BC Hydro

British Columbia Hydro and Power Authority F2020 to F2021 Revenue Requirements Application ~ Project No. 1598990

Completed: 2020

Hearing and Other Documents

Title Document Description
EXHIBIT LIST Updated: August 21, 2020 @ 9:05 am
Information Sheet: BC Hydro's Fiscal 2020-2021 Rate Application Uploaded: September 4, 2019 @ 10:36 am
Decision Decision with accompanying Order G-246-20 October 2, 2020

Arguments/Submissions

Title Document Description
BC Hydro Final Argument Final Argument April 1, 2020
Willis Final Argument Final Argument May 2, 2020
CEC Final Argument Final Argument May 4, 2020
AMPC Final Argument Final Argument May 4, 2020
Gjoshe Final Argument Final Argument May 4, 2020
McCandless Final Argument Final Argument May 4, 2020
MoveUP Final Argument Final Argument May 4, 2020
ZoneIIRPG Final Argument Final Argument May 4, 2020
BCSEA Final Argument Final Argument May 4, 2020
Ince Final Argument Final Argument May 4, 2020
BCOAPO Final Argument Final Argument May 4, 2020
CEABC Final Argument Final Argument May 4, 2020
BC Hydro Reply Argument Reply Argument May 27, 2020
BC Hydro Additional Submissions BC Hydro Additional Submission June 15, 2020
CEC Comment on BCH Submission CEC Comment on BC Hydro Additional Submission dated June 16, 2020
Willis Comment on BCH Additional Submission Willis Comment on BC Hydro Additional Submission dated June 16, 2020
MoveUP Comment on BCH Submissions MoveUP Comment on BC Hydro Additional Submission dated June 16, 2020
BCSEA Comment on BCH Submissions BCSEA Comment on BC Hydro Additional Submission dated June 16, 2020
ZoneII-RGP Comment on BCH Submissions ZoneII-RPG Comment on BC Hydro Additional Submission dated June 18, 2020
AMPC Comment on BCH Submissions Comments on BC Hydro Additional Submission June 18, 2020
Gjoshe Comments on BCH Submission Comments on BC Hydro Additional Submission June 18, 2020
CEABC Comment on BCH Submissions Comments on BC Hydro Additional Submission June 18, 2020
Ince Comment on BCH Submissions Comments on BC Hydro Additional Submission June 18, 2020
BCOAPO Comment on BCH Submission Comments on BC Hydro Additional Submission June 18, 2020
BC Hydro Reply Argument Reply Argument June 22, 2020

Exhibits

A Exhibits - BCUC Documents

Date Title Document Description
February 26, 2019 A-1 Letter dated February 26, 2019 – Appointing the Panel for the review of British Columbia Hydro and Power Authority F2020 to F2021 Revenue Requirements Application
March 01, 2019 A-2 Letter dated March 1, 2019 – BCUC Order G-45-19 establishing the Regulatory Timetable
March 28, 2019 A-3 Letter dated March 28, 2019 – Panel Information Request No. 1 to BC Hydro
April 23, 2019 A-4 Letter dated April 23, 2019 – BCUC Information Request No. 1
May 22, 2019 A-5 Letter dated May 22, 2019 – BCUC response to BC Hydro’s Confidentiality Request (Exhibit B-1-1)
May 24, 2019 A-6 Letter dated May 24, 2019 – Community Input Sessions Information
June 14, 2019 A-7 Letter dated June 14, 2019 – Procedural Conference Information
June 28, 2019 A-8 Letter dated June 28, 2019 – BCUC Order G-146-19 furthering the Regulatory Timetable
July 26, 2019 A-9 Letter dated July 26, 2019 – BCUC Information Request No. 2 to BC Hydro
August 02, 2019 A-10 Letter dated August 2, 2019 – Request for Comments on Proposed Regulatory Timetable
August 15, 2019 A-11 Letter dated August 15, 2019 – BCUC response to Zone II RPG’s Extension Request for Comments on Proposed Regulatory Timetable (Exhibit C5-5)
August 22, 2019 A-12 Letter dated August 22, 2019 – Community Input Sessions Information
September 11, 2019 A-13 Letter dated September 11, 2019 – BCUC Order G-218-19 amending the Regulatory Timetable
September 13, 2019 A-14 Letter dated September 13, 2019 – Community Input Session Cancellation
September 19, 2019 A-15 Letter dated September 19, 2019 – BCUC Information Request No. 3 to BC Hydro
September 19, 2019 A-16 CONFIDENTIAL - Letter dated September 19, 2019 – BCUC Confidential Information Request No. 3 to BC Hydro
September 27, 2019 A-17 Letter dated September 27, 2019 – Request for Comments on BC Hydro’s Performance Based Regulation Report Review Process
October 11, 2019 A-18 Letter dated October 11, 2019 – BCUC Order G-244-19 establishing a separate process to review the PBR Report
October 30, 2019 A-19 Letter dated October 30, 2019 – BCUC Information Request No. 4 to BC Hydro
November 01, 2019 A-20 Letter dated November 1, 2019 – BCUC Order G-268-19 amending the Regulatory Timetable
November 13, 2019 A-21 Letter dated November 13, 2019 – BCUC Order G-279-19 amending the Regulatory Timetable with Reasons for Decision
November 14, 2019 A-22 Letter dated November 14, 2019 – Procedural conference information
November 29, 2019 A-23 Letter dated November 29, 2019 – BCUC Order G-311-19 establishing the scope of the oral hearing
November 29, 2019 A-24 Letter dated November 29, 2019 – BCUC Order G-312-19 amending the Regulatory Timetable with Reasons for Decision
December 12, 2019 A-25 Letter dated December 12, 2019 - Panel Information Request No. 2 to BC Hydro
December 17, 2019 A-26 Letter dated December 17, 2019 – BCUC Submitting Information Request No 1 to ZoneII RPG on Intervener Evidence
December 17, 2019 A-27 Letter dated December 17, 2019 – BCUC Submitting Information Request No 1 to AMPC on Intervener Evidence
January 13, 2020 A-28 Letter dated January 13, 2020 – Oral Hearing Information
February 26, 2020 A-29 Letter dated February 26, 2020 – BCUC Order G-32-20 approving F2021 Interim Rates
March 05, 2020 A-30 Letter dated March 5, 2020 – Final Submissions Schedule and Amended Regulatory Timetable
March 26, 2020 A-31 Letter dated March 26, 2020 – Panel Request regarding Final Arguments and BCUC Order G-63-20 amending the Regulatory Timetable
March 27, 2020 A-32 Letter dated March 27, 2020 – Panel reopening the evidentiary record
May 01, 2020 A-33 Letter dated May 1, 2020 – Providing information regarding Oral Phase of argument
June 02, 2020 A-34 Letter dated June 2, 2020 – Further information regarding Oral Phase of argument
June 09, 2020 A-35 Letter dated June 9, 2020 – Panel Questions to BC Hydro for the Oral Phase of Argument
June 16, 2020 A-36 Letter dated June 16, 2020 – Panel response to BC Hydro Additional Submissions and Timetable Extension
July 06, 2020 A-37 Letter dated July 6, 2020 – Panel request for comments
July 15, 2020 A-38 Letter dated July 15, 2020 – Panel request for comments on Section 3 of Direction 8
April 23, 2019 A2-1 Letter dated April 23, 2019 – British Columbia Hydro and Power Authority Compliance Filing to Order G-47-18, Responses to BCUC Staff Questions dated August 23, 2018
April 23, 2019 A2-2 Letter dated April 23, 2019 - British Columbia Hydro and Power Authority Compliance Filing to Order G-47-18 dated April 27, 2018
September 20, 2019 A2-3 Letter dated September 20, 2019 – BCUC Community Input Session Staff Presentation
December 05, 2019 A2-4 Letter dated December 5, 2019 – BCUC Staff Capital Projects Submission for Oral Hearing
January 23, 2020 A2-5 Letter dated January 23, 2020 – BCUC Staff Submitting page 34 of 118 from Order G-47-18 at the Oral Hearing
January 23, 2020 A2-6 Letter dated January 23, 2020 – BCUC Staff Submitting excerpt from BC Hydro Application for Approval of Debt Management Regulatory Account pages 3, 6, 7 and 10 at the Oral Hearing
January 23, 2020 A2-7 Letter dated January 23, 2020 – BCUC Staff Submitting excerpts from BC Hydro F2009/2010 RRA Decision dated March 13, 2009 at the Oral Hearing
February 24, 2020 A2-8 Letter dated February 24, 2020 – BCUC Staff Submitting BCUC Order G-199-19 dated August 23, 2019 at Oral Hearing
March 02, 2020 A2-9 Letter dated March 2, 2020 – BCUC Staff Submitting excerpt from BC Hydro Bridge River System Upgrades dated February 24, 2020 at the Oral Hearing
March 02, 2020 A2-10 Letter dated March 2, 2020 – BCUC Staff Submitting excerpt from BC Hydro F2017/2019 RRA Decision to Order G-47-18 at the Oral Hearing
March 02, 2020 A2-11 Letter dated March 2, 2020 – BCUC Staff Submitting Review of the Regulatory Oversight of Capital Expenditures and Projects, B-4, CEABC 1.18.0 dated April 24, 2018 at the Oral Hearing
March 02, 2020 A2-12 Letter dated March 2, 2020 – BCUC Staff Submitting Review of the Regulatory Oversight of Capital Expenditures and Projects, B-4, BCUC 1.5.2 Attachment 1 at the Oral Hearing

