2017/03/23 Seascapes Reconsideration & Variance G-172-16 ~ Phase 2
Seascapes Strata Corporation BCS776 Reconsideration and Variance of Order G-172-16 ~ Phase 2

Panel: B. Magnan Panel Chair, W. Everett

Hearing Location:
Date & Time: @
Location: , ,

Seascapes filing of Evidence on Insurance CostsG-29-17
2017/03/27 BC Hydro F2017-F2019 Revenue Requirements
British Columbia Hydro and Power Authority ~ F2017 to F2019 Revenue Requirements Application ~ Project No. 3698869

Panel: D. Morton Panel Chair, K. Keilty and D. Enns

Hearing Location:
Date & Time: @
Location: , ,

Intervener Responses to IRs on Intervener EvidenceG-20-17
2017/03/27 ICBC 2016 Revenue Requirements Application
Insurance Corporation of British Columbia ~ 2016 Revenue Requirements Application ~ Project No.3698890

Panel: D. Cote, Panel Chair, B. Magnan and R. Mason

Hearing Location:
Date & Time: @
Location: , ,

ICBC ReplyG-23 -17
2017/03/27 Corix Burnaby Mountain District Energy Utility CPCN
Corix Multi-Utility Services Inc. Application for a Certificate of Public Convenience and Necessity for the Burnaby Mountain District Energy Utility

Panel: D. Cote Panel Chair, D. Enns, W. Everett and B. Magnan

Hearing Location:
Date & Time: @
Location: , ,

Corix Public NoticeG-40-17
2017/03/31 BC Hydro F2017-F2019 Revenue Requirements
British Columbia Hydro and Power Authority ~ F2017 to F2019 Revenue Requirements Application ~ Project No. 3698869

Panel: D. Morton Panel Chair, K. Keilty and D. Enns

Hearing Location:
Date & Time: @
Location: , ,

BC Hydro Final Argument - Without Rebuttal EvidenceG-20-17
2017/03/31 Sustainable Services Ltd. Geothermal Energy System Status as a Public Utility
Sustainable Services Ltd. (SSL) Geothermal Energy System Status as a Public Utility under the Utilities Commission Act ~ Project No.3698884

Panel: D. Morton Panel Chair, B. Magnan

Hearing Location:
Date & Time: @
Location: , ,

Commission Information Request No. 1 to SSL’s Respondent PackageG-12-17;G-22-17
2017/03/31 Sustainable Services Ltd. Geothermal Energy System Status as a Public Utility
Sustainable Services Ltd. (SSL) Geothermal Energy System Status as a Public Utility under the Utilities Commission Act ~ Project No.3698884

Panel: D. Morton Panel Chair, B. Magnan

Hearing Location:
Date & Time: @
Location: , ,

Commission Information Request No. 1 to City of Langford’s PackageG-12-17;G-22-17
2017/03/31 Class Exemption for BC Hydro Customers that Resell Electricity Under Certain Lease Arrangements
Class Exemption for BC Hydro Customers that Resell Electricity Under Certain Lease Arrangements ~ Project No.3698898

Panel: R. Revel Panel Chair, R. Mason and D. Enns

Hearing Location:
Date & Time: @
Location: , ,

Intervener response submissions and any comments on revisions to the draft exemption orderG-38-17
2017/03/31 E-Plus Homeowners Group Reconsideration and Variance G-5-17
E-Plus Homeowners Group Application for Reconsideration and Variance of Order G-5-17

Panel: D. Morton Panel Chair, K. Keilty and D. Cote

Hearing Location:
Date & Time: @
Location: , ,

EPHG Reply SubmissionA-2
2017/03/31 BCOAPO Reconsideration and Variance G-5-17
BCOAPO Application for Reconsideration and Variance of Order G-5-17

Panel: D. Morton Panel Chair, K. Keilty and D. Cote

Hearing Location:
Date & Time: @
Location: , ,

BCOAPO Reply SubmissionA-2
2017/04/03 Corix Burnaby Mountain District Energy Utility CPCN
Corix Multi-Utility Services Inc. Application for a Certificate of Public Convenience and Necessity for the Burnaby Mountain District Energy Utility

