Nelson Hydro

Cost of Service Analysis and Rate Design

Completed: 2023

Nelson Hydro is seeking BCUC approval to increase its Rural residential rates, which it proposes to be adjusted over a three-year period (5.72% annually for 2021 to 2023), and approval of a return on equity for the Rural service area at 9.25% to be used for future rate applications and certain policies relating to the non-municipal portion of the utility.

Hearing and Other Documents

Title Document Description
EXHIBIT LIST Updated: February 7, 2023 @ 4:05 pm
Decision and G-196-22 Decision and G-196-22 July 19, 2022
G-40-23 Final Order March 2, 2023

Arguments/Submissions

Title Document Description
Nelson Hydro Final Argument Final Argument October 21, 2021
RCIA Final Argument Final Argument November 22, 2021
Faust Final Argument Final Argument November 22, 2021
BCOAPO Final Argument Final Argument November 22, 2021
Okros Final Argument Final Argument November 22, 2021
Nelson Hydro Reply Argument Reply Argument December 9, 2021
Faust Sur Reply Sur Reply January 19, 2022
BCOAPO Sur Reply Sur Reply January 20, 2022
Nelson Hydro Response to Sur-Reply Response to Sur-Reply February 3, 2022
Nelson Hydro Reply Argument Reply Argument February 8, 2023

Exhibits

A Exhibits - BCUC Documents

Date Title Document Description
December 22, 2022 A2-5 Letter dated December 22, 2022 – BCUC Staff submitting BCUC Staff Acknowledgement of Nelson Hydro’s Compliance Filing of the Modified 2019 Cost of Service Analysis dated December 9, 2022
December 22, 2022 A2-4 Letter dated December 22, 2022 – BCUC Staff submitting Nelson Hydro Responses to BCUC Staff Questions No. 2 dated November 23, 2022
December 22, 2022 A2-3 Letter dated December 22, 2022 – BCUC Staff submitting Nelson Hydro Responses to BCUC Staff Questions No. 1 dated October 20, 2022
December 22, 2022 A2-2 Letter dated December 22, 2022 – BCUC Staff submitting Nelson Hydro Compliance Filing of Modified 2019 Cost of Service Analysis dated October 3, 2022
February 16, 2021 A2-1 Letter dated February 16, 2021 – BCUC Staff submitting Nelson Hydro 2020 Virtual Open House Presentation dated December 10, 2020
December 22, 2022 A-22 Letter dated December 22, 2022 – BCUC request for submissions on Rate Design Application
July 29, 2022 A-21 Letter dated July 29, 2022 – BCUC approval of Nelson Hydro request for extension to file modified Cost of Service Analysis (COSA)
January 05, 2022 A-20 Letter dated January 5, 2022 – BCUC Order G-1-22 amending the Regulatory Timetable
December 21, 2021 A-19 Letter dated December 21, 2021 – BCUC Order G-387-21 amending the Regulatory Timetable
December 09, 2021 A-18 Letter dated December 9, 2021 – BCUC Order G-363-21 regarding interim rates with Reasons for Decision
November 12, 2021 A-17 Letter dated November 12, 2021 – BCUC establishing an amended Regulatory Timetable
September 27, 2021 A-16 Letter dated September 27, 2021 – BCUC establishing a deadline for Letters of Comment
September 22, 2021 A-15 Letter dated September 22, 2021 – BCUC G-278-21 establishing an amended Regulatory Timetable
September 22, 2021 A-14 Letter dated September 22, 2021 – BCUC request to Nelson Hydro for clarification to BCUC Information Request No. 3 Question 97.1
August 11, 2021 A-13 Letter dated August 11, 2021 – BCUC Information Request No. 3 to Nelson Hydro
August 10, 2021 A-12 Letter dated August 10, 2021 – BCUC clarification request on interim rates to Nelson Hydro’s
July 26, 2021 A-11 Letter dated July 26, 2021 – BCUC Order G-224-21 establishing an Amended Regulatory Timetable
June 07, 2021 A-10 Letter dated June 7, 2021 – BCUC Order G-178-21 establishing an Amended Regulatory Timetable
May 25, 2021 A-9 Letter dated May 25, 2021 – BCUC Information Request No. 2 to Nelson Hydro
April 27, 2021 A-8 Letter dated April 27, 2021 – BCUC response regarding Feeder Loading Study availability
April 21, 2021 A-7 Letter dated April 21, 2021 – BCUC Order G-117-21 establishing a further regulatory timetable
April 15, 2021 A-6 Letter dated April 15, 2021 – BCUC request Nelson Hydro to file feeder loading study
March 01, 2021 A-5 Letter dated March 1, 2021 – BCUC Order G-57-21 amending the regulatory timetable
February 16, 2021 A-4 Letter dated February 16, 2021 – BCUC Information Request No. 1 to Nelson Hydro
January 27, 2021 A-3 Letter dated January 27, 2021 – BCUC request Nelson Hydro to file supporting COSA spreadsheets
December 22, 2020 A-2 Letter dated December 22, 2020 – BCUC Order G-346-20 establishing a regulatory timetable
December 22, 2020 A-1 Letter dated December 22, 2020 – Appointing the Panel for the review of Nelson Hydro Cost of Service Analysis and Rate Design Application

