BC Hydro

British Columbia Hydro and Power Authority ~ F2017 to F2019 Revenue Requirements Application ~ Project No. 3698869

Completed: 2018

Hearing and Other Documents

Title Document Description
*_Exhibit List Updated: January 22, 2018 @ 2:38 pm
*_Key Findings - Load Forecast Dated August 25, 2017
*_Decision and Order G-47-18 March 1, 2018

Arguments/Submissions

Title Document Description
BC Hydro Final Argument Final Argument May 23, 2017
McCandless Final Argument Final Argument June 8, 2017
Landale Final Argument Final Argument June 13, 2017
MoveUP Final Argument Final Argument June 13, 2017
Zone II Final Argument Final Argument June 13, 2017
BCSEA Final Argument Final Argument June 13, 2017
CEC Final Argument Final Argument June 13, 2017
BCOAPO Final Argument Final Argument June 13, 2017
AMPC Final Argument Final Argument June 13, 2017
CEBC Final Argument Final Argument June 13, 2017
NIARG Final Argument Final Argument June 13, 2017
CEBC Amended Final Argument Amended Final Argument June 15, 2017
SWF Final Argument Final Argument June 20, 2017
BC Hydro Reply Argument BC Hydro's Reply Argument - July 4, 2017
BC Hydro Final Argument Final Argument December 21, 2017
McCandless Final Argument Final Argument January 11, 2018
BCSEA Final Argument Final Argument January 15, 2018
FortisBC Final Argument Final Argument January 15, 2018
Zone II Final Argument Final Argument January 15, 2018
CEC Final Argument Final Argument January 15, 2018
CEABC Final Argument Final Argument January 15, 2018
NIARG Final Argument Final Argument January 15, 2018
BCOAPO Final Argument Final Argument January 15, 2018
AMPC Final Argument Final Argument January 15, 2018
SWF Final Argument Final Argument January 16, 2018
BC Hydro Reply Argument Reply Argument January 19, 2018
BC Hydro Final Argument on the Premier’s comments Final Argument on the Premier’s comments January 24, 2018
BCSEA Final Argument on the Premier’s comments Final Argument on the Premier’s comments January 25, 2018
BCOAPO Final Argument on the Premier’s comments Final Argument on the Premier’s comments January 25, 2018
Vulcano Final Argument on the Premier’s comments Final Argument on the Premier’s comments January 25, 2018
McCandless Final Argument on the Premier’s comments Final Argument on the Premier’s comments January 25, 2018
Zone II Final Argument on the Premier’s comments Final Argument on the Premier’s comments January 26, 2018
CEC Final Argument on the Premier’s comments Final Argument on the Premier’s comments January 26, 2018
AMPC Final Argument on the Premier’s comments Final Argument on the Premier’s comments January 26, 2018
FortisBC Final Argument on the Premier’s comments Final Argument on the Premier’s comments January 26, 2018
NIARG Final Argument on the Premier’s comments Final Argument on the Premier’s comments January 26, 2018
BC Hydro Reply Argument on the Premier’s comments Reply Argument on the Premier’s comments January 30, 2018

