Due DateUtilities & ProceedingRegulatory ItemOrder/Letter
2016/09/23 FortisBC Inc. Net Metering Program Tariff Update
FortisBC Inc. Net Metering Program Tariff Update Application ~ Project No.3698875

Panel: H. Harowitz Panel Chair, R. Revel and R. Mason

Hearing Location:
Date & Time: @
Location: , ,

Interveners Final ArgumentG-126-16
2016/09/23 FEI 2017-18 Revenue Requirements & Rates Fort Nelson
FortisBC Energy Inc. Application for 2017 and 2018 Revenue Requirements and Rates for the Fort Nelson Service Area ~ Project No.3698885

Panel: B. Magnan Panel Chair, D. Enns

Hearing Location:
Date & Time: @
Location: , ,

Intervener Final ArgumentsG-108-16
2016/09/26 BC Hydro 2015 Rate Design Application
British Columbia Hydro and Power Authority 2015 Rate Design Application ~ Project No.3698781

Panel: D. Morton Panel Chair, K. Keilty, and D. Cote

Hearing Location:
Date & Time: @
Location: , ,

BC Hydro Final Arguments A-39
2016/09/26 BC Hydro 2015 Rate Design Application
British Columbia Hydro and Power Authority 2015 Rate Design Application ~ Project No.3698781

Panel: D. Morton Panel Chair, K. Keilty, and D. Cote

Hearing Location:
Date & Time: @
Location: , ,

BCOAPO Final ArgumentsA-39
2016/09/26 Port Alice Gas Rate Review
Port Alice Gas Inc. Rate Review Application ~ Project No.3698862

Panel: B. Magnan

Hearing Location:
Date & Time: @
Location: , ,

Affected Parties Comments on Exemption ApplicationG-134-16
2016/09/26 ICBC 2016 Revenue Requirements Application
Insurance Corporation of British Columbia ~ 2016 Revenue Requirements Application ~ Project No.3698890

Panel: D. Cote, Panel Chair, B. Magnan and R. Mason

Hearing Location:
Date & Time: @
Location: , ,

Deadline for intervener registrationG-142-16
2016/09/26 ICBC 2016 Revenue Requirements Application
Insurance Corporation of British Columbia ~ 2016 Revenue Requirements Application ~ Project No.3698890

Panel: D. Cote, Panel Chair, B. Magnan and R. Mason

Hearing Location:
Date & Time: @
Location: , ,

Commission Information Request (IR) No. 1G-142-16
2016/09/28 Sustainable Services Ltd. Geothermal Energy System Status as a Public Utility
Sustainable Services Ltd. (SSL) Geothermal Energy System Status as a Public Utility under the Utilities Commission Act ~ Project No.3698884

Panel: D. Morton

Hearing Location:
Date & Time: @
Location: , ,

Intervener Information Request No. 1 to SSLG-127-16
2016/09/28 FortisBC Inc. Annual Review 2017 Rates
FortisBC Inc. Annual Review for 2017 Rates pursuant to the Multi-Year Performance Based Ratemaking Plan approved for 2014 through 2019 by Order G-139-14 ~ Project No.3698887

Panel: N. MacMurchy, Panel Chair, W. Everett and M. Kresivo

Hearing Location:
Date & Time: @
Location: , ,

FBC Responses to IRs No. 1G-123-16
2016/09/29 ICBC 2016 Revenue Requirements Application
Insurance Corporation of British Columbia ~ 2016 Revenue Requirements Application ~ Project No.3698890

Panel: D. Cote, Panel Chair, B. Magnan and R. Mason

Hearing Location:
Date & Time: @
Location: , ,

Intervener IR No. 1G-142-16
2016/09/30 FortisBC Inc. Net Metering Program Tariff Update
FortisBC Inc. Net Metering Program Tariff Update Application ~ Project No.3698875

Panel: H. Harowitz Panel Chair, R. Revel and R. Mason

Hearing Location:
Date & Time: @
Location: , ,

FortisBC Reply ArgumentG-126-16
2016/09/30 BC Hydro Inquiry of Expenditures SAP Platform
British Columbia Hydro and Power Authority Inquiry of Expenditures related to the adoption of the SAP Platform ~ Project No. 3698878

Panel: D. Morton Panel Chair, H. Harowitz, and R. Mason

Hearing Location:
Date & Time: @
Location: , ,

BC Hydro Response to IRs No. 1G-81-16; A-6;G-146-16
2016/09/30 FEI 2017-18 Revenue Requirements & Rates Fort Nelson
FortisBC Energy Inc. Application for 2017 and 2018 Revenue Requirements and Rates for the Fort Nelson Service Area ~ Project No.3698885