B Exhibits - Applicant Documents

Date Title Document Description
February 25, 2019 B-1 BRITISH COLUMBIA HYDRO AND POWER AUTHORITY (BC HYDRO) - Letter dated February 25, 2019 – Submitting the F2020 to F2021 Revenue Requirements Application
February 26, 2019 B-1-1 CONFIDENTIAL – Letter dated February 26, 2019 – BC Hydro Submitting Confidential Appendices I, J, K and Y to the Application
March 02, 2019 B-5-1-1 CONFIDENTIAL - Letter dated March 2, 2020 – BC Hydro Submitting Revised Confidential responses to BCUC Information Request No. 1
March 07, 2019 B-1-2 Letter dated March 7, 2019 – BC Hydro Submitting Supplemental Information to the Application
March 07, 2019 B-1-3 CONFIDENTIAL - Letter dated March 7, 2019 – BC Hydro Submitting Confidential Supplemental Information to the Application
March 19, 2019 B-2 Letter dated March 19, 2019 - BC Hydro presentation from March 15, 2019 Workshop
March 19, 2019 B-3 Letter dated March 19, 2019 - BC Hydro providing notifications in Compliance with BCUC Order G-45-19
March 26, 2019 B-1-4 Letter dated March 26, 2019 – BC Hydro Submitting Supplemental Information – Summary Audit Report and Management Audit Report
April 03, 2019 B-4 Letter dated April 3, 2019 – BC Hydro Submitting responses to Panel Information Request No. 1
April 03, 2019 B-4-1 CONFIDENTIAL - Letter dated April 3, 2019 – BC Hydro Submitting Confidential responses to Panel Information Request No. 1
June 06, 2019 B-5 Letter dated June 6, 2019 – BC Hydro Submitting responses to BCUC Information Request No. 1
June 06, 2019 B-5-1 CONFIDENTIAL - Letter dated June 6, 2019 – BC Hydro Submitting Confidential responses to BCUC Information Request No. 1
June 06, 2019 B-6 Letter dated June 6, 2019 – BC Hydro Submitting responses to Intervener Information Request No. 1
June 06, 2019 B-6-1 CONFIDENTIAL - Letter dated June 6, 2019 – BC Hydro Submitting Confidential responses to Intervener Information Request No. 1 (Letter)
June 06, 2019 B-7 Letter dated June 6, 2019 – BC Hydro Submitting updated Appendix J of the Application in response to BCUC IR 1.121.1.2
June 19, 2019 B-8 Letter dated June 19, 2019 – BC Hydro Submitting Comments on Procedural Matters
July 26, 2019 B-9 Letter dated July 26, 2019 – BC Hydro Submitting update on Government of BC’s Public Accounts release
August 15, 2019 B-10 Letter dated August 15, 2019 – BC Hydro Submitting Comments on Proposed Regulatory Timetable
August 22, 2019 B-11 Letter dated August 22, 2019 – BC Hydro Submitting Evidentiary Update
August 22, 2019 B-11-1 CONFIDENTIAL - Letter dated August 22, 2019 – BC Hydro Submitting Confidential Evidentiary Update
September 03, 2019 B-12 Letter dated September 3, 2019 – BC Hydro Submitting Responses to BCUC Information Request No. 2
September 03, 2019 B-12-1 CONFIDENTIAL – Letter dated September 3, 2019 – BC Hydro Submitting Confidential Responses to BCUC Information Requests No. 2
September 03, 2019 B-13 Letter dated September 3, 2019 – BC Hydro Submitting Responses to Intervener Information Requests No. 2
September 03, 2019 B-13-1 CONFIDENTIAL – Letter dated September 3, 2019 – BC Hydro Submitting Confidential Responses to Intervener Information Requests No. 2
October 02, 2019 B-14 Letter dated October 2, 2019 – BC Hydro Submitting Comments on review process for BC Hydro’s Performance Based Regulation Report
October 03, 2019 B-15 Letter dated October 3, 2019 – BC Hydro Submitting a 20 Year Load Forecast
October 03, 2019 B-15-1 CONFIDENTIAL - Letter dated October 3, 2019 – BC Hydro Submitting a Confidential 20 Year Load Forecast
October 10, 2019 B-16 Letter dated October 10, 2019 – BC Hydro Submitting Responses to BCUC Information Request No. 3
October 10, 2019 B-16-1 CONFIDENTIAL - Letter dated October 10, 2019 – BC Hydro Submitting Confidential Responses to BCUC Information Request No. 3
October 10, 2019 B-17 Letter dated October 10, 2019 – BC Hydro Submitting Responses to Intervener Information Requests No. 3
October 10, 2019 B-17-1 CONFIDENTIAL - Letter dated October 10, 2019 – BC Hydro Submitting Confidential Responses to Intervener Information Requests No. 3
October 10, 2019 B-18 CONFIDENTIAL - Letter dated October 10, 2019 – BC Hydro Submitting Responses to BCUC Confidential Information Request No. 3
October 18, 2019 B-19 BC Hydro Submitting un-redacted version of the Evidentiary Update
October 18, 2019 B-20 Letter dated October 18, 2019 - BC Hydro publicly release some Information responses previously considered Confidential
November 08, 2019 B-21 Letter dated November 8, 2019 – BC Hydro Submitting Extension Request to File Information Request Responses
November 14, 2019 B-22 Letter dated November 14, 2019 – BC Hydro Submitting responses to BCUC Information Request No. 4
November 14, 2019 B-22-1 CONFIDENTIAL - Letter dated November 14, 2019 – BC Hydro Submitting responses to BCUC Information Request No. 4
November 14, 2019 B-23 Letter dated November 14, 2019 – BC Hydro Submitting responses to Intervener Information Request No. 4
November 14, 2019 B-23-1 CONFIDENTIAL - Letter dated November 14, 2019 – BC Hydro Submitting responses to Intervener Information Request No. 4
November 18, 2019 B-24 Letter dated November 18, 2019 – BC Hydro Submitting written submission prior to procedural conference
November 19, 2019 B-25 Letter dated November 19, 2019 – BC Hydro Submitting response on Attachment A of Exhibit B-21
November 19, 2019 B-23-2 Letter dated November 19, 2019 – BC Hydro Submitting remaining responses to Intervener Information Requests No. 4
December 13, 2019 B-26 Letter dated December 13, 2019 – BC Hydro Submitting update on the Peace Kelly Lake Capacitors Project
December 13, 2019 B-22-2 Letter dated December 13, 2019 – BC Hydro Response to BCUC Information Request No. 4 on 20-Year Load Forecast – December 13, 2019
December 13, 2019 B-23-3 Letter dated December 13, 2019 – BC Hydro Responses to Interveners Information Request No. 4 on 20-Year Load Forecast
January 09, 2020 B-27 Letter dated January 9, 2020 – BC Hydro Submitting witness panels for upcoming oral hearing
January 15, 2020 B-28 Letter dated January 15, 2020 – BC Hydro Submitting Rebuttal Evidence
January 15, 2020 B-28-1 CONFIDENTIAL - Letter dated January 15, 2020 – BC Hydro Submitting Confidential Rebuttal Evidence
January 15, 2020 B-29 Letter dated January 15, 2020 – BC Hydro Submitting Updated Information on Technology Capital Projects and the Metro North Transmission Project
January 16, 2020 B-30 Letter dated January 16, 2020 – BC Hydro Submitting Chris O’Reilly oral hearing Opening Statement
January 17, 2020 B-28-2 Letter dated January 17, 2020 – BC Hydro Submitting revised Rebuttal Evidence
January 17, 2020 B-31 Letter dated January 17, 2020 – BC Hydro Submitting responses to Panel Information Request No. 2