Exhibits

A Exhibits - BCUC Documents

Date Title Document Description
March 22, 2016 A-1 Letter dated March 22, 2016 - Panel Appointment
March 22, 2016 A-2 Letter dated March 22, 2016 - Commission Order G-40-16 approving interim rates
March 22, 2016 A-3 Letter dated March 22, 2016 - Community input sessions
May 16, 2016 A-4 Removed from Web Only - Letter dated May 16, 2016 – Community Input Sessions Information
May 27, 2016 A-4-1 Letter dated May 27, 2016 – Revised Community Input Sessions Information
August 09, 2016 A-5 Letter dated August 9, 2016 – Commission Order G-130-16 establishing Regulatory Timetable and Public Notice
August 09, 2016 A-5-1 Letter dated August 9, 2016 – Commission Order G-130-16A establishing Regulatory Timetable and Public Notice
August 17, 2016 A-6 Letter dated August 17, 2017 – Procedural Conference Information
September 07, 2016 A-7 Letter dated September 7, 2016 – Commission Order G-144-16 with reasons and Regulatory Timetable
September 28, 2016 A-8 Letter dated September 28, 2016 – Request for Submissions on Mr. Bryenton’s Request to Intervene
October 06, 2016 A-9 Letter dated October 6, 2016 – Commission Information Request No. 1 to BC Hydro
October 21, 2016 A-10 CONFIDENTIAL letter dated October 6, 2016 – Confidential Commission Information Request No. 1 to BC Hydro (Web version Cover Letter only)
October 25, 2016 A-11 Letter dated October 25, 2016 – Commission response to Mr. Bryenton’s Request to Intervene
November 17, 2016 A-12 Letter dated November 16, 2016 – Procedural Conference Information
December 02, 2016 A-13 Letter dated December 2, 2016 – Further Written Submissions
December 14, 2016 A-14 Letter dated December 14, 2016 – Commission Information Request No. 2 to BC Hydro
December 14, 2016 A-15 CONFIDENTIAL letter dated December 14, 2016 – Confidential Commission Information Request No. 2 to BC Hydro (Web version Cover Letter only)
January 06, 2017 A-16 Letter dated January 6, 2017 – Supplemental Commission Information Request to IR No. 2
January 20, 2017 A-17 Letter dated January 20, 2017 – Commission Order G-7-17 with Regulatory Timetable and reasons to follow
January 27, 2017 A-18 Letter dated January 27, 2017 – Commission Order G-7-17 Reasons for Decision
February 02, 2017 A-19 Letter dated February 2, 2017 – Commission suspending Regulatory Timetable in response to AMPC request for an extension of the deadline for intervener evidence Exhibit C9-5
February 03, 2017 A-20 Letter dated February 3, 2017 – Commission extending Intervener Evidence Deadline
February 09, 2017 A-21 Letter dated February 9, 2017 – Commission request for regulatory timetable comments
February 17, 2017 A-22 Letter dated February 17, 2017 – Commission Order G-20-17 with Regulatory Timetable
March 10, 2017 A-23 Letter dated March 10, 2017 – Commission Information Request No. 1 to AMPC
March 10, 2017 A-24 Letter dated March 10, 2017 – Commission Information Request No. 1 to Zone II
March 10, 2017 A-25 Letter dated March 10, 2017 – Commission Information Request No. 1 to BCSEA
March 16, 2017 A-26 Letter dated March 16, 2017 – Commission Order G-39-17 regarding interim rates
March 23, 2017 A-27 Letter dated March 23, 2017 – Commission Order G-46-17 regarding interim OATT rates
March 30, 2017 A-28 Letter dated March 30, 2017 – Commission Order G-50-17 providing time in the regulatory timetable for information requests on new evidence
April 24, 2017 A-29 Letter dated April 24, 2017 – Commission Information Request No. 3 – Rebuttal Evidence and New Evidence
April 25, 2017 A-30 Letter dated April 25, 2017 – Commission response to Landale request in Intervener Evidence
November 15, 2017 A-31 Letter dated November 15, 2017 - Panel letter regarding Procedural Conference
November 21, 2017 A-31-1 Letter dated November 21, 2017 – Correction regarding the PACA reference
November 27, 2017 A-32 Letter dated November 27, 2017 – Commission Order G-171-17 establishing a regulatory timetable
December 01, 2017 A-33 Letter dated December 1, 2017 – Commission Submitting Information Request on the Amended Application to BC Hydro
December 07, 2017 A-34 Letter dated December 7, 2017 – Commission correspondence amending the regulatory timetable
December 13, 2017 A-35 Letter dated December 13, 2017 – Commission correspondence amending the regulatory timetable
January 22, 2018 A-36 Letter dated January 22, 2018 – Commission Order G-16-18 establishing a regulatory timetable
June 24, 2016 A2-1 Letter dated June 23, 2016 – Commission staff filing BCUC Community Input Sessions Staff Presentation – Participating in BCUC Proceedings
June 24, 2016 A2-2 Letter dated June 23, 2016 – Commission staff filing BCUC Community Input Sessions Staff Presentation – Regulatory Process