Panel: D. Cote Panel Chair, D. Enns, W. Everett and B. Magnan

Hearing Location:
Date & Time: @
Location: , ,

Intervener and Interested Party RegistrationG-40-17
2017/04/04 BC Hydro Inquiry of Expenditures SAP Platform
British Columbia Hydro and Power Authority Inquiry of Expenditures related to the adoption of the SAP Platform ~ Project No. 3698878

Panel: D. Morton Panel Chair, H. Harowitz, and R. Mason

Hearing Location:
Date & Time: @
Location: , ,

Information Requests on BC Hydro Witness StatementsG-26-17
2017/04/04 Seascapes Reconsideration & Variance G-172-16 ~ Phase 2
Seascapes Strata Corporation BCS776 Reconsideration and Variance of Order G-172-16 ~ Phase 2

Panel: B. Magnan Panel Chair, W. Everett

Hearing Location:
Date & Time: @
Location: , ,

Commission and Superior Information Request No. 1 on Seascapes EvidenceG-29-17
2017/04/05 BC Hydro F2017-F2019 Revenue Requirements
British Columbia Hydro and Power Authority ~ F2017 to F2019 Revenue Requirements Application ~ Project No. 3698869

Panel: D. Morton Panel Chair, K. Keilty and D. Enns

Hearing Location:
Date & Time: @
Location: , ,

BC Hydro Rebuttal EvidenceG-20-17
2017/04/05 FEI 2016 Rate Design
FortisBC Energy Inc. 2016 Rate Design Application ~ Project No.3698899

Panel: K. Keilty Panel Chair, W. Everett and D. Enns

Hearing Location: Commission Hearing Room
Date & Time: Apr 05, 2017 @ 09:00 AM
Location: 12th Floor, 1125 Howe Street, Vancouver, BC

Procedural Conference on the Rate Design Report key topicsG-30-17
2017/04/06 FortisBC Inc. 2016 Long Term Electric Resource Plan & Long Term Demand Side Management Plan
FortisBC Inc. 2016 Long Term Electric Resource Plan (LTERP) and Long Term Demand Side Management Plan (LT DSM Plan) ~ Project No.3698896



Hearing Location:
Date & Time: @
Location: , ,

FBC Response to Information Request No. 1G-197-16
2017/04/06 BC Hydro Supply Chain Applications Project
BC Hydro Supply Chain Applications Project Application ~ Project No.3698901



Hearing Location:
Date & Time: @
Location: , ,

ABB Intervener EvidenceG-32-17
2017/04/12 Nelson Hydro 2017 Rate Application
Nelson Hydro 2017 Rate Application

Panel: D. Cote Panel Chair, M. Kresivo, and B. Magnan

Hearing Location:
Date & Time: @
Location: , ,

Intervener Participant Assistance/Cost Award Budget DeadlineG-47-17
2017/04/12 Nelson Hydro 2017 Rate Application
Nelson Hydro 2017 Rate Application

Panel: D. Cote Panel Chair, M. Kresivo, and B. Magnan

Hearing Location:
Date & Time: @
Location: , ,

Commission and Intervener Information Request No. 1G-47-17
2017/04/13 FortisBC Inc. 2016 Long Term Electric Resource Plan & Long Term Demand Side Management Plan
FortisBC Inc. 2016 Long Term Electric Resource Plan (LTERP) and Long Term Demand Side Management Plan (LT DSM Plan) ~ Project No.3698896



Hearing Location:
Date & Time: @
Location: , ,

Deadline for Intervener Notice on Filing Intervener EvidenceG-197-16
2017/04/13 BC Hydro Supply Chain Applications Project
BC Hydro Supply Chain Applications Project Application ~ Project No.3698901



Hearing Location:
Date & Time: @
Location: , ,

Commission and Intervener Information Request (IR) No. 2G-32-17
2017/04/13 BC Hydro Supply Chain Applications Project
BC Hydro Supply Chain Applications Project Application ~ Project No.3698901



Hearing Location:
Date & Time: @
Location: , ,

IRs on ABB Intervener EvidenceG-32-17
2017/04/14 Sustainable Services Ltd. Geothermal Energy System Status as a Public Utility
Sustainable Services Ltd. (SSL) Geothermal Energy System Status as a Public Utility under the Utilities Commission Act ~ Project No.3698884