January 17, 2020 B-31-1 CONFIDENTIAL - Letter dated January 17, 2020 – BC Hydro Submitting Confidential responses to Panel Information Request No. 2
January 17, 2020 B-5-2 Letter dated January 17, 2020 – BC Hydro Submitting revised response to BCUC Information Request No. 1.164.1
January 17, 2020 B-6-2 Letter dated January 17, 2020 – BC Hydro Submitting revised response to BCOAPO Information Request No. 1.16.2
January 17, 2020 B-12-2 Letter dated January 17, 2020 – BC Hydro Submitting revised response to BCUC Information Request No. 2.267.1
January 17, 2020 B-23-4 Letter dated January 17, 2020 – BC Hydro Submitting revised response to CEABC Information Request No. 4.58.4
January 21, 2020 B-32 Letter dated January 21, 2020 – BC Hydro Submitting Undertaking No. 1 from CEABC at Oral Hearing
January 21, 2020 B-33 Letter dated January 21, 2020 – BC Hydro Submitting Undertaking No. 2 from CEABC at Oral Hearing
January 21, 2020 B-11-2 Letter dated January 21, 2020 – BC Hydro Submitting correction in Appendix A of Evidentiary Update
January 22, 2020 B-34 Letter dated January 22, 2020 – BC Hydro Submitting F07-08 Revenue Requirements Appendix F at the Oral Hearing
January 23, 2020 B-35 Letter dated January 23, 2020 – BC Hydro Submitting BC Hydro Undertaking No. 8 at the Oral Hearing
January 23, 2020 B-36 Letter dated January 23, 2020 – BC Hydro Submitting BC Hydro Undertaking No. 9 at the Oral Hearing
January 23, 2020 B-37 Letter dated January 23, 2020 – BC Hydro Submitting BC Hydro Undertaking No. 10 at the Oral Hearing
January 23, 2020 B-38 Letter dated January 23, 2020 – BC Hydro Submitting BC Hydro Undertaking No. 7 at the Oral Hearing
January 23, 2020 B-39 Letter dated January 23, 2020 – BC Hydro Submitting BC Hydro Undertaking No. 5 at the Oral Hearing
January 24, 2020 B-40 dated January 24, 2020 – BC Hydro Submitting BC Hydro Undertaking No. 13 at the Oral Hearing
January 24, 2020 B-41 Letter dated January 24, 2020 – BC Hydro Submitting BC Hydro Undertaking No. 15 at the Oral Hearing
January 24, 2020 B-42 Letter dated January 24, 2020 – BC Hydro Submitting BC Hydro Undertaking No. 16 at the Oral Hearing
February 14, 2020 B-43 Letter dated February 14, 2020 – BC Hydro Submitting response to Oral Hearing Feedback
February 14, 2020 B-44 Letter dated February 14, 2020 – BC Hydro Submitting response to remaining Undertakings from the Oral Hearing
February 14, 2020 B-45 Letter dated February 14, 2020 – BC Hydro Submitting request for Interim Fiscal 2021 Rates
February 27, 2020 B-46 Letter dated February 27, 2020 – BC Hydro Submitting BCOAPO Undertaking dated January 22, 2020 at Oral Hearing
February 28, 2020 B-48 Letter dated February 28, 2020 - BC Hydro Submitting CEC Undertaking dated February 25, 2020 at Oral Hearing
February 28, 2020 B-48-1 CONFIDENTIAL - Letter dated February 28, 2020 - BC Hydro Submitting Confidential CEC Undertaking dated February 25, 2020 at Oral Hearing
February 28, 2020 B-47 Letter dated February 28, 2020 – BC Hydro Submitting CEABC Undertaking dated February 25, 2020 at Oral Hearing
February 28, 2020 B-47-1 CONFIDENTIAL – Letter dated February 28, 2020 - BC Hydro Submitting Confidential CEABC Undertaking dated February 25, 2020 at Oral Hearing
March 02, 2020 B-50 Letter dated March 2, 2020 - BC Hydro Submitting AMPC Undertaking dated February 28, 2020 at Oral Hearing
March 02, 2020 B-5-3 Letter dated March 2, 2020 – BC Hydro Submitting Revised responses to BCUC Information Request No. 1
March 02, 2020 B-49 Letter dated March 2, 2020 - BC Hydro Submitting Intervener Undertakings dated February 24, 2020 at Oral Hearing
March 02, 2020 B-49-1 CONFIDENTIAL - Letter dated March 2, 2020 - BC Hydro Submitting Confidential Intervener Undertakings dated February 24, 2020 at Oral Hearing
March 02, 2020 B-17-1-1 CONFIDENTIAL - Letter dated March 2, 2020 – BC Hydro Submitting Revised Confidential Responses to AMPC Information Requests No. 3
March 02, 2020 B-17-2 Letter dated March 2, 2020 – BC Hydro Submitting Revised Responses to AMPC Information Requests No. 3
March 03, 2020 B-51 Letter dated March 3, 2020 - BC Hydro Submitting Undertakings No. 25 from Gjoshe, No. 39 from AMPC and No. 47 from Commissioner Fung at Oral Hearing
March 03, 2020 B-51-1 CONFIDENTIAL - Letter dated March 3, 2020 - BC Hydro Submitting Confidential Undertaking No. 39 from AMPC at Oral Hearing
March 03, 2020 B-52 Letter dated March 3, 2020 - BC Hydro Submitting Undertakings No. 29 from Mr. Miller and No. 53 from Commissioner Morton at Oral Hearing
March 03, 2020 B-53 Letter dated March 3, 2020 - BC Hydro Submitting Undertakings No. 35 from AMPC and No. 46 from BCOAPO at Oral Hearing
March 03, 2020 B-54 Letter dated March 3, 2020 - BC Hydro Submitting Undertaking No. 50 from BCUC Staff at Oral Hearing
March 04, 2020 B-55 Letter dated March 4, 2020 - BC Hydro Submitting Undertakings No. 55 from Commissioner Lockhart and No. 56 from Commissioner Morton at Oral Hearing
March 04, 2020 B-55-1 CONFIDENTIAL Letter dated March 4, 2020 - BC Hydro Submitting Confidential Undertaking No. 56 from Commissioner Morton at Oral Hearing
March 06, 2020 B-56 Letter dated March 6, 2020 - BC Hydro Submitting remaining Undertakings Nos. 41, 45, 49 and 51
March 13, 2020 B-57 Letter dated March 13, 2020 – BC Hydro Submitting Undertaking Nos. 36, 42, 43, 48, 52, 57, 58, 59, 60, 61, 63, 64, 65 and 66 from Oral Hearing
March 13, 2020 B-57-1 CONFIDENTIAL - Letter dated March 13, 2020 – BC Hydro Submitting Confidential Versions of Undertaking Nos. 43 and 48 from Oral Hearing
March 20, 2020 B-50-1 Letter dated March 20, 2020 – BC Hydro Submitting Supplemental Response to Undertaking No. 37
March 20, 2020 B-57-2 Letter dated March 20, 2020 – BC Hydro Submitting Supplemental Response to Undertaking No. 58
March 20, 2020 B-58 Letter dated March 20, 2020 – BC Hydro Submitting Responses to Undertakings No. 44, 54 and 62
March 20, 2020 B-58-1 CONFIDENTIAL - Letter dated March 20, 2020 – BC Hydro Submitting Responses to Undertakings No. 44 and 54
March 20, 2020 B-51-2 Letter dated March 20, 2020 – BC Hydro Submitting Supplemental Response to Undertaking No. 39
March 20, 2020 B-53-1 Letter dated March 20, 2020 – BC Hydro Submitting Supplemental Response to Undertaking No. 35
March 26, 2020 B-58-2 Letter dated March 26, 2020 – BC Hydro Submitting Supplemental Response to Undertaking No. 62
July 24, 2020 B-59 Letter dated July 24, 2020 – BC Hydro Submitting response to Panel Request for comment
July 24, 2020 B-60 Letter dated July 24, 2020 – BC Hydro Submitting response to Panel Questions in Exhibit A-38
August 20, 2020 B-61 Letter dated August 20, 2020 – BC Hydro Submitting response to Intervener comments

