British Columbia Utilities Commission Generic Cost of Capital Proceeding (GCOC) Stage 1 ~ Project No.3698660

Hearing and Other Documents

Arguments

Exhibits

"A" Exhibits - Commission Documents

DateTitleDocument Description
Feb 28, 2012 A-1 Letter Dated February 28, 2012 and Order G-20-12 – Establishing an initial Regulatory Timetable
Apr 17, 2012 A-2 Letter Dated April 17, 2012 – Response clarifying Union Gas’s Intervener Status
Apr 18, 2012 A-3 Letter dated April 18, 2012 and Order G-47-2012 – Reasons for Decision and Final Scoping Document
Apr 18, 2012 A-4 Letter dated April 18, 2012 – Appointment of Panel
Apr 19, 2012 A-5 Letter dated April 19, 2012 - Order G-50-12 List of Further Procedural Matters
Jun 1, 2012 A-6 Letter dated June 1, 2012 - Order G-72-12 Issuing Preliminary Timetable, PACA costs, Final Minimum Filing Requirements for Affected Utilities
Jun 6, 2012 A-7 Letter dated June 6, 2012- Request for Variance of Order G-72-12
Jun 8, 2012 A-8 Letter dated June 8, 2012 – Commission Consultant’s Survey Report
Jun 20, 2012 A-9 Letter dated June 20, 2012 –Order G-84-12 Amended Preliminary Regulatory Timetable
Jul 27, 2012 A-10 Letter dated July 27, 2012 – Request for comments on the addition of a panel member
Aug 23, 2012 A-11 Letter dated August 22, 2012 – Appointment of Commissioner Mr. Giammarino
Aug 31, 2012 A-12 Letter dated August 31, 2012 – Information Request No. 1 to FortisBC Utilities
Aug 31, 2012 A-13 CONFIDENTIAL Letter dated August 31, 2012 – CONFIDENTIAL Information Request No. 1 to FortisBC Utilities
Aug 31, 2012 A-14 Letter dated August 31, 2012 – Information Request No. 1 to PNG
Aug 31, 2012 A-15 Letter dated August 31, 2012 – Information Request No. 1 to Corix
Sep 13, 2012 A-16 Letter dated September 13, 2012 – L-52-12 Amending Regulatory Timetable
Sep 27, 2012 A-17 Letter dated September 27, 2012 – Agenda for Procedural Conference
Oct 10, 2012 A-18 Letter dated October 9, 2012 – Information Request No. 2 to FortisBC Utilities
Oct 10, 2012 A-19 CONFIDENTIAL Letter dated October 9, 2012 – CONFIDENTIAL Information Request No. 2 to FortisBC Utilities
Oct 10, 2012 A-20 Letter dated October 9, 2012 –Information Request No. 2 to Corix
Oct 11, 2012 A-21 Letter dated October 11, 2012 – Order G-148-12 and Reasons for Decision
Oct 24, 2012 A-22 Letter dated October 24, 2012 –Request to Access Confidential Material
Oct 31, 2012 A-23 Letter dated October 31, 2012 - Access to Confidential Material Response
Nov 1, 2012 A-24 Letter November 1, 2012 – Confidential Material Access to AMPC (Exhibit C6-11)
Nov 16, 2012 A-25 Letter dated November 16, 2012– Information Request No. 1 to ICG on Intervener Evidence
Nov 16, 2012 A-26 Letter dated November 16, 2012– Information Request No. 1 to AMPC on Intervener Evidence
Nov 20, 2012 A-27 Letter dated November 20, 2012 – Request for submissions
Dec 3, 2012 A-28 Letter dated December 3, 2012 – Oral Public Hearing Information
Dec 5, 2012 A-29 Letter dated December 5, 2012 – Opening Statements Clarification
Dec 10, 2012 A-30 Letter dated December 10, 2012 - Commission Order G-187-12 establishing the current ROE and capital structure
Feb 14, 2013 A-31 Letter dated February 14, 2013 – Commission Response to request for extension
Feb 28, 2012 A2-1 Letter Dated February 28, 2012 Commission Staff filing British Columbia Utilities Commission letter dated November 28, 2011-Preliminary Notification of Initiation of Generic Cost of Capital Proceeding
Feb 28, 2012 A2-2 Letter Dated February 28, 2012 Commission Staff filing The Terasen Utilities (December 8, 2010) – Automatic Adjustment Mechanism Review
Jun 8, 2012 A2-3 Letter dated June 8, 2012 – Commission Staff filing The Brattle Group Survey of Cost of Capital Practices in Canada
Jul 12, 2012 A2-4 Letter dated July 12, 2012 - Commission Staff filing Response to AMPC Information Request to Commission Consultants
Jul 12, 2012 A2-5 Letter dated July 12, 2012 - Commission Staff filing Response to FEU Information Request on the Consultants Survey Report
Jul 12, 2012 A2-6 Letter dated July 12, 2012 - Commission Staff filing Response to Industrial Customer Group Information Request on the Consultants Survey Report
Jul 12, 2012 A2-7 Letter dated July 12, 2012 - Commission Staff filing Response to BCOAPO Information Request to Consultants Report
Jul 12, 2012 A2-8 Letter dated July 12, 2012 - Commission Staff filing Response to CEC Information Request to Consultants Report
Jul 16, 2012 A2-9 Letter dated July 13, 2012 – Commission Staff filing BCUC Request for Proposal for a Survey of Canadian Cost of Capital Practice Report