Panel: B. Magnan Panel Chair, D. Enns

Hearing Location:
Date & Time: @
Location: , ,

FEI Reply ArgumentG-108-16
2016/10/05 FEI All-Inclusive Code of Conduct and Transfer Pricing Policy
FortisBC Energy Inc. All-Inclusive Code of Conduct and Transfer Pricing Policy Application ~ Project No.3698873

Panel: N. MacMurchy, Panel Chair, W. Everett and K. Keilty

Hearing Location:
Date & Time: @
Location: , ,

Interveners provide written submissions on scope and processA-3
2016/10/05 FortisBC Inc. 2017 Demand Side Management Expenditures
FortisBC Inc. - Application for Acceptance of Demand Side Management (DSM) Expenditures for 2017 ~ Project No.3698889

Panel: H. Harowitz Panel Chair, D. Enns, B. Magnan

Hearing Location:
Date & Time: @
Location: , ,

FortisBC Responses to Commission and Intervener IR No. 1G-135-16
2016/10/06 BC Hydro F2017-F2019 Revenue Requirements
British Columbia Hydro and Power Authority ~ F2017 to F2019 Revenue Requirements Application ~ Project No. 3698869

Panel: D. Morton Panel Chair, K. Keilty and D. Enns

Hearing Location:
Date & Time: @
Location: , ,

BCUC Information Request No. 1 to BCHG-144-16
2016/10/06 FortisBC Inc. CPCN Corra Linn Dam Spillway Gates
FortisBC Inc. Application for a Certificate of Public Convenience and Necessity for Replacement of the Corra Linn Dam Spillway Gates ~ Project No.3698883

Panel: D. Cote Panel Chair, M. Kresivo, and B. Magnan

Hearing Location:
Date & Time: @
Location: , ,

Commission and Intervener Information Requests No. 2G-107-16
2016/10/11 BC Hydro 2015 Rate Design Application
British Columbia Hydro and Power Authority 2015 Rate Design Application ~ Project No.3698781

Panel: D. Morton Panel Chair, K. Keilty, and D. Cote

Hearing Location:
Date & Time: @
Location: , ,

Interveners Final ArgumentsA-39
2016/10/11 BC Hydro 2015 Rate Design Application
British Columbia Hydro and Power Authority 2015 Rate Design Application ~ Project No.3698781

Panel: D. Morton Panel Chair, K. Keilty, and D. Cote

Hearing Location:
Date & Time: @
Location: , ,

BC Hydro and BCOAPO arguments in response to each otherA-39
2016/10/11 FEI All-Inclusive Code of Conduct and Transfer Pricing Policy
FortisBC Energy Inc. All-Inclusive Code of Conduct and Transfer Pricing Policy Application ~ Project No.3698873

Panel: N. MacMurchy, Panel Chair, W. Everett and K. Keilty

Hearing Location:
Date & Time: @
Location: , ,

FEI reply submissionA-3
2016/10/12 FortisBC Inc. Annual Review 2017 Rates
FortisBC Inc. Annual Review for 2017 Rates pursuant to the Multi-Year Performance Based Ratemaking Plan approved for 2014 through 2019 by Order G-139-14 ~ Project No.3698887

Panel: N. MacMurchy, Panel Chair, W. Everett and M. Kresivo

Hearing Location: Commission Hearing Room
Date & Time: Oct 12, 2016 @ 01:30 PM
Location: 12th Floor, 1125 Howe Street, Vancouver, BC

WorkshopG-123-16
2016/10/12 FEI Annual Review 2017 Delivery Rates
FortisBC Energy Inc. Annual Review for 2017 Delivery Rates pursuant to the Multi-Year Performance Based Ratemaking Plan approved for 2014 through 2019 by Order G-138-14 ~ Project No.3698886

Panel: D. Enns Panel Chair, B. Magnan and N. MacMurchy

Hearing Location: Commission Hearing Room
Date & Time: Oct 12, 2016 @ 09:00 AM
Location: 12th Floor, 1125 Howe Street, Vancouver, BC

WorkshopG-122-16
2016/10/13 BC Hydro Capital Expenditures and Projects Review
British Columbia Hydro and Power Authority Review of the Regulatory Oversight of Capital Expenditures and Projects ~ Project No. 3698877

Panel: N. MacMurchy Panel Chair, W. Everett, and R. Mason

Hearing Location: Commission Hearing Room on 12th Floor
Date & Time: Oct 13, 2016 @ 10:00 AM
Location: 1125 Howe Street, Vancouver, BC

