FortisBC Energy Inc. (gas)

Biomethane Energy Recovery Charge Rate Methodology and Comprehensive Review of a Revised Renewable Gas Program

Completed: 2024

FortisBC Energy Inc. is seeking BCUC approval for revisions to its Renewable Natural Gas Program as part of the second stage in a two-stage proceeding. FEI requests changes to its tariff, cost recovery methods, and accounting treatment to provide new and revised Renewable Gas service to its customers. In Stage 1, the BCUC reviewed FEI’s Biomethane Energy Recovery Charge Rate Methodology Assessment Report and issued its Decision and Order G-242-21.

Hearing and Other Documents

Title Document Description
EXHIBIT LIST Updated: December 20, 2023 @ 3:59 pm
Decision and G-242-21 - Stage 1 Decision and Order G-242-21 - Stage 1 August 12, 2021
Decision and G-77-24 - Stage 2 Decision and Order G-77-24 - Stage 2 March 20, 2024

Arguments/Submissions

Title Document Description
FEI Final Argument - Stage 1 Final Argument Stage 1 March 25, 2021
MoveUP Argument - Stage 1 Argument Stage 1 April 7, 2021
BCOAPO Final Argument Final Argument April 8, 2021
CEC Final Argument - Stage 1 Argument Stage 1 April 8, 2021
BCSEA Argument - Stage 1 Argument Stage 1 April 8, 2021
FEI Reply Argument - Stage 1 Reply Argument Stage 1 April 16, 2021
FEI Final Argument - Stage 2 Final Argument Stage 2 October 26, 2023
FEI Additional Final Argument - Stage 2 Additional Final Argument Stage 2 November 10, 2023
BCSEA Final Argument Stage 2 Final Argument Stage 2 November 16, 2023
MoveUP Final Argument Stage 2-Amended Amended Final Argument Stage 2 November 17, 2023
Local Government Interveners Final Argument Stage 2 Final Argument Stage 2 November 17, 2023
BC Hydro Final Argument Stage 2 Final Argument Stage 2 November 17, 2023
RCIA Final Argument Stage 2 Final Argument Stage 2 November 17, 2023
Brightside Final Argument Stage 2 Final Argument Stage 2 November 17, 2023
BCOAPO Final Argument Stage 2 Final Argument Stage 2 November 21, 2023
GNAR Final Argument Stage 2 Final Argument Stage 2 November 23, 2023
MS2S Final Argument Stage 2 Final Argument Stage 2 November 23, 2023
CEC Final Argument Stage 2 Final Argument Stage 2 November 23, 2023
FEI Reply Argument Reply Argument December 13, 2023

Exhibits

A Exhibits - BCUC Documents

Date Title Document Description
October 09, 2020 A-1 Letter dated October 9, 2020 – Appointing the Panel for the review of FortisBC Energy Inc. Biomethane Energy Recovery Charge (BERC) Rate Methodology - British Columbia Utilities Commission Decision and Order G-133-16 Compliance Filing – BERC Rate Assessment Report
October 13, 2020 A-2 Letter dated October 13, 2020 – BCUC Amending the Panel for the review of the Application
November 12, 2020 A-3 Letter dated November 12, 2020 – BCUC Order G-292-20 establishing a regulatory timetable
November 20, 2020 A-4 Letter dated November 20, 2020 – BCUC response to FEI Regulatory Timetable Amendment Request
November 30, 2020 A-5 Letter dated November 30, 2020 – BCUC Order G-301-20 establishing an amended regulatory timetable
January 29, 2021 A-6 Letter dated January 29, 2021 – BCUC Order G-35-21 establishing a further regulatory timetable
February 23, 2021 A-7 Letter dated February 23, 2021 – BCUC Information Request No. 1 to FEI
April 28, 2021 A-8 Letter dated April 28, 2021 – BCUC request for Oral Submissions
January 07, 2022 A-9 Letter dated January 7, 2022 – BCUC Order G-3-22 establishing a regulatory timetable
February 17, 2022 A-10 Letter dated February 17, 2022 –BCUC Stage 2 Information Request No. 1 to FEI
February 18, 2022 A-11 Letter dated February 18, 2022 – BCUC amending the regulatory timetable
February 24, 2022 A-12 Letter dated February 24, 2022 – BCUC approval for City of Richmond and Lulu Island Energy Company’s Request to Intervene
February 28, 2022 A-13 Letter dated February 28, 2022 – BCUC approval for Force of Nature Alliance’s Request to Intervene
March 17, 2022 A-14 Letter dated March 17, 2022 – BCUC providing procedural conference information
April 07, 2022 A-15 Letter dated April 7, 2022 – BCUC response to FEI proposed regulatory timetable
April 14, 2022 A-16 Letter dated April 14 2022 – BCUC Order G-103-22 amending the regulatory timetable
May 18, 2022 A-17 Letter dated May 18, 2022 – BCUC providing updated procedural conference information
May 27, 2022 A-18 Letter dated May 27, 2022 – BCUC requesting submissions on expert evidence
June 01, 2022 A-19 Letter dated June 1, 2022 – BCUC requesting submissions on scope of Application
June 16, 2022 A-20 REPLACED - Letter dated June 16, 2022 – BCUC Order G-165-22 amending the regulatory timetable with Reasons for Decision
June 20, 2022 A-20-1 Letter dated June 20, 2022 – BCUC issuing Order G-165-22A with Reasons for Decision, updated regulatory timetable and Scope
July 12, 2022 A-21 Letter dated July 12, 2022 – BCUC Stage 2 Information Request No. 2 to FEI
July 19, 2022 A-22 Letter dated July 19, 2022 – BCUC requesting submissions on FEI objection to Information Request No. 2 as out of scope questions
July 29, 2022 A-23 Letter dated July 29, 22 – BCUC Order G-214-22 with reasons
August 04, 2022 A-24 Letter dated August 4, 2022 – BCUC providing clarification on deadline to file responses to Information Requests No. 2
October 06, 2022 A-25 Letter dated October 6, 2022 – BCUC invitation to City of Richmond, District of North Vancouver, The Corporation of the District of Saanich, City of Victoria, and Lulu Island Energy Company Ltd. to provide a reply submission to FEI’s letter dated October 5, 2022
October 14, 2022 A-26 Letter dated October 14, 2022 – BCUC requesting information regarding My Sea to Sky Society’s Notice of Intent to submit Intervener Evidence
October 14, 2022 A-27 Letter dated October 14, 2022 – BCUC requesting information regarding District of North Vancouver and the District of Saanich’s Notice of Intent to submit Intervener Evidence
October 14, 2022 A-28 Letter dated October 14, 2022 – BCUC requesting information regarding Brightside Solution’s Notice of Intent to submit Intervener Evidence
October 20, 2022 A-29 Letter dated October 20, 2022 – BCUC Order G-293-22 with Reasons for Decision
January 16, 2023 A-30 Letter dated January 16, 2023 – BCUC Information Request No. 1 to BCSEA on intervener evidence
January 16, 2023 A-31 Letter dated January 16, 2023 – BCUC Information Request No. 1 to City of Vancouver on intervener evidence
January 16, 2023 A-32 Letter dated January 16, 2023 – BCUC Information Request No. 1 to City of Richmond and Lulu Island Energy Company Ltd. on intervener evidence
January 16, 2023 A-33 Letter dated January 16, 2023 – BCUC Information Request No. 1 to BC Hydro on intervener evidence
January 16, 2023 A-34 Letter dated January 16, 2023 – BCUC Information Request No. 1 to Brattle Group on intervener evidence
January 16, 2023 A-35 Letter dated January 16, 2023 – BCUC Information Request No. 1 to BrightSide Solutions on intervener evidence
January 16, 2023 A-36 Letter dated January 16, 2023 – BCUC Information Request No. 1 to City of Victoria on intervener evidence
January 16, 2023 A-37 Letter dated January 16, 2023 – BCUC Information Request No. 1 to District of Saanich and District of North Vancouver on intervener evidence
January 16, 2023 A-38 Letter dated January 16, 2023 – BCUC Information Request No. 1 to My Sea to Sky on intervener evidence
February 02, 2023 A-39 Letter dated February 2, 2023 –BCUC request for comment to Metro Vancouver timetable extension request
February 14, 2023 A-40 Letter dated February 14, 2023 – BCUC Order G-28-23 amending the regulatory timetable
March 21, 2023 A-41 Letter dated March 21, 2023 – BCUC Information Request No. 1 on FEI Rebuttal Evidence to BCSEA
March 21, 2023 A-42 Letter dated March 21, 2023 – BCUC Information Request No. 1 on FEI Rebuttal Evidence to Brattle
March 21, 2023 A-43 Letter dated March 21, 2023 – BCUC Information Request No. 1 on FEI Rebuttal Evidence to BrightSide
March 21, 2023 A-44 Letter dated March 21, 2023 – BCUC Information Request No. 1 on FEI Rebuttal Evidence to CoV et al
March 21, 2023 A-45 Letter dated March 21, 2023 – BCUC Information Request No. 1 on FEI Rebuttal Evidence to MS2S and Brattle
March 21, 2023 A-46 Letter dated March 21, 2023 – BCUC Information Request No. 1 on FEI Rebuttal Evidence to Strunk
April 04, 2023 A-47 Letter dated April 4, 2023 – BCUC response to FEI extension request to the regulatory timetable
April 19, 2023 A-48 Letter dated April 19, 2023 – BCUC Order G-86-23 amending the regulatory timetable
May 09, 2023 A-49 Letter dated May 9, 2023 – BCUC Order G-112-23 amending the regulatory timetable
June 14, 2023 A-50 Letter dated June 14, 2023 – BCUC Order G-142-23 establishing a further regulatory timetable
August 14, 2023 A-51 Letter dated August 14, 2023 – BCUC Order G-215-23 establishing a further regulatory timetable
September 07, 2023 A-52 Letter dated September 7,2023 – BCUC Information Request No. 3 to FEI on Evidentiary Update
October 10, 2023 A-53 Letter dated October 10, 2023 – BCUC amending the Panel for the review of the application
November 15, 2023 A-54 Letter dated November 15, 2023 – BCUC response to BCOAPO and CEC extension requests
November 17, 2023 A-55 Letter dated November 17, 2023 – BCUC response to MS2S and GNAR extension requests
December 06, 2023 A-56 Letter dated December 6, 2023 – BCUC response to FEI extension request to file Reply Argument
December 20, 2023 A-57 Letter dated December 20, 2023 –BCUC confirming the appointment of an additional panel member in this proceeding
December 24, 2021 A2-1 Letter dated December 24, 2021 – BCUC Staff Questions No. 1 to FEI
May 31, 2022 A2-2 Letter dated May 31, 2022 – BCUC Staff submitting draft regulatory timetable
August 30, 2022 A2-3 Letter dated August 30, 2022 – BCUC Staff submitting Terms of Reference for independent expert report
December 06, 2022 A2-4 Letter dated December 6, 2022 – BCUC Staff submitting The Brattle Group Independent Expert Report dated December 5, 2022
February 07, 2023 A2-5 Letter dated February 7, 2023 – BCUC Staff submitting The Brattle Group response to BC Hydro Information Request No. 1 on expert evidence
February 07, 2023 A2-6 Letter dated February 7, 2023 – BCUC Staff submitting The Brattle Group response to the CEC Information Request No. 1 on expert evidence
February 07, 2023 A2-7 Letter dated February 7, 2023 – BCUC Staff submitting The Brattle Group response to BCSEA Information Request No. 1 on expert evidence
February 07, 2023 A2-8 Letter dated February 7, 2023 – BCUC Staff submitting The Brattle Group response to the City of Richmond Information Request No. 1 on expert evidence
February 07, 2023 A2-4-1 Letter dated February 7 2023 – BCUC Staff submitting The Brattle Group Memorandum regarding Errata on The Brattle Group Independent Expert Report and the Errata on the independent expert report
February 07, 2023 A2-9 Letter dated February 7, 2023 – BCUC Staff submitting The Brattle Group response to BCUC Information Request No. 1 on expert evidence
February 07, 2023 A2-10 Letter dated February 7, 2023 – BCUC Staff submitting The Brattle Group response to MoveUp Information Request No. 1 on expert evidence