Aug 31, 2012 A2-10 Letter dated August 31 2012 – Commission Staff filing Behavior of the Firm under Regulatory Constraint by Harvey Averch and Leland L. Johnson
Aug 31, 2012 A2-11 Letter dated August 31 2012 – Commission Staff filing Extract from Terasen 2005 and 209 ROE CAP applications
Aug 31, 2012 A2-12 Letter dated August 31 2012 – Commission Staff filing Extract from FEU 2012-13RR Decision
Aug 31, 2012 A2-13 Letter dated August 31 2012 – Commission Staff filing extract from Bloomberg News (Report dated August 6, 2012)
Aug 31, 2012 A2-14 Letter dated August 31 2012 – Commission Staff filing Capital Structure - A Comparison
Aug 31, 2012 A2-15 Letter dated August 31 2012 – Commission Staff filing Summaries of Reports and Notes from Recent Credit Rating Agencies and Investment Banks on FEI’s Risk and Credit Metrics
Aug 31, 2012 A2-16 Letter dated August 31 2012 – Commission Staff filing Extract from Washington Utilities and Transportation Commission Order 08 Decision
Aug 31, 2012 A2-17 Letter dated August 31 2012 – Commission Staff filing Fitch Affirms National Fuel Gas’ IDR at ‘A’
Aug 31, 2012 A2-18 Letter dated August 31 2012 – Commission Staff filing The City of Vancouver - District Energy Connectivity Standards Information for Developers
Aug 31, 2012 A2-19 Letter dated August 31 2012 – Commission Staff filing City of Surrey – District Energy System By-law, 2012, No. 17667
Aug 31, 2012 A2-20 Letter dated August 31 2012 – Commission Staff filing Extract from BCUC Information Request No. 2 to River District Energy Limited Partnership
Aug 31, 2012 A2-21 Letter dated August 31 2012 – Commission Staff Ontario Energy Board Report of the Board on the Cost of Capital for Ontario’s Regulated Utilities December 11, 2009
Aug 31, 2012 A2-22 Letter dated August 31 2012 – Commission Staff filing Ontario Energy Board Cost of Capital Parameter Updates for 2012 Cost of Service Applications for Rates Effective January 1, 2012
Aug 31, 2012 A2-23 Letter dated August 31 2012 – Commission Staff filing Summary of Reports from Recent Credit Rating Agencies and Investment Banks on PNG’s Risks and Credit Metrics
Oct 10, 2012 A2-24 Letter dated October 9, 2012 – Commission Staff filing Bradshaw et al. - Playing Favorites
Oct 10, 2012 A2-25 Letter dated October 9, 2012 –CTA-Risk-free rate determination
Oct 10, 2012 A2-26 Letter dated October 9, 2012 – Commission Staff filing Exhibit A2-26 OEB Cost of Capital Parameter, May 1 2012
Nov 16, 2012 A2-27 Letter dated November 16, 2012 - Commission Staff Filing Cost of Capital by Sector_NYU_Value Line Database
Nov 16, 2012 A2-28 Letter dated November 16, 2012 - Commission Staff Filing Gau, Thompson 2012 Capitalization Rate Study
Nov 16, 2012 A2-29 Letter dated November 16, 2012 - Commission Staff Filing Schaeffler and Weber-The Cost of Equity of Network Operators
Nov 16, 2012 A2-30 Letter dated November 16, 2012 - Commission Staff Filing TD-Long-Term Returns October 2012
Nov 16, 2012 A2-31 Letter dated November 16, 2012 - Commission Staff Filing Ashton et al- Analysts' Optimism in Earnings Forecasts
Nov 16, 2012 A2-32 Letter dated November 16, 2012 - Commission Staff Filing Understanding Corporate Bond Spreads Using Credit Default Swaps
Dec 12, 2012 A2-33 Submitted at Oral Hearing December 12, 2012 – Commission Staff Filing FEU 2012-2013 Revenue Requirements G-44-12 Compliance Filing
Dec 12, 2012 A2-33-1 Submitted at Oral Hearing December 13, 2012 – Commission Staff Filing PAGE 1 OF LETTER DATED MAY 1, 2012 TO BCUC FROM FORTISBC, WITH TWO PAGES ATTACHED
Dec 13, 2012 A2-34 Submitted at Oral Hearing December 13, 2012 – Commission Staff Filing Vancouver Sun Article Natural gas seen as green fuel
Dec 13, 2012 A2-35 Submitted at Oral Hearing December 13, 2012 – Commission Staff Filing Staff Witness Aid
Dec 17, 2012 A2-36 Submitted at Oral Hearing December 14, 2012 – Commission Staff Filing PAGES 7 TO 10 FROM STANDARD & POORS REPORT
Dec 17, 2012 A2-37 Submitted at Oral Hearing December 14, 2012 – Commission Staff Filing LONG-TERM ECONOMIC FORECAST, TD ECONOMICS,SEPTEMBER 18, 2012
Dec 17, 2012 A2-38 Submitted at Oral Hearing December 14, 2012 – Commission Staff Filing ATTACHMENT 8.2(A), PAGE 17 OF 18, RESULTS OF DIFFERENCES IN SYSTEMATIC RISK
Dec 17, 2012 A2-39 Submitted at Oral Hearing December 14, 2012 – Commission Staff Filing EXTRACT FROM ORDER NO. 09-176 FROM PUBLIC UTILITY COMMISSION OF OREGON
Dec 17, 2012 A2-40 Submitted at Oral Hearing December 14, 2012 – Commission Staff Filing RATING REPORT, FEBRUARY 29, 2012 FROM DBRS
Dec 17, 2012 A2-41 Submitted at Oral Hearing December 14, 2012 – Commission Staff Filing DOCUMENT HEADED MOODY'S INVESTORS SERVICE, CREDIT OPINION: FORTISBC ENERGY INC.