B Exhibits - Applicant Documents

Date Title Document Description
November 27, 2020 B-1 NELSON HYDRO - Cost of Service Analysis and Rate Design Application dated November 27, 2020
February 03, 2021 B-2 Letter dated February 3, 2021 – Nelson Hydro submitting supporting spreadsheets
February 26, 2021 B-3 Letter dated February 26, 2021 - Nelson Hydro request extension to file responses to Intervener Information Requests No. 1
March 15, 2021 B-4 Letter dated March 15, 2021 – Nelson Hydro submitting responses to BCUC Information Request No. 1
March 26, 2021 B-5 Letter dated March 26, 2021 – Nelson Hydro submitting responses to BCUC Information Request No. 1 - Addendum
March 30, 2021 B-6 Letter dated March 30, 2021 – Nelson Hydro submitting responses to RCIG Information Request No. 1
March 30, 2021 B-8 Letter dated March 30, 2021 – Nelson Hydro submitting responses to Faust Information Request No. 1
March 30, 2021 B-7 Letter dated March 30, 2021 – Nelson Hydro submitting responses to Newell Information Request No. 1
March 30, 2021 B-9 Letter dated March 30, 2021 – Nelson Hydro submitting responses to BCOAPO Information Request No. 1
April 21, 2021 B-10 Letter dated April 21, 2021 – Nelson Hydro submitting Feeder Loading Study
June 03, 2021 B-11 Letter dated June 3, 2021 – Nelson Hydro submitting extension request to file responses to BCUC and Intervener Information Requests No. 2
June 22, 2021 B-12 Letter dated June 22, 2021 – Nelson Hydro submitting responses to BCUC Information Request No. 2
July 06, 2021 B-13 Letter dated July 6, 2021 – Nelson Hydro submitting responses to Faust Information Request No. 2
July 06, 2021 B-14 Letter dated July 6, 2021 – Nelson Hydro submitting responses to RCIA Information Request No. 2
July 06, 2021 B-15 Letter dated July 6, 2021 – Nelson Hydro submitting responses to BCOAPO Information Request No. 2 with Attachment
July 07, 2021 B-12-1 Letter dated July 7, 2021 – Nelson Hydro submitting correction to BCUC Information Request No. 2 Question No. 71.6
August 18, 2021 B-16 Letter dated August 18, 2021 – Nelson Hydro submitting clarification on interim rates
August 30, 2021 B-17 Letter dated August 30, 2021 – Nelson Hydro submitting responses to RCIA Information Request No. 3
August 30, 2021 B-18 Letter dated August 30, 2021 – Nelson Hydro submitting responses to BCUC Information Request No. 3
August 30, 2021 B-19 Letter dated August 30, 2021 – Nelson Hydro submitting responses to BCOAPO Information Request No. 3
September 03, 2021 B-20 Letter dated September 3, 2021 – Nelson Hydro submitting response regarding further process
September 16, 2021 B-21 Letter dated September 16, 2021 – Nelson Hydro submitting reply regarding further process
September 29, 2021 B-18-1 Letter dated September 29, 2021 – Nelson Hydro submitting Revised response to BCUC Information Request No. 3 Question 97.1 as requested
July 29, 2022 B-22 Letter dated July 26, 2022 – Nelson Hydro submitting an extension request
January 16, 2023 B-23 Letter dated January 16, 2023 – Nelson Hydro submission on Rate Design