C Exhibits - Intervener Documents

MOVEMENT OF UNITED PROFESSIONALS (MOVEUP) Letter dated March 1, 2019 Request to Intervene by Susanna Quail
CATALYST PAPER CORPORATION (CATALYST) Letter dated March 4, 2019 Request to Intervene by Carlo Dal Monte
FORTISBC ENERGY INC. AND FORTISBC INC. (FORTISBC) Letter dated March 13, 2019 Request to Intervene by Doug Slater
RICHARD MCCANDLESS (MCCANDLESS) Letter dated March 14, 2019 Request for Intervener Status
KWADACHA NATION AND TSAY KEH DENE NATION, TOGETHER THE ZONE II RATEPAYERS GROUP (ZONE II RPG) Letter dated March 18, 2019 Request to Intervene by Jana McLean
BRITISH COLUMBIA OLD AGE PENSIONERS’ ORGANIZATION ET AL. (BCOAPO) Letter dated March 20, 2019 Request to Intervene by Leigha Worth & Irina Mis
PAUL WILLIS (WILLIS) Letter dated March 19, 2019 Request for Intervener Status
BC SUSTAINABLE ENERGY ASSOCIATION AND SIERRA CLUB (BCSEA) - Letter dated May 20, 2019 Request to Intervene by William Andrews
COMMERCIAL ENERGY CONSUMERS ASSOCIATION OF BRITISH COLUMBIA (CEC) Letter dated March 21, 2019 Request to Intervene by Christopher Weafer
CLEAN ENERGY ASSOCIATION OF B. C. (CEABC) Letter dated March 21, 2019 Request to Intervene by Martin Mullany
ASSOCIATION OF MAJOR POWER CUSTOMERS OF BRITISH COLUMBIA (AMPC) Letter dated March 21, 2019 Request to Intervene by Matthew D. Keen
DAVID INCE (INCE) - Letter dated March 21, 2019 Request for Intervener Status
STEVE DAVIS & ASSOCIATES CONSULTING LTD. (DAVIS-ASSOCIATES) - Letter dated March 21, 2019 Request to Intervene by Steve Davis
EDLIRA GJOSHE (GJOSHE) Letter dated March 21, 2019 Request to Intervene by Edlira Gjoshe
BC NON-PROFIT HOUSING ASSOCIATION (BCNPHA) - Letter dated April 2, 2019 – Late Request to Intervene by Ian Cullis