B Exhibits - Applicant Documents

Date Title Document Description
April 19, 2023 B-71-1 CONFIDENTIAL - Letter dated April 18, 2023 – FEI submitting confidential Attachment 2.1 to response to BCUC Information Request No. 1 on FEI Rebuttal Evidence to BCSEA
April 19, 2023 B-71-2 CONFIDENTIAL - Letter dated April 18, 2023 – FEI submitting confidential Attachment 2.6 to response to BCUC Information Request No. 1 on FEI Rebuttal Evidence to BCSEA
January 16, 2023 B-53 CONFIDENTIAL - Letter dated January 16, 2023 – FEI submitting confidential Information Request No. 1 to BCSEA on intervener evidence
August 12, 2020 B-1 FORTISBC ENERGY INC. (FEI) - Application for Biomethane Energy Recovery Charge (BERC) Rate Methodology - British Columbia Utilities Commission Decision and Order G-133-16 Compliance Filing – BERC Rate Assessment Report
April 12, 2023 B-70 Letter dated April 12, 2023 – FEI submitting reply response on submissions for proposed Final Argument dates
April 14, 2022 B-14 Letter dated April 14, 2021 – FEI submitting reply comment to Intervener submissions on proposed timetable amendment
April 19, 2023 B-78 Letter dated April 18, 2023 – FEI submitting response to BCSEA Information Request No. 1 on FEI Rebuttal Evidence
April 19, 2023 B-71 Letter dated April 18, 2023 – FEI submitting response to BCUC Information Request No. 1 on FEI Rebuttal Evidence to BCSEA
April 18, 2023 B-79 Letter dated April 18, 2023 – FEI submitting response to BCUC Information Request No. 1 on FEI Rebuttal Evidence to Brattle
April 18, 2023 B-80 Letter dated April 18, 2023 – FEI submitting response to BCUC Information Request No. 1 on FEI Rebuttal Evidence to Brightside
April 18, 2023 B-81 Letter dated April 18, 2023 – FEI submitting response to BCUC Information Request No. 1 on FEI Rebuttal Evidence to CoV
April 18, 2023 B-82 Letter dated April 18, 2023 – FEI submitting response to BCUC Information Request No. 1 on FEI Rebuttal Evidence to MS2S and Brattle
April 18, 2023 B-83 Letter dated April 18, 2023 – FEI submitting response to BCUC Information Request No. 1 on FEI Rebuttal Evidence to Strunk
April 18, 2023 B-84 Letter dated April 18, 2023 – FEI submitting response to CEC Information Request No. 1 on FEI Rebuttal Evidence to BCSEA
April 18, 2023 B-85 Letter dated April 18, 2023 – FEI submitting response to CEC Information Request No. 1 on FEI Rebuttal Evidence to Brattle
April 19, 2023 B-73 Letter dated April 18, 2023 – FEI submitting response to CEC Information Request No. 1 on FEI Rebuttal Evidence to Brattle and MS2S
April 18, 2023 B-86 Letter dated April 18, 2023 – FEI submitting response to CEC Information Request No. 1 on FEI Rebuttal Evidence to Brightside
April 19, 2023 B-72 Letter dated April 18, 2023 – FEI submitting response to CEC Information Request No. 1 on FEI Rebuttal Evidence to CoV
April 19, 2023 B-74 Letter dated April 18, 2023 – FEI submitting response to CEC Information Request No. 1 on FEI Rebuttal Evidence to RCIA
April 19, 2023 B-75 Letter dated April 18, 2023 – FEI submitting response to CEC Information Request No. 1 on FEI Rebuttal Evidence to Strunk
April 19, 2023 B-76 Letter dated April 18, 2023 – FEI submitting response to MS2S Information Request No. 1 on FEI Rebuttal Evidence to MS2S and Brattle
April 19, 2023 B-77 Letter dated April 18, 2023 – FEI submitting response to RCIA Information Request No. 1 on FEI Rebuttal Evidence
April 21, 2023 B-78-1 Letter dated April 21, 2023 – FEI submitting erratum to response to BCSEA Information Request No. 1 on FEI Rebuttal Evidence
April 03, 2023 B-69 Letter dated April 3, 2023 – FEI submitting request to amend the Regulatory Timetable
April 05, 2022 B-13 Letter dated April 5, 2021 – FEI submitting extension request to file responses to Information Requests No. 1
August 01, 2023 B-89 Letter dated August 1, 2023 – FEI submitting Update No. 2 on Carbon Tax Matter
August 02, 2022 B-34 Letter dated August 2, 2022 – FEI submitting request for clarification
December 13, 2022 B-50 Letter dated December 13, 2022 – FEI submitting Confidentiality Declaration and Undertaking for R. Gosselin
December 14, 2022 B-51 Letter dated December 14, 2022 – FEI submitting Confidentiality Declaration and Undertaking for R. Cook
December 17, 2021 B-11 Letter dated December 17, 2021 – FEI submitting the Stage 2 Comprehensive Review and Application for a Revised Renewable Gas Program
December 04, 2023 B-97 Letter dated December 4, 2023 – FEI submitting extension request to file Reply Argument
February 28, 2023 B-62 Letter dated February 28, 2023 – FEI submitting Rebuttal Evidence to BCSEA
February 28, 2023 B-63 Letter dated February 28, 2023 – FEI submitting Rebuttal Evidence to Brattle Group
February 28, 2023 B-64 Letter dated February 28, 2023 – FEI submitting Rebuttal Evidence to Brightside
February 28, 2023 B-65 Letter dated February 28, 2023 – FEI submitting Rebuttal Evidence to CoV
February 28, 2023 B-66 Letter dated February 28, 2023 – FEI submitting Rebuttal Evidence to MS2S and Brattle
February 28, 2023 B-67 Letter dated February 28, 2023 – FEI submitting Rebuttal Evidence to RCIA
February 28, 2023 B-68 Letter dated February 28, 2023 – FEI submitting Rebuttal Evidence to Strunk
February 06, 2023 B-60 Letter dated February 6, 2023 – FEI submitting comment to Metro Vancouver timetable extension request
February 08, 2023 B-61 Letter dated February 8, 2023 – FEI submitting Confidentiality Declaration and Undertaking for Richard Gosselin
January 10, 2023 B-52 Letter dated January 10, 2023 – FEI submitting Confidentiality Declaration and Undertaking for P. Koepfgen
January 16, 2023 B-54 Letter dated January 16, 2023 – FEI submitting Information Request No. 1 to Brightside on intervener evidence
January 16, 2023 B-56 Letter dated January 16, 2023 – FEI submitting Information Request No. 1 to City of Vancouver on intervener evidence
January 16, 2023 B-55 Letter dated January 16, 2023 – FEI submitting Information Request No. 1 to City of Victoria on intervener evidence
January 16, 2023 B-57 Letter dated January 16, 2023 – FEI submitting Information Request No. 1 to My Sea to Sky on intervener evidence
January 16, 2023 B-58 Letter dated January 16, 2023 – FEI submitting Information Request No. 1 to RCIA on intervener evidence
January 16, 2023 B-59 Letter dated January 16, 2023 – FEI submitting Information Request No. 1 to Saanich and North Vancouver on intervener evidence
January 28, 2021 B-3 Letter dated January 28, 2021 – FEI submitting reply to intervener submissions on process
January 04, 2022 B-12 Letter dated January 4, 2021 – FEI submitting response to BCUC Staff Information Request No. 1
July 19, 2022 B-32 Letter dated July 19, 2022 – FEI submitting Information Request No. 2 questions are Out of Scope
July 22, 2022 B-33 Letter dated July 22, 2022 – FEI reply to Participants response to FEI out of scope comments
June 30, 2021 B-9 Letter dated June 30, 2021 – FEI submitting Stage 2 Comprehensive Review and Assessment of the Renewable Gas Program – Status update in compliance with G-35-21
June 05, 2023 B-88 Letter dated June 5, 2023 – FEI submitting Update on Carbon Tax Matter
March 15, 2021 B-8 Letter dated March 15, 2021 – FEI submitting response to BCOAPO Information Request No. 1
March 15, 2021 B-5 Letter dated March 15, 2021 – FEI submitting response to BCSEA Information Request No. 1
March 15, 2021 B-4 Letter dated March 15, 2021 – FEI submitting response to BCUC Information Request No. 1
March 15, 2021 B-7 Letter dated March 15, 2021 – FEI submitting response to CEC Information Request No. 1
March 15, 2021 B-6 Letter dated March 15, 2021 – FEI submitting response to MoveUp Information Request No. 1
May 16, 2022 B-15 Letter dated May 16, 2022 – FEI submitting responses to BC Hydro Information Request No. 1
May 16, 2022 B-16 Letter dated May 16, 2022 – FEI submitting responses to BC Transit Information Request No. 1
May 16, 2022 B-21 Letter dated May 16, 2022 – FEI submitting responses to BCOAPO Information Request No. 1
May 16, 2022 B-19 Letter dated May 16, 2022 – FEI submitting responses to BCSEA Information Request No. 1
May 16, 2022 B-17 Letter dated May 16, 2022 – FEI submitting responses to BCUC Information Request No. 1
May 16, 2022 B-18 Letter dated May 16, 2022 – FEI submitting responses to BrightSide Solutions Information Request No. 1
May 16, 2022 B-22 Letter dated May 16, 2022 – FEI submitting responses to CEC Information Request No. 1
May 16, 2022 B-20 Letter dated May 16, 2022 – FEI submitting responses to CoR Information Request No. 1
May 16, 2022 B-24 Letter dated May 16, 2022 – FEI submitting responses to CoV Information Request No. 1
May 16, 2022 B-26 Letter dated May 16, 2022 – FEI submitting responses to Creative Energy Information Request No. 1
May 16, 2022 B-27 Letter dated May 16, 2022 – FEI submitting responses to Force of Nature Information Request No. 1
May 16, 2022 B-23 Letter dated May 16, 2022 – FEI submitting responses to GNAR Information Request No. 1
May 16, 2022 B-25 Letter dated May 16, 2022 – FEI submitting responses to MetroVan Information Request No. 1
May 16, 2022 B-31 Letter dated May 16, 2022 – FEI submitting responses to MoveUP Information Request No. 1
May 16, 2022 B-29 Letter dated May 16, 2022 – FEI submitting responses to MS2S Information Request No. 1
May 16, 2022 B-30 Letter dated May 16, 2022 – FEI submitting responses to RCIA Information Request No. 1
May 16, 2022 B-28 Letter dated May 16, 2022 – FEI submitting responses to TransLink Information Request No. 1
May 27, 2022 B-11-1 Letter dated May 27, 2022 – FEI submitting errata to the Stage 2 Comprehensive Review and Application for a Revised Renewable Gas Program
May 08, 2023 B-87 Letter dated May 8, 2023 – FEI submitting request for amendment of the regulatory timetable
November 17, 2020 B-2 Letter dated November 17, 2020 – FEI submitting request to rescind Order G-292-20
November 03, 2022 B-48 Letter dated November 3, 2022 – FEI submitting response to CoR Information Request No. 2 in scope
November 07, 2022 B-49 Letter dated November 7, 2022 – FEI submitting supporting information for the response to CoR Information Request No. 2 in scope
October 04, 2023 B-91 Letter dated October 4, 2023 – FEI submitting response to BCOAPO Information Request No. 3 on Evidentiary Update
October 04, 2023 B-92 Letter dated October 4, 2023 – FEI submitting response to BCSEA Information Request No. 3 on Evidentiary Update
October 04, 2023 B-90 Letter dated October 4, 2023 – FEI submitting response to BCUC Information Request No. 3 on Evidentiary Update
October 04, 2023 B-93 Letter dated October 4, 2023 – FEI submitting response to CEC Information Request No. 3 on Evidentiary Update
October 04, 2023 B-94 Letter dated October 4, 2023 – FEI submitting response to MoveUP Information Request No. 3 on Evidentiary Update
October 04, 2023 B-95 Letter dated October 4, 2023 – FEI submitting response to MS2S Information Request No. 3 on Evidentiary Update
October 04, 2023 B-96 Letter dated October 4, 2023 – FEI submitting response to RCIA Information Request No. 3 to Evidentiary Update
October 05, 2022 B-47 Letter dated October 5, 2022 – FEI submitting responses to COR Out-of-Scope Information Requests
September 12, 2022 B-35 Letter dated September 12, 2022 – FEI submitting responses to BC Hydro Information Request No. 2
September 12, 2022 B-36 Letter dated September 12, 2022 – FEI submitting responses to BCOAPO Information Request No. 2
September 12, 2022 B-45 Letter dated September 12, 2022 – FEI submitting responses to BCSEA Information Request No. 2
September 12, 2022 B-42 Letter dated September 12, 2022 – FEI submitting responses to BCUC Information Request No. 2
September 12, 2022 B-46 Letter dated September 12, 2022 – FEI submitting responses to BrightSide Information Request No. 2
September 12, 2022 B-43 Letter dated September 12, 2022 – FEI submitting responses to CEC Information Request No. 2
September 12, 2022 B-39 Letter dated September 12, 2022 – FEI submitting responses to CoR Information Request No. 2
September 12, 2022 B-37 Letter dated September 12, 2022 – FEI submitting responses to CoV Information Request No. 2
September 12, 2022 B-38 Letter dated September 12, 2022 – FEI submitting responses to GNAR Information Request No. 2
September 12, 2022 B-41 Letter dated September 12, 2022 – FEI submitting responses to MetroVan Information Request No. 2
September 12, 2022 B-40 Letter dated September 12, 2022 – FEI submitting responses to MoveUP Information Request No. 2
September 12, 2022 B-44 Letter dated September 12, 2022 – FEI submitting responses to RCIA Information Request No. 2
September 09, 2021 B-10 Letter dated September 9, 2021 – FEI submitting proposed contract wording and billing correction in Compliance with Order G-242-21