Procedural ConferenceG-86-16
2016/10/14 FortisBC Inc. 2017 Demand Side Management Expenditures
FortisBC Inc. - Application for Acceptance of Demand Side Management (DSM) Expenditures for 2017 ~ Project No.3698889

Panel: H. Harowitz Panel Chair, D. Enns, B. Magnan

Hearing Location:
Date & Time: @
Location: , ,

FortisBC Final ArgumentG-135-16
2016/10/19 BC Hydro F2017-F2019 Revenue Requirements
British Columbia Hydro and Power Authority ~ F2017 to F2019 Revenue Requirements Application ~ Project No. 3698869

Panel: D. Morton Panel Chair, K. Keilty and D. Enns

Hearing Location:
Date & Time: @
Location: , ,

Intervener Information Request No. 1 to BCHG-144-16
2016/10/19 FEI Annual Review 2017 Delivery Rates
FortisBC Energy Inc. Annual Review for 2017 Delivery Rates pursuant to the Multi-Year Performance Based Ratemaking Plan approved for 2014 through 2019 by Order G-138-14 ~ Project No.3698886

Panel: D. Enns Panel Chair, B. Magnan and N. MacMurchy

Hearing Location:
Date & Time: @
Location: , ,

FEI’s Responses to Workshop Undertakings (if any)G-122-16
2016/10/20 ICBC 2016 Revenue Requirements Application
Insurance Corporation of British Columbia ~ 2016 Revenue Requirements Application ~ Project No.3698890

Panel: D. Cote, Panel Chair, B. Magnan and R. Mason

Hearing Location:
Date & Time: @
Location: , ,

ICBC IR No. 1 responseG-142-16
2016/10/24 BC Hydro 2015 Rate Design Application
British Columbia Hydro and Power Authority 2015 Rate Design Application ~ Project No.3698781

Panel: D. Morton Panel Chair, K. Keilty, and D. Cote

Hearing Location:
Date & Time: @
Location: , ,

BC Hydro and BCOAPO Reply ArgumentsA-39
2016/10/24 BC Hydro Inquiry of Expenditures SAP Platform
British Columbia Hydro and Power Authority Inquiry of Expenditures related to the adoption of the SAP Platform ~ Project No. 3698878

Panel: D. Morton Panel Chair, H. Harowitz, and R. Mason

Hearing Location:
Date & Time: @
Location: , ,

Submission deadline for comments on further processG-81-16;G-146-16
2016/10/26 FortisBC Inc. Annual Review 2017 Rates
FortisBC Inc. Annual Review for 2017 Rates pursuant to the Multi-Year Performance Based Ratemaking Plan approved for 2014 through 2019 by Order G-139-14 ~ Project No.3698887

Panel: N. MacMurchy, Panel Chair, W. Everett and M. Kresivo

Hearing Location:
Date & Time: @
Location: , ,

FBC Responses to Workshop Undertakings (if any)G-123-16
2016/10/26 FEI Annual Review 2017 Delivery Rates
FortisBC Energy Inc. Annual Review for 2017 Delivery Rates pursuant to the Multi-Year Performance Based Ratemaking Plan approved for 2014 through 2019 by Order G-138-14 ~ Project No.3698886

Panel: D. Enns Panel Chair, B. Magnan and N. MacMurchy

Hearing Location:
Date & Time: @
Location: , ,

Intervener Written ArgumentG-122-16
2016/10/26 FortisBC Inc. 2017 Demand Side Management Expenditures
FortisBC Inc. - Application for Acceptance of Demand Side Management (DSM) Expenditures for 2017 ~ Project No.3698889

Panel: H. Harowitz Panel Chair, D. Enns, B. Magnan

Hearing Location:
Date & Time: @
Location: , ,

Intervener Final ArgumentsG-135-16
2016/10/28 BC Hydro Inquiry of Expenditures SAP Platform
British Columbia Hydro and Power Authority Inquiry of Expenditures related to the adoption of the SAP Platform ~ Project No. 3698878

Panel: D. Morton Panel Chair, H. Harowitz, and R. Mason

Hearing Location:
Date & Time: @
Location: , ,

Procedural ConferenceG-81-16;G-146-16
2016/10/28 ICBC 2016 Revenue Requirements Application
Insurance Corporation of British Columbia ~ 2016 Revenue Requirements Application ~ Project No.3698890

Panel: D. Cote, Panel Chair, B. Magnan and R. Mason

Hearing Location: Commission Hearing Room
Date & Time: Oct 28, 2016 @ 09:00 AM
Location: 12th Floor, 1125 Howe Street, Vancouver, BC