Dec 17, 2012 A2-42 Submitted at Oral Hearing December 14, 2012 – Commission Staff Filing FIVE-PAGE DOCUMENT, FIRST PAGE HEADED RETURNS ON AVERAGE COMMON STOCK EQUITY FOR SAMPLE OF U.S. UTILITIES
Dec 17, 2012 A2-43 Submitted at Oral Hearing December 17, 2012 – Commission Staff Filing Approaches to Estimating the Deemed Interest Rate for Long Term Debt
Dec 17, 2012 A2-44 Submitted at Oral Hearing December 17, 2012 – Commission Staff Filing excerpt of FEI Kelowna DES CPCN Application
Dec 19, 2012 A2-45 Submitted at Oral Hearing December 17, 2012 – DOCUMENT HEADED CREDIT RATING AND EQUITY RISK PREMIUM
Dec 19, 2012 A2-46 Submitted at Oral Hearing December 18, 2012 – Commission Staff Filing DOCUMENT HEADED WEATHERING THE HEADWINDS TO CANADA'S ECONOMIC GROWTH…21 NOVEMBER 2012
Dec 19, 2012 A2-47 Submitted at Oral Hearing December 18, 2012 – Commission Staff Filing DOCUMENT HEADED PUGET SOUND ENERGY INC.
Dec 19, 2012 A2-48 Submitted at Oral Hearing December 18, 2012 – Commission Staff Filing DOCUMENT HEADED POWER & UTILITIES RESEARCH, THE ONE-TWO PUNCH: GROWTH COMBINED WITH ATTRACTIVE YIELD
Dec 19, 2012 A2-48-1 Submitted at Oral Hearing December 18, 2012 – Commission Staff Filing EXTRACT FROM BMO CAPITAL MARKETS, PAGE 11, HEADED POWER & UTILITIES
Dec 20, 2012 A2-49 Submitted at Oral Hearing December 19, 2012 – Commission Staff Filing EXTRACT FROM ONTARIO ENERGY BOARD, REPORT OF BOARD, DECEMBER 20, 2006
Dec 20, 2012 A2-50 Submitted at Oral Hearing December 19, 2012 – Commission Staff Filing EXTRACT FROM RENEWING ONTARIO'S ELECTRICITY DISTRIBUTION SECTOR: PUTTING THE CONSUMER FIRST
Dec 20, 2012 A2-51 Submitted at Oral Hearing December 19, 2012 – Commission Staff Filing WITNESS AID PREPARED BY COMMISSION STAFF ENTITLED INFORMED EXPERT JUDGMENT
   

"B" Exhibits - Proponent Documents

DateTitleDocument Description
Mar 16, 2012 B1-1 BC UTILITIES OF FORTIS INC. COMPRISED OF FORTISBC ENERGY INC., FORTISBC ENERGY VANCOUVER ISLAND INC., FORTISBC ENERGY WHISTLER INC. AND FORTISBC INC. (FBCU) Letter Dated March 15, 2012 – Notice of Registration
Mar 21, 2012 B1-2 Letter Dated March 21, 2012 – FBCU Submission on the Preliminary Scoping Document
May 3, 2012 B1-3 Letter Dated May 3, 2012 – FBCU Submission on Minimum Filing Requirements
May 9, 2012 B1-4 Letter Dated May 9, 2012 – FBCU Submission regarding Order G-50-12 Appendix A
Jun 5, 2012 B1-5 Letter Dated June 5, 2012 – FBCU Submitting Request for Variance of Preliminary Regulatory Timetable
Jun 12, 2012 B1-6 Letter Dated June 5, 2012 – FBCU Reply Submissions regarding Request for Variance of Preliminary Regulatory Timetable
Jun 22, 2012 B1-7 Letter Dated June 22, 2012 – FBCU Submitting Information Request regarding the Commission Consultant Survey Report
Aug 3, 2012 B1-8 Letter Dated August 2, 2012 – FBCU Submitting comments regarding the addition of a panel member
Aug 3, 2012 B1-9 Letter Dated August 3, 2012 – FBCU Submitting Evidence
Aug 3, 2012 B1-9-1 Letter Dated August 3, 2012 – FBCU Submitting Evidence Appendix A – Sections 1 to 2
Aug 3, 2012 B1-9-2 Letter Dated August 3, 2012 – FBCU Submitting Evidence Appendix A – Section 3A – Debt Investment Analyst Reports for FEI
Aug 3, 2012 B1-9-3 Letter Dated August 3, 2012 – FBCU Submitting Evidence Appendix A – Section 3B – Equity Analyst Reports Beacon to Credit Suisse
Aug 3, 2012 B1-9-4 Letter Dated August 3, 2012 – FBCU Submitting Evidence Appendix A – Section 3B – Equity Analyst Reports Macquarie to UBS
Aug 3, 2012 B1-9-5 Letter Dated August 3, 2012 – FBCU Submitting Evidence Appendix A – Sections 4 to 11