B Exhibits - Applicant Documents

Date Title Document Description
March 22, 2016 B-1 Letter dated February 26, 2016 - BC Hydro application for approval of a interim refundable rate
July 28, 2016 B-1-1 Letter dated July 28, 2016 – BC Hydro Submitting Fiscal 2017 to Fiscal 2019 Revenue Requirements Application
July 29, 2016 B-1-1-1 CONFIDENTIAL Letter dated July 29, 2016 – BC Hydro Submitting Confidential Appendix J of the F2017-F2019 RRA Application
August 17, 2016 B-1-2 Letter dated August 18, 2016 - BC Hydro Submitting Errata No. 1 to the Application
August 17, 2016 B-1-3 Letter dated December 8, 2016 - BC Hydro Submitting Errata No. 2 to the Application
August 17, 2016 B-1-4 Letter dated December 21, 2016 - BC Hydro Submitting Appendix P Update - Smart Metering and Infrastructure Completion Report
August 17, 2016 B-1-5 Letter dated February 22, 2017 - BC Hydro Submitting Project Name Changes
August 18, 2016 B-2 Letter dated August 17, 2016 - BC Hydro Submitting Evidentiary Update
August 25, 2016 B-3 Letter dated August 25, 2016 - BC Hydro Submitting copies of Appendix B as published in news publications
August 29, 2016 B-4 Letter dated August 29, 2016 - BC Hydro Submitting Outline of Procedural Conference submission
September 23, 2016 B-5 Letter dated September 23, 2016 - BC Hydro Submitting Demand-Side Management Information Responses
September 23, 2016 B-6 Letter dated September 23, 2016 - BC Hydro Submitting Further Information on F2015 and F2016 Capital Additions and Forecast Capital Projects over Test Period
October 04, 2016 B-7 Letter dated October 4, 2016 - BC Hydro Submitting response on Mr. Bryenton’s Request to Intervene
November 21, 2016 B-8 CONFIDENTIAL Letter dated November 21, 2016 – BC Hydro Submitting Confidential Responses to BCUC Confidential Information Request No. 1 (Web version Cover Letter only)
November 21, 2016 B-9 Letter dated November 21, 2016 – BC Hydro Submitting Responses to BCUC Information Request No. 1
November 21, 2016 B-9-1 CONFIDENTIAL Letter dated November 21, 2016 – BC Hydro Submitting Confidential Responses to BCUC Information Requests No. 1 (Web version Cover Letter only)
November 21, 2016 B-9-1-1 CONFIDENTIAL Letter dated December 1, 2016 – BC Hydro Submitting Confidential Response to BCUC IR 1.5.1 Attachment 2 (Web version Cover Letter only)
November 21, 2016 B-9-2 Letter dated December 1, 2016 – BC Hydro Submitting Response to BCUC IR 1.5.1 Attachment 2 - Public Version
November 22, 2016 B-10 Letter dated November 21, 2016 – BC Hydro Submitting Responses to Interveners Information Request No. 1
November 22, 2016 B-10-1 CONFIDENTIAL Letter dated November 21, 2016 – BC Hydro Submitting Confidential Responses to Intervener Information Requests No. 1 (Web version Cover Letter only)
November 22, 2016 B-10-2 Letter dated December 1, 2016 – BC Hydro Submitting Response to AMPC IRs 1.4.2; 1.4.3; 1.4.7.2; 1.4.7.4; 1.4.7
November 24, 2016 B-11 Letter dated November 24, 2016 - BC Hydro Advanced Submission for Procedural Conference
January 04, 2017 B-12 Letter dated January 4, 2017 - BC Hydro Submitting Reply Submission
January 23, 2017 B-13 CONFIDENTIAL Letter dated January 23, 2017 - BC Hydro Submitting Response to Confidential Commission Information Request No. 2
January 23, 2017 B-14 Letter dated January 23, 2017 - BC Hydro Submitting Response to BCUC Information Request No. 2
January 23, 2017 B-14-1 CONFIDENTIAL Letter dated January 23, 2017 - BC Hydro Submitting Confidential Response to BCUC Information Request No. 2
January 23, 2017 B-14-1-1 CONFIDENTIAL Letter dated February 16, 2017 – BC Hydro Submitting Confidential Response to BCUC IR – Web cover letter
January 23, 2017 B-14-2 Letter dated February 16, 2017 – BC Hydro Submitting PUBLIC Response to BCUC IR
January 23, 2017 B-15 Letter dated January 23, 2017 - BC Hydro Submitting Responses to Intervener Information Request No. 2
January 23, 2017 B-15-1 CONFIDENTIAL Letter dated January 23, 2017 – BC Hydro Submitting Responses to Confidential Intervener Information Request No. 2
January 23, 2017 B-15-2 Letter dated February 16, 2017 – BC Hydro Submitting Responses to AMPC
January 23, 2017 B-15-3 Letter dated February 16, 2017 – BC Hydro Submitting Response to BCOAPO and CEA IR
January 23, 2017 B-15-4 Letter dated April 28, 2017 – BC Hydro Submitting revision to Attachment 1 to CEC IR 2.135.1
February 14, 2017 B-16 Letter dated February 14, 2017 – BC Hydro Submitting Regulatory Timetable Comments
March 03, 2017 B-17 Letter dated March 1, 2017 – BC Hydro Submission regarding Rate Schedules and updated Electric Tariff
March 10, 2017 B-18 Letter dated March 10, 2017 – BC Hydro Submission Providing notification of issuance of Order In Council No. 100 and 101
March 13, 2017 B-18-1 Letter dated March 13, 2017 – BC Hydro Correction of Submission Providing notification of issuance of Order In Council No. 100 and 101
March 28, 2017 B-19 Letter dated March 28, 2017 – BC Hydro Request for Confidential Information redacted in Zone II Responses to IRs
April 05, 2017 B-20 Letter dated April 5, 2017 –BC Hydro Submitting Rebuttal Evidence and information on the termination of Accenture contract
May 11, 2017 B-21 Letter dated May 11, 2017 –BC Hydro Submitting Responses to Commission IRs on Rebuttal Evidence
May 11, 2017 B-21-1 CONFIDENTIAL Letter dated May 11, 2017 –BC Hydro Submitting Confidential Responses to Commission IRs on Rebuttal Evidence
May 11, 2017 B-22 Letter dated May 11, 2017 –BC Hydro Submitting Responses to Intervener IRs on Rebuttal Evidence
May 11, 2017 B-22-1 CONFIDENTIAL Letter dated May 11, 2017 –BC Hydro Submitting Confidential Responses to Intervener IRs on Rebuttal Evidence
May 23, 2017 B-22-2 Letter dated May 11, 2017 –BC Hydro Submitting Revision to CEA IR No. 3.46.1
November 09, 2017 B-23 Letter dated November 8, 2017 - BC Hydro Requesting Rate Freeze
December 06, 2017 B-24 Letter dated December 6, 2017 - BC Hydro Requesting Filing Extension
December 15, 2017 B-25 Letter dated December 15, 2017 - BC Hydro Submitting Responses to Commission and Intervener Information Request No. 4 on the Amended Application