C Exhibits - Intervener Documents



Date Title Document Description
January 25, 2021 C1-1 RESIDENTIAL CONSUMER INTERVENOR GROUP (RCIG) - Letter dated January 25, 2021 Request to Intervene by Sam Mason, Midgard Consulting
February 23, 2021 C1-2 Letter dated February 23, 2021 – RCIG submitting Information Request No. 1 to Nelson Hydro
May 25, 2021 C1-3 Letter dated May 25, 2021 – RCIA Information Request No. 2 to Nelson Hydro
August 16, 2021 C1-4 Letter dated August 16, 2021 – RCIA Information Request No. 3 to Nelson Hydro
September 13, 2021 C1-5 Letter dated September 13, 2021 – RCIA submission on further process
January 20, 2022 C1-6 Letter dated January 20, 2022 – RCIA will not be submitting a Sur Reply
January 31, 2023 C1-7 Letter dated January 31, 2023 – RCIA written submission on Rate Design
January 25, 2021 C2-1 OKROS, DAVID (OKROS) - Letter dated January 25, 2021 Request to Intervene
February 04, 2021 C3-1 FORTISBC INC. (FBC) - Letter dated February 4, 2021 Request to Intervene by Diane Roy
February 03, 2021 C4-1 NELSON AND DISTRICT CHAMBER OF COMMERCE (NELSON-DISTRICT) – Letter dated February 3, 2021 Request to Intervene by Tom Thomson
February 19, 2021 C5-1 REMOVED – NOW EXHIBIT D-14
February 09, 2021 C6-1 BRITISH COLUMBIA OLD AGE PENSIONERS’ ORGANIZATION, ACTIVE SUPPORT AGAINST POVERTY, DISABILITY ALLIANCE BC, COUNCIL OF SENIOR CITIZENS’ ORGANIZATIONS OF BC, AND TENANTS RESOURCE AND ADVISORY CENTRE (BCOAPO ET AL) – Submission dated February 9, 2021 Request to Intervene by Leigha Worth and Irina Mis
February 23, 2021 C6-2 Letter dated February 23, 2021 – BCOAPO submitting Information Request No. 1 to Nelson Hydro
May 25, 2021 C6-3 Letter dated May 25, 2021 – BCOAPO Information Request No. 2 to Nelson Hydro
August 16, 2021 C6-4 Letter dated August 16, 2021 – BCOAPO Information Request No. 3 to Nelson Hydro
September 13, 2021 C6-5 Letter dated September 13, 2021 – BCOAPO submission on further process
November 10, 2021 C6-6 Letter dated November 10, 2021 – BCOAPO submitting request for extension to file Final Argument
January 31, 2023 C6-7 Letter dated January 31, 2023 – BCOAPO written submission on Rate Design
February 09, 2021 C7-1 FAUST, RAMONA (FAUST) – Submission dated February 9, 2021 Request to Intervene
February 24, 2021 C7-2 Letter dated February 23, 2021 – Faust submitting Information Request No. 1 to Nelson Hydro
May 25, 2021 C7-3 Letter dated May 25, 2021 – Faust Information Request No. 2 to Nelson Hydro
January 02, 2022 C7-4 Letter dated January 2, 2022 – Faust submitting extension request for Final Argument Sur Reply
January 31, 2023 C7-5 Letter dated January 31, 2023 – Faust written submission on Rate Design
February 09, 2021 C8-1 NEWELL, THOMAS (NEWELL) – Submission dated February 9, 2021 Request to Intervene
February 24, 2021 C8-2 Letter dated February 24, 2021 – Newell submitting Late Information Request No. 1 to Nelson Hydro