Aug 3, 2012 B1-9-6 Letter Dated August 3, 2012 – FBCU Submitting Evidence Appendices B to J
Aug 3, 2012 B1-9-7 CONFIDENTIAL Letter Dated August 3, 2012 – FBCU Submitting Evidence CONFIDENTIAL Appendices
Sep 24, 2012 B1-10 Letter Dated September 24, 2012 – FBCU Submitting Response to BCPSO IR No. 1
Sep 25, 2012 B1-11 Letter Dated September 24, 2012 – FBCU Response to BC Utility Customers IR1 – FBCU
Sep 25, 2012 B1-12 Letter Dated September 24, 2012 – FBCU Response to BC Utility Customers IR1 – AEngen
Sep 25, 2012 B1-13 Letter Dated September 24, 2012 – FBCU Response to BC Utility Customers IR1 – Concentric
Sep 25, 2012 B1-14 Letter Dated September 24, 2012 – FBCU Response to BC Utility Customers IR1 – Dr.VanderWeide
Sep 25, 2012 B1-15 Letter Dated September 24, 2012 – FBCU Response to BC Utility Customers IR1 – KMcShane
Sep 25, 2012 B1-16 Letter Dated September 24, 2012 – FBCU Response to ICG IR No.1 - AEngen
Sep 25, 2012 B1-17 Letter Dated September 24, 2012 – FBCU Response to ICG IR No.1 - Concentric
Sep 25, 2012 B1-18 Letter Dated September 24, 2012 – FBCU Response to ICG IR No.1 - Dr.VanderWeide
Sep 25, 2012 B1-19 Letter Dated September 24, 2012 – FBCU Response to ICG IR No.1 - KMcShane
Sep 25, 2012 B1-20 Letter Dated September 24, 2012 – FBCU Response to BCUC IR No.1
Sep 25, 2012 B1-20-1 CONFIDENTIAL Letter Dated September 24, 2012 – FBCU Confidential Response to BCUC IR No.1
Sep 25, 2012 B1-21 CONFIDENTIAL Letter Dated September 24, 2012 – FBCU Response to Confidential BCUC IR No.1
Oct 12, 2012 B1-22 Submitted at Procedural Conference Letter Dated October 3, 2012 – FBCU Counsel's Oral Submissions
Oct 26, 2012 B1-23 Letter dated October 26, 2012 – FBCU Response to Confidentiality Request
Oct 29, 2012 B1-24 Letter dated October 29, 2012 – FBCU Response to BCUC IR No. 2
Oct 29, 2012 B1-25 CONFIDENTIAL Letter dated October 29, 2012 – FBCU Response to BCUC Confidential IR No. 2
Oct 29, 2012 B1-26 Letter dated October 29, 2012 – FBCU Response to BCPSO IR No. 2
Nov 2, 2012 B1-27 Letter dated November 2, 2012 – FBCU Comments regarding Confidential Material Access
Nov 16, 2012 B1-28 Letter dated November 16, 2012 – FBCU Submitting IR No. 1 to AMPC/BC Utility Customers on the Evidence of Dr. Booth
Nov 16, 2012 B1-29 Letter dated November 16, 2012 – FBCU Submitting IR No. 1 to ICG on the Evidence of Dr. Safir
Nov 23, 2012 B1-30 Letter Dated November 23, 2012 – FBCU Submission on Interim Rates Jan 1, 2013
Nov 30, 2012 B1-31 Letter Dated November 30, 2012 – FBCU Submitting Witness Panels and Direct Testimony
Dec 6, 2012 B1-32 Letter dated December 6, 2012 – FBCU Submitting Rebuttal Evidence
Dec 10, 2012 B1-33 Letter dated December 10, 2012 – FBCU Submitting Opening Statement
Dec 12, 2012 B1-34 Submitted at Oral Hearing December 12, 2012 – FBCU Written Opening Statement of Counsel
Dec 12, 2012 B1-35 Submitted at Oral Hearing December 12, 2012 – FBCU Revised: Exhibit B1-9-6, Appendix H, page 51, Figure 34
Dec 13, 2012 B1-36 Submitted at Oral Hearing December 12, 2012 – FBCU Undertaking No. 1
Dec 13, 2012 B1-37 Submitted at Oral Hearing December 12, 2012 – FBCU Undertaking No. 2
Dec 13, 2012 B1-38 Submitted at Oral Hearing December 13, 2012 – FBCU Undertaking No. 3
Dec 13, 2012 B1-39 Submitted at Oral Hearing December 13, 2012 – FBCU Undertaking No. 4
Dec 13, 2012 B1-40 Submitted at Oral Hearing December 13, 2012 – FBCU Undertaking No. 5
Dec 13, 2012 B1-41 Submitted at Oral Hearing December 13, 2012 – FBCU Undertaking No. 6
Dec 14, 2012 B1-42 Submitted at Oral Hearing December 13, 2012 – FBCU Undertaking No. 7
