements Application ~ Project No.3698859

Panel: K. Keitly Panel Chair, H. Harowitz and R. Revel

Hearing Location:
Date & Time: @
Location: , ,

Commission and Intervener Information Request (IR) No. 1G-13-16
2016/03/31 ICBC 2015 Revenue Requirements
Insurance Corporation of British Columbia 2015 Revenue Requirements Application ~ Project No.3698849

Panel: B. Magnan Panel Chair, I. MacPhail and H. Harowitz

Hearing Location:
Date & Time: @
Location: , ,

ICBC Written Reply Argument - if INTERVENER EVIDENCEG-212-15
2016/03/31 FEI Common Equity Component and Return on Equity for 2016
FortisBC Energy Inc. Application for Common Equity Component and Return on Equity for 2016 ~ Project No.3698852

Panel: K. Keilty Panel Chair, D. Cote and N. MacMurchy

Hearing Location:
Date & Time: @
Location: , ,

FEI Written Final SubmissionG-177-15
2016/04/06 PNGNE 2016-17 Revenue Requirements
Pacific Northern Gas (N.E.) Fort St. John/Dawson Creek Division and Tumbler Ridge Division 2016-2017 Revenue Requirements Application ~ Project No.3698860

Panel: K. Keitly Panel Chair, H. Harowitz and R. Revel

Hearing Location:
Date & Time: @
Location: , ,

Commission and Intervener Information Request No. 1G-14-16
2016/04/12 BC Hydro 2015 Rate Design Application
British Columbia Hydro and Power Authority 2015 Rate Design Application ~ Project No.3698781

Panel: D. Morton Panel Chair, K. Keilty, and D. Cote

Hearing Location:
Date & Time: @
Location: , ,

BC Hydro Response to IR2G-12-16
2016/04/12 FEI Common Equity Component and Return on Equity for 2016
FortisBC Energy Inc. Application for Common Equity Component and Return on Equity for 2016 ~ Project No.3698852

Panel: K. Keilty Panel Chair, D. Cote and N. MacMurchy

Hearing Location:
Date & Time: @
Location: , ,

Intervener Written Final SubmissionG-177-15
2016/04/15 BC Hydro WAC Bennett Riprap Upgrade Project
British Columbia Hydro and Power Authority W.A.C. Bennett Riprap Upgrade Project Application ~ Project No.3698854

Panel: D. Morton Panel Chair, H. Harowitz, N. MacMurchy

Hearing Location:
Date & Time: @
Location: , ,

Saulteau First Nation submits its Traditional Use Study and joint Independent Technical ReportG-15-16
2016/04/18 BC Hydro WAC Bennett Riprap Upgrade Project
British Columbia Hydro and Power Authority W.A.C. Bennett Riprap Upgrade Project Application ~ Project No.3698854

Panel: D. Morton Panel Chair, H. Harowitz, N. MacMurchy

Hearing Location: Commission Hearing Room
Date & Time: Apr 18, 2016 @ 01:00 PM
Location: 12th Floor, 1125 Howe Street, Vancouver, BC

Procedural ConferenceG-15-16
2016/04/20 PNG 2016-17 Revenue Requirements
Pacific Northern Gas Ltd. 2016-2017 Revenue Requirements Application ~ Project No.3698859

Panel: K. Keitly Panel Chair, H. Harowitz and R. Revel

Hearing Location:
Date & Time: @
Location: , ,

PNG Response to IRs No. 1G-13-16
2016/04/21 BC Hydro 2015 Rate Design Application
British Columbia Hydro and Power Authority 2015 Rate Design Application ~ Project No.3698781

Panel: D. Morton Panel Chair, K. Keilty, and D. Cote

Hearing Location:
Date & Time: @
Location: , ,

Intervener EvidenceG-12-16
2016/04/22 FEI Common Equity Component and Return on Equity for 2016
FortisBC Energy Inc. Application for Common Equity Component and Return on Equity for 2016 ~ Project No.3698852

Panel: K. Keilty Panel Chair, D. Cote and N. MacMurchy

Hearing Location:
Date & Time: @
Location: , ,

FEI Written Reply SubmissionG-177-15
2016/04/27 PNGNE 2016-17 Revenue Requirements
Pacific Northern Gas (N.E.) Fort St. John/Dawson Creek Division and Tumbler Ridge Division 2016-2017 Revenue Requirements Application ~ Project No.3698860

Panel: K. Keitly Panel Chair, H. Harowitz and R. Revel

Hearing Location:
Date & Time: @
Location: , ,

PNG Responses to Information Request No. 1G-14-16
2016/05/05 BC Hydro 2015 Rate Design Application
British Columbia Hydro and Power Authority 2015 Rate Design Application ~ Project No.3698781