C Exhibits - Intervener Documents

BC SUSTAINABLE ENERGY ASSOCIATION AND SIERRA CLUB BC (BCSEA) Letter dated August 19, 2016 Request to Intervene by Thomas Hackney and William J. Andrews
CANADIAN OFFICE AND PROFESSIONAL EMPLOYEES UNION, LOCAL 378 ( MOVEUP) Letter dated August 17, 2016 Request to Intervene by Iain Reeve, Leigha Worth and Jim Quail
THE BRITISH COLUMBIA OLD AGE PENSIONERS ORGANIZATION ET AL. (BCOAPO) Letter dated August 25, 2016 Request to Intervene by Erin Pritchard
CLEAN ENERGY ASSOCIATION OF BC (CEABC) Letter dated July 28, 2016 Request to Intervene by Paul Kariya and David Austin
MCCANDLESS, RICHARD (MCCANDLESS) Letter dated August 15, 2016 Request to Intervene
PEACE RIVER REGIONAL DISTRICT (PRRD) Letter dated August 23, 2016 Request to Intervene by Karen Goodings
TRANSCANADA ENERGY LTD. (TCE) Letter dated August 25, 2016 Request to Intervene by Mark Thompson and Steven Kley
FORTISBC ENERGY INC./FORTISBC INC. (FORTISBC) Letter dated August 23, 2016 Request to Intervene by Diane Roy
ASSOCIATION OF MAJOR POWER CUSTOMERS OF BRITISH COLUMBIA (AMPC) Letter dated August 25, 2016 Request to Intervene by Richard Stout and Matthew Keen
COMMERCIAL ENERGY CONSUMERS ASSOCIATION OF BRITISH COLUMBIA (CEC) Letter dated August 25, 2016 Request to Intervene by David Craig and Chris Weafer
NON-INTEGRATED AREAS RATEPAYERS GROUP (NIARG) Letter dated August 25, 2016 Request to Intervene by Fred Weisberg
SKYWIND FOUNDATION (SWF) Letter dated August 9, 2016 Request to Intervene by Terry Vulcano
JOHANSSON, GWEN (JOHANSSON) Letter dated August 25, 2016 Request to Intervene
SAVE OUR NORTHERN SENIORS (SONS) Letter dated August 29, 2016 Request to Intervene by Jean Leahy
LANDALE, RICHARD (LANDALE) Letter dated August 9, 2016 Request to Intervene by Richard Landale
LITTLE, MARGARET AND JAMES (LITTLE) Letter dated August 9, 2016 Request to Intervene by Margaret and James Little
ZONE II RATEPAYERS GROUP (ZONE II) Letter dated August 29, 2016 Request to Intervene by Dawn Bursey and Linda Dong