Procedural ConferenceG-142-16
2016/10/31 FortisBC Inc. CPCN Corra Linn Dam Spillway Gates
FortisBC Inc. Application for a Certificate of Public Convenience and Necessity for Replacement of the Corra Linn Dam Spillway Gates ~ Project No.3698883

Panel: D. Cote Panel Chair, M. Kresivo, and B. Magnan

Hearing Location:
Date & Time: @
Location: , ,

FBC Responses to Information Requests No. 2G-107-16
2016/11/02 FortisBC Inc. Annual Review 2017 Rates
FortisBC Inc. Annual Review for 2017 Rates pursuant to the Multi-Year Performance Based Ratemaking Plan approved for 2014 through 2019 by Order G-139-14 ~ Project No.3698887

Panel: N. MacMurchy, Panel Chair, W. Everett and M. Kresivo

Hearing Location:
Date & Time: @
Location: , ,

Intervener Written ArgumentG-123-16
2016/11/02 FEI Annual Review 2017 Delivery Rates
FortisBC Energy Inc. Annual Review for 2017 Delivery Rates pursuant to the Multi-Year Performance Based Ratemaking Plan approved for 2014 through 2019 by Order G-138-14 ~ Project No.3698886

Panel: D. Enns Panel Chair, B. Magnan and N. MacMurchy

Hearing Location:
Date & Time: @
Location: , ,

FEI’s Written Reply ArgumentG-122-16
2016/11/02 FortisBC Inc. 2017 Demand Side Management Expenditures
FortisBC Inc. - Application for Acceptance of Demand Side Management (DSM) Expenditures for 2017 ~ Project No.3698889

Panel: H. Harowitz Panel Chair, D. Enns, B. Magnan

Hearing Location:
Date & Time: @
Location: , ,

FortisBC Reply ArgumentG-135-16
2016/11/09 FortisBC Inc. Annual Review 2017 Rates
FortisBC Inc. Annual Review for 2017 Rates pursuant to the Multi-Year Performance Based Ratemaking Plan approved for 2014 through 2019 by Order G-139-14 ~ Project No.3698887

Panel: N. MacMurchy, Panel Chair, W. Everett and M. Kresivo

Hearing Location:
Date & Time: @
Location: , ,

FBC Written Reply ArgumentG-123-16
2016/11/14 FortisBC Inc. CPCN Corra Linn Dam Spillway Gates
FortisBC Inc. Application for a Certificate of Public Convenience and Necessity for Replacement of the Corra Linn Dam Spillway Gates ~ Project No.3698883

Panel: D. Cote Panel Chair, M. Kresivo, and B. Magnan

Hearing Location:
Date & Time: @
Location: , ,

FBC Final Written SubmissionG-107-16
2016/11/21 BC Hydro F2017-F2019 Revenue Requirements
British Columbia Hydro and Power Authority ~ F2017 to F2019 Revenue Requirements Application ~ Project No. 3698869

Panel: D. Morton Panel Chair, K. Keilty and D. Enns

Hearing Location:
Date & Time: @
Location: , ,

BC Hydro Responses to BCUC/Intervener IRs-1G-144-16
2016/11/28 BC Hydro F2017-F2019 Revenue Requirements
British Columbia Hydro and Power Authority ~ F2017 to F2019 Revenue Requirements Application ~ Project No. 3698869

Panel: D. Morton Panel Chair, K. Keilty and D. Enns

Hearing Location:
Date & Time: @
Location: , ,

Procedural Conference No. 2G-144-16
2016/11/28 FortisBC Inc. CPCN Corra Linn Dam Spillway Gates
FortisBC Inc. Application for a Certificate of Public Convenience and Necessity for Replacement of the Corra Linn Dam Spillway Gates ~ Project No.3698883

Panel: D. Cote Panel Chair, M. Kresivo, and B. Magnan

Hearing Location:
Date & Time: @
Location: , ,

Intervener Final Written SubmissionsG-107-16
2016/12/12 BC Hydro F2017-F2019 Revenue Requirements
British Columbia Hydro and Power Authority ~ F2017 to F2019 Revenue Requirements Application ~ Project No. 3698869

Panel: D. Morton Panel Chair, K. Keilty and D. Enns

Hearing Location:
Date & Time: @
Location: , ,

Intervener PACA Budgets (on or before)G-144-16
2016/12/12 FortisBC Inc. CPCN Corra Linn Dam Spillway Gates
FortisBC Inc. Application for a Certificate of Public Convenience and Necessity for Replacement of the Corra Linn Dam Spillway Gates ~ Project No.3698883