C Exhibits - Intervener Documents

BC SUSTAINABLE ENERGY ASSOCIATION AND SIERRA CLUB (BCSEA) - Letter dated October 29, 2020 Request to Intervene by T. Hackney and W. Andrews
MOVEMENT OF UNITED PROFESSIONALS (MOVEUP) – Letter dated December 8, 2020 – Request to Intervene by Jim Quail, Allevato Quail & Roy, Barristers & Solicitors
COMMERCIAL ENERGY CONSUMERS ASSOCIATION OF BRITISH COLUMBIA (CEC) - Letter dated January 14, 2021 Request to Intervene by Christopher Weafer
BC OLD AGE PENSIONERS’ ORGANIZATION, ACTIVE SUPPORT AGAINST POVERTY, COUNCIL OF SENIOR CITIZENS’ ORGANIZATIONS OF BC, DISABILITY ALLIANCE BC, TENANTS RESOURCE AND ADVISORY CENTRE, AND TOGETHER AGAINST POVERTY SOCIETY, KNOWN COLLECTIVELY IN REGULATORY PROCESSES AS “BCOAPO ET AL.” (BCOAPO ET AL) - Letter dated January 15, 2020 - Request for Intervener Status by Leigha Worth and Irina Mis
PACIFIC NORTHERN GAS INC. (PNG) - Letter dated February 4, 2022 Request to Intervene by Verlon Otto
CITIZENS FOR MY SEA TO SKY SOCIETY (MS2S) - Letter dated February 4, 2022 Request to Intervene by Eoin Finn
CITY OF VANCOUVER (COV) - Letter dated February 4, 2022 Request to Intervene by Ian Neville
BC TRANSIT (TRANSIT) - Letter dated February 7, 2022 Request to Intervene by Geoff Huber
CITY OF VICTORIA (COVICTORIA) - Letter dated February 8, 2022 Request to Intervene by Laura Berndt
RESIDENTIAL CONSUMER INTERVENER ASSOCIATION (RCIA) - Letter dated February 9, 2022 Request to Intervene by Samuel Mason
METRO VANCOUVER REGIONAL DISTRICT (METRO VANCOUVER) - Letter dated February 9, 2022 Request to Intervene by Roger Quan
CREATIVE ENERGY VANCOUVER PLATFORMS INC. (CREATIVE ENERGY) - Letter dated February 9, 2022 Request to Intervene by Rob Gorter
DISTRICT OF NORTH VANCOUVER (NORTH VANCOUVER) - Letter dated February 9, 2022 Request to Intervene by Caroline Jackson
TRANSLINK (TRANSLINK) - Letter dated February 9, 2022 Request to Intervene by Ralf Nielsen
SEASPAN FERRIES (SEASPAN) - Letter dated January 22, 2022 Request to Intervene by Harly Penner
BRITISH COLUMBIA HYDRO AND POWER AUTHORITY (BC HYDRO) - Letter dated January 24, 2022 Request to Intervene by Chris Sandve
BRIGHTSIDE SOLUTIONS INC. (BRIGHTSIDE SOLUTIONS) - Letter dated January 31, 2022 Request to Intervene by Mark Grist
GNAR INC - SUSTAINABLE HOME DESIGN (GNAR) - Letter dated February 7, 2022 Request to Intervene by Edgar Dearden
BRITISH COLUMBIA FERRY SERVICES INC. (BC FERRIES) - Letter dated February 8, 2022 Request to Intervene by Frank Cholette
CITY OF SURREY (COSURREY) - Letter dated February 8, 2022 Request to Intervene by Bentjie Lee
DISTRICT OF SAANICH (SAANICH) - Letter dated February 15, 2022 Request to Intervene by Rebecca Newlove
CITY OF RICHMOND (CoR) - Letter dated February 9, 2022 Request to Intervene by Anthony Capuccinello Iraci
LULU ISLAND ENERGY COMPANY LTD. (LULU ISLAND) - Letter dated February 9, 2022 Request to Intervene by Anthony Capuccinello Iraci
FORCE OF NATURE ALLIANCE (FORCE OF NATURE) - Letter dated February 23, 2022 Late Request to Intervene by Laurie Parkinson
Letter dated March 3, 2022 – City of Richmond, City of Surrey, District of North Vancouver, District of Saanich, City of Victoria and Lulu Island Energy Company Stage 2 Information Request No. 1 to FEI
REMOVED – NOW EXHIBIT D-19