Date Title Document Description
August 22, 2016 C1-1 BC SUSTAINABLE ENERGY ASSOCIATION AND SIERRA CLUB BC (BCSEA) Letter dated August 19, 2016 Request to Intervene by Thomas Hackney and William J. Andrews
August 23, 2016 C2-1 CANADIAN OFFICE AND PROFESSIONAL EMPLOYEES UNION, LOCAL 378 ( MOVEUP) Letter dated August 17, 2016 Request to Intervene by Iain Reeve, Leigha Worth and Jim Quail
August 26, 2016 C3-1 THE BRITISH COLUMBIA OLD AGE PENSIONERS ORGANIZATION ET AL. (BCOAPO) Letter dated August 25, 2016 Request to Intervene by Erin Pritchard
August 26, 2016 C4-1 CLEAN ENERGY ASSOCIATION OF BC (CEABC) Letter dated July 28, 2016 Request to Intervene by Paul Kariya and David Austin
August 26, 2016 C5-1 MCCANDLESS, RICHARD (MCCANDLESS) Letter dated August 15, 2016 Request to Intervene
August 26, 2016 C6-1 PEACE RIVER REGIONAL DISTRICT (PRRD) Letter dated August 23, 2016 Request to Intervene by Karen Goodings
August 26, 2016 C7-1 TRANSCANADA ENERGY LTD. (TCE) Letter dated August 25, 2016 Request to Intervene by Mark Thompson and Steven Kley
August 26, 2016 C8-1 FORTISBC ENERGY INC./FORTISBC INC. (FORTISBC) Letter dated August 23, 2016 Request to Intervene by Diane Roy
August 26, 2016 C9-1 ASSOCIATION OF MAJOR POWER CUSTOMERS OF BRITISH COLUMBIA (AMPC) Letter dated August 25, 2016 Request to Intervene by Richard Stout and Matthew Keen
August 26, 2016 C10-1 COMMERCIAL ENERGY CONSUMERS ASSOCIATION OF BRITISH COLUMBIA (CEC) Letter dated August 25, 2016 Request to Intervene by David Craig and Chris Weafer
August 26, 2016 C11-1 NON-INTEGRATED AREAS RATEPAYERS GROUP (NIARG) Letter dated August 25, 2016 Request to Intervene by Fred Weisberg
August 26, 2016 C12-1 SKYWIND FOUNDATION (SWF) Letter dated August 9, 2016 Request to Intervene by Terry Vulcano
August 26, 2016 C13-1 JOHANSSON, GWEN (JOHANSSON) Letter dated August 25, 2016 Request to Intervene
August 29, 2016 C14-1 SAVE OUR NORTHERN SENIORS (SONS) Letter dated August 29, 2016 Request to Intervene by Jean Leahy
August 30, 2016 C15-1 LANDALE, RICHARD (LANDALE) Letter dated August 9, 2016 Request to Intervene by Richard Landale
August 30, 2016 C16-1 LITTLE, MARGARET AND JAMES (LITTLE) Letter dated August 9, 2016 Request to Intervene by Margaret and James Little
August 30, 2016 C17-1 ZONE II RATEPAYERS GROUP (ZONE II) Letter dated August 29, 2016 Request to Intervene by Dawn Bursey and Linda Dong
September 01, 2016 C15-2 Submitted at Procedural Conference September 1, 2016 - WRITTEN SUBMISSIONS FROM MR. LANDALE
September 28, 2016 C12-2 Letter dated September 28, 2016 – SWF Submitting Information Request No. 1 to BC Hydro
September 29, 2016 C3-2 Letter dated September 29, 2016 - BCOAPO Submission on Mr. Bryenton’s Request to Intervene
September 30, 2016 C15-3 Letter dated September 30, 2016 - Landale Submission on Mr. Bryenton’s Request to Intervene
September 30, 2016 C1-2 Letter dated October 1, 2016 - BCSEA Submission on Mr. Bryenton’s Request to Intervene
October 03, 2016 C15-4 Letter dated October 3, 2016 – Landale Submitting Information Request No. 1
October 17, 2016 C5-2 Letter dated October 17, 2016 – McCandless Submitting Information Request No. 1 to BC Hydro
October 17, 2016 C12-2-1 Letter dated September 29, 2016 – SWF submitting additional question to Information Request No. 1 to BC Hydro
October 19, 2016 C17-2 Letter dated October 19, 2016 – Zone II Submitting IR No. 1 to BC Hydro
October 19, 2016 C8-2 Letter dated October 19, 2016 – FortisBC Submitting IR No. 1 to BC Hydro
October 19, 2016 C3-3 Letter dated October 19, 2016 – BCOAPO Submitting IR No. 1 to BC Hydro
October 19, 2016 C10-2 Letter dated October 19, 2016 – CEC Submitting IR No. 1 to BC Hydro
October 19, 2016 C1-3 Letter dated October 19, 2016 – BCSEA Submitting IR No. 1 to BC Hydro
October 19, 2016 C9-2 Letter dated October 19, 2016 – AMPC Submitting IR No. 1 to BC Hydro
October 19, 2016 C2-2 Letter dated October 19, 2016 – MoveUp Submitting IR No. 1 to BC Hydro
October 19, 2016 C4-2 Letter dated October 19, 2016 – CEABC Submitting IR No. 1 to BC Hydro
October 19, 2016 C11-2 Letter dated October 19, 2016 – NIARG Submitting IR No. 1 to BC Hydro
October 21, 2016 C7-2 Letter dated October 19, 2016 – TCE Late Submission of IR No. 1 to BC Hydro
October 27, 2016 C15-5 Letter dated August 9, 2016 - Landale Submitting Undertaking of Confidentiality
November 24, 2016 C10-3 Letter dated November 24, 2016 - CEC Submitting response to Exhibit A-12
November 24, 2016 C10-3-1 Letter dated November 24, 2016 - CEC Submitting Revised response to Exhibit A-12
November 24, 2016 C11-3 Letter dated November 24, 2016 - NIARG Submitting response to Exhibit A-12