D Exhibits — Interested Party Documents

Date Title Document Description
January 25, 2021 D-2 MACPHERSON, WILLIAM (MACPHERSON) – Submission dated January 25, 2021 Request for Interested Party Status
January 25, 2021 D-3 FOLKARD, L. (FOLKARD-L) – Submission dated January 25, 2021 Request for Interested Party Status
January 25, 2021 D-4 FOLKARD, SHEILA (FOLKARD-S) – Submission dated January 25, 2021 Request for Interested Party Status
January 25, 2021 D-4-1 Folkard-S – Letter of Comment dated January 25, 2021
January 28, 2021 D-5-1 Nystrom – Letter of Comment dated January 28, 2021
January 29, 2021 D-5 NYSTROM, B. (NYSTROM) – Submission dated January 29, 2021 Request for Interested Party Status
January 30, 2021 D-6 POWELL, T. (POWELL) – Submission dated January 30, 2021 Request for Interested Party Status
January 30, 2021 D-3-1 Folkard-L. – Letter of Comment dated January 30, 2021
February 01, 2021 D-7 REGIONAL DISTRICT OF CENTRAL KOOTENAY (RDCK) – Submission dated February 1, 2021 Request for Interested Party Status by Ramona Faust
February 01, 2021 D-8-1 Woods – Letter of Comment dated February 1, 2021
February 02, 2021 D-8 WOODS, C. (WOODS) – Submission dated February 2, 2021 Request for Interested Party Status
February 02, 2021 D-9 LOJPUR, J. (LOJPUR) – Submission dated February 2, 2021 Request for Interested Party Status
February 04, 2021 D-10 MURPHY, J. (MURPHY) – Submission dated February 4, 2021 Request for Interested Party Status
February 08, 2021 D-2-1 Macpherson, W. – Letter of Comment dated February 5, 2021
February 08, 2021 D-10-1 Murphy – Letter of Comment dated February 8, 2021
February 10, 2021 D-11 YANKE, M. (YANKE) – Submission dated February 10, 2021 Request for Interested Party Status
February 10, 2021 D-1 REMOVED now Exhibit C4-1
February 14, 2021 D-12 BEERBOWER, J. (BEERBOWER) - Submission dated February 14, 2021 Request for Interested Party Status
February 17, 2021 D-13 WEIR, D. (WEIR) - Submission dated February 17, 2021 Request for Interested Party Status
February 17, 2021 D-15-1 Howroyd, A. – Letter of Comment dated February 17, 2021
February 18, 2021 D-14 ZINKAN, CHARLIE (ZINKAN) – Submission dated February 18, 2021 change of status from Intervener to Interested Party
February 18, 2021 D-16 CLARE, C. (CLARE) - Submission dated February 18, 2021 Request for Interested Party Status
February 19, 2021 D-15 HOWROYD, A. (HOWROYD) - Submission dated February 19, 2021 Request for Interested Party Status
February 22, 2021 D-17 REGIONAL DISTRICT OF CENTRAL KOOTENAY (RDCK) - Submission dated February 22, 2021 Request for Interested Party Status by Stuart Horn
February 24, 2021 D-18 MARTIN, M. (MARTIN) - Submission dated February 24, 2021 Request for Interested Party Status
February 24, 2021 D-19 BALLANCE, P. (BALLANCE) - Submission dated February 24, 2021 Request for Interested Party Status
