March 26, 2009 |
C1-1 |
FIRST NATIONS ENERGY & MINING (BCFNEMC) -COUNCIL Letter dated March 23, 2009 from Peter Dimitrov Barrister/Solicitor filing request for Registered Intervenor status |
April 09, 2009 |
C1-2 |
BC FIRST NATIONS ENERGY & MINING COUNCIL VIA FAX Dated April 09, 2009 filing request by and for Peter Dimitrov and John Lawson to participate the Workshop and Procedural Conference |
April 14, 2009 |
C1-3 |
VIA FAX Dated April 13, 2009 Request for Cam Osler of Intergroup Consultants to participate in the Workshop on behalf of BCFNEMC |
April 27, 2009 |
C1-4 |
VIA FAX Dated April 25, 2009 - PROPOSAL TO B.C. UTILITIES COMMISSION from B.C. FIRST NATIONS ENERGY & MINING
COUNCIL |
June 10, 2009 |
C1-5 |
VIA EMAIL - Dated June 10, 2009 BCFNemc Response to Staff Discussion Paper on Scope |
June 23, 2009 |
C1-6 |
VIA EMAIL - Dated June 23, 2009 BCFNemc on Duty to Consult & Accommodate |
June 23, 2009 |
C1-7 |
VIA EMAIL - Dated June 23, 2009 BCFNemc Supplementary Response to Staff Discussion Paper on s. 5 Transmission Inquiry Scope |
July 27, 2009 |
C1-8 |
VIA FAX - Dated July 24, 2009 BCFNemc submission regarding First Nations consultation |
August 04, 2009 |
C1-9 |
Letter Dated July 31, 2009 Reply to First Nation consultation issues |
August 18, 2009 |
C1-10 |
Letter Dated August 18, 2009 Reply to A-19 and Book of Authorities |
September 22, 2009 |
C1-11 |
Letter received September 22, 2009 Resumes for Andrew McLaren and Cameron Osler |
October 07, 2009 |
C1-12 |
Letter Dated October 5, 2009 Comments on First Nations Phase and Request Amendment of Dates |
October 07, 2009 |
C1-13 |
Letter Dated October 7, 2009 Via Email Comments on First Nations phase and the engagement of a First Nations consultant or consultants |
October 08, 2009 |
C1-14 |
Letter Dated October 8, 2009 Comments regarding the Inquiry schedule |
October 15, 2009 |
C1-15 |
Letter Dated October 13, 2009 - Via Fax BCFNEMC Comments supporting terms of reference for FN Advisory Panel |
March 26, 2009 |
C2-1 |
DUCKS-Unlimited Received via Email Letter dated March 25, 2009 from Andrea Barnett filing to register for Workshop and Procedural Conference |
March 26, 2009 |
C3-1 |
David Suzuki Foundation Received via Email Letter dated March 25, 2009 from Nicholas Heap filing to register for Workshop and Procedural Conference |
June 23, 2009 |
C3-2 |
Letter dated June 23, 2009 - VIA EMAIL submission for William J. Andrews, legal
counsel, and Thomas Hackney, case manager, to act as its representatives |
March 26, 2009 |
C4-1 |
Ocean Renewable Energy Group Received via Email Letter dated March 25, 2009 from Chris Campbell filing to participate |
June 10, 2009 |
C4-2 |
Letter dated June 9, 2009 comments concerning scope |
August 17, 2009 |
C4-3 |
Letter dated August 14, 2009 Comments on BC Hydro Workshop |
August 17, 2009 |
C4-4 |
Letter dated August 14, 2009 Comments on BCTC Workshop |
August 17, 2009 |
C4-5 |
Dated June 17, 2009 Presentation - Assessment of Tidal Current Energy in the Minas Passage, Bay of Fundy |
September 25, 2009 |
C4-6 |
Letter dated September 24, 2009 Comments on filing extensions |
March 26, 2009 |
C5-1 |
Catalyst Paper Received via Email Letter dated March 26, 2009 from Carlo Dal Monte filing request for Registered Intervenor status |
March 30, 2009 |
C6-1 |
Joint Industry Electricity Steering Committee (JIESC) Letter dated March 27, 2009 from R. Brian Wallace filing request for Registered Intervenor status |
June 12, 2009 |
C6-2 |
Letter dated June 11, 2009 Comments on Commission Staff paper on issues and scoping |
July 27, 2009 |
C6-3 |
Letter dated July 24, 2009 written submission First Nations consultation issues |
August 04, 2009 |
C6-4 |
Letter dated July 24, 2009 Reply to First Nation consultation issues |
August 21, 2009 |
C6-5 |
Letter dated August 21, 2009 JIESC correction to Transcript volume 3 |
February 08, 2010 |
C6-7 |
Letter dated February 8, 2010 – JIESC Notification of change |
March 30, 2009 |
C7-1 |
Line Contractors Association of BC Letter dated March 27, 2009 from Jeff Skosnik, filing request for Workshop and the Procedural Conference |
June 10, 2009 |
C7-2 |
Letter dated June 8, 2009 comments concerning the “scope of Issues and the level of analyses |