November 24, 2016 C15-6 Letter dated November 24, 2016 - Landale Submitting response to Exhibit A-12
November 25, 2016 C17-3 Letter dated November 25, 2016 – Zone II Submitting Intervener Information
November 28, 2016 C15-7 Submitted at Procedural Conference November 28, 2016 – PRESENTATION FROM MR. LANDALE
December 01, 2016 C12-3 Letter dated December 1, 2016 - SWF submitting Information Request No. 2 to BC Hydro
December 14, 2016 C15-8 Letter dated December 14, 2016 - Landale Submitting Comments regarding Oral Hearing Components
December 14, 2016 C15-9 Letter dated December 14, 2016 - Landale Submitting IR No. 2 to BC Hydro
December 14, 2016 C1-4 Letter dated December 14, 2016 - BCSEA Submitting Comments on Process
December 14, 2016 C1-5 Letter dated December 14, 2016 - BCSEA Submitting IR No. 2 to BC Hydro
December 15, 2016 C2-3 Letter dated December 13, 2016 – MoveUp Submitting Confidentiality Undertaking for A. Pullman
December 15, 2016 C2-4 Letter dated December 13, 2016 – MoveUp Submitting Confidentiality Undertaking for L. Worth
December 15, 2016 C5-3 Letter dated December 15, 2016 - McCandless Submitting IR No. 2 to BC Hydro
December 16, 2016 C3-4 Letter dated December 16, 2016 - BCOAPO Submitting IR No. 2 to BC Hydro
December 16, 2016 C2-5 Letter dated December 16, 2016 - MoveUp Submitting IR No. 2 to BC Hydro
December 16, 2016 C2-5-1 Letter dated January 6, 2017 – MoveUp Supplemental IR No. 2.1
December 16, 2016 C10-4 Letter dated December 16, 2016 - CEC Submitting IR No. 2 to BC Hydro
December 16, 2016 C17-4 Letter dated December 16, 2016 - Zone II Submitting IR No. 2 to BC Hydro
December 16, 2016 C11-4 Letter dated December 16, 2016 – NIARG Submitting IR No. 2 to BC Hydro
December 16, 2016 C9-3 Letter dated December 16, 2016 – AMPC Submitting IR No. 2 to BC Hydro
December 19, 2016 C4-3 Letter dated December 16, 2016 - CEABC submitting IR No. 2 to BC Hydro
December 22, 2016 C17-5 Letter dated December 22, 2016 – Zone II Submitting Comments on Need for Oral Hearing
December 22, 2016 C2-6 Letter dated December 22, 2016 – MoveUp Submitting Comments on Need for Oral Hearing
December 22, 2016 C3-5 Letter dated December 22, 2016 – BCOAPO Submitting Comments on Need for Oral Hearing
December 22, 2016 C10-5 Letter dated December 22, 2016 – CEC Submitting Confidential Undertakings
December 22, 2016 C10-6 Letter dated December 22, 2016 – CEC Submitting Comments on Need for Oral Hearing
December 22, 2016 C9-4 Letter dated December 22, 2016 – AMPC Submitting Comments on Need for Oral Hearing
December 22, 2016 C3-6 Letter dated December 22, 2016 – BCOAPO Submitting Confidential Undertakings
December 22, 2016 C4-4 Letter dated December 22, 2016 – CEABC Submitting Comments on Need for Oral Hearing
December 22, 2016 C11-5 Letter dated December 22, 2016 – NIARG Submitting Comments on Need for Oral Hearing
December 23, 2016 C3-7 Letter dated December 23, 2016 – BCOAPO Submitting Confidential Undertakings
January 24, 2017 C1-6 Letter dated January 24, 2017 - BCSEA Submitting Confidentiality Declaration and Undertaking for Thomas Hackney, James Grevatt and William Andrews
February 01, 2017 C9-5 Letter dated February 1, 2017 – AMPC requesting extension of intervener evidence deadline
February 02, 2017 C1-7 Letter dated February 2, 2017 - BCSEA Submitting Comments regarding AMPC request for an extension of the deadline for intervener evidence Exhibit C9-5
February 02, 2017 C17-6 Letter dated February 2, 2017 - Zone II Submitting Comments regarding AMPC request for an extension of the deadline for intervener evidence Exhibit C9-5
February 09, 2017 C1-8 Letter dated February 9, 2017 – BCSEA Submitting Intervener Evidence
February 10, 2017 C1-9 Letter dated February 10, 2017 – BCSEA Submitting Regulatory Timetable Comments
February 14, 2017 C10-7 Letter dated February 14, 2017 – CEC Submitting Regulatory Timetable Comments
February 14, 2017 C3-8 Letter dated February 14, 2017 – BCOAPO Submitting Regulatory Timetable Comments
February 14, 2017 C17-7 Letter dated February 14, 2017 – Zone II Submitting Regulatory Timetable Comments
February 14, 2017 C2-7 Letter dated February 14, 2017 – MoveUp Submitting Regulatory Timetable Comments
February 14, 2017 C11-6 Letter dated February 14, 2017 – NIARG Submitting Regulatory Timetable Comments
February 14, 2017 C15-10 Letter dated February 14, 2017 – Landale Submitting Regulatory Timetable Comments
February 14, 2017 C9-6 Letter dated February 14, 2017 – AMPC Submitting Regulatory Timetable Comments
February 14, 2017 C5-4 Letter dated February 14, 2017 – McCandless Submitting Regulatory Timetable Comments
February 14, 2017 C4-5 Letter dated February 14, 2017 – CEABC Submitting Regulatory Timetable Comments