Panel: D. Cote Panel Chair, M. Kresivo, and B. Magnan

Hearing Location:
Date & Time: @
Location: , ,

FBC Written Reply SubmissionG-107-16
2016/12/14 BC Hydro F2017-F2019 Revenue Requirements
British Columbia Hydro and Power Authority ~ F2017 to F2019 Revenue Requirements Application ~ Project No. 3698869

Panel: D. Morton Panel Chair, K. Keilty and D. Enns

Hearing Location:
Date & Time: @
Location: , ,

Commission IR No. 2 to BC Hydro (by noon)G-144-16
2016/12/16 BC Hydro F2017-F2019 Revenue Requirements
British Columbia Hydro and Power Authority ~ F2017 to F2019 Revenue Requirements Application ~ Project No. 3698869

Panel: D. Morton Panel Chair, K. Keilty and D. Enns

Hearing Location:
Date & Time: @
Location: , ,

Intervener IR No. 2 to BC HydroG-144-16
2017/01/23 BC Hydro F2017-F2019 Revenue Requirements
British Columbia Hydro and Power Authority ~ F2017 to F2019 Revenue Requirements Application ~ Project No. 3698869

Panel: D. Morton Panel Chair, K. Keilty and D. Enns

Hearing Location:
Date & Time: @
Location: , ,

BC Hydro Responses to IR No. 2G-144-16
2017/02/03 BC Hydro F2017-F2019 Revenue Requirements
British Columbia Hydro and Power Authority ~ F2017 to F2019 Revenue Requirements Application ~ Project No. 3698869

Panel: D. Morton Panel Chair, K. Keilty and D. Enns

Hearing Location:
Date & Time: @
Location: , ,

Intervener Evidence (if any)G-144-16
2017/02/17 BC Hydro F2017-F2019 Revenue Requirements
British Columbia Hydro and Power Authority ~ F2017 to F2019 Revenue Requirements Application ~ Project No. 3698869

Panel: D. Morton Panel Chair, K. Keilty and D. Enns

Hearing Location:
Date & Time: @
Location: , ,

Commission, BC Hydro and Intervener IRs on Intervener Evidence (if any)G-144-16
2017/03/03 BC Hydro F2017-F2019 Revenue Requirements
British Columbia Hydro and Power Authority ~ F2017 to F2019 Revenue Requirements Application ~ Project No. 3698869

Panel: D. Morton Panel Chair, K. Keilty and D. Enns

Hearing Location:
Date & Time: @
Location: , ,

Intervener Responses to IRs on Intervener Evidence (if any)G-144-16
2017/03/10 BC Hydro F2017-F2019 Revenue Requirements
British Columbia Hydro and Power Authority ~ F2017 to F2019 Revenue Requirements Application ~ Project No. 3698869

Panel: D. Morton Panel Chair, K. Keilty and D. Enns

Hearing Location:
Date & Time: @
Location: , ,

BC Hydro Rebuttal Evidence (if any)G-144-16
2017/03/13 BC Hydro F2017-F2019 Revenue Requirements
British Columbia Hydro and Power Authority ~ F2017 to F2019 Revenue Requirements Application ~ Project No. 3698869

Panel: D. Morton Panel Chair, K. Keilty and D. Enns

Hearing Location:
Date & Time: @
Location: , ,

Oral Hearing Commences (if oral proceeding)G-144-16
2017/03/20 BC Hydro F2017-F2019 Revenue Requirements
British Columbia Hydro and Power Authority ~ F2017 to F2019 Revenue Requirements Application ~ Project No. 3698869

Panel: D. Morton Panel Chair, K. Keilty and D. Enns

Hearing Location:
Date & Time: @
Location: , ,

BC Hydro Final Argument (if written proceeding)G-144-16
2017/04/10 BC Hydro F2017-F2019 Revenue Requirements
British Columbia Hydro and Power Authority ~ F2017 to F2019 Revenue Requirements Application ~ Project No. 3698869

Panel: D. Morton Panel Chair, K. Keilty and D. Enns

Hearing Location:
Date & Time: @
Location: , ,

Intervener Final Argument (if written proceeding)G-144-16
2017/04/28 BC Hydro F2017-F2019 Revenue Requirements
British Columbia Hydro and Power Authority ~ F2017 to F2019 Revenue Requirements Application ~ Project No. 3698869

Panel: D. Morton Panel Chair, K. Keilty and D. Enns

Hearing Location:
Date & Time: @
Location: , ,

BC Hydro Reply Argument (if written proceeding)G-144-16