Panel: D. Morton Panel Chair, K. Keilty, and D. Cote

Hearing Location:
Date & Time: @
Location: , ,

IR 1 on Intervener EvidenceG-12-16
2016/05/06 PNG 2016-17 Revenue Requirements
Pacific Northern Gas Ltd. 2016-2017 Revenue Requirements Application ~ Project No.3698859

Panel: K. Keitly Panel Chair, H. Harowitz and R. Revel

Hearing Location:
Date & Time: @
Location: , ,

Commission and Intervener IRs No. 2G-13-16
2016/05/13 PNGNE 2016-17 Revenue Requirements
Pacific Northern Gas (N.E.) Fort St. John/Dawson Creek Division and Tumbler Ridge Division 2016-2017 Revenue Requirements Application ~ Project No.3698860

Panel: K. Keitly Panel Chair, H. Harowitz and R. Revel

Hearing Location:
Date & Time: @
Location: , ,

Commission and Intervener Information Request No. 2G-14-16
2016/05/20 PNG 2016-17 Revenue Requirements
Pacific Northern Gas Ltd. 2016-2017 Revenue Requirements Application ~ Project No.3698859

Panel: K. Keitly Panel Chair, H. Harowitz and R. Revel

Hearing Location:
Date & Time: @
Location: , ,

PNG Response to IRs No. 2G-13-16
2016/05/27 PNGNE 2016-17 Revenue Requirements
Pacific Northern Gas (N.E.) Fort St. John/Dawson Creek Division and Tumbler Ridge Division 2016-2017 Revenue Requirements Application ~ Project No.3698860

Panel: K. Keitly Panel Chair, H. Harowitz and R. Revel

Hearing Location:
Date & Time: @
Location: , ,

PNG Responses to Information Request No. 2G-14-16
2016/05/30 BC Hydro 2015 Rate Design Application
British Columbia Hydro and Power Authority 2015 Rate Design Application ~ Project No.3698781

Panel: D. Morton Panel Chair, K. Keilty, and D. Cote

Hearing Location:
Date & Time: @
Location: , ,

Intervener Response to IR 1G-12-16
2016/06/03 PNG 2016-17 Revenue Requirements
Pacific Northern Gas Ltd. 2016-2017 Revenue Requirements Application ~ Project No.3698859

Panel: K. Keitly Panel Chair, H. Harowitz and R. Revel

Hearing Location:
Date & Time: @
Location: , ,

PNG Final ArgumentG-13-16
2016/06/10 PNGNE 2016-17 Revenue Requirements
Pacific Northern Gas (N.E.) Fort St. John/Dawson Creek Division and Tumbler Ridge Division 2016-2017 Revenue Requirements Application ~ Project No.3698860

Panel: K. Keitly Panel Chair, H. Harowitz and R. Revel

Hearing Location:
Date & Time: @
Location: , ,

PNG Final ArgumentG-14-16
2016/06/14 PNG 2016-17 Revenue Requirements
Pacific Northern Gas Ltd. 2016-2017 Revenue Requirements Application ~ Project No.3698859

Panel: K. Keitly Panel Chair, H. Harowitz and R. Revel

Hearing Location:
Date & Time: @
Location: , ,

Intervener Final ArgumentG-13-16
2016/06/15 BC Hydro 2015 Rate Design Application
British Columbia Hydro and Power Authority 2015 Rate Design Application ~ Project No.3698781

Panel: D. Morton Panel Chair, K. Keilty, and D. Cote

Hearing Location:
Date & Time: @
Location: , ,

BC Hydro Rebuttal EvidenceG-12-16
2016/06/21 PNGNE 2016-17 Revenue Requirements
Pacific Northern Gas (N.E.) Fort St. John/Dawson Creek Division and Tumbler Ridge Division 2016-2017 Revenue Requirements Application ~ Project No.3698860

Panel: K. Keitly Panel Chair, H. Harowitz and R. Revel

Hearing Location:
Date & Time: @
Location: , ,

Intervener Final ArgumentG-14-16
2016/06/23 PNG 2016-17 Revenue Requirements
Pacific Northern Gas Ltd. 2016-2017 Revenue Requirements Application ~ Project No.3698859

Panel: K. Keitly Panel Chair, H. Harowitz and R. Revel

Hearing Location:
Date & Time: @
Location: , ,

PNG Reply ArgumentG-13-16
2016/06/30 PNGNE 2016-17 Revenue Requirements
Pacific Northern Gas (N.E.) Fort St. John/Dawson Creek Division and Tumbler Ridge Division 2016-2017 Revenue Requirements Application ~ Project No.3698860

Panel: K. Keitly Panel Chair, H. Harowitz and R. Revel

Hearing Location:
Date & Time: @
Location: , ,

PNG Reply ArgumentG-14-16
2016/08/05 BCUC RIB Rate Report
British Columbia Utilities Commission Residential Inclining Block Rate Report to the Government of British Columbia ~ Project No.3698845



Hearing Location:
Date & Time: @
Location: , ,

Filing of ReportsA-10