February 15, 2017 C12-4 Letter dated February 14, 2017 – SWF submitting Comments
February 20, 2017 C1-10 Letter dated February 20, 2017 – BCSEA Submitting Request to Withdraw Confidential Access
February 27, 2017 C15-11 Letter dated February 27, 2017 – Landale Submitting Evidence
February 27, 2017 C9-7 Letter dated February 27, 2017 – AMPC Submitting Evidence
February 28, 2017 C4-6 Letter dated February 27, 2017 – CEABC Submitting Evidence
February 28, 2017 C17-8 Letter dated February 27, 2017 – Zone II Submitting Evidence
March 10, 2017 C11-7 Letter dated March 10, 2017 – NIARG Information Request No. 1 to AMPC
March 10, 2017 C11-8 Letter dated March 10, 2017 – NIARG Information Request No. 1 to CEABC
March 10, 2017 C11-9 Letter dated March 10, 2017 – NIARG Information Request No. 1 to BCSEA
March 10, 2017 C10-8 Letter dated March 10, 2017 – CEC Information Request No. 1 to AMPC
March 10, 2017 C10-9 Letter dated March 10, 2017 – CEC Information Request No. 1 to BCSEA
March 10, 2017 C1-11 Letter dated March 10, 2017 – BCSEA Information Request No. 1 to AMPC
March 10, 2017 C1-12 Letter dated March 10, 2017 – BCSEA Information Request No. 1 to Zone II
March 10, 2017 C1-13 Letter dated March 10, 2017 – BCSEA Information Request No. 1 to Landale
March 13, 2017 C1-14 Letter dated March 10, 2017 – BCSEA Information Request No. 1 to Clean Energy BC
March 15, 2017 C4-7 Letter dated March 10, 2017 – CEABC submitting Information Request No. 1 to BCSEA
March 26, 2017 C15-12 Letter dated March 27, 2017 – Landale Submitting Responses to IRs on Intervener Evidence
March 27, 2017 C1-15 Letter dated March 27, 2017 – BCSEA response to BCUC A-25
March 27, 2017 C1-16 Letter dated March 27, 2017 – BCSEA response to CEABC C4-7
March 27, 2017 C1-17 Letter dated March 27, 2017 – BCSEA response to CEC C10-9
March 27, 2017 C1-18 Letter dated March 27, 2017 – BCSEA response to NIARG C11-9
March 27, 2017 C17-9 Letter dated March 27, 2017 – Zone II Submitting Responses to IRs on Intervener Evidence
March 27, 2017 C4-8 Letter dated March 27, 2017 – CEABC Submitting Responses to NIARG IRs on Intervener Evidence
March 27, 2017 C4-9 Letter dated March 27, 2017 – CEABC Submitting Responses to BCSEA IRs on Intervener Evidence
March 27, 2017 C9-8 Letter dated March 27, 2017 – AMPC response to BCUC
March 27, 2017 C9-9 Letter dated March 27, 2017 – AMPC response to BCSEA
March 27, 2017 C9-11 Letter dated March 27, 2017 – AMPC response to NIARG
March 27, 2017 C9-10 Letter dated March 27, 2017 – AMPC response to CEC
March 29, 2017 C17-9-1 CONFIDENTIAL Letter dated March 27, 2017 – Zone II Submitting Confidential non-redacted Responses to IRs on Intervener Evidence
April 24, 2017 C10-10 Letter dated April 24, 2017 – CEC Submitting IR No. 3 to BC Hydro
April 24, 2017 C1-19 Letter dated April 24, 2017 – BCSEA Submitting IR No. 3 to BC Hydro
April 24, 2017 C17-10 Letter dated April 24, 2017 – Zone II Submitting IR No. 3 to BC Hydro
April 24, 2017 C8-3 Letter dated April 24, 2017 – FortisBC Submitting IR No. 3 to BC Hydro
April 24, 2017 C4-10 Letter dated April 24, 2017 – CEABC Submitting IR No. 3 to BC Hydro
April 24, 2017 C11-10 Letter dated April 24, 2017 – NIARG Submitting IR No. 3 to BC Hydro
April 24, 2017 C15-13 Letter dated April 24, 2017 – Landale Submitting IR No. 3 to BC Hydro
April 25, 2017 C17-10-1 Letter dated April 24, 2017 – Zone II Submitting IR No. 3 to BC Hydro –Replacement
November 20, 2017 C5-5 Letter dated November 20, 2017 – McCandless Submitting Comments on Proposal to Amend BC Hydro's F17-F19 Revenue Requirements Application
November 30, 2017 C1-20 Letter dated December 1, 2017 – BCSEA Submitting Information Request on the Amended Application to BC Hydro
December 01, 2017 C3-9 Letter dated December 1, 2017 – BCOAPO Submitting Information Request on the Amended Application to BC Hydro
December 01, 2017 C17-11 Letter dated December 1, 2017 – Zone II Submitting Information Request on the Amended Application to BC Hydro
December 01, 2017 C10-11 Letter dated December 1, 2017 – CEC Submitting Information Request on the Amended Application to BC Hydro
December 01, 2017 C8-4 Letter dated December 1, 2017 – FortisBC Submitting Information Request on the Amended Application to BC Hydro
December 01, 2017 C11-11 Letter dated December 1, 2017 – NIARG Submitting Information Request on the Amended Application to BC Hydro
December 08, 2017 C10-12 Letter dated December 8, 2017 – CEC Submitting Comments Regarding Timing on Filing Arguments
December 12, 2017 C17-12 Letter dated December 12, 2017 – Zone II Submitting Comments Regarding Timing on Filing Arguments