Dec 14, 2012 B1-43 Submitted at Oral Hearing December 13, 2012 – FBCU Undertaking No. 8
Dec 14, 2012 B1-44 Submitted at Oral Hearing December 13, 2012 – FBCU Undertaking No. 9
Dec 14, 2012 B1-45 Submitted at Oral Hearing December 14, 2012 – FBCU Undertaking No. 10
Dec 14, 2012 B1-46 Submitted at Oral Hearing December 14, 2012 – FBCU Undertaking No. 11
Dec 14, 2012 B1-47 Submitted at Oral Hearing December 14, 2012 – FBCU Filing Testimony of Kathleen C. McShane Tab 2
Dec 17, 2012 B1-48 Submitted at Oral Hearing December 17, 2012 – FBCU Undertaking No. 12
Dec 18, 2012 B1-49 Submitted at Oral Hearing December 18, 2012 – FBCU Filing Testimony Figures Update
Jan 3, 2013 B1-49-1 Letter received January 3, 2013 – FBCU Filing Remaining Chart Updates
Dec 20, 2012 B1-50 Submitted at Oral Hearing December 19, 2012 – FBCU Filing 104 PAGE COLLECTION OF DOCUMENTS USED IN CROSS EXAMINATION OF DR. BOOTH
Dec 24, 2012 B1-51 Submitted at Oral Hearing December 21, 2012 – FBCU Filing COMPENDIUM OF EXTRACTS, FIRST PAGE ENTITLED FAIR RETURN FOR TERASEN GAS INC (TGI) AUGUST 2009
Jan 3, 2013 B1-52 Letter received January 3, 2013 – FBCU Undertaking No. 13
Jan 3, 2013 B1-53 Letter received January 3, 2013 – FBCU Undertaking No. 14
Jan 3, 2013 B1-54 Letter received January 3, 2013 – FBCU Undertaking No. 15
Jan 3, 2013 B1-55 Letter received January 3, 2013 – FBCU Undertaking No. 16
Jan 3, 2013 B1-56 Letter received January 3, 2013 – FBCU Undertaking No. 17
Jan 3, 2013 B1-57 Letter received January 3, 2013 – FBCU Undertaking No. 18
Jan 3, 2013 B1-58 Letter received January 3, 2013 – FBCU Undertaking No. 19
Jan 3, 2013 B1-59 Letter received January 3, 2013 – FBCU Undertaking No. 20
Jan 29, 2013 B1-60 Letter received January 29, 2013 – FBCU Undertaking No. 21
Jan 29, 2013 B1-61 Letter received January 29, 2013 – FBCU Undertaking No. 22
Jan 29, 2013 B1-62 Letter received January 29, 2013 – FBCU Undertaking No. 23
Jan 29, 2013 B1-63 Letter received January 29, 2013 – FBCU Undertaking No. 24
Jan 29, 2013 B1-64 Letter received January 29, 2013 – FBCU Undertaking No. 25
Jan 29, 2013 B1-65 Letter received January 29, 2013 – FBCU Undertaking No. 26
Jan 29, 2013 B1-66 Letter received January 29, 2013 – FBCU Undertaking No. 27
Jan 29, 2013 B1-67 Letter received January 29, 2013 – FBCU Undertaking No. 28
Jan 29, 2013 B1-68 Letter received January 29, 2013 – FBCU Undertaking No. 29
Mar 16, 2012 B2-1 CORIX MULTI-UTILITY SERVICES INC. (CORIX) Letter Dated March 14, 2012 – Notice of Registration
Mar 22, 2012 B2-2 Letter Dated March 21, 2012 – Corix Submission on the Preliminary Scoping Document
May 3, 2012 B2-3 Letter Dated May 3, 2012 – Corix Submission on Minimum Filing Requirements
May 10, 2012 B2-4 Letter Dated May 9, 2012 – Corix Submission regarding Order G-50-12 Appendix A
Jun 11, 2012 B2-5 Letter Dated June 8, 2012 – Corix Submission on FBCU Request for Variance
Aug 3, 2012 B2-6 Letter Dated August 3, 2012 – Corix Submitting comments regarding the addition of a panel member
Aug 3, 2012 B2-7 Letter Dated August 3, 2012 – Corix Submitting Evidence
Sep 24, 2012 B2-8 Letter Dated September 24, 2012 – Corix Submitting Response to BCPSO IR No. 1
Sep 24, 2012 B2-9 Letter Dated September 24, 2012 – Corix Submitting Response to BCUC IR No. 1
Oct 18, 2012 B2-10 Letter Dated October 18, 2012 – Corix Submitting Response to BCUC IR No. 2
Nov 23, 2012 B2-11 Letter Dated November 23, 2012 – Corix Submission regarding A-27
Dec 19, 2012 B2-12 PENDING - Submitted at Oral Hearing December 18, 2012 – Corix Filing OPENING REMARKS OF COUNSEL FOR CORIX MULTIUTILITY SERVICES INC., DECEMBER 12, 2012