February 25, 2021 D-14-1 Zinkan – Letter of Comment dated February 25, 2021
February 25, 2021 D-16-1 Clare, C. – Letter of Comment dated February 25, 2021
February 25, 2021 D-20 HAWKINS, D. (HAWKINS) - Submission dated February 25, 2021 Request for Interested Party Status
February 26, 2021 D-24-1 Iwanik, L. – Letter of Comment dated February 26, 2021
February 28, 2021 D-26-1 O’Fallon, S. – Letter of Comment dated February 28, 2021
March 02, 2021 D-11-1 Yanke, M. – Letter of Comment dated March 2, 2021
March 02, 2021 D-25 MARSH, I. (MARSH) - Submission dated March 2, 2021 Request for Interested Party Status
March 02, 2021 D-21 BAILEY, B. (BAILEY) - Submission dated March 2, 2021 Request for Interested Party Status
March 02, 2021 D-22 BEAULAC, E. (BEAULAC) - Submission dated March 2, 2021 Request for Interested Party Status
March 02, 2021 D-23 CLEMENT, B. (CLEMENT) - Submission dated March 2, 2021 Request for Interested Party Status
March 02, 2021 D-24 IWANIK, L. (IWANIK) - Submission dated March 2, 2021 Request for Interested Party Status
March 02, 2021 D-26 O’FALLON, S. (O’FALLON) - Submission dated March 2, 2021 Request for Interested Party Status
March 02, 2021 D-27 POPOFF, W. (POPOFF) - Submission dated March 2, 2021 Request for Interested Party Status
March 02, 2021 D-28 SULLIVAN, A. (SULLIVAN) - Submission dated March 2, 2021 Request for Interested Party Status
March 03, 2021 D-25-1 Marsh – Letter of Comment dated March 3, 2021
March 03, 2021 D-12-1 Beerbower – Letter of Comment dated March 3, 2021
March 03, 2021 D-23-1 Clement, B. – Letter of Comment dated March 3, 2021
March 04, 2021 D-29-1 Hill – Letter of Comment dated March 4, 2021
March 04, 2021 D-30-1 Howard – Letter of Comment dated March 4, 2021
March 04, 2021 D-31-1 Jessen- Letter of Comment dated March 4, 2021
March 04, 2021 D-16-2 Clare, C. – Additional Letter of Comment dated March 4, 2021
March 09, 2021 D-29 HILL, K. (HILL) - Submission dated March 9, 2021 Request for Interested Party Status
March 09, 2021 D-30 HOWARD, P. (HOWARD) - Submission dated March 9, 2021 Request for Interested Party Status
March 09, 2021 D-31 JESSEN, M. (JESSEN) - Submission dated March 9, 2021 Request for Interested Party Status
March 24, 2021 D-8-2 Woods – Additional Letter of Comment dated March 24, 2021
March 24, 2021 D-20-1 Hawkins – Letter of Comment dated March 24, 2021
April 01, 2021 D-32-1 Vallentyne, S. – Letter of Comment dated April 1, 2021
April 06, 2021 D-32 Vallentyne, S. (Vallentyne) - Submission dated April 6, 2021 Request for Interested Party Status
April 08, 2021 D-4-2 Folkard-S. – Additional Letter of Comment dated April 8, 2021
April 14, 2021 D-9-1 Lojpur – Letter of Comment dated April 14, 2021
May 05, 2021 D-33 COLUMBIA INSTITUTE OF RENEWABLE ENERGY SOCIETY (CIRES) – Submission dated May 5, 2021 Request for Interested Party Status
October 13, 2021 D-11-2 Yanke, M. – Letter of Comment dated October 13, 2021