Date Title Document Description
May 01, 2019 C15-2 Letter dated May 1, 2019 – BCNPHA Information Request No. 1 to BC Hydro
April 02, 2019 C15-1 BC NON-PROFIT HOUSING ASSOCIATION (BCNPHA) - Letter dated April 2, 2019 – Late Request to Intervene by Ian Cullis
August 14, 2020 C14-9 Letter dated August 14, 2020 – Gjoshe Submitting response to Panel Request for comments
February 27, 2020 C14-8 Letter dated February 27, 2020 – Gjoshe Submitting article dated February 20, 2020 at the Oral Hearing
December 03, 2019 C14-7 Letter dated December 3, 2019 – Gjoshe Submitting capital projects for cross-examination at oral hearing
October 30, 2019 C14-6 Letter dated October 30, 2019 – Gjoshe Submitting Information Request No. 5 to BC Hydro
October 30, 2019 C14-5 Letter dated October 30, 2019 – Gjoshe Submitting Information Request No. 4 to BC Hydro
September 19, 2019 C14-4 Letter dated September 19, 2019 – Gjoshe Submitting Information Request No. 3 to BC Hydro
August 01, 2019 C14-3 Letter dated August 1, 2019 – Gjoshe Submitting Information Request No. 2 to BC Hydro
May 02, 2019 C14-2 Letter dated May 2, 2019 – Gjoshe Information Request No. 1 to BC Hydro
March 21, 2019 C14-1 EDLIRA GJOSHE (GJOSHE) Letter dated March 21, 2019 Request to Intervene by Edlira Gjoshe
March 21, 2019 C13-1 STEVE DAVIS & ASSOCIATES CONSULTING LTD. (DAVIS-ASSOCIATES) - Letter dated March 21, 2019 Request to Intervene by Steve Davis
August 14, 2020 C12-8 Letter dated August 14, 2020 – Ince Submitting response to Panel Request for comments
November 12, 2019 C12-7 Letter dated November 12, 2019 – Ince Submitting Response to BC Hydro letter dated November 8, 2019 (Exhibit B-21)
October 30, 2019 C12-6 Letter dated October 30, 2019 – Ince Submitting Information Request No. 4 to BC Hydro on 20-Year Load Forecast
September 19, 2019 C12-5 Letter dated September 19, 2019 – Ince Information Request No. 3 to BC Hydro
August 01, 2019 C12-4 Letter dated August 1, 2019 – Ince Information Request No. 2 to BC Hydro
May 06, 2019 C12-3 Letter dated May 6, 2019 – Ince Submitting Confidential Undertaking
May 01, 2019 C12-2 Letter dated May 1, 2019 – Ince Information Request No. 1 to BC Hydro
March 21, 2019 C12-1 DAVID INCE (INCE) - Letter dated March 21, 2019 Request for Intervener Status
August 14, 2020 C11-28 Letter dated August 14, 2020 – AMPC Submitting response to Panel Request for comments
February 28, 2020 C11-27 Letter dated February 28, 2020 – AMPC Submitting F2017–F2019 RRA, Exhibit B-14, BCUC IR 2.318.1 at Oral Hearing
February 28, 2020 C11-26 Letter dated February 28, 2020 – AMPC Submitting Undertaking No. 1 from Zone II RPG at Oral Hearing
February 28, 2020 C11-25 Letter dated February 28, 2020 – AMPC Submitting article from Alaska Highway News dated February 27, 2020 at the Oral Hearing
February 28, 2020 C11-24 Letter dated February 28, 2020 – AMPC Submitting Business Practice for Load Interconnection Queue Management dated November 10 2014 at the Oral Hearing
February 28, 2020 C11-23 Letter dated February 28, 2020 – AMPC Submitting excerpt from Industrial Connections dated February 23, 2020 at the Oral Hearing
February 24, 2020 C11-22 Letter dated February 24, 2020 – AMPC Submitting Opening Statement of Patrick Bowman (InterGroup Consultants)
February 04, 2020 C11-21 Letter dated February 4, 2020 – AMPC Submitting Confidential Undertaking for Alexander Baer
January 22, 2020 C11-20 Letter dated January 22, 2020 – AMPC Submitting Aid to Cross 2-BC Hydro Letter of Agreement at Oral Hearing
January 22, 2020 C11-19 Letter dated January 22, 2020 – AMPC Submitting First Quarterly Report 2019 at Oral Hearing
January 21, 2020 C11-18 Letter dated January 21, 2020 – AMPC Submitting Aid to Cross 11 at Oral Hearing
January 20, 2020 C11-17 Letter dated January 20, 2020 – AMPC Submitting aid to cross 9 “News” dated May 16, 2018 at Oral Hearing
January 20, 2020 C11-16 Letter dated January 20, 2020 – AMPC Submitting response from F2012 to F2014 Revenue Requirement Application at Oral Hearing
January 20, 2020 C11-15 Letter dated January 20, 2020 – AMPC Submitting Terms of Reference for the Comprehensive Review of BC Hydro at Oral Hearing
January 13, 2020 C11-14 Letter dated January 13, 2020 – AMPC Submitting responses to BCUC, CEABC and CEC information requests on intervener evidence
January 10, 2020 C11-13 Letter dated January 10, 2020 – AMPC Submitting responses to MoveUP, Zone II RPG and BCSEA information requests on intervener evidence
December 03, 2019 C11-12 Letter dated December 3, 2019 – AMPC Submitting capital projects for cross-examination at oral hearing
December 03, 2019 C11-11 Letter dated December 3, 2019 – AMPC Submitting Intervener Evidence
November 15, 2019 C11-10 Letter dated November 15, 2019 – AMPC Submission regarding Extension Request to file Attachment A Information Requests
October 30, 2019 C11-9 Letter dated October 30, 2019 – AMPC Submitting Information Request No. 4 to BC Hydro on 20-Year Load Forecast and Cost of Energy Evidentiary Update
October 23, 2019 C11-8 Letter dated October 23, 2019 – AMPC Extension Request to file Intervener Information Request Response
September 19, 2019 C11-7 Letter dated September 19, 2019 – AMPC Information Request No. 3 to BC Hydro
August 19, 2019 C11-6 Letter dated August 19, 2019 – AMPC Submitting Comments on Proposed Regulatory Timetable
August 01, 2019 C11-5 Letter dated August 1, 2019 – AMPC Information Request No. 2 to BC Hydro
June 24, 2019 C11-4 Letter dated June 24, 2019 – AMPC Outline Submitted at Procedural Conference
May 02, 2019 C11-3 Letter dated May 2, 2019 – AMPC Information Request No. 1 to BC Hydro
April 30, 2019 C11-2 Letter dated April 30, 2019 – AMPC Submitting Confidential Undertakings
March 21, 2019 C11-1 ASSOCIATION OF MAJOR POWER CUSTOMERS OF BRITISH COLUMBIA (AMPC) Letter dated March 21, 2019 Request to Intervene by Matthew D. Keen
August 14, 2020 C10-30 Letter dated August 14, 2020 – CEABC Submitting response to Panel Request for comments on Section 3 of Direction 8
August 14, 2020 C10-29 Letter dated August 14, 2020 – CEABC Submitting response to Panel Request for comments
February 25, 2020 C10-28 Letter dated February 25, 2020 – CEABC Submitting Times Colonist article date January 12, 2020 at the Oral Hearing
February 25, 2020 C10-27 Letter dated February 25, 2020 – CEABC Submitting BC Hydro 2016/17 – 2018/19 Service Plan at the Oral Hearing