Panel: D. Morton Panel Chair, B. Magnan

Hearing Location:
Date & Time: @
Location: , ,

Intervener Information Request No. 1 to SSL’s Respondent PackageG-12-17;G-22-17
2017/04/14 Sustainable Services Ltd. Geothermal Energy System Status as a Public Utility
Sustainable Services Ltd. (SSL) Geothermal Energy System Status as a Public Utility under the Utilities Commission Act ~ Project No.3698884

Panel: D. Morton Panel Chair, B. Magnan

Hearing Location:
Date & Time: @
Location: , ,

SSL and Intervener Information Request No. 1 to City of Langford’s PackageG-12-17;G-22-17
2017/04/20 Corix Burnaby Mountain District Energy Utility CPCN
Corix Multi-Utility Services Inc. Application for a Certificate of Public Convenience and Necessity for the Burnaby Mountain District Energy Utility

Panel: D. Cote Panel Chair, D. Enns, W. Everett and B. Magnan

Hearing Location:
Date & Time: @
Location: , ,

Commission and Intervener Information Request (IR) No. 1G-40-17
2017/04/21 Seascapes Reconsideration & Variance G-172-16 ~ Phase 2
Seascapes Strata Corporation BCS776 Reconsideration and Variance of Order G-172-16 ~ Phase 2

Panel: B. Magnan Panel Chair, W. Everett

Hearing Location:
Date & Time: @
Location: , ,

Seascapes response to Commission and Superior Information Request No. 1G-29-17
2017/04/21 FortisBC Inc. Self-Generation Policy Stage II
FortisBC Inc. Self-Generation Policy Stage II Application ~ Project No.3698820



Hearing Location:
Date & Time: @
Location: , ,

FBC Response to Commission IR No. 1G-14-17
2017/04/24 BC Hydro F2017-F2019 Revenue Requirements
British Columbia Hydro and Power Authority ~ F2017 to F2019 Revenue Requirements Application ~ Project No. 3698869

Panel: D. Morton Panel Chair, K. Keilty and D. Enns

Hearing Location:
Date & Time: @
Location: , ,

Commission and Intervener IRs on BC Hydro Rebuttal EvidenceG-20-17
2017/04/25 BC Hydro F2017-F2019 Revenue Requirements
British Columbia Hydro and Power Authority ~ F2017 to F2019 Revenue Requirements Application ~ Project No. 3698869

Panel: D. Morton Panel Chair, K. Keilty and D. Enns

Hearing Location:
Date & Time: @
Location: , ,

Intervener Final Argument - Without Rebuttal EvidenceG-20-17
2017/04/26 FEI 2016 Rate Design
FortisBC Energy Inc. 2016 Rate Design Application ~ Project No.3698899

Panel: K. Keilty Panel Chair, W. Everett and D. Enns

Hearing Location:
Date & Time: @
Location: , ,

Elenchus’ Cost of Service Allocation ReportG-30-17
2017/04/27 FortisBC Inc. 2016 Long Term Electric Resource Plan & Long Term Demand Side Management Plan
FortisBC Inc. 2016 Long Term Electric Resource Plan (LTERP) and Long Term Demand Side Management Plan (LT DSM Plan) ~ Project No.3698896



Hearing Location:
Date & Time: @
Location: , ,

Commission and Intervener Information Requests No. 2G-197-16
2017/04/27 Nelson Hydro 2017 Rate Application
Nelson Hydro 2017 Rate Application

Panel: D. Cote Panel Chair, M. Kresivo, and B. Magnan

Hearing Location:
Date & Time: @
Location: , ,

Nelson Hydro Response to Commission and Intervener Information Request No. 1G-47-17
2017/04/28 Seascapes Reconsideration & Variance G-172-16 ~ Phase 2
Seascapes Strata Corporation BCS776 Reconsideration and Variance of Order G-172-16 ~ Phase 2

Panel: B. Magnan Panel Chair, W. Everett

Hearing Location:
Date & Time: @
Location: , ,

Superior filing of Rebuttal Evidence on Insurance Costs (if any)G-29-17
2017/04/28 FortisBC Inc. Self-Generation Policy Stage II
FortisBC Inc. Self-Generation Policy Stage II Application ~ Project No.3698820



Hearing Location:
Date & Time: @
Location: , ,

Intervener Registration DeadlineG-14-17
2017/05/02 Sustainable Services Ltd. Geothermal Energy System Status as a Public Utility
Sustainable Services Ltd. (SSL) Geothermal Energy System Status as a Public Utility under the Utilities Commission Act ~ Project No.3698884