E Exhibits - Letters of Comment

Date Title Document Description
January 16, 2021 E-14 Irvine, R. – Letter of Comment dated January 16, 2021
January 18, 2021 E-1 Urech, J. – Letter of Comment dated January 18, 2021
January 20, 2021 E-2 Beattie, K. – Letter of Comment dated January 20, 2021
January 20, 2021 E-3 Reese, T. – Letter of Comment dated January 20, 2021
January 21, 2021 E-4 Haynes, K. – Letter of Comment dated January 21, 2021
January 22, 2021 E-5 Balfour Recreation Commission – Letter of Comment dated January 22, 2021
January 23, 2021 E-6 Dooley, P. – Letter of Comment dated January 23, 2021
January 25, 2021 E-16 Laird, M. – Letter of Comment dated January 25, 2021
January 25, 2021 E-7 White, D. – Letter of Comment dated January 25, 2021
January 26, 2021 E-9 Hart, S. – Letter of Comment dated January 26, 2021
January 26, 2021 E-11 Ellison, S. – Letter of Comment dated January 26, 2021
January 28, 2021 E-8 Postnikoff, C. – Letter of Comment dated January 28, 2021
January 29, 2021 E-20 Burton, C. – Letter of Comment dated January 29, 2021
January 30, 2021 E-10 McBride, D. – Letter of Comment dated January 30, 2021
February 01, 2021 E-13 Haynes, S. – Letter of Comment dated February 1, 2021
February 01, 2021 E-18 Russell-Ames – Letter of Comment dated February 1, 2021
February 01, 2021 E-17 O’Dowd-Kuhn – Letter of Comment dated February 1, 2021
February 02, 2021 E-12 Arnott, B. – Letter of Comment dated February 2, 2021
February 03, 2021 E-15 Edgar, J. – Letter of Comment dated February 3, 2021
February 09, 2021 E-21 Coburn, N. and K. – Letter of Comment dated February 9, 2021
February 10, 2021 E-19 Chapman, M. – Letter of Comment dated February 10, 2021
February 10, 2021 E-22 Doyle, J. – Letter of Comment dated February 10, 2021
February 10, 2021 E-23 Gagnon, P. - Letter of Comment dated February 10, 2021
February 11, 2021 E-8-1 Postnikoff, C. – Additional Letter of Comment dated February 11, 2021
February 11, 2021 E-24 Hamilton, B. - Letter of Comment dated February 11, 2021
February 12, 2021 E-25 Wrangler, D. - Letter of Comment dated February 12, 2021
February 16, 2021 E-26 Wiseman, R. and Lino, M. – Letter of Comment dated February 16, 2021
February 17, 2021 E-40 Weese, G. – Letter of Comment dated February 17, 2021
February 18, 2021 E-28 Gehr, H. and Wright, A. – Letter of Comment dated February 18, 2021
February 19, 2021 E-27 REMOVED now Exhibit D-15-1
February 22, 2021 E-39 Gulayets, J. – Letter of Comment dated February 22, 2021
February 22, 2021 E-41 Erickson, M. and W. – Letter of Comment dated February 22, 2021
February 24, 2021 E-38 Reid, P. – Letter of Comment dated February 24, 2021
February 24, 2021 E-22-1 Doyle, J. – Additional Letter of Comment dated February 17, 2021
February 24, 2021 E-29 Frye, R. and Porter, E. – Letter of Comment dated February 16, 2021
February 24, 2021 E-30 Smienk, J. – Letter of Comment dated February 22, 2021
February 24, 2021 E-31 Taylor, L. – Letter of Comment dated February 19, 2021
February 24, 2021 E-32 Swenson, J. – Letter of Comment dated February 20, 2021
February 24, 2021 E-33 MacPherson, C. – Letter of Comment dated February 17, 2021
February 24, 2021 E-34 Farrell, L. – Letter of Comment dated February 22, 2021
February 24, 2021 E-35 LePape, K. – Letter of Comment dated February 22, 2021