Dec 24, 2012 B2-13 Submitted December 24, 2012 – Corix Filing Undertaking Document titled BEFORE THE FLORIDA PUBLIC SERVICE COMMISSION
Dec 24, 2012 B2-14 Submitted December 24, 2012 – Corix Filing Undertaking Document titled Comparison of Business Risk Adjustments in Cost of Capital Testimony Filed by Ms. Pauline M. Ahern
Jan 3, 2013 B2-15 Letter received January 3, 2013 - Corix Filing response to undertaking
Mar 19, 2012 B3-1 PACIFIC NORTHERN GAS LTD. AND PACIFIC NORTHERN GAS N.E. LTD. (PNG) Online Registration Dated March 16, 2012 – Notice of Registration
Mar 21, 2012 B3-2 Letter Dated March 21, 2012 – PNG Submission on the Preliminary Scoping Document
May 3, 2012 B3-3 Letter Dated May 3, 2012 – PNG Submission on Minimum Filing Requirements
May 9, 2012 B3-4 Letter Dated May 9, 2012 – PNG Submission regarding Order G-50-12 Appendix A
Jun 8, 2012 B3-5 Letter Dated June 8, 2012 – PNG Submission regarding variance of the Regulatory Timetable
Aug 3, 2012 B3-6 Letter Dated August 3, 2012 – PNG Submitting comments regarding the addition of a panel member
Aug 3, 2012 B3-7 Letter Dated August 3, 2012 – PNG Submitting Evidence
Sep 24, 2012 B3-8 Letter Dated September 24, 2012 – PNG Submitting Response to BCUC IR No. 1
Sep 24, 2012 B3-9 Letter Dated September 24, 2012 – PNG Submitting Response to BCPSO
Sep 24, 2012 B3-10 Letter Dated September 24, 2012 – PNG Submitting Response to AMPC, BCPSO and CEC
Nov 23, 2012 B3-11 Letter Dated November 23, 2012 – PNG Submission regarding A-27
Nov 30, 2012 B3-12 Letter Dated November 30, 2012 – PNG Submitting Comments regarding Witness Panels
Mar 16, 2012 B4-1 BRITISH COLUMBIA HYDRO AND POWER AUTHORITY (BCH) Letter Dated March 12, 2012 – Notice of Registration
Mar 21, 2012 B4-2 Letter Dated March 21, 2012 – BCH Submission on the Preliminary Scoping Document
May 3, 2012 B4-3 Letter Dated May 3, 2012 – BCH Submission on Minimum Filing Requirements
May 9, 2012 B4-4 Letter Dated May 9, 2012 – BCH Submission regarding Order G-50-12 Appendix A
Jun 8, 2012 B4-5 Letter Dated June 8, 2012 – BCH Submission regarding variance of the Regulatory Timetable
Aug 3, 2012 B4-6 Letter Dated August 3, 2012 – BCH Submitting comments regarding the addition of a panel member
Nov 23, 2012 B4-7 Letter Dated November 23, 2012 - BCH Submission regarding A-27
Nov 30, 2012 B4-8 Letter Dated November 30, 2012 – BCH Submitting Comments regarding Witness Panels
Mar 16, 2012 B5-1 RIVER DISTRICT ENERGY (RDE ) Letter Dated March 12, 2012 – Notice of Registration
Jul 2, 2013 BCUC July 2, 2013 Response to FBCU Request for Variance of the Regulatory Timetable
Jun 27, 2013 BCUC June 27, 2013 Requests for Written Submissions on AAM
   

"C" Exhibits - Intervener Documents

DateTitleDocument Description
Mar 9, 2012 C1-1 UNION GAS LIMITED (UG) Letter dated March 5, 2012 – Request for Intervener Status by Patrick McMahon
Mar 19, 2012 C2-1 CANADIAN OFFICE AND PROFESSIONAL EMPLOYEES’ UNION, LOCAL 378 (COPE 378) Letter dated March 15, 2012 – Request for Intervener Status by James Quail
Mar 21, 2012 C2-1-1 Letter dated March 20, 2012 – COPE 378 Submitting Intervention Supplementary Comments
Apr 20, 2012 C2-2 Letter dated April 19, 2012 - COPE 378 Submitting Updating Consultant details
Jun 27, 2012 C2-3 Letter dated June 26, 2012 - COPE 378 Submitting Updating Consultant information
Mar 21, 2012 C3-1 SENTINEL ENERGY MANAGEMENT (SEM) Online Registration dated March 20, 2012 – Request for Intervener Status by Jim Langley
Mar 21, 2012 C4-1 INDUSTRIAL CUSTOMERS GROUP (ICG) Letter dated March 20, 2012 Via Email – Request for Intervener Status by Robert Hobbs and Brian Merwin