March 31, 2009 |
C8-1 |
NaiKun Wind Energy Group Inc. Letter dated March 31, 2009 from Tony Fogarassy, filing request participate as an intervenor and attendance at the Procedural Conference |
April 01, 2009 |
C9-1 |
Cloudworks Energy Inc. Letter dated March 31, 2009 from John Johnson, filing request participate as an Intervenor |
April 15, 2009 |
C9-2 |
Letter dated April 08, 2009 - VIA EMAIL Filing request for John Johnson and Devon Hemsworth to attend Workshop |
June 12, 2009 |
C9-3 |
Letter dated June 11, 2009 Comments on the Staff Discussion Draft on the Scope |
April 01, 2009 |
C10-1 |
B.C. Sustainable Energy Association (BCSEA) and the Sierra Club
of British Columbia (SCBC) Letter dated April 01, 2009 from William J. Andrews, filing request participate as an Intervenor
|
April 30, 2009 |
C10-2 |
FOREST ETHICS REPRESENTED BY BCSEA Letter Dated April 29, 2009 filing request for William J. Andrews and Thomas Hackney to participate |
June 11, 2009 |
C10-3 |
Letter Dated June 11, 2009 comments on the Staff Discussion Draft on Scope |
July 27, 2009 |
C10-4 |
Letter Dated July 24, 2009 submission on First Nations Issues |
July 27, 2009 |
C10-4-1 |
Letter Dated July 24, 2009 submission on First Nations Issues part 2 |
July 31, 2009 |
C10-5 |
Letter Dated July 31, 2009 reply submissions on First Nations Issues |
August 17, 2009 |
C10-6 |
Letter Dated August 14, 2009 BCSEA, et al comments on BC Hydro 23 July 2009 workshop on Generation Resource Options |
August 25, 2009 |
C10-7 |
Letter Dated August 12, 2009 BCSEA, et al comments on BCTC 5 August 2009 workshop on demand scenarios |
April 02, 2009 |
C11-1 |
The Progressive Group Online Registration from Cindy Burton, filing request to participate as an Intervenor |
April 02, 2009 |
C12-1 |
The Cascadia Institute Online Registration from Charles Kelly, filing request to participate as an Intervenor and Interested Party |
April 15, 2009 |
C12-2 |
Online Registration request by KEITH MCPHERSON to participate in the Workshop and Procedural Conference |
April 02, 2009 |
C13-1 |
David Shipway Letter Dated April 01, 2009 Via Email filing request to participate |
April 02, 2009 |
C14-1 |
BC Hydro Online Registration Dated April 01, 2009 filing request to attend Workshop and the Procedural Conference |
April 20, 2009 |
C14-2 |
Dated April 17, 2009 BC Hydro’s Presentation to the BCUC Preliminary Workshop by Randy Reimann |
April 03, 2009 |
C15-1 |
MarkUs Resource Consulting E-mail dated April 2, 2009 from Bernie Banovic filing request for Intervenor Status |
April 03, 2009 |
C16-1 |
West Coast Environmental Law E-mail dated April 3, 2009 from Greg Gowe, Staff Lawyer filing request for Intervenor Status |
April 03, 2009 |
C17-1 |
COLUMBIA POWER CORPORATION - E-mail dated April 3, 2009 from Glenn McIntyre, Director, Regulatory & Government Affairs filing request for Intervenor Status |
June 08, 2009 |
C17-2 |
Letter Dated June 11, 2009 Comments on the Commission Staff Discussion Draft on Scope of the Inquiry |
April 03, 2009 |
C18-1 |
BC TRANSMISSION CORPORATION - E-mail dated April 3, 2009 from Gerry Lister filing request for Intervenor Status |
April 21, 2009 |
C18-2 |
Letter dated April 17, 2009 Overview of BCTC Planning |
April 03, 2009 |
C19-1 |
ENMAX CORPORATION - E-mail dated April 3, 2009 from Ron Sanderson filing request for Intervenor Status
|
April 08, 2009 |
C19-2 |
Letter dated April 08, 2009 - VIA EMAIL Filing request for Jim Gemmill to attend Workshop and Procedural Conference |
June 12, 2009 |
C19-3 |
Letter dated June 11, 2009 Comments on Scope of the Inquiry |
April 03, 2009 |
C20-1 |
SOBOLEWSKI, ANDRE - E-mail dated April 3, 2009 filing request for Intervenor Status |
April 06, 2009 |
C21-1 |
BARBARA BUCHANAN VIA EMAIL LETTER Dated April 04, 2009 filing request to attend Workshop and the Procedural Conference |
April 06, 2009 |
C22-1 |
CANADIAN WIND ENERGY ASSOCIATION (CANWEA) LETTER Dated April 06, 2009 from David Huggill request for Intervenor Status |
April 06, 2009 |
C23-1 |
RICHARD MCLAREN VIA EMAIL LETTER Dated April 03, 2009 request for Intervenor Status |
April 06, 2009 |
C24-1 |
SAULTEAU FIRST NATIONS VIA EMAIL LETTER Dated April 06, 2009 filing request by Glenda