Panel: D. Morton Panel Chair, B. Magnan

Hearing Location:
Date & Time: @
Location: , ,

SSL and City of Langford Response to Commission and Intervener IR No. 1G-12-17;G-22-17
2017/05/04 FEI 2016 Rate Design
FortisBC Energy Inc. 2016 Rate Design Application ~ Project No.3698899

Panel: K. Keilty Panel Chair, W. Everett and D. Enns

Hearing Location:
Date & Time: @
Location: , ,

Commission Information Request No. 1 to FortisBC Energy Inc. (FEI)G-30-17
2017/05/04 Corix Burnaby Mountain District Energy Utility CPCN
Corix Multi-Utility Services Inc. Application for a Certificate of Public Convenience and Necessity for the Burnaby Mountain District Energy Utility

Panel: D. Cote Panel Chair, D. Enns, W. Everett and B. Magnan

Hearing Location:
Date & Time: @
Location: , ,

Corix Response to Commission and Intervener IRs No. 1G-40-17
2017/05/11 BC Hydro F2017-F2019 Revenue Requirements
British Columbia Hydro and Power Authority ~ F2017 to F2019 Revenue Requirements Application ~ Project No. 3698869

Panel: D. Morton Panel Chair, K. Keilty and D. Enns

Hearing Location:
Date & Time: @
Location: , ,

BC Hydro Response to IRs on Rebuttal EvidenceG-20-17
2017/05/11 FEI 2016 Rate Design
FortisBC Energy Inc. 2016 Rate Design Application ~ Project No.3698899

Panel: K. Keilty Panel Chair, W. Everett and D. Enns

Hearing Location:
Date & Time: @
Location: , ,

Intervener Information Request No. 1 to FEIG-30-17
2017/05/11 Nelson Hydro 2017 Rate Application
Nelson Hydro 2017 Rate Application

Panel: D. Cote Panel Chair, M. Kresivo, and B. Magnan

Hearing Location:
Date & Time: @
Location: , ,

Commission and Intervener Information Request No. 2G-47-17
2017/05/12 BC Hydro Supply Chain Applications Project
BC Hydro Supply Chain Applications Project Application ~ Project No.3698901



Hearing Location:
Date & Time: @
Location: , ,

BC Hydro Responses to IRs No. 2G-32-17
2017/05/12 BC Hydro Supply Chain Applications Project
BC Hydro Supply Chain Applications Project Application ~ Project No.3698901



Hearing Location:
Date & Time: @
Location: , ,

ABB Response to IRs on ABB Intervener EvidenceG-32-17
2017/05/16 BC Hydro Inquiry of Expenditures SAP Platform
British Columbia Hydro and Power Authority Inquiry of Expenditures related to the adoption of the SAP Platform ~ Project No. 3698878

Panel: D. Morton Panel Chair, H. Harowitz, and R. Mason

Hearing Location:
Date & Time: @
Location: , ,

BC Hydro Response to Information RequestsG-26-17
2017/05/17 BC Hydro F2017-F2019 Revenue Requirements
British Columbia Hydro and Power Authority ~ F2017 to F2019 Revenue Requirements Application ~ Project No. 3698869

Panel: D. Morton Panel Chair, K. Keilty and D. Enns

Hearing Location:
Date & Time: @
Location: , ,

BC Hydro Reply Argument - Without Rebuttal EvidenceG-20-17
2017/05/17 BC Hydro Supply Chain Applications Project
BC Hydro Supply Chain Applications Project Application ~ Project No.3698901



Hearing Location:
Date & Time: @
Location: , ,

BC Hydro Notice of Intent to File Rebuttal EvidenceG-32-17
2017/05/18 FortisBC Inc. 2016 Long Term Electric Resource Plan & Long Term Demand Side Management Plan
FortisBC Inc. 2016 Long Term Electric Resource Plan (LTERP) and Long Term Demand Side Management Plan (LT DSM Plan) ~ Project No.3698896



Hearing Location:
Date & Time: @
Location: , ,

FBC Responses to Information Request No. 2G-197-16
2017/05/19 BC Hydro Supply Chain Applications Project
BC Hydro Supply Chain Applications Project Application ~ Project No.3698901