Mar 23, 2012 C4-2 Letter Dated March 21, 2012 – ICG Submission on the Preliminary Scoping Document
May 3, 2012 C4-3 Letter Dated May 3, 2012 – ICG Submission regarding the Preliminary Minimum Filing Requirements for Affected Utilities
May 9, 2012 C4-4 Letter Dated May 9, 2012 – ICG Submission regarding Order G-50-12 Appendix A
Jun 8, 2012 C4-5 Letter Dated June 8, 2012 – ICG Submission regarding variance of the Regulatory Timetable
Jun 21, 2012 C4-6 Letter Dated June 21, 2012 – ICG Submitting Information Request regarding the Commission Consultant Survey Report
Sep 4, 2012 C4-7 Letter Dated August 31, 2012 – ICG Submitting Information Request No. 1
Oct 24, 2012 C4-8 Letter Dated October 24, 2012 - ICG Submitting Comments regarding Request for Confidential Information
Nov 6, 2012 C4-9 Letter dated November 5, 2012 – ICG Submitting Evidence
Nov 27, 2012 C4-10 Letter dated November 6, 2012 – ICG Submitting Confidential Undertakings
Dec 3, 2012 C4-11 Letter dated November 30, 2012 – ICG Submitting Responses to Information Request No. 1
Dec 4, 2012 C4-12 Letter dated November 30, 2012 – ICG Submission regarding Exhibit A-27
Dec 13, 2012 C4-13 Submitted at Oral Hearing December 12, 2012 – ICG Opening Comments
Dec 14, 2012 C4-14 Submitted at Oral Hearing December 14, 2012 – ICG Filing Tab 2 Testimony of Kathleen C. McShane
Dec 18, 2012 C4-15 Submitted at Oral Hearing December 17, 2012 – ICG Filing OPENING STATEMENT OF DR. ANDREW SAFIR
Jan 15, 2013 C4-16 Letter dated January 14, 2013 – ICG Submitting Undertakings
Jan 25, 2013 C4-17 Letter dated January 25, 2013 – ICG Submitting Dr. Lawrence Booth Undertaking No. 2
Mar 21, 2012 C5-1 BRITISH COLUMBIA OLD AGE PENSIONERS’ ORGANIZATION (BCOAPO) VIA EMAIL Letter Dated March 20, 2012 – Request for Intervener Status by Leigha Worth, Tannis Braithwaite and Bill Harper
Mar 23, 2012 C5-2 Letter Dated March 21, 2012 – BCOAPO Submission on the Preliminary Scoping Document
May 7, 2012 C5-3 Letter Dated May 3, 2012 – BCOAPO Submission on Minimum Filing Requirements
May 10, 2012 C5-4 Letter Dated May 9, 2012 – BCOAPO Submission regarding Order G-50-12 Appendix A
Jun 8, 2012 C5-5 Letter Dated June 8, 2012 – BCOAPO Submission regarding variance of the Regulatory Timetable
Jun 22, 2012 C5-6 Letter Dated June 22, 2012 – BCOAPO Submitting Information Request regarding the Commission Consultant Survey Report
Jul 23, 2012 C5-7 Letter dated July 23, 2012 – BCOAPO Submitting notice of Name Change to British Columbia Pensioners’ and Seniors’ Organization (BCPSO)
Aug 3, 2012 C5-8 Letter Dated August 3, 2012 – BCPSO Submitting comments regarding the addition of a panel member
Aug 31, 2012 C5-9 Letter Dated August 31, 2012 – BCPSO Submitting Information Request No. 1 to Corix
Aug 31, 2012 C5-10 Letter Dated August 31, 2012 – BCPSO Submitting Information Request No. 1 to FBCU
Aug 31, 2012 C5-11 Letter Dated August 31, 2012 – BCPSO Submitting Information Request No. 1 to PNG
Oct 11, 2012 C5-12 Letter Dated October 9, 2012 - BCPSO Submitting Information Request No. 2 to FBCU
Oct 11, 2012 C5-13 Letter Dated October 9, 2012 - BCPSO Submitting Contact Update
Nov 30, 2012 C5-14 Letter Dated November 30, 2012 - BCPSO Submission regarding Exhibit A-27
Dec 18, 2012 C5-15 Submitted at Oral Hearing December 17, 2012 – BCPSO filing BUSINESS SPECTATOR DOCUMENT
Mar 21, 2012 C6-1 ASSOCIATION OF MAJOR POWER CUSTOMERS OF BC (AMPC) Letter Dated March 20, 2012 – Request for Intervener Status by Richard Stout and Lloyd Guenther