Date Title Document Description
October 29, 2020 C1-1 BC SUSTAINABLE ENERGY ASSOCIATION AND SIERRA CLUB (BCSEA) - Letter dated October 29, 2020 Request to Intervene by T. Hackney and W. Andrews
December 02, 2020 C1-2 Letter dated December 2, 2020 - BCSEA submitting comments on process
February 23, 2021 C1-3 Letter dated February 23, 2021 – BCSEA Information Request No. 1 to FEI
March 03, 2022 C1-4 Letter dated March 3, 2022 – BCSEA Stage 2 Information Request No. 1 to FEI
April 12, 2022 C1-5 Letter dated April 12, 2022 – BCSEA response to FEI’s proposed timetable amendment
May 30, 2022 C1-6 Letter dated May 30, 2022 – BCSEA submitting intent to file evidence
May 30, 2022 C1-7 Letter dated May 30, 2022 – BCSEA submitting Oral Submission notes for Procedural Conference
July 12, 2022 C1-8 Letter dated July 12, 2022 – BCSEA Stage 2 Information Request No. 2 to FEI
July 21, 2022 C1-9 Letter dated July 21, 2022 – BCSEA response to FEI objection to Stage 2 Information Request No. 2
October 03, 2022 C1-10 Letter dated October 3, 2022 – BCSEA submitting notice to provide Intervener evidence
December 05, 2022 C1-11 Letter dated December 5, 2022 – BCSEA submitting Intervener evidence
December 05, 2022 C1-11-1 CONFIDENTIAL - Letter dated December 5, 2022 – BCSEA submitting confidential Intervener evidence Attachment
January 16, 2023 C1-12 Letter dated January 16, 2023 – BCSEA submitting Information Request No. 1 to The Brattle Group, Inc. on Expert Evidence
January 16, 2023 C1-13 Letter dated January 16, 2023 – BCSEA submitting Information Request No. 1 to BrightSide
January 16, 2023 C1-14 Letter dated January 16, 2023 – BCSEA submitting Information Request No. 1 to CoV
January 16, 2023 C1-15 Letter dated January 16, 2023 – BCSEA submitting Information Request No. 1 to North Vancouver and Saanich
January 16, 2023 C1-16 Letter dated January 16, 2023 – BCSEA submitting Information Request No. 1 to RCIA
January 16, 2023 C1-17 Letter dated January 16, 2023 – BCSEA submitting Information Request No. 1 to CoR and Lulu Island
January 16, 2023 C1-18 Letter dated January 16, 2023 – BCSEA submitting Information Request No. 1 to CoVictoria
February 03, 2023 C1-19 Letter dated February 3, 2023 –BCSEA submitting comment to Metro Vancouver timetable extension request
February 06, 2023 C1-20 Letter dated February 6, 2023 – BCSEA submitting response to BCUC Information Request No. 1
February 06, 2023 C1-21 Letter dated February 6, 2023 – BCSEA submitting response to FEI Information Request No. 1
March 21, 2023 C1-11-2 Letter dated March 21, 2023 – BCSEA submitting errata and revised Intervener evidence
March 21, 2023 C1-22 Letter dated March 21, 2023 – BCSEA submitting Information Request No. 1 on Rebuttal Evidence
April 06, 2023 C1-23 Letter dated April 6, 2023 – BCSEA submitting response on proposed amended dates for Final Argument
September 12, 2023 C1-24 Letter dated September 12, 2023 – BCSEA submitting Information Request No. 3 to FEI on Evidentiary Update
October 17, 2023 C1-25 Letter dated October 17, 2023 – BCSEA submitting no objection to Panel Amendment
December 14, 2023 C1-26 Letter dated December 14, 2023 – BCSEA submitting question regarding Panel Amendment
December 08, 2020 C2-1 MOVEMENT OF UNITED PROFESSIONALS (MOVEUP) – Letter dated December 8, 2020 – Request to Intervene by Jim Quail, Allevato Quail & Roy, Barristers & Solicitors
December 08, 2020 C2-2 Letter dated December 8, 2020 – MoveUP submitting comments on process
February 22, 2021 C2-3 Letter dated February 22, 2021 – MoveUP Information Request No. 1 to FEI
March 03, 2022 C2-4 Letter dated March 3, 2022 – MoveUP Stage 2 Information Request No. 1 to FEI
April 08, 2022 C2-5 Letter dated April 8, 2022 – MoveUp submitting comments on the proposed amendment to the regulatory timetable
July 11, 2022 C2-6 Letter dated July 11, 2022 – MoveUP Stage 2 Information Request No. 2 to FEI
July 19, 2022 C2-7 Letter dated July 19, 2022 – MoveUP response to FEI objection to Stage 2 Information Request No. 2 Question 1.4
January 16, 2023 C2-8 Letter dated January 16, 2023 – MoveUP submitting Information Request No. 1 to The Brattle Group, Inc. on Expert Evidence
February 02, 2023 C2-9 Letter dated February 2, 2023 –MoveUP submitting comment to Metro Vancouver timetable extension request
September 07, 2023 C2-10 Letter dated September 7, 2023 – MoveUP submitting Information Request No. 3 to FEI on Evidentiary Update
January 14, 2021 C3-2 Letter dated January 14, 2020 – CEC submission on process alternatives
January 14, 2021 C3-1 COMMERCIAL ENERGY CONSUMERS ASSOCIATION OF BRITISH COLUMBIA (CEC) - Letter dated January 14, 2021 Request to Intervene by Christopher Weafer
February 23, 2021 C3-3 Letter dated February 23, 2021 – CEC Information Request No. 1 to FEI
March 03, 2022 C3-4 Letter dated March 3, 2022 – CEC Stage 2 Information Request No. 1 to FEI
April 12, 2022 C3-5 Letter dated April 12, 2022 – CEC response to FEI’s proposed timetable amendment
July 12, 2022 C3-6 Letter dated July 12, 2022 – CEC Stage 2 Information Request No. 2 to FEI
January 16, 2023 C3-7 Letter dated January 16, 2023 – CEC submitting Information Request No. 1 to The Brattle Group, Inc. on Expert Evidence
March 21, 2023 C3-8 Letter dated March 21, 2023 – CEC Information Request No. 1 on FEI Rebuttal Evidence to Brightside
March 21, 2023 C3-9 Letter dated March 21, 2023 – CEC Information Request No. 1 on FEI Rebuttal Evidence to Brattle Group and MS2S
March 21, 2023 C3-10 Letter dated March 21, 2023 – CEC Information Request No. 1 on FEI Rebuttal Evidence to RCIA
March 21, 2023 C3-11 Letter dated March 21, 2023 – CEC Information Request No. 1 on FEI Rebuttal Evidence to CoV
March 21, 2023 C3-12 Letter dated March 21, 2023 – CEC Information Request No. 1 on FEI Rebuttal Evidence to Strunk
March 21, 2023 C3-13 Letter dated March 21, 2023 – CEC Information Request No. 1 on FEI Rebuttal Evidence to Brattle Group
March 21, 2023 C3-14 Letter dated March 21, 2023 – CEC Information Request No. 1 on FEI Rebuttal Evidence to BCSEA
September 12, 2023 C3-15 Letter dated September 12, 2023 – CEC submitting Information Request No. 3 to FEI on Evidentiary Update
November 14, 2023 C3-16 Letter dated November 14, 2023 – CEC submitting extension request to file Final Argument
January 14, 2021 C4-2 Letter dated January 14, 2020 – BCOAPO submission on process alternatives
January 15, 2021 C4-1 BC OLD AGE PENSIONERS’ ORGANIZATION, ACTIVE SUPPORT AGAINST POVERTY, COUNCIL OF SENIOR CITIZENS’ ORGANIZATIONS OF BC, DISABILITY ALLIANCE BC, TENANTS RESOURCE AND ADVISORY CENTRE, AND TOGETHER AGAINST POVERTY SOCIETY, KNOWN COLLECTIVELY IN REGULATORY PROCESSES AS “BCOAPO ET AL.” (BCOAPO ET AL) - Letter dated January 15, 2020 - Request for Intervener Status by Leigha Worth and Irina Mis
February 23, 2021 C4-3 Letter dated February 23, 2021 – BCOAPO Information Request No. 1 to FEI
March 03, 2022 C4-4 Letter dated March 3, 2022 – BCOAPO Stage 2 Information Request No. 1 to FEI
April 12, 2022 C4-5 Letter dated April 12, 2022 – BCOAPO response to FEI’s proposed timetable amendment
July 12, 2022 C4-6 Letter dated July 12, 2022 – BCOAPO Stage 2 Information Request No. 2 to FEI
January 16, 2023 C4-7 Letter dated January 16, 2023 – BCOAPO submitting Information Request No. 1 to RCIA on Expert Evidence
January 16, 2023 C4-8 Letter dated January 16, 2023 – BCOAPO submitting Information Request No. 1 to City of Vancouver on Expert Evidence
April 06, 2023 C4-9 Letter dated April 6, 2023 – BCOAPO submitting response on proposed amended dates for Final Argument
September 12, 2023 C4-10 Letter dated September 12, 2023 – BCOAPO submitting Information Request No. 3 to FEI on Evidentiary Update
November 10, 2023 C4-11 Letter dated November 10, 2023 – BCOAPO submitting extension request to file Final Argument
February 04, 2022 C5-1 PACIFIC NORTHERN GAS INC. (PNG) - Letter dated February 4, 2022 Request to Intervene by Verlon Otto
February 04, 2022 C6-1 CITIZENS FOR MY SEA TO SKY SOCIETY (MS2S) - Letter dated February 4, 2022 Request to Intervene by Eoin Finn
March 03, 2022 C6-2 Letter dated March 3, 2022 – MS2S Stage 2 Information Request No. 1 to FEI
October 05, 2022 C6-3 Letter dated October 5, 2022 – MS2S submitting Notice of Intent to file Intervener Evidence
December 05, 2022 C6-4 Letter dated December 5, 2022 – MS2S submitting Intervener evidence
December 15, 2022 C6-5 Letter dated December 15, 2022 – MS2S submitting notice of Emma Hume as Legal Counsel
February 04, 2023 C6-6 Letter dated February 4, 2023 –MS2S submitting comment to Metro Vancouver timetable extension request
February 06, 2023 C6-7 Letter dated February 6, 2023 – MS2S submitting response to FEI Information Request No. 1
February 06, 2023 C6-8 Letter dated February 6, 2023 – MS2S submitting response to BCUC Information Request No. 1
March 21, 2023 C6-9 Letter dated March 21, 2023 – MS2S Information Request No. 1 on Rebuttal Evidence to FEI
September 12, 2023 C6-10 Letter dated September 12, 2023 – MS2S submitting Information Request No. 3 to FEI on Evidentiary Update
November 15, 2023 C6-11 Letter dated November 15, 2023 – MS2S submitting extension request to file Final Argument
February 04, 2022 C7-1 CITY OF VANCOUVER (COV) - Letter dated February 4, 2022 Request to Intervene by Ian Neville
March 03, 2022 C7-2 Letter dated March 3, 2022 – CoV Stage 2 Information Request No. 1 to FEI
August 12, 2022 C7-3 Letter dated August 12, 2022 – CoV Stage 2 Information Request No. 2 to FEI
October 05, 2022 C7-4 Letter dated October 5, 2022 – CoV submitting Notice of Intent to file Intervener Evidence
December 05, 2022 C7-5 Letter dated December 5, 2022 – CoV submitting Intervener evidence
February 03, 2023 C7-6 Letter dated February 3, 2023 –CoV submitting comment to Metro Vancouver timetable extension request
February 06, 2023 C7-7 Letter dated February 6, 2023 – CoV submitting response to BCOAPO Information Request No. 1
February 06, 2023 C7-8 Letter dated February 6, 2023 – CoV submitting response to BCUC Information Request No. 1
February 06, 2023 C7-9 Letter dated February 6, 2023 – CoV submitting response to FEI Information Request No. 1
February 06, 2023 C7-10 Letter dated February 6, 2023 – CoV submitting response to BCSEA Information Request No. 1
February 07, 2022 C8-1 BC TRANSIT (TRANSIT) - Letter dated February 7, 2022 Request to Intervene by Geoff Huber
March 01, 2022 C8-2 Letter dated March 1, 2021 – Transit submitting Information Request No. 1 to FEI
February 08, 2022 C9-1 CITY OF VICTORIA (COVICTORIA) - Letter dated February 8, 2022 Request to Intervene by Laura Berndt