Hearing Location:
Date & Time: @
Location: , ,

BC Hydro Rebuttal Evidence (if any)G-32-17
2017/05/23 BC Hydro F2017-F2019 Revenue Requirements
British Columbia Hydro and Power Authority ~ F2017 to F2019 Revenue Requirements Application ~ Project No. 3698869

Panel: D. Morton Panel Chair, K. Keilty and D. Enns

Hearing Location:
Date & Time: @
Location: , ,

BC Hydro Final Argument - With Rebuttal EvidenceG-20-17
2017/05/24 FEI 2016 Rate Design
FortisBC Energy Inc. 2016 Rate Design Application ~ Project No.3698899

Panel: K. Keilty Panel Chair, W. Everett and D. Enns

Hearing Location:
Date & Time: @
Location: , ,

Information Request to Elenchus on COSA ReportG-30-17
2017/05/24 FEI 2016 Rate Design
FortisBC Energy Inc. 2016 Rate Design Application ~ Project No.3698899

Panel: K. Keilty Panel Chair, W. Everett and D. Enns

Hearing Location:
Date & Time: @
Location: , ,

Participant Assistance/Cost Award BudgetsG-30-17
2017/05/25 FortisBC Inc. 2016 Long Term Electric Resource Plan & Long Term Demand Side Management Plan
FortisBC Inc. 2016 Long Term Electric Resource Plan (LTERP) and Long Term Demand Side Management Plan (LT DSM Plan) ~ Project No.3698896



Hearing Location:
Date & Time: @
Location: , ,

Intervener EvidenceG-197-16
2017/05/25 FortisBC Inc. 2016 Long Term Electric Resource Plan & Long Term Demand Side Management Plan
FortisBC Inc. 2016 Long Term Electric Resource Plan (LTERP) and Long Term Demand Side Management Plan (LT DSM Plan) ~ Project No.3698896



Hearing Location:
Date & Time: @
Location: , ,

FBC Final Argument - No Intervener EvidenceG-197-16
2017/05/25 Nelson Hydro 2017 Rate Application
Nelson Hydro 2017 Rate Application

Panel: D. Cote Panel Chair, M. Kresivo, and B. Magnan

Hearing Location:
Date & Time: @
Location: , ,

Nelson Hydro Response to Commission and Intervener Information Request No. 2G-47-17
2017/05/25 Nelson Hydro 2017 Rate Application
Nelson Hydro 2017 Rate Application

Panel: D. Cote Panel Chair, M. Kresivo, and B. Magnan

Hearing Location:
Date & Time: @
Location: , ,

Letters of Comment DeadlineG-47-17
2017/05/25 Corix Burnaby Mountain District Energy Utility CPCN
Corix Multi-Utility Services Inc. Application for a Certificate of Public Convenience and Necessity for the Burnaby Mountain District Energy Utility

Panel: D. Cote Panel Chair, D. Enns, W. Everett and B. Magnan

Hearing Location:
Date & Time: @
Location: , ,

Commission and Intervener IR No. 2G-40-17
2017/05/31 FortisBC Inc. Self-Generation Policy Stage II
FortisBC Inc. Self-Generation Policy Stage II Application ~ Project No.3698820



Hearing Location:
Date & Time: @
Location: , ,

Commission IR No. 2 and Intervener IRs No. 1G-14-17
2017/06/01 Nelson Hydro 2017 Rate Application
Nelson Hydro 2017 Rate Application

Panel: D. Cote Panel Chair, M. Kresivo, and B. Magnan

Hearing Location:
Date & Time: @
Location: , ,

Nelson Hydro Written Final ArgumentG-47-17
2017/06/02 BC Hydro Supply Chain Applications Project
BC Hydro Supply Chain Applications Project Application ~ Project No.3698901



Hearing Location:
Date & Time: @
Location: , ,

IRs on BC Hydro Rebuttal Evidence (if any)G-32-17
2017/06/08 FortisBC Inc. 2016 Long Term Electric Resource Plan & Long Term Demand Side Management Plan
FortisBC Inc. 2016 Long Term Electric Resource Plan (LTERP) and Long Term Demand Side Management Plan (LT DSM Plan) ~ Project No.3698896



Hearing Location:
Date & Time: @
Location: , ,

Intervener Final Arguments - No Intervener EvidenceG-197-16
2017/06/08 FortisBC Inc. 2016 Long Term Electric Resource Plan & Long Term Demand Side Management Plan
FortisBC Inc. 2016 Long Term Electric Resource Plan (LTERP) and Long Term Demand Side Management Plan (LT DSM Plan) ~ Project No.3698896