May 3, 2012 C6-2 Letter Dated May 2, 2012 – AMPC Submitting Contact Update
May 7, 2012 C6-3 Letter Dated May 3, 2012 – AMPC Submission on Minimum Filing Requirement
May 10, 2012 C6-4 Letter Dated May 9, 2012 – AMPC Submission regarding Order G-50-12 Appendix A
Jun 8, 2012 C6-5 Letter Dated June 8, 2012 – AMPC Submission regarding variance of the Regulatory Timetable
Jun 22, 2012 C6-6 Letter Dated June 22, 2012 – AMPC Submitting Information Request regarding the Commission Consultant Survey Report
Aug 3, 2012 C6-7 Letter Dated August 3, 2012 – AMPC Submitting comments regarding the addition of a panel member
Sep 5, 2012 C6-8 Letter Dated August 31, 2012 – Filing on behalf of BCUC Utility Customers AMPC/BCPSO/CEC Information Request No. 1 to FBCU
Sep 5, 2012 C6-9 Letter Dated August 31, 2012 – Filing on behalf of BCUC Utility Customers AMPC/BCPSO/CEC Information Request No. 1 to FBCU on Mr. Engen’s Evidence
Sep 24, 2012 C6-9-1 Letter Dated September 23, 2012 – Filing on behalf of BCUC Utility Customers AMPC/BCPSO/CEC CORRECTED Information Request No. 1 to FBCU on Mr. Engen’s Evidence
Oct 23, 2012 C6-10 Letter Dated October 22, 2012 - AMPC Filing a Request for Confidential Information
Nov 1, 2012 C6-11 Letter Dated October 31, 2012 - AMPC Submitting Comments regarding Access to Confidential Information
Nov 6, 2012 C6-12 Letter dated November 5, 2012 – AMPC Submitting Evidence
Nov 6, 2012 C6-13 Letter dated November 5, 2012 – AMPC Submitting Confidential Undertakings
Dec 3, 2012 C6-14 Letter dated November 30, 2012 – AMPC Submission regarding Exhibit A-27
Dec 4, 2012 C6-15 Letter dated November 30, 2012 – AMPC Submitting Responses to Information Request No. 1 to BCUC
Dec 4, 2012 C6-16 Letter dated November 30, 2012 – AMPC Submitting Responses to Information Request No. 1 to FBCU
Dec 13, 2012 C6-17 Submitted at Oral Hearing December 12, 2012 – AMPC filing BC Natural Gas Strategy Fueling BC’s Economy for the Next Decade and Beyond
Dec 14, 2012 C6-18 Submitted at Oral Hearing December 14, 2012 – AMPC filing AUC 2011 GCOC IR Responses CAPP McShane ROE Attach 17d
Dec 14, 2012 C6-19 Submitted at Oral Hearing December 14, 2012 – AMPC filing AUC 2011 GCOC IR Responses CAPP McShane ROE Attach 21 i
Dec 17, 2012 C6-20 Submitted at Oral Hearing December 17, 2012 – AMPC filing ALBERTA UTILITIES COMMISSION 2009 GENERIC COST OF CAPITAL PROCEEDING DIRECT TESTIMONY OF JAMES M. COYNE
Dec 19, 2012 C6-21 Submitted at Oral Hearing December 18, 2012 – AMPC filing WITNESS AID PREPARED BY BC UTILITIES CUSTOMERS
Dec 20, 2012 C6-22 Submitted at Oral Hearing December 19, 2012 – AMPC filing DR. BOOTH'S OPENING STATEMENT
Jan 22, 2013 C6-23 Letter dated January 18, 2013 – AMPC Submitting Dr. Booth Undertaking No. 1
Feb 14, 2013 C6-24 Letter Dated February 14, 2013 – AMPC Submitting Extension Request
Mar 21, 2012 C7-1 COMMERCIAL ENERGY CONSUMERS ASSOCIATION OF BRITISH COLUMBIA (CEC) Letter Dated March 20, 2012 – Request for Intervener Status by Christopher Weafer
May 10, 2012 C7-2 Letter Dated May 9, 2012 – CEC Submission regarding Order G-50-12 Appendix A
Jun 8, 2012 C7-3 Letter Dated June 8, 2012 – CEC Submission regarding variance of the Regulatory Timetable
Jun 25, 2012 C7-4 Letter dated June 25, 2012 – CEC Submitting Information Request regarding the Commission Consultant Survey Report
Aug 3, 2012 C7-5 Letter Dated August 3, 2012 – CEC Submitting comments regarding the addition of a panel member
Nov 13, 2012 C7-6 Letter dated November 9, 2012 – CEC Submitting Confidential Undertakings
   

"D" Exhibits - Interested Party Documents

Transcripts