February 24, 2021 E-36 Witt, S. – Letter of Comment dated February 22, 2021
February 24, 2021 E-37 Corrie, V. – Letter of Comment dated February 23, 2021
February 24, 2021 E-40-1 Weese, G. – Additional Letter of Comment dated February 24, 2021
February 25, 2021 E-42 Cardinal, B. – Letter of Comment dated February 25, 2021
February 25, 2021 E-78 Malone, A. – Letter of Comment dated February 25, 2021
February 26, 2021 E-43 Cash, A. – Letter of Comment dated February 25, 2021
February 26, 2021 E-44 Childs, T. – Letter of Comment dated February 25, 2021
February 26, 2021 E-45 Jarmson, R. – Letter of Comment dated February 25, 2021
February 26, 2021 E-46 Barrette, P. – Letter of Comment dated February 25, 2021
February 26, 2021 E-47 Martin, M. – Letter of Comment dated February 25, 2021
February 26, 2021 E-69 Morley, R. – Letter of Comment dated February 26, 2021
February 27, 2021 E-20-1 Burton, C. – Additional Letter of Comment dated February 27, 2021
February 27, 2021 E-66 Seeger, H. – Letter of Comment dated February 27, 2021
February 27, 2021 E-67 Demers, M. – Letter of Comment dated February 27, 2021
February 28, 2021 E-62 Cheshire, L. – Letter of Comment dated February 28, 2021
February 28, 2021 E-64 Seeger, M. – Letter of Comment dated February 28, 2021
February 28, 2021 E-65 Frederiksen, C. – Letter of Comment dated February 28, 2021
February 28, 2021 E-68 Seeger, A. – Letter of Comment dated February 28, 2021
February 28, 2021 E-74 Cheshire, B. – Letter of Comment dated February 28, 2021
March 01, 2021 E-63 Neufeld, V. – Letter of Comment dated March 1, 2021
March 01, 2021 E-70 Etelamaki, A. - Letter of Comment dated March 1, 2021
March 01, 2021 E-71 Dock N Duck – Letter of Comment dated March 1, 2021
March 01, 2021 E-72 McIntyre, C. – Letter of Comment dated March 1, 2021
March 01, 2021 E-77 Paradis, R. – Letter of Comment dated March 1, 2021
March 02, 2021 E-82 Ryan, S. – Letter of Comment dated March 2, 2021
March 02, 2021 E-83 Thibault, M. – Letter of Comment dated March 2, 2021
March 02, 2021 E-87 Anton, T. – Letter of Comment dated March 2, 2021
March 02, 2021 E-90 Demers, J. – Letter of Comment dated March 2, 2021
March 02, 2021 E-49 Giannetto, R. – Letter of Comment dated February 24, 2021
March 02, 2021 E-51 Demers, J. – Letter of Comment dated February 25, 2021
March 02, 2021 E-52 Sullivan, A. – Letter of Comment dated February 26, 2021
March 02, 2021 E-53 Lucas, T. – Letter of Comment dated February 22, 2021
March 02, 2021 E-54 Popoff, W. – Letter of Comment dated March 1, 2021
March 02, 2021 E-55 Bailey, B. – Letter of Comment dated February 27, 2021
March 02, 2021 E-56 Treijs, E. – Letter of Comment dated February 27, 2021
March 02, 2021 E-58 Beaulac, L. – Letter of Comment dated February 28, 2021
March 02, 2021 E-59 Schlichting, D. – Letter of Comment dated March 1, 2021
March 02, 2021 E-61 LeFebour, S. – Letter of Comment dated February 27, 2021
March 02, 2021 E-73 Price, H. – Letter of Comment dated March 2, 2021
March 02, 2021 E-75 Morrison, S. – Letter of Comment dated March 2, 2021
March 02, 2021 E-76 Kane, K. – Letter of Comment dated March 2, 2021
March 02, 2021 E-79 Buck, C. – Letter of Comment dated March 2, 2021
March 03, 2021 E-84 Thomas, A. – Letter of Comment dated March 3, 2021