February 25, 2020 C10-26 Letter dated February 25, 2020 – CEABC Submitting Industrial Electricity Policy Review Task Force Final Report dated October 31, 2013 at the Oral Hearing
February 25, 2020 C10-25 Letter dated February 25, 2020 – CEABC Submitting Exhibit B-15 excerpt from BC Hydro F2017-F2019 Revenue Requirements dated January 23, 2017 at the Oral Hearing
February 25, 2020 C10-24 Letter dated February 25, 2020 – CEABC Submitting Exhibit B-15 excerpt from BC Hydro F2017-F2019 Revenue Requirements dated January 23, 2017 at the Oral Hearing
January 24, 2020 C10-23 Letter dated January 24, 2020 – CEABC Submitting Exhibit B-8 from BC Hydro Waneta 2017 Transaction at the Oral Hearing
January 24, 2020 C10-22 Letter dated January 24, 2020 – CEABC Submitting Enbridge News Article at the Oral Hearing
January 24, 2020 C10-21 Letter dated January 24, 2020 – CEABC additional Submission from BC Hydro 2020-21 Revenue Requirements Application B-23-3 at the Oral Hearing
January 24, 2020 C10-20 Letter dated January 24, 2020 – CEABC Submission from BC Hydro 2020-21 Revenue Requirements Application B-23-3 at the Oral Hearing
January 24, 2020 C10-19 Letter dated January 24, 2020 – CEABC Submitting graph headed Load Compared to System Energy including IPPS at the Oral Hearing
January 24, 2020 C10-18 Letter dated January 24, 2020 – CEABC Submitting BC Hydro Undertaking from BCH 2004/05 and 2005/06 RR Hearing dated June 8, 2004 at the Oral Hearing
January 24, 2020 C10-17 Letter dated January 24, 2020 – CEABC Submitting excerpt from Transcript Volume 12 dated October 20, 2008 from BC Hydro F2009 and F2010 RRA at the Oral Hearing
January 21, 2020 C10-16 Letter dated January 21, 2020 – CEABC Submitting excerpt from Zapped: A Review of BC Hydro’s Purchase of Power from IPPs at Oral Hearing
January 21, 2020 C10-15 Letter dated January 21, 2020 – CEABC Submitting California Public Utilities 2018 Annual Report on Renewable Portfolio Standard at Oral Hearing
January 21, 2020 C10-14 Letter dated January 21, 2020 – CEABC Submitting response to Zapped Allegation of Overspending Billions on IPPs at Oral Hearing
January 21, 2020 C10-13 Letter dated January 21, 2020 – CEABC Submitting BC Hydro Dam Safety 1 Report – F2014 Executive Summary at Oral Hearing
January 20, 2020 C10-12 Letter dated January 20, 2020 – CEABC Submitting excerpt from MEMPR Letter dated August 24, 2017 at Oral Hearing
January 20, 2020 C10-11 Letter dated January 20, 2020 – CEABC Submitting MEMPR Letter reference 98538 dated February 16, 2017 at Oral Hearing
January 20, 2020 C10-10 Letter dated January 20, 2020 – CEABC Submitting excerpt from BC Hydro’s Service Plan at Oral Hearing
January 20, 2020 C10-9 Letter dated January 20, 2020 – CEABC Submitting excerpt from Shareholder’s Letter of Expectations at Oral Hearing
December 17, 2019 C10-8 Letter dated December 17, 2019 – CEABC Submitting Information Request No 1 to AMPC on Intervener Evidence
November 15, 2019 C10-7 Letter dated November 15, 2019 – CEABC Submission regarding Extension Request to file Attachment A Information Requests
October 30, 2019 C10-6 Letter dated October 30, 2019 – CEABC Submitting Information Request No. 4 to BC Hydro
September 19, 2019 C10-5 Letter dated September 19, 2019 – CEABC Information Request No. 3 to BC Hydro
August 16, 2019 C10-4 Letter dated August 16, 2019 – CEABC Comments on Proposed Regulatory Timetable
August 01, 2019 C10-3 Letter dated August 1, 2019 – CEABC Information Request No. 2 to BC Hydro
May 02, 2019 C10-2 Letter dated May 2, 2019 – CEABC Information Request No. 1 to BC Hydro
March 21, 2019 C10-1 CLEAN ENERGY ASSOCIATION OF B. C. (CEABC) Letter dated March 21, 2019 Request to Intervene by Martin Mullany
August 14, 2020 C9-19 Letter dated August 14, 2020 – CEC Submitting response to Panel Request for comments on Section 3 of Direction 8
August 14, 2020 C9-18 Letter dated August 14, 2020 – CEC Submitting response to Panel Request for comments
January 23, 2020 C9-17 Letter dated January 23, 2020 – CEC Submitting excerpt from BCUC Reasons for Decision regarding BC Hydro … Application for Electricity Purchase Agreement Renewals … dated November 8, 2019 at the Oral Hearing
January 20, 2020 C9-16 Letter dated January 20, 2020 – CEC Submitting Review of BC Hydro’s Purchase of Power from IPPs conducted for the Minister of Energy, Mines and Petroleum Resources at Oral Hearing
January 20, 2020 C9-15 Letter dated January 20, 2020 – CEC Submitting article from Vancouver Sun at Oral Hearing
January 20, 2020 C9-14 Letter dated January 20, 2020 – CEC Submitting excerpt from SAP Inquiry Report at Oral Hearing
December 17, 2019 C9-13 Letter dated December 17, 2019 – CEC Submitting Information Request No 1 to ZoneII RPG on Intervener Evidence
December 17, 2019 C9-12 Letter dated December 17, 2019 – CEC Submitting Information Request No 1 to AMPC on Intervener Evidence
December 03, 2019 C9-11 Letter dated December 3, 2019 – CEC Submitting capital projects for cross-examination at oral hearing
November 22, 2019 C9-10 Letter dated November 22, 2019 – CEC Additional Submission at Procedural Conference
November 14, 2019 C9-9 Letter dated November 14, 2019 – CEC Submitting extension request to Information Request responses
October 30, 2019 C9-8 Letter dated October 30, 2019 – CEC Submitting Information Request No. 4 to BC Hydro on Cost of Energy Update
October 30, 2019 C9-7 Letter dated October 30, 2019 – CEC Submitting Information Request No. 4 to Hydro on 20-Year Load Forecast
September 19, 2019 C9-6 Letter dated September 19, 2019 – CEC Information Request No. 3 to BC Hydro
August 14, 2019 C9-5 Letter dated August 14, 2019 – CEC Comments on Proposed Regulatory Timetable
August 01, 2019 C9-4 Letter dated August 1, 2019 – CEC Information Request No. 2 to BC Hydro
May 02, 2019 C9-3 Letter dated May 2, 2019 – CEC Information Request No. 1 to BC Hydro
April 24, 2019 C9-2-1 Letter dated April 24, 2019 – CEC Submitting additional Confidential Undertaking for Patrick J. Weafer
April 23, 2019 C9-2 Letter dated April 23, 2019 – CEC Submitting Confidential Undertakings for David W. Craig, Janet Rhodes and Christopher P. Weafer
March 21, 2019 C9-1 COMMERCIAL ENERGY CONSUMERS ASSOCIATION OF BRITISH COLUMBIA (CEC) Letter dated March 21, 2019 Request to Intervene by Christopher Weafer
August 12, 2020 C8-9 Letter dated August 12, 2020 – BCSEA Submitting response to Panel Request for comments on Section 3 of Direction 8