October 05, 2022 C9-2 Letter dated October 5, 2022 – CoVictoria submitting Notice of Intent to file Intervener Evidence
December 05, 2022 C9-3 Letter dated December 5, 2022 – CoVictoria submitting intervener evidence
February 06, 2023 C9-4 Letter dated February 6, 2023 – CoVictoria submitting response to FEI Information Request No. 1
February 06, 2023 C9-5 Letter dated February 6, 2023 – CoVictoria submitting response to BCSEA Information Request No. 1
February 06, 2023 C9-6 Letter dated February 6, 2023 – CoVictoria submitting response to BCUC Information Request No. 1
February 06, 2023 C9-7 Letter dated February 6, 2023 –CoVictoria submitting comment to Metro Vancouver timetable extension request
February 09, 2022 C10-1 RESIDENTIAL CONSUMER INTERVENER ASSOCIATION (RCIA) - Letter dated February 9, 2022 Request to Intervene by Samuel Mason
March 03, 2022 C10-2 Letter dated March 3, 2022 – RCIA Stage 2 Information Request No. 1 to FEI
April 12, 2022 C10-3 Letter dated April 12, 2022 – RCIA response to FEI’s proposed timetable amendment
June 01, 2022 C10-4 Letter dated June 1, 2022 – RCIA submitting intent to file evidence
July 12, 2022 C10-5 Letter dated July 12, 2022 – RCIA Stage 2 Information Request No. 2 to FEI
October 05, 2022 C10-4-1 Letter dated October 5, 2022 – RCIA submitting updated Notice of Intent to file evidence
December 06, 2022 C10-6 Letter dated December 5, 2022 – RCIA submitting Intervener evidence
February 03, 2023 C10-7 Letter dated February 3, 2023 – RCIA submitting comment to Metro Vancouver timetable extension request
February 06, 2023 C10-8 Letter dated February 6, 2023 – RCIA submitting response to BCOAPO Information Request No. 1
February 06, 2023 C10-9 Letter dated February 6, 2023 – RCIA submitting response to BCSEA Information Request No. 1
February 06, 2023 C10-10 Letter dated February 6, 2022 – RCIA submitting response to FEI Information Request No. 1 updated to include excel Model
March 21, 2023 C10-11 Letter dated March 21, 2023 – RCIA Information Request No. 1 on Rebuttal Evidence to FEI
September 12, 2023 C10-12 Letter dated September 12, 2023 – RCIA submitting Information Request No. 3 to FEI on Evidentiary Update
February 09, 2022 C11-1 METRO VANCOUVER REGIONAL DISTRICT (METRO VANCOUVER) - Letter dated February 9, 2022 Request to Intervene by Roger Quan
March 03, 2022 C11-2 Letter dated March 3, 2022 – MetroVancouver Stage 2 Information Request No. 1 to FEI
August 12, 2022 C11-3 Letter dated August 12, 2022 – Metro Vancouver Stage 2 Information Request No. 2 to FEI
January 30, 2023 C11-4 Letter dated January 30, 2023 – Metro Vancouver requesting extension to the regulatory timetable
August 02, 2023 C11-5 Letter dated August 2, 2023 – Metro Vancouver submitting notification of representative change
February 09, 2022 C12-1 CREATIVE ENERGY VANCOUVER PLATFORMS INC. (CREATIVE ENERGY) - Letter dated February 9, 2022 Request to Intervene by Rob Gorter
March 03, 2022 C12-2 Letter dated March 3, 2022 – Creative Energy Stage 2 Information Request No. 1 to FEI
February 09, 2022 C13-1 DISTRICT OF NORTH VANCOUVER (NORTH VANCOUVER) - Letter dated February 9, 2022 Request to Intervene by Caroline Jackson
October 05, 2022 C13-2 Letter dated October 5, 2022 – North Vancouver and Saanich submitting Notice of Intent to file Intervener Evidence
October 21, 2022 C13-3 Letter dated October 21, 2022 – North Vancouver and Saanich submitting additional information regarding Notice of Intent to file Intervener Evidence
February 09, 2022 C14-1 TRANSLINK (TRANSLINK) - Letter dated February 9, 2022 Request to Intervene by Ralf Nielsen
February 28, 2022 C14-2 Letter dated February 28, 2021 – Translink submitting Information Request No. 1 to FEI
March 30, 2022 C15-1 REMOVED – NOW EXHIBIT D-19
January 22, 2022 C16-1 SEASPAN FERRIES (SEASPAN) - Letter dated January 22, 2022 Request to Intervene by Harly Penner
February 25, 2022 C16-2 Letter dated February 25, 2022 – Seaspan submitting their Information Request mirrors Brightside Solutions and will not be submitting separate Information Requests
January 24, 2022 C17-1 BRITISH COLUMBIA HYDRO AND POWER AUTHORITY (BC HYDRO) - Letter dated January 24, 2022 Request to Intervene by Chris Sandve
March 03, 2022 C17-2 Letter dated March 3, 2022 – BC Hydro Stage 2 Information Request No. 1 to FEI
July 12, 2022 C17-3 Letter dated July 12, 2022 – BC Hydro Stage 2 Information Request No. 2 to FEI
January 10, 2023 C17-4 Letter dated January 10, 2023 – BC Hydro submitting Confidentiality Declaration and Undertakings
January 16, 2023 C17-5 Letter dated January 16, 2023 – BC Hydro submitting Information Request No. 1 to The Brattle Group, Inc. on Expert Evidence
February 06, 2023 C17-6 Letter dated February 6, 2023 – BC Hydro submitting response to BCUC Information Request No. 1
January 31, 2022 C18-1 BRIGHTSIDE SOLUTIONS INC. (BRIGHTSIDE SOLUTIONS) - Letter dated January 31, 2022 Request to Intervene by Mark Grist
February 28, 2022 C18-2 Letter dated February 28, 2022 – Brightside Solutions submitting Information Request No. 1 to FEI
May 27, 2022 C18-3 Letter dated May 27, 2022 – Brightside Solutions written submission for Procedural Conference
August 09, 2022 C18-4 Letter dated August 9, 2022 – Brightside Solutions submitting Information Request No. 2 to FEI
September 28, 2022 C18-5 Letter dated September 28, 2022 – Brightside Solutions submitting notice of intent to file intervener evidence
October 21, 2022 C18-6 Letter dated October 21, 2022 – Brightside Solutions submitting clarification regarding notice of intent to file intervener evidence
December 04, 2022 C18-7 Letter dated December 4, 2022 – Brightside Solutions submitting intervener evidence
February 06, 2023 C18-8 Letter dated February 6, 2023 – Brightside Solutions submitting response to BCUC Information Request No. 1
February 06, 2023 C18-9 Letter dated February 6, 2023 – Brightside Solutions submitting response to BCSEA Information Request No. 1
February 06, 2023 C18-10 REDACTED - Letter dated February 6, 2023 – Brightside Solutions submitting redacted response to FEI Information Request No. 1
February 06, 2023 C18-10-1 CONFIDENTIAL - Letter dated February 6, 2023 – Brightside Solutions submitting confidential response to FEI Information Request No. 1
February 07, 2022 C19-1 GNAR INC - SUSTAINABLE HOME DESIGN (GNAR) - Letter dated February 7, 2022 Request to Intervene by Edgar Dearden
March 03, 2022 C19-2 Letter dated March 3, 2022 – GNAR Stage 2 Information Request No. 1 to FEI
July 12, 2022 C19-3 Letter dated July 12, 2022 – GNAR Stage 2 Information Request No. 2 to FEI
July 19, 2022 C19-4 Letter dated July 19, 2022 – GNAR response to FEI objection to Stage 2 Information Request No. 2 Questions
November 15, 2023 C19-5 Letter dated November 15, 2023 – GNAR submitting extension request to file Final Argument
February 08, 2022 C20-1 BRITISH COLUMBIA FERRY SERVICES INC. (BC FERRIES) - Letter dated February 8, 2022 Request to Intervene by Frank Cholette
February 08, 2022 C21-1 CITY OF SURREY (COSURREY) - Letter dated February 8, 2022 Request to Intervene by Bentjie Lee
February 06, 2023 C21-2 Letter dated February 6, 2023 –CoSurrey submitting comment to Metro Vancouver timetable extension request
February 15, 2022 C22-1 DISTRICT OF SAANICH (SAANICH) - Letter dated February 15, 2022 Request to Intervene by Rebecca Newlove
February 09, 2022 C23-1 CITY OF RICHMOND (CoR) - Letter dated February 9, 2022 Request to Intervene by Anthony Capuccinello Iraci
February 09, 2022 C24-1 LULU ISLAND ENERGY COMPANY LTD. (LULU ISLAND) - Letter dated February 9, 2022 Request to Intervene by Anthony Capuccinello Iraci
February 23, 2022 C25-1 FORCE OF NATURE ALLIANCE (FORCE OF NATURE) - Letter dated February 23, 2022 Late Request to Intervene by Laurie Parkinson
March 03, 2022 C25-2 Letter dated March 3, 2022 – Force of Nature Stage 2 Information Request No. 1 to FEI
March 03, 2022 C26-1 Letter dated March 3, 2022 – City of Richmond, City of Surrey, District of North Vancouver, District of Saanich, City of Victoria and Lulu Island Energy Company Stage 2 Information Request No. 1 to FEI
August 12, 2022 C26-2 Letter dated August 12, 2022 – City of Richmond, City of Surrey, District of North Vancouver, District of Saanich, City of Victoria and Lulu Island Energy Company Stage 2 Information Request No. 1 to FEI
September 26, 2022 C26-3 Letter dated September 26, 2022 – City of Richmond, City of Surrey, District of North Vancouver, District of Saanich, City of Victoria and Lulu Island Energy Company Stage 2 submitting FEI Information Request No. 2 responses are inadequate
October 05, 2022 C26-4 Letter dated October 5, 2022 – City of Richmond and Lulu Island Energy Company submitting Notice of Intent to file Intervener Evidence
October 14, 2022 C26-5 Letter dated October 14, 2022 – City of Richmond submitting response to FEI Stage 2 Information Request No. 2 clarifying how responses are inadequate as requested in Exhibit A-25
November 07, 2022 C26-6 Letter dated November 7, 2022 – City of Richmond submitting response to FEI Stage 2 Information Request No. 2 responses
December 05, 2022 C26-7 Letter dated December 5, 2022 – City of Richmond and Lulu Island Energy Company submitting intervener evidence
December 05, 2022 C26-8 Letter dated December 5, 2022 – District of Saanich and DNV submitting Intervener evidence
January 13, 2023 C26-9 Letter dated January 13, 2023 – City of Richmond, City of Surrey, District of North Vancouver, District of Saanich, City of Victoria and Lulu Island Energy Company submitting Information Request No. 1 on Expert Evidence to The Brattle Group, Inc.
February 06, 2023 C26-11 Letter dated February 6, 2023 – City of Richmond and Lulu Island Energy Company submitting responses to BCUC Information Request No. 1
February 06, 2023 C26-12 Letter dated February 6, 2023 – City of Richmond and Lulu Island Energy Company submitting responses to BCSEA Information Request No. 1
February 06, 2023 C26-13 Letter dated February 6, 2023 – DNV and Saanich submitting responses to BCUC Information Request No. 1
February 06, 2023 C26-14 Letter dated February 6, 2023 – DNV and Saanich submitting responses to BCSEA Information Request No. 1
February 06, 2023 C26-15 Letter dated February 6, 2023 – DNV and Saanich submitting responses to FEI Information Request No. 1
February 06, 2023 C26-10 Letter dated February 6, 2023 – City of Richmond and Lulu Island Energy Company submitting comment to Metro Vancouver timetable extension request
February 08, 2023 C26-16 Letter dated February 8, 2023 – DNV and Saanich submitting comment to Metro Vancouver timetable extension request