March 03, 2021 E-85 Sauter, R. – Letter of Comment dated March 3, 2021
March 03, 2021 E-86 Marvin – Letter of Comment dated March 3, 2021
March 03, 2021 E-88 Foot, K. – Letter of Comment dated March 3, 2021
March 03, 2021 E-89 Foot, M. – Letter of Comment dated March 3, 2021
March 03, 2021 E-95 Duggan, D. – Letter of Comment dated March 3, 2021
March 03, 2021 E-98 Goody, M. – Letter of Comment dated March 3, 2021
March 03, 2021 E-105 Benamran, N. – Letter of Comment dated March 3, 2021
March 03, 2021 E-80 Held, T. – Letter of Comment dated March 3, 2021
March 03, 2021 E-81 Facchina, L. – Letter of Comment dated March 3, 2021
March 04, 2021 E-50 REMOVED now Exhibit D-24-1
March 04, 2021 E-60 Vishloff, S. – Letter of Comment dated February 27, 2021
March 04, 2021 E-91 Gatto, D. – Letter of Comment dated March 4, 2021
March 04, 2021 E-92 Evanchuk, R. – Letter of Comment dated March 4, 2021
March 04, 2021 E-93 McDermott, B. – Letter of Comment dated March 4, 2021
March 04, 2021 E-94 Carter, J. – Letter of Comment dated March 4, 2021
March 04, 2021 E-96 Lucas, B. – Letter of Comment dated March 4, 2021
March 04, 2021 E-97 Fellowes, T. – Letter of Comment dated March 4, 2021
March 04, 2021 E-99 Williams, P. – Letter of Comment dated March 4, 2021
March 04, 2021 E-100 Kennedy, H. – Letter of Comment dated March 4, 2021
March 04, 2021 E-101 Schmidt, E. – Letter of Comment dated March 4, 2021
March 04, 2021 E-103 Jonker, D. – Letter of Comment dated March 4, 2021
March 04, 2021 E-104 Krolak, J. – Letter of Comment dated March 4, 2021
March 05, 2021 E-97-1 Fellowes, T. – Additional Letter of Comment dated March 5, 2021
March 05, 2021 E-102 Leighland, C. – Letter of Comment dated March 5, 2021
March 09, 2021 E-106 Shepherd, K. – Letter of Comment dated March 9, 2021
March 10, 2021 E-57 REMOVED now Exhibit D-26-1
March 10, 2021 E-48 REMOVED now D-16-1
March 12, 2021 E-107 Miller, V. – Letter of Comment dated March 12, 2021
April 02, 2021 E-92-1 Evanchuk, R. – Additional Letter of Comment dated April 2, 2021
April 11, 2021 E-8-2 Postnikoff, C. – Additional Letter of Comment dated April 11, 2021
April 22, 2021 E-92-2 Evanchuk, R. – Additional Letter of Comment dated April 27, 2021
May 06, 2021 E-92-3 Evanchuk, R. – Additional Letter of Comment dated May 6, 2021
July 19, 2021 E-92-4 Evanchuk, R. – Additional Letter of Comment dated July 19, 2021
July 20, 2021 E-92-4-1 Evanchuk, R. – Addendum to Additional Letter of Comment dated July 20, 2021
July 27, 2021 E-108 Brochhagen, D. and C. - Letter of Comment dated July 27, 2021
August 06, 2021 E-8-3 Postnikoff, C. – Additional Letter of Comment dated August 6, 2021
September 24, 2021 E-8-4 Postnikoff, C. – Additional Letter of Comment dated September 24, 2021
October 04, 2021 E-92-5 Evanchuk, R. – Additional Letter of Comment dated October 4, 2021
October 07, 2021 E-109 Denkovski, G – Letter of Comment dated October 7, 2021
January 29, 2023 E-110 Hawe, P – Letter of Comment dated January 29, 2023
February 07, 2023 E-111 Bivar, C. – Letter of Comment dated February 7, 2023

Our Review Process

Learn more about how we review applications, which are submitted to us by the entities we regulate. You'll see the types of reviews we conduct and how you can get involved in the process.

Learn more