August 12, 2020 C8-8 Letter dated August 12, 2020 – BCSEA Submitting response to Panel Request for comments
December 13, 2019 C8-7 Letter dated December 13, 2019 – BCSEA Submitting Information Request No. 1 to AMPC
October 30, 2019 C8-6 Letter dated October 30, 2019 – BCSEA Submitting Information Request No. 4 to BC Hydro
September 19, 2019 C8-5 Letter dated September 19, 2019 – BCSEA Information Request No. 3 to BC Hydro
August 02, 2019 C8-4 Letter dated August 2, 2019 – BCSEA Comments on Proposed Regulatory Timetable
August 01, 2019 C8-3 Letter dated August 1, 2019 – BCSEA Information Request No. 2 to BC Hydro
May 02, 2019 C8-2 Letter dated May 2, 2019 – BCSEA Information Request No. 1 to BC Hydro
March 20, 2019 C8-1 BC SUSTAINABLE ENERGY ASSOCIATION AND SIERRA CLUB (BCSEA) - Letter dated May 20, 2019 Request to Intervene by William Andrews
August 14, 2020 C7-5 Letter dated August 14, 2020 – Willis Submitting Comments on Hearing Process
October 23, 2019 C7-4 Letter dated October 23, 2019 – Willis Information Request No. 3 to BC Hydro
August 01, 2019 C7-3 Letter dated August 1, 2019 – Willis Information Request No. 2 to BC Hydro
May 02, 2019 C7-2 Letter dated May 2, 2019 – Willis Information Request No. 1 to BC Hydro
March 19, 2019 C7-1 PAUL WILLIS (WILLIS) Letter dated March 19, 2019 Request for Intervener Status
August 14, 2020 C6-10 Letter dated August 14, 2020 – BCOAPO Submitting response to Panel Request for comments
March 03, 2020 C6-9 Letter dated March 3, 2020 – BCOAPO Submitting Customer Energy Use Profiles from Low Income Advisory Committee dated September 26, 2019 at Oral Hearing
January 20, 2020 C6-8 Letter dated January 20, 2020 – BCOAPO Submitting Ministry of Energy, Mines and Petroleum Resources Press Release ‘Government will help low-income families manage electricity costs’ at Oral Hearing
December 03, 2019 C6-7 Letter dated December 3, 2019 – BCOAPO Submitting capital projects for cross-examination at oral hearing
October 30, 2019 C6-6 Letter dated October 30, 2019 – BCOAPO Submitting Information Request No. 4 to BC Hydro on 20-Year Load Forecast and Cost of Energy Evidentiary Update
September 19, 2019 C6-5 Letter dated September 19, 2019 – BCOAPO Information Request No. 3 to BC Hydro
August 19, 2019 C6-4 Letter dated August 19, 2019 – BCOAPO Submitting Comments on Proposed Regulatory Timetable
August 01, 2019 C6-3 Letter dated August 1, 2019 – BCOAPO Information Request No. 2 to BC Hydro
May 02, 2019 C6-2 Letter dated May 2, 2019 – BCOAPO Information Request No. 1 to BC Hydro
March 20, 2019 C6-1 BRITISH COLUMBIA OLD AGE PENSIONERS’ ORGANIZATION ET AL. (BCOAPO) Letter dated March 20, 2019 Request to Intervene by Leigha Worth & Irina Mis
August 14, 2020 C5-13 Letter dated August 14, 2020 – Zone II Submitting response to Panel Request for comments
January 10, 2020 C5-12 Letter dated January 10, 2020 – Zone II RPG Submitting Response to BCUC Information Request No. 1 on Zone II RPG Intervener Evidence
January 10, 2020 C5-11 Letter dated January 10, 2020 – Zone II RPG Submitting Response to CEC Information Request No. 1 on Zone II RPG Intervener Evidence
December 17, 2019 C5-10 Letter dated December 17, 2019 – Zone II RPG Submitting Information Request No 1 to AMPC on Intervener Evidence
December 03, 2019 C5-9 Letter dated December 3, 2019 – Zone II RPG Submitting Intervener Evidence
October 30, 2019 C5-8 Letter dated October 30, 2019 – Zone II RPG Submitting Information Request No. 4 to BC Hydro
September 18, 2019 C5-7 Letter dated September 18, 2019 – Zone II RPG Submitting Information Request No. 3 to BC Hydro
August 19, 2019 C5-6 Letter dated August 19, 2019 – Zone II RPG Submitting Comments on Proposed Regulatory Timetable
August 14, 2019 C5-5-1 Letter dated August 14, 2019 – Zone II RPG Submitting Details Regarding the Extension Request
August 14, 2019 C5-5 Letter dated August 14, 2019 – Zone II RPG Submitting an Extension Request
August 01, 2019 C5-4 Letter dated August 1, 2019 – Zone II RPG Submitting Information Request No. 2 to BC Hydro
May 02, 2019 C5-3 Letter dated May 2, 2019 – Zone II RPG Submitting Confidentiality Declarations
May 02, 2019 C5-2 Letter dated May 2, 2019 – Zone II RPG Information Request No. 1 to BC Hydro
March 18, 2019 C5-1 KWADACHA NATION AND TSAY KEH DENE NATION, TOGETHER THE ZONE II RATEPAYERS GROUP (ZONE II RPG) Letter dated March 18, 2019 Request to Intervene by Jana McLean
August 10, 2020 C4-3 Letter dated August 10, 2020 – McCandless Submitting response to Panel Requests for comments
May 01, 2019 C4-2 Letter dated May 1, 2019 – McCandless Information Request No. 1 to BC Hydro
March 14, 2019 C4-1 RICHARD MCCANDLESS (MCCANDLESS) Letter dated March 14, 2019 Request for Intervener Status
August 12, 2019 C3-3 Letter dated August 12, 2019 – FortisBC Comment on Proposed Regulatory Timetable
May 02, 2019 C3-2 Letter dated May 2, 2019 – FortisBC Information Request No. 1 to BC Hydro
March 13, 2019 C3-1 FORTISBC ENERGY INC. AND FORTISBC INC. (FORTISBC) Letter dated March 13, 2019 Request to Intervene by Doug Slater
March 04, 2019 C2-1 CATALYST PAPER CORPORATION (CATALYST) Letter dated March 4, 2019 Request to Intervene by Carlo Dal Monte
August 11, 2020 C1-10 Letter dated August 11, 2020 – MoveUP Submitting response to Panel Request for comments on Section 3 of Direction 8
August 11, 2020 C1-9 Letter dated August 11, 2020 – MoveUP Submitting response to Panel Request for comments
January 24, 2020 C1-8 Letter dated January 24, 2020 – MoveUP Submitting one page excerpt from ZAPPED Report at the Oral Hearing
January 24, 2020 C1-7 Letter dated January 24, 2020 – MoveUP Submitting document entitled Cost of IPP Energy at the Oral Hearing
December 13, 2019 C1-6 Letter dated December 13, 2019 – MoveUP Submitting Information Request No. 1 to AMPC
November 14, 2019 C1-5 Letter dated November 14, 2019 – MoveUP advising Dr. Marvin Shaffer to assist MoveUP
October 18, 2019 C1-4 Letter dated October 18, 2019 – MoveUP Information Request on 20-Year Load Forecast to BC Hydro
September 19, 2019 C1-3 Letter dated September 19, 2019 – MoveUP Information Request No. 3 to BC Hydro
May 02, 2019 C1-2 Letter dated May 2, 2019 – MoveUP Information Request No. 1 to BC Hydro
March 01, 2019 C1-1 MOVEMENT OF UNITED PROFESSIONALS (MOVEUP) Letter dated March 1, 2019 Request to Intervene by Susanna Quail