D Exhibits — Interested Party Documents

Date Title Document Description
December 11, 2020 D-1 SHELL ENERGY NORTH AMERICA (SHELL ENERGY) – Submission dated December 11, 2020 Request for Interested Party Status by Marcie Milner
February 18, 2021 D-2 SENTINEL ENERGY MANAGEMENT INC. (SENTINEL ENERGY) – Submission dated February 18, 2021 Request for Interested Party Status by Jim Langley
November 03, 2021 D-3 UNIVERSITY OF BRITISH COLUMBIA (UBC) - Submission dated November 3, 2021 Request for Interested Party Status by Joshua Wauthy
December 09, 2021 D-4 CITY OF SURREY (SURREY) - Submission dated December 9, 2021 Request for Interested Party Status by Jason Owen
January 10, 2022 D-5 BOREALIS GEOPOWER (BOREALIS) - Submission dated January 10, 2022 Request for Interested Party Status by Alison Thompson
January 24, 2022 D-6 FINK MACHINE INC. (FINKMACHINE) - Submission dated January 24, 2022 Request for Interested Party Status by David Dubois
January 25, 2022 D-7 CITY OF ABBOTSFORD (ABBOTSFORD) - Submission dated January 25, 2021 Request for Interested Party Status by Wasel Rahman
February 07, 2022 D-8 ZERO EMISSIONS BUILDING EXCHANGE (ZEBX) - Submission dated February 7, 2021 Request for Interested Party Status by Roberto Pecora
February 10, 2022 D-10 CURREN, M. (CURREN) - Submission dated February 10, 2022 Request for Interested Party Status
February 10, 2022 D-9 FIRST THINGS FIRST OKANAGAN (FRFO) - Submission dated February 10, 2022 Request for Interested Party Status by Margaret Hollm
February 16, 2022 D-11 GOLDMAN, L. (GOLDMAN) - Submission dated February 16, 2022 Request for Interested Party Status
February 18, 2022 D-12 DAUNCY, G. (DAUNCY) - Submission dated February 18, 2022 Request for Interested Party Status
February 18, 2022 D-13 MAAS, K. (MAAS) - Submission dated February 18, 2022 Request for Interested Party Status
February 20, 2022 D-14 CANADIAN ASSOCIATION OF PHYSICIANS FOR THE ENVIRONMENT (CAPE) - Submission dated February 20, 2022 Request for Interested Party Status by Deborah Curry
February 20, 2022 D-15 DEROO, J. (DEROO) - Submission dated February 20, 2022 Request for Interested Party Status
February 25, 2022 D-16 ZERO WASTE BC - Submission dated February 25, 2022 Request for Interested Party Status by Sue Maxwell
February 25, 2022 D-17 ZERO WASTE CANADA - Submission dated February 25, 2022 Request for Interested Party Status by Jamie Kaminski
March 02, 2022 D-18 DISTRICT OF WEST VANCOUVER (D-WESTVANCOUVER) - Submission dated March 2, 2022 Request for Interested Party Status by Shazeen Tejani
March 30, 2022 D-19 CANADIAN BIOGAS ASSOCIATION (CBA) - Letter dated March 30, 2022 Request to change status to Interested Party by Jennifer Green
September 25, 2022 D-20 CONSCIOUS ENERGY SERVICES (CES) – Letter dated September 25, 2022 submitting request for Interested Party Status by Hugh Prodan
October 12, 2022 D-21 SOUTH ISLAND CLIMATE ACTION NETWORK (SI-CAN) – Letter dated October 12, 2022 submitting request for Interested Party Status by Jane Devonshire
December 07, 2022 D-22 HUXTABLE, C. (HUXTABLE) - Letter dated December 7, 2022 submitting request for Interested Party Status