Hearing Location:
Date & Time: @
Location: , ,

Information Request No. 1 on Intervener EvidenceG-197-16
2017/06/08 Corix Burnaby Mountain District Energy Utility CPCN
Corix Multi-Utility Services Inc. Application for a Certificate of Public Convenience and Necessity for the Burnaby Mountain District Energy Utility

Panel: D. Cote Panel Chair, D. Enns, W. Everett and B. Magnan

Hearing Location:
Date & Time: @
Location: , ,

Corix Response to Commission and Intervener IRs No. 2G-40-17
2017/06/09 FEI 2016 Rate Design
FortisBC Energy Inc. 2016 Rate Design Application ~ Project No.3698899

Panel: K. Keilty Panel Chair, W. Everett and D. Enns

Hearing Location:
Date & Time: @
Location: , ,

FEI Response to Information Request No. 1G-30-17
2017/06/09 FEI 2016 Rate Design
FortisBC Energy Inc. 2016 Rate Design Application ~ Project No.3698899

Panel: K. Keilty Panel Chair, W. Everett and D. Enns

Hearing Location:
Date & Time: @
Location: , ,

Elenchus Response to Information Request on COSA ReportG-30-17
2017/06/13 BC Hydro F2017-F2019 Revenue Requirements
British Columbia Hydro and Power Authority ~ F2017 to F2019 Revenue Requirements Application ~ Project No. 3698869

Panel: D. Morton Panel Chair, K. Keilty and D. Enns

Hearing Location:
Date & Time: @
Location: , ,

Intervener Final Argument - With Rebuttal EvidenceG-20-17
2017/06/15 Nelson Hydro 2017 Rate Application
Nelson Hydro 2017 Rate Application

Panel: D. Cote Panel Chair, M. Kresivo, and B. Magnan

Hearing Location:
Date & Time: @
Location: , ,

Intervener Written Final ArgumentG-47-17
2017/06/16 BC Hydro Supply Chain Applications Project
BC Hydro Supply Chain Applications Project Application ~ Project No.3698901



Hearing Location:
Date & Time: @
Location: , ,

BC Hydro Response to Rebuttal Evidence IRs (if any)G-32-17
2017/06/22 FortisBC Inc. 2016 Long Term Electric Resource Plan & Long Term Demand Side Management Plan
FortisBC Inc. 2016 Long Term Electric Resource Plan (LTERP) and Long Term Demand Side Management Plan (LT DSM Plan) ~ Project No.3698896



Hearing Location:
Date & Time: @
Location: , ,

FBC Reply Argument - No Intervener EvidenceG-197-16
2017/06/22 Nelson Hydro 2017 Rate Application
Nelson Hydro 2017 Rate Application

Panel: D. Cote Panel Chair, M. Kresivo, and B. Magnan

Hearing Location:
Date & Time: @
Location: , ,

Nelson Hydro Reply ArgumentG-47-17
2017/06/22 Corix Burnaby Mountain District Energy Utility CPCN
Corix Multi-Utility Services Inc. Application for a Certificate of Public Convenience and Necessity for the Burnaby Mountain District Energy Utility

Panel: D. Cote Panel Chair, D. Enns, W. Everett and B. Magnan

Hearing Location:
Date & Time: @
Location: , ,

Corix Final ArgumentG-40-17
2017/06/23 FEI 2016 Rate Design
FortisBC Energy Inc. 2016 Rate Design Application ~ Project No.3698899

Panel: K. Keilty Panel Chair, W. Everett and D. Enns

Hearing Location:
Date & Time: @
Location: , ,

Elenchus’ Rate Design ReportG-30-17
2017/06/23 BC Hydro Supply Chain Applications Project
BC Hydro Supply Chain Applications Project Application ~ Project No.3698901



Hearing Location:
Date & Time: @
Location: , ,

BC Hydro Final SubmissionG-32-17
2017/06/28 FEI 2016 Rate Design
FortisBC Energy Inc. 2016 Rate Design Application ~ Project No.3698899