D Exhibits — Interested Party Documents

Date Title Document Description
June 09, 2016 D-1 Bryenton, Roger (Bryenton) Letter dated June 9, 2016 – Request for Interested Party Status
June 09, 2016 D-1-1 Letter dated October 11, 2016 – Bryenton Submitting Comments
June 09, 2016 D-1-2 Letter dated October 11, 2016 – Bryenton Submitting Further Comments
July 27, 2016 D-2 HARBOURGREENE CONSULTING INC. (HARBOURGREENE) Letter dated July 27, 2016 – Request for Interested Party Status by Christine Gustafson
September 12, 2016 D-3 SURPLUS ENERGY MATCH INC. (SURPLUS ENERGY) Letter dated September 8, 2016 – Request for Interested Party Status
May 11, 2017 D-4 ACCENTURE BUSINESS SERVICES OF BRITISH COLUMBIA LIMITED PARTNERSHIP (ACCENTURE) Letter dated May 10, 2017 - Request for Interested Party Status by Janet Clark
June 06, 2017 D-5 MINISTRY OF ENERGY AND MINES (MEM) Letter dated June 5, 2017 – Request for Interested Party Status by Jack Buchanan

E Exhibits - Letters of Comment

Date Title Document Description
June 20, 2016 E-1 Grogan, John Letter of Comment dated June 16, 2016
August 26, 2016 E-2 Wenman, Joan Letter of Comment dated August 23, 2016
May 01, 2017 E-3 Lewko, J Letter of Comment dated April 28, 2017
November 21, 2017 E-4 Swain, H Letter of Comment dated November 20, 2017

Transcripts

Date Title Document Description
June 17, 2016 Transcript Volume 1 Community Input Session Victoria June 10, 2016
June 17, 2016 Transcript Volume 2 Community Input Session Nanaimo June 11, 2016
June 17, 2016 Transcript Volume 3 Community Input Session Prince George June 13, 2016
June 17, 2016 Transcript Volume 4 Community Input Session Fort St John June 14, 2016
June 17, 2016 Transcript Volume 5 Community Input Session Vancouver June 16, 2016
September 01, 2016 Transcript Volume 6 Transcript Volume 6 Procedural Conference September 1, 2016
November 28, 2016 Transcript Volume 7 Transcript Volume 7 Procedural Conference November 28, 2016
November 23, 2017 Transcript Volume 8 Procedural Conference November 23, 2017