E Exhibits - Letters of Comment

Date Title Document Description
April 27, 2021 E-1 Langley, J. – Letter of Comment dated April 27, 2021
October 26, 2021 E-26 ARPA Investments Ltd. (ARPA Investments) – Letter of Comment dated October 26, 2021
January 04, 2022 E-2 E3 Eco Group (E3-Eco) – Letter of Comment dated January 4, 2022
January 17, 2022 E-3 City of Coquitlam (Coquitlam) – Letter of Comment dated January 17, 2022
January 26, 2022 E-20 The Aboriginal Housing Management Association (AHMA) – Letter of Comment dated January 26, 2022
February 03, 2022 E-4 Caldwell, R. – Letter of Comment dated February 3, 2022
February 03, 2022 E-8 Little, M. – Letter of Comment dated February 3, 2022
February 06, 2022 E-5 Orr, D. – Letter of Comment dated February 6, 2022
February 08, 2022 E-6 Canadian Geothermal Energy Association (CanGEA) – Letter of Comment dated February 8, 2022
February 10, 2022 E-7 Mayba, J. – Letter of Comment dated February 10, 2022
February 10, 2022 E-9 City of Kelowna (Kelowna) – Letter of Comment dated February 10, 2022
February 16, 2022 E-17 Coldstar Solutions Inc. (Coldstar Solutions) – Letter of Comment dated February 16, 2022
February 18, 2022 E-11 White, E. – Letter of Comment dated February 18, 2022
February 18, 2022 E-19 Canadian Linen & Uniform Supply Corp. (Canadian Linen) – Letter of Comment dated February 18, 2022
February 18, 2022 E-10 Maas, K. – Letter of Comment dated February 18, 2022
February 19, 2022 E-12 Wilson, M. – Letter of Comment dated February 19, 2022
February 20, 2022 E-13 Curry, D. – Letter of Comment dated February 20, 2022
February 22, 2022 E-18 4 Less Disposal Inc. (4 Less Disposal) - Letter of Comment dated February 22, 2022
February 22, 2022 E-14 Vaneck, K. – Letter of Comment dated February 22, 2022
February 23, 2022 E-15 Rusland, P. – Letter of Comment dated February 23, 2022
February 26, 2022 E-16 Dronkers, A. – Letter of Comment dated February 26, 2022
March 17, 2022 E-21 Hepting, C. (Hepting) – Letter of Comment dated March 17, 2022
March 24, 2022 E-22 Building Owners and Managers Association Of British Columbia (BOMA BC) – Letter dated March 24, 2022
March 28, 2022 E-23 Martini Film Studios (Martini Film) – Letter of Comment dated March 28, 2022
March 30, 2022 E-24 MacKinnon, B. (MacKinnon) – Letter of Comment dated March 30, 2022
April 02, 2022 E-25 Zero Waste British Columbia (Zero Waste BC) – Letter of Comment dated April 2, 2022
May 16, 2022 E-27 Goldman, L. (Goldman) – Letter of Comment dated May 16, 2022
July 13, 2022 E-28 City of West Kelowna (West Kelowna) – Letter of Comment dated July 13, 2022
July 25, 2022 E-29 Regional District of Okanagan-Similkameen (RDOS) –Letter of Commend dated July 25, 202
September 28, 2022 E-30 Thompson Okanagan Tourism Association (TOTA) – Letter of Comment dated September 28, 2022
October 03, 2022 E-31 Town of Oliver (Oliver) – Letter of Comment dated September 13, 2022, received via letter mail October 3, 2022
October 11, 2022 E-32 South Island Climate Action Network (SI-CAN) – Letter of Comment dated October 11, 2022
October 20, 2022 E-33 District of Logan Lake (DLL) – Letter of Comment dated October 20, 2022
October 27, 2022 E-34 BC Hotel Association (BCHA) – Letter of Comment dated October 27, 2022
December 04, 2022 E-35 Huxtable, C. (Huxtable) - Letter of Comment dated December 4 2022
March 14, 2023 E-140 Canadian Home Builders' Association of BC (CHBA BC) – Letter of Comment dated March 14, 2023
April 18, 2023 E-36 District of Sicamous (Sicamous) - Letter of Comment dated April 18, 2023
April 26, 2023 E-37 Capital Home Energy (CHE) - Letter of Comment dated April 26, 2023
May 23, 2023 E-38 Town of Creston (Creston) – Letter of Comment dated May 23, 2023
June 29, 2023 E-39 District of Chetwynd (Chetwynd) – Letter of Comment dated June 29, 2023
July 21, 2023 E-40 van der Vorm, C. (van der Vorm) – Letter of Comment dated July 21, 2023
July 21, 2023 E-41 Freeman, M. (Freeman) - Letter of Comment dated July 21, 2023
July 21, 2023 E-42 Sy, S. (Sy) - Letter of Comment dated July 21, 2023
July 21, 2023 E-43 Darnell, B. (Darnell) - Letter of Comment dated July 21, 2023
July 21, 2023 E-27-1 Goldman, L. (Goldman) – Additional Letter of Comment dated July 21, 2023
July 21, 2023 E-60 Slade, D. (Slade) – Letter of Comment dated July 21, 2023
July 21, 2023 E-62 Whistler, J. (Whistler) – Letter of Comment dated July 21, 2023
July 21, 2023 E-44 O’Leary, J. (O’Leary) – Letter of Comment dated July 21, 2023
July 21, 2023 E-45 Hopwood, D. (Hopwood) – Letter of Comment dated July 21, 2023
July 21, 2023 E-46 Horstman, S. (Horstman) – Letter of Comment dated July 21, 2023
July 21, 2023 E-47 Kilthei, J. (Kilthei) – Letter of Comment dated July 21, 2023
July 21, 2023 E-48 Isaac, R. (Isaac) – Letter of Comment dated July 21, 2023
July 21, 2023 E-49 van Eyk, D. (van Eyk) – Letter of Comment dated July 21, 2023
July 21, 2023 E-50 Welton, J. (Welton) – Letter of Comment dated July 21, 2023
July 21, 2023 E-51 Varga, D. (Varga) – Letter of Comment dated July 21, 2023
July 22, 2023 E-55 Diller, E. (Diller) – Letter of Comment dated July 22, 2023
July 22, 2023 E-58 Peterson, M. (Peterson) – Letter of Comment dated July 22, 2023
July 22, 2023 E-61 Stewart, B. (Stewart) – Letter of Comment dated July 22, 2023
July 23, 2023 E-52 Bass, F. (Bass) – Letter of Comment dated July 23, 2023
July 23, 2023 E-53 Baumann, E. (Baumann) – Letter of Comment dated July 23, 2023
July 23, 2023 E-54 Crosby, K. (Crosby) – Letter of Comment dated July 23, 2023
July 23, 2023 E-57 Mayfield, BJM (Mayfield) – Letter of Comment dated July 23, 2023
July 23, 2023 E-59 Ruckert, G. (Ruckert) – Letter of Comment dated July 23, 2023
July 24, 2023 E-56 Hackett, H. and E. (Hackett) – Letter of Comment dated July 24, 2023
July 24, 2023 E-64 Ashwell, M. (Ashwell) – Letter of Comment dated July 24, 2023
July 24, 2023 E-65 Voth, B. (Voth) – Letter of Comment dated July 24, 2023
July 24, 2023 E-63 McMahon, K. (McMahon) – Letter of Comment dated July 24, 2023
July 26, 2023 E-67 Cross, S. (Cross) – Letter of Comment dated July 26, 2023
July 26, 2023 E-68 Guthier, J. (Guthier) – Letter of Comment dated July 26, 2023
July 26, 2023 E-69 Hourigan, G. (Hourigan) – Letter of Comment dated July 26, 2023
July 26, 2023 E-70 Parkins, J. (Parkins) – Letter of Comment dated July 26, 2023
July 27, 2023 E-66 Baughen, C. (Baughen) – Letter of Comment dated July 27, 2023
July 27, 2023 E-71 Kenyon, G. (Kenyon) – Letter of Comment dated July 27, 2023
July 28, 2023 E-75 Schultz, A. (Schultz) – Letter of Comment dated July 28, 2023
July 28, 2023 E-76 Maas, K. (Maas) – Letter of Comment dated July 28, 2023
July 28, 2023 E-77 Quipp, S. (Quipp) – Letter of Comment dated July 28, 2023
July 28, 2023 E-72 Bryenton, R. (Bryenton) – Letter of Comment dated July 28, 2023
July 28, 2023 E-73 Parkinson, L. (Parkinson) – Letter of Comment dated July 28, 2023
July 28, 2023 E-74 Swail, B. (Swail) – Letter of Comment dated July 28, 2023
July 29, 2023 E-78 Landell, B. (Landell) – Letter of Comment dated July 29, 2023
July 30, 2023 E-79 Weixl, J. (Weixl) – Letter of Comment dated July 30, 2023
July 30, 2023 E-80 Quigley, S. (Quigley) – Letter of Comment dated July 30, 2023
July 30, 2023 E-81 Brook, J. (Brook) – Letter of Comment dated July 30, 2023
July 31, 2023 E-82 Crosby, K. (Crosby) – Letter of Comment dated July 31, 2023
July 31, 2023 E-83 Holm, M. (Holm) – Letter of Comment dated July 31, 2023
July 31, 2023 E-84 District of Hope (District of Hope) – Letter of Comment dated July 31, 2023
August 01, 2023 E-85 Lawes, K. (Lawes) – Letter of Comment dated August 1, 2023
August 02, 2023 E-86 Hammond, J. (Hammond) – Letter of Comment dated August 2, 2023
August 03, 2023 E-87 Isaac, R. (Isaac) – Letter of Comment dated August 3, 2023
August 04, 2023 E-88 Blacklin, S. (Blacklin) – Letter of Comment dated August 4, 2023
August 04, 2023 E-89 Lissau, J. (Lissau) – Letter of Comment dated August 4, 2023
August 04, 2023 E-90 Brown, A. (Brown) – Letter of Comment dated August 4, 2023
August 04, 2023 E-91 Slakov, J. (Slakov) – Letter of Comment dated August 4, 2023
August 04, 2023 E-92 Schroder, J. (Schroder) – Letter of Comment dated August 4, 2023
August 04, 2023 E-56-1 Hackett, H. and E. (Hackett) – Additional Letter of Comment dated August 4, 2023
August 04, 2023 E-93 Burns, S. (Burns) – Letter of Comment dated August 4, 2023
August 04, 2023 E-94 Waller, H. (Waller) – Letter of Comment dated August 4, 2023
August 04, 2023 E-95 Elliott, K. (Elliott) – Letter of Comment dated August 4, 2023
August 05, 2023 E-96 Wilson, S. (Wilson) – Letter of Comment dated August 5, 2023
August 05, 2023 E-97 Cairns, S. (Cairns) – Letter of Comment dated August 5, 2023
August 05, 2023 E-103 Michaud, D. (Michaud) – Letter of Comment dated August 5, 2023
August 05, 2023 E-104 Sander, C. (Sander) – Letter of Comment dated August 5, 2023
August 06, 2023 E-98 Cojocaru, S. (Cojocaru) – Letter of Comment dated August 6, 2023
August 06, 2023 E-99 Dunne, K. (Dunne) – Letter of Comment dated August 6, 2023
August 06, 2023 E-101 Hendry, K. (Hendry) – Letter of Comment dated August 6, 2023
August 07, 2023 E-11-1 White, E. – Additional Letter of Comment dated August 7, 2023
August 07, 2023 E-100 Friskie, L. (Friskie) – Letter of Comment dated August 7, 2023
August 07, 2023 E-102 Lindgren, B. (Lindgren) – Letter of Comment dated August 7, 2023
August 11, 2023 E-106 Kirschmann, S. (Kirschmann) – Letter of Comment dated August 11, 2023
August 11, 2023 E-105 Fast, C. (Fast) – Letter of Comment dated August 11, 2023
August 13, 2023 E-107 Brassard, F. (Brassard) – Letter of Comment dated August 13, 2023
August 14, 2023 E-111 Calder, E. (Calder) – Letter of Comment dated August 14, 2023
August 14, 2023 E-112 Hourigan, K. (Hourigan) – Letter of Comment dated August 14, 2023
August 14, 2023 E-108 Cornwall, C. (Cornwall) – Letter of Comment dated August 14, 2023
August 14, 2023 E-109 Woodland, K. (Woodland) – Letter of Comment dated August 14, 2023
August 14, 2023 E-110 Mewhort, K. (Mewhort) – Letter of Comment dated August 14, 2023
August 15, 2023 E-113 Moorhead, D. (Moorhead) – Letter of Comment dated August 15, 2023
August 15, 2023 E-114 McCourt, K. (McCourt) – Letter of Comment dated August 15, 2023
August 16, 2023 E-125 Sharp, E. (Sharp) – Letter of Comment dated August 16, 2023
August 16, 2023 E-115 Crozier, S. (Crozier) – Letter of Comment dated August 16, 2023
August 16, 2023 E-116 Doyle, P. (Doyle) – Letter of Comment dated August 16, 2023
August 16, 2023 E-117 Macgregor, N. (Macgregor) – Letter of Comment dated August 16, 2023
August 16, 2023 E-118 Smith, L. (Smith) – Letter of Comment dated August 16, 2023
August 16, 2023 E-119 Frketich, F. (Frketich) – Letter of Comment dated August 16, 2023
August 16, 2023 E-120 Sparrow, M. (Sparrow) – Letter of Comment dated August 16, 2023
August 16, 2023 E-90-1 Brown – Additional Letter of Comment dated August 16, 2023
August 16, 2023 E-56-2 Hackett – Additional Letter of Comment dated August 16, 2023
August 16, 2023 E-121 Brown, I. (Brown) – Letter of Comment dated August 16, 2023
August 16, 2023 E-122 Lea, G. (Lea) – Letter of Comment dated August 16, 2023
August 17, 2023 E-123 Grube, A. (Grube) – Letter of Comment dated August 17, 2023
August 17, 2023 E-124 McLaren, A. (McLaren) – Letter of Comment dated August 17, 2023
August 18, 2023 E-127 Wieder, S. (Wieder) – Letter of Comment dated August 18, 2023
August 18, 2023 E-128 Wieder, C. (Wieder) – Letter of Comment dated August 18, 2023
August 18, 2023 E-129 Evans, G. (Evans) – Letter of Comment dated August 18, 2023
August 18, 2023 E-130 Mckone, G. (McKone) – Letter of Comment dated August 18, 2023
August 18, 2023 E-126 Siemens, J. (Siemens) – Letter of Comment dated August 18, 2023
August 20, 2023 E-82-1 Crosby – Additional Letter of Comment dated August 20, 2023
August 20, 2023 E-131 Cross, J. (Cross) – Letter of Comment dated August 20, 2023
August 20, 2023 E-132 Alcock, R. (Alcock) – Letter of Comment dated August 20, 2023
August 21, 2023 E-133 Wallace, W. (Wallace) – Letter of Comment dated August 21, 2023
August 21, 2023 E-134 Kmet, W. (Kmet) – Letter of Comment dated August 21, 2023
August 21, 2023 E-135 Crabtree, C. (Crabtree) – Letter of Comment dated August 21, 2023
August 22, 2023 E-136 District of Kent (Kent) – Letter of Comment dated August 22, 2023
August 23, 2023 E-137 Dieno, C. (Dieno) – Letter of Comment dated August 23, 2023
August 25, 2023 E-139 Algra Bros Development Ltd. (Algra Bros) – Letter of Comment dated August 25, 2023
August 26, 2023 E-138 Parry, M. (Parry) – Letter of Comment dated August 26, 2023
August 29, 2023 E-64-1 Ashwell – Additional Letter of Comment dated August 29, 2023
August 31, 2023 E-141 Torrence, A. (Torrence) – Letter of Comment dated August 31, 2023
September 01, 2023 E-142 Gibson, C. (Gibson) – Letter of Comment dated September 1, 2023
September 01, 2023 E-143 Pangilinan, J. (Pangilinan) – Letter of Comment dated September 1, 2023
September 02, 2023 E-146 Walp, S. (Walp) – Letter of Comment dated September 2, 2023
September 04, 2023 E-144 Anderson, G. (Anderson) – Letter of Comment dated September 4, 2023
September 04, 2023 E-145 Armstrong, A. (Armstrong) – Letter of Comment dated September 4, 2023
September 05, 2023 E-147 Eyre, S. (Eyre) – Letter of Comment dated September 5, 2023
September 06, 2023 E-149 Choquette, W. (Choquette) – Letter of Comment dated September 6, 2023
September 06, 2023 E-150 Wesbild Holdings Ltd. (Wesbild) – Letter of Comment dated September 6, 2023