D Exhibits — Interested Party Documents

Date Title Document Description
March 15, 2019 D-1 MOVEUP - Party Status Changed to Intervener (Exhibit C1-1)
March 19, 2019 D-2 BRITISH COLUMBIA MINISTRY OF ENERGY, MINES AND PETROLEUM RESOURCES (MEMPR) – Letter dated March 19, 2019 Request for Interested Party Status by Jack Buchanan
July 05, 2019 D-3 KING, MARTIN (KING) - Submission dated July 5, 2019 Request for Interested Party Status
July 05, 2019 D-3-1 KING - Letter of Comment dated July 5, 2019
February 04, 2020 D-4 WAUTHY, J. (Wauthy) – Submission dated February 4, 2020 Request for Interested Party Status

E Exhibits - Letters of Comment

Date Title Document Description
March 04, 2019 E-1 Dempsey, B. – Letter of Comment dated March 1, 2019
March 04, 2019 E-2 Griffin, L. – Letter of Comment dated March 2, 2019
March 11, 2019 E-3 Wright, J. – Letter of Comment dated March 10, 2019
September 04, 2019 E-4 Stoppard, C. – Letter of Comment dated August 30, 2019
November 08, 2019 E-5 Harrap, K. – Letter of Comment dated November 8, 2019
December 16, 2019 E-6 Danes, B. – Letter of Comment dated December 13, 2019
December 16, 2019 E-6-1 Danes, B. – Letter of Comment dated December 15, 2019
January 21, 2020 E-7 Barton, K. – Letter of Comment dated January 18, 2020
January 21, 2020 E-8 Morven, M. – Letter of Comment dated January 19, 2020

Transcripts

Date Title Document Description
March 18, 2019 Transcript Volume 1 Workshop March 15, 2019
June 24, 2019 Transcript Volume 2 Procedural Conference June 24, 2019
September 05, 2019 Transcript Volume 3 Community Input Session September 5, 2019
November 22, 2019 Transcript Volume 4 Procedural Conference November 22, 2019
January 20, 2020 Transcript Volume 5 Oral Hearing January 20, 2020
January 21, 2020 Transcript Volume 6 Oral Hearing January 21, 2020
January 22, 2020 Transcript Volume 7 Oral Hearing January 22, 2020
January 23, 2020 Transcript Volume 8B Oral Hearing January 23, 2020
January 23, 2020 Transcript Volume 8A Oral Hearing January 23, 2020
January 24, 2020 Transcript Volume 9 Oral Hearing January 24, 2020
February 24, 2020 Transcript Volume 10 Oral Hearing February 24, 2020
February 25, 2020 Transcript Volume 11 Oral Hearing February 25, 2020
February 28, 2020 Transcript Volume 12 Oral Hearing February 28, 2020
March 02, 2020 Transcript Volume 13 Oral Hearing March 2, 2020
March 03, 2020 Transcript Volume 14 Oral Hearing March 3, 2020
March 04, 2020 Transcript Volume 15 Oral Hearing March 4, 2020
June 12, 2020 Transcript Volume 16 Oral Argument June 12, 2020

Our Review Process