Panel: K. Keilty Panel Chair, W. Everett and D. Enns

Hearing Location:
Date & Time: @
Location: , ,

Intervener Notice on Filing Intervener EvidenceG-30-17
2017/06/28 FortisBC Inc. Self-Generation Policy Stage II
FortisBC Inc. Self-Generation Policy Stage II Application ~ Project No.3698820



Hearing Location:
Date & Time: @
Location: , ,

FBC Response to Commission IR No. 2 and Intervener IRs No. 1G-14-17
2017/06/29 FortisBC Inc. 2016 Long Term Electric Resource Plan & Long Term Demand Side Management Plan
FortisBC Inc. 2016 Long Term Electric Resource Plan (LTERP) and Long Term Demand Side Management Plan (LT DSM Plan) ~ Project No.3698896



Hearing Location:
Date & Time: @
Location: , ,

Intervener Response to Information Request No. 1G-197-16
2017/07/04 BC Hydro F2017-F2019 Revenue Requirements
British Columbia Hydro and Power Authority ~ F2017 to F2019 Revenue Requirements Application ~ Project No. 3698869

Panel: D. Morton Panel Chair, K. Keilty and D. Enns

Hearing Location:
Date & Time: @
Location: , ,

BC Hydro Reply Argument - With Rebuttal EvidenceG-20-17
2017/07/05 FEI 2016 Rate Design
FortisBC Energy Inc. 2016 Rate Design Application ~ Project No.3698899

Panel: K. Keilty Panel Chair, W. Everett and D. Enns

Hearing Location: Commission Hearing Room
Date & Time: Jul 05, 2017 @ 09:00 AM
Location: 12th Floor, 1125 Howe Street, Vancouver, BC

Procedural Conference - on further processG-30-17
2017/07/06 Corix Burnaby Mountain District Energy Utility CPCN
Corix Multi-Utility Services Inc. Application for a Certificate of Public Convenience and Necessity for the Burnaby Mountain District Energy Utility

Panel: D. Cote Panel Chair, D. Enns, W. Everett and B. Magnan

Hearing Location:
Date & Time: @
Location: , ,

Intervener Final ArgumentsG-40-17
2017/07/07 BC Hydro Supply Chain Applications Project
BC Hydro Supply Chain Applications Project Application ~ Project No.3698901



Hearing Location:
Date & Time: @
Location: , ,

Interveners Final SubmissionG-32-17
2017/07/13 FortisBC Inc. 2016 Long Term Electric Resource Plan & Long Term Demand Side Management Plan
FortisBC Inc. 2016 Long Term Electric Resource Plan (LTERP) and Long Term Demand Side Management Plan (LT DSM Plan) ~ Project No.3698896



Hearing Location:
Date & Time: @
Location: , ,

FBC Final Argument If Intervener EvidenceG-197-16
2017/07/20 Corix Burnaby Mountain District Energy Utility CPCN
Corix Multi-Utility Services Inc. Application for a Certificate of Public Convenience and Necessity for the Burnaby Mountain District Energy Utility

Panel: D. Cote Panel Chair, D. Enns, W. Everett and B. Magnan

Hearing Location:
Date & Time: @
Location: , ,

Corix Reply ArgumentG-40-17
2017/07/21 BC Hydro Supply Chain Applications Project
BC Hydro Supply Chain Applications Project Application ~ Project No.3698901



Hearing Location:
Date & Time: @
Location: , ,

BC Hydro Reply SubmissionG-32-17
2017/07/27 FortisBC Inc. 2016 Long Term Electric Resource Plan & Long Term Demand Side Management Plan
FortisBC Inc. 2016 Long Term Electric Resource Plan (LTERP) and Long Term Demand Side Management Plan (LT DSM Plan) ~ Project No.3698896



Hearing Location:
Date & Time: @
Location: , ,

Intervener Final Arguments If Intervener EvidenceG-197-16
2017/08/10 FortisBC Inc. 2016 Long Term Electric Resource Plan & Long Term Demand Side Management Plan
FortisBC Inc. 2016 Long Term Electric Resource Plan (LTERP) and Long Term Demand Side Management Plan (LT DSM Plan) ~ Project No.3698896



Hearing Location:
Date & Time: @
Location: , ,

FBC Reply Argument If Intervener EvidenceG-197-16
Copyright © BCUC, 2004 - 2016.    Registered Users Log In   Career Opportunities Privacy  BCUC on Twitter

                                      This Web site is best viewed using Internet Explorer.