September 06, 2023 E-148 Citizens for Climate Action and Transition Kamloops (Transition Kamloops) – Letter of Comment dated September 6, 2023
September 10, 2023 E-151 Gingras, J. (Gingras) – Letter of Comment dated September 10, 2023
September 13, 2023 E-149-1 Choquette – Additional Letter of Comment dated September 13, 2023
September 14, 2023 E-152 Choy, R. (Choy-R) – Letter of Comment dated September 14, 2023
September 14, 2023 E-153 Choy, M. (Choy-M) – Letter of Comment dated September 14, 2023
September 14, 2023 E-154 Fuentes, M. (Fuentes) – Letter of Comment dated September 14, 2023
September 18, 2023 E-155 Cheah, J. (Cheah) – Letter of Comment dated September 18, 2023
September 29, 2023 E-156 Formwerks Boutique Properties (Formwerks) – Letter of Comment dated September 20, 2023
October 02, 2023 E-163 Hadgkiss, B. (Hadgkiss) – Letter of Comment dated October 2, 2023
October 02, 2023 E-157 Wi, P. (Wi) – Letter of Comment dated October 2, 2023
October 02, 2023 E-159 Vogel, J. (Vogel) – Letter of Comment dated October 2, 2023
October 02, 2023 E-164 Spice, A. (Spice) – Letter of Comment dated October 2, 2023
October 03, 2023 E-161 Granger, B. (Granger) – Letter of Comment dated October 3, 2023
October 03, 2023 E-162 Alore, D. (Alore) – Letter of Comment dated October 3, 2023
October 03, 2023 E-148-1 Citizens for Climate Action and Transition Kamloops (Transition Kamloops) – Letter of Comment dated October 3, 2023
October 03, 2023 E-158 Wismath, D. (Wismath) – Letter of Comment dated October 2, 2023
October 03, 2023 E-160 Vogel, H. (Vogel) – Letter of Comment dated October 3, 2023
October 03, 2023 E-123-1 Grube, A. (Grube) – Letter of Comment dated October 3, 2023
October 03, 2023 E-244 City of Kamloops (Kamloops) – Letter of Comment dated October 3, 2023
October 04, 2023 E-56-3 Hackett – Additional Letter of Comment dated October 4, 2023
October 04, 2023 E-166 Richards, L. (Richards) – Letter of Comment dated October 4, 2023
October 04, 2023 E-167 Stewart, F. (Stewart) – Letter of Comment dated October 4, 2023
October 05, 2023 E-165 Pruden, M. (Pruden) – Letter of Comment dated October 2, 2023
October 06, 2023 E-168 Fairweather, A. (Fairweather) – Letter of Comment dated October 6, 2023
October 06, 2023 E-169 Buerk, J. (Buerk) – Letter of Comment dated October 6, 2023
October 06, 2023 E-170 Kehtler, R. (Kehtler) – Letter of Comment dated October 6, 2023
October 06, 2023 E-171 Rafiee, S. (Rafiee) – Letter of Comment dated October 6, 2023
October 06, 2023 E-172 Heating, Refrigeration and Air Conditioning Institute of Canada (HRAI) – Letter of Comment dated October 6, 2023
October 06, 2023 E-278 Cowichan Bay Investments Ltd. (CBI) – Letter of Comment dated October 6, 2023
October 06, 2023 E-279 Shawnigan Lake Developments Ltd. (SLD) – Letter of Comment dated October 6, 2023
October 06, 2023 E-262 Rolston Plumbing & Heating (Rolston) - Letter of Comment dated October 6, 2023
October 06, 2023 E-225 Sharpline Developments (Sharpline) – Letter of Comment dated October 6, 2023
October 06, 2023 E-173 Ghinis Holdings Ltd. (Ghinis) – Letter of Comment dated October 6, 2023
October 06, 2023 E-174 Zenn Developments (Zenn) – Letter of Comment dated October 6, 2023
October 06, 2023 E-175 Bryans Mechanical Ltd. (Bryans) – Letter of Comment dated October 6, 2023
October 06, 2023 E-176 Murley, A. (Murley) – Letter of Comment dated October 6, 2023
October 06, 2023 E-177 Renaud, A. (Renaud) – Letter of Comment dated October 6, 2023
October 06, 2023 E-178 Stuart, R. (Stuart) – Letter of Comment dated October 6, 2023
October 06, 2023 E-179 G. Datoff & Sons Bldg Ltd. (Datoff) – Letter of Comment dated October 6, 2023
October 06, 2023 E-180 Sartori Custom Homes (Sartori) – Letter of Comment dated October 6, 2023
October 06, 2023 E-181 Merdyn Group of Companies (Merdyn) – Letter of Comment dated October 6, 2023
October 06, 2023 E-269 Pro-West Sales Ltd. (Pro-West) - Letter of Comment dated October 6, 2023
October 06, 2023 E-182 Metropolitan Hospitality Management (Metropolitan) – Letter of Comment dated October 6, 2023
October 06, 2023 E-184 Airstream Mechanical (Airstream) – Letter of Comment dated October 6, 2023
October 06, 2023 E-192 CAOBC Construction LTD. (COABC) – Letter of Comment dated October 6, 2023
October 06, 2023 E-193 Canadian Institute of Plumbing and Heating (CIPH) – Letter of Comment dated October 6, 2023
October 06, 2023 E-200 Dueck General Contracting (DGC) – Letter of Comment dated October 6, 2023
October 07, 2023 E-222 Rush, C. (Rush) – Letter of Comment dated October 7, 2023
October 07, 2023 E-241 VanGarderen, J. (VanGarderen) – Letter of Comment dated October 7, 2023
October 08, 2023 E-68-1 Guthier – Additional Letter of Comment dated October 8, 2023
October 08, 2023 E-124-1 McLaren – Additional Letter of Comment dated October 8, 2023
October 08, 2023 E-218 Milligan, J. (Milligan) – Letter of Comment dated October 8, 2023
October 08, 2023 E-221 Patz, A. (Patz) – Letter of Comment dated October 8, 2023
October 08, 2023 E-224 Schmidt, L. (Schmidt, L.) – Letter of Comment dated October 8, 2023
October 08, 2023 E-228 Silva Pacific Developments (Silva) – Letter of Comment dated October 7, 2023
October 08, 2023 E-231 Sundset, J. (Sundset) – Letter of Comment dated October 8, 2023
October 08, 2023 E-235 Wells, M. (Wells) – Letter of Comment dated October 8, 2023
October 08, 2023 E-237 Woodbury, B. (Woodbury) – Letter of Comment dated October 8, 2023
October 08, 2023 E-238 Guthier, J. (Guthier, J.) – Letter of Comment dated October 8, 2023
October 08, 2023 E-239 Guthier, T. (Guthier, T.) – Letter of Comment dated October 8, 2023
October 08, 2023 E-187 Billwiller, D. (Billwiller) – Letter of Comment dated October 8, 2023
October 09, 2023 E-223 Schmidt, K. (Schmidt) – Letter of Comment dated October 9, 2023
October 09, 2023 E-189 Bloomfield, D. (Bloomfield) – Letter of Comment dated October 9, 2023
October 10, 2023 E-90-2 Brown – Additional Letter of Comment dated October 10, 2023
October 10, 2023 E-201 Befus, C. (Befus) – Letter of Comment dated October 10, 2023
October 10, 2023 E-202 Bowen, C. (Bowen) – Letter of Comment dated October 10, 2023
October 10, 2023 E-203 DRG Plumbing & Heating Ltd. (DRG) – Letter of Comment dated October 10, 2023
October 10, 2023 E-204 Egerton, D. (Egerton) – Letter of Comment dated October 10, 2023
October 10, 2023 E-205 Ellis, D. (Ellis) – Letter of Comment dated October 10, 2023
October 10, 2023 E-206 Elmworth Construction (Elmworth) – Letter of Comment dated October 10, 2023
October 10, 2023 E-207 Finlay, J. (Finlay) – Letter of Comment dated October 10, 2023
October 10, 2023 E-208 Fouquette, D. (Fouquette) – Letter of Comment dated October 10, 2023
October 10, 2023 E-209 Goosen, A. (Goosen) – Letter of Comment dated October 10, 2023
October 10, 2023 E-210 Hamalainen, J. (Hamalainen) – Letter of Comment dated October 10, 2023
October 10, 2023 E-211 Hamalainen, E. (Hamalainen) – Letter of Comment dated October 10, 2023
October 10, 2023 E-212 Holland Creek Partnership (HCP) – Letter of Comment dated October 10, 2023
October 10, 2023 E-213 J, C. (J) – Letter of Comment dated October 10, 2023
October 10, 2023 E-214 Joosse, B. (Joosse) – Letter of Comment dated October 10, 2023
October 10, 2023 E-215 Kuan, V. (Kuan) – Letter of Comment dated October 10, 2023
October 10, 2023 E-216 McGill, B. (McGill) – Letter of Comment dated October 10, 2023
October 10, 2023 E-217 Miles, P. (Miles) – Letter of Comment dated October 10, 2023
October 10, 2023 E-220 Patrick, R. (Patrick) – Letter of Comment dated October 10, 2023
October 10, 2023 E-227 Shuswap Climate Action Society (Shuswap CAS) – Letter of Comment dated October 10, 2023
October 10, 2023 E-229 Singh, A. (Singh) – Letter of Comment dated October 10, 2023
October 10, 2023 E-230 Stahlstrom, D. (Stahlstrom) – Letter of Comment dated October 10, 2023
October 10, 2023 E-233 Waterstradt, C. (Waterstradt) – Letter of Comment dated October 10, 2023
October 10, 2023 E-234 Waterstradt, W. (Waterstradt, W.) – Letter of Comment dated October 10, 2023
October 10, 2023 E-236 Whittall, A. (Whittall) – Letter of Comment dated October 10, 2023
October 10, 2023 E-242 Zebra Group (Zebra) – Letter of Comment dated October 10, 2023
October 10, 2023 E-243 Zhang, G. (Zhang) – Letter of Comment dated October 10, 2023
October 10, 2023 E-245 Victoria Residential Builders Association (VRBA) – Letter of Comment dated October 10, 2023
October 10, 2023 E-183 Abrams, S. (Abrams) – Letter of Comment dated October 10, 2023
October 10, 2023 E-185 Barnes, J. (Barnes) – Letter of Comment dated October 10, 2023
October 10, 2023 E-186 Barnes, M. (Barnes) – Letter of Comment dated October 10, 2023
October 10, 2023 E-188 Black, A. (Black) – Letter of Comment dated October 10, 2023
October 10, 2023 E-190 Cameron, T. (Cameron) – Letter of Comment dated October 10, 2023
October 10, 2023 E-191 Campbell, J. (Campbell) – Letter of Comment dated October 10, 2023
October 10, 2023 E-194 Citta Construction Ltd. (Citta) – Letter of Comment dated October 10, 2023
October 10, 2023 E-195 Cooper, A. (Cooper) – Letter of Comment dated October 10, 2023
October 10, 2023 E-196 Cormack, M. (Cormack) – Letter of Comment dated October 10, 2023
October 10, 2023 E-197 Degelman, C. (Degelman) – Letter of Comment dated October 10, 2023
October 10, 2023 E-198 Degelman, D. (Degelman) – Letter of Comment dated October 10, 2023
October 10, 2023 E-199 Dickson, C. (Dickson) – Letter of Comment dated October 10, 2023
October 11, 2023 E-47-1 Kilthei - Additional Letter of Comment dated October 11, 2023
October 11, 2023 E-148-2 Transition Kamloops – Additional Letter of Comment dated October 11, 2023
October 11, 2023 E-253 Heller, D. (Deller) - Letter of Comment dated October 11, 2023
October 11, 2023 E-254 Kalack, D. (Kalack) - Letter of Comment dated October 11, 2023
October 11, 2023 E-255 Bowen, C. (Bowen) - Letter of Comment dated October 11, 2023
October 11, 2023 E-256 Johnsen, R. (Johnsen) - Letter of Comment dated October 11, 2023
October 11, 2023 E-257 Pro-West Sales Ltd. (Pro-West) - Letter of Comment dated October 11, 2023
October 11, 2023 E-258 Broekhuysen, J. (Broekhuysen) - Letter of Comment dated October 11, 2023
October 11, 2023 E-259 Bradbury, M. (Bradbury) - Letter of Comment dated October 11, 2023
October 11, 2023 E-260 Huff, M. (Huff) - Letter of Comment dated October 11, 2023
October 11, 2023 E-219 Newton, R. (Newton) – Letter of Comment dated October 11, 2023
October 11, 2023 E-226 Shulver, D. (Shulver) – Letter of Comment dated October 11, 2023
October 11, 2023 E-232 von Schleinitz, M. (von Schleinitz) – Letter of Comment dated October 11, 2023
October 11, 2023 E-240 Rosvold, D. (Rosvold) – Letter of Comment dated October 11, 2023
October 11, 2023 E-246 Archgard Fireplaces (Archgard) – Letter of Comment dated October 11, 2023
October 11, 2023 E-247 Blaze King (Blaze King) – Letter of Comment dated October 11, 2023
October 11, 2023 E-248 Badesha, G. (Badesha) – Letter of Comment dated October 11, 2023
October 11, 2023 E-249 Campbell, J. (Campbell) – Letter of Comment dated October 11, 2023
October 11, 2023 E-250 Johnstone, J. (Johnstone) – Letter of Comment dated October 11, 2023
October 11, 2023 E-251 Westhills (Westhills) – Letter of Comment dated October 11, 2023
October 11, 2023 E-269-1 Pro-West - Additional Letter of Comment dated October 11, 2023
October 11, 2023 E-280 The Fireplace Warehouse – Letter of Comment dated October 11, 2023
October 11, 2023 E-281 Savannah Heating Products – Letter of Comment dated October 11, 2023
October 11, 2023 E-252 City of Campbell River (Campbell River) – Letter of Comment dated October 11, 2023
October 12, 2023 E-270 Khowutzun Development Corporation (Khowutzun) – Letter of Comment dated October 12, 2023
October 12, 2023 E-261 Cormack, N. (Cormack) - Letter of Comment dated October 12, 2023
October 12, 2023 E-269-3 Pro-West – Additional Letter of Comment dated October 12, 2023
October 12, 2023 E-271 AES Engineering Ltd. (AES) – Letter of Comment dated October 12, 2023
October 12, 2023 E-272 First Things First Okanagan (FTFO) – Letter of Comment dated October 12, 2023
October 12, 2023 E-273 Gagnier, C. (Gagnier) – Letter of Comment dated October 12, 2023
October 12, 2023 E-274 Rosiak, E. (Rosiak) – Letter of Comment dated October 12, 2023
October 12, 2023 E-275 Jackson, B. (Jackson) – Letter of Comment dated October 12, 2023
October 12, 2023 E-276 Many Concerned Citizens of BC (MCCBC) – Letter of Comment dated October 12, 2023
October 12, 2023 E-277 Russell, A. (Russell) – Letter of Comment dated October 12, 2023
October 12, 2023 E-263 Crampton, T. (Crampton) - Letter of Comment dated October 12, 2023
October 12, 2023 E-264 Jones, B. (Jones) - Letter of Comment dated October 12, 2023
October 12, 2023 E-265 Strate, D. (Strate) - Letter of Comment dated October 12, 2023
October 12, 2023 E-266 Sangha, M. (Sangha) - Letter of Comment dated October 12, 2023
October 12, 2023 E-267 Logan, S. (Logan) - Letter of Comment dated October 12, 2023
October 12, 2023 E-268 Citizens Oversight Accountability Project (COAP) - Letter of Comment dated October 12, 2023
October 12, 2023 E-269-2 Pro-West – Additional Letter of Comment dated October 12, 2023

Transcripts

Date Title Document Description
May 14, 2021 Transcript Volume 1 Web based Oral Submissions May 14, 2021
June 02, 2022 Transcript Volume 2 Procedural Conference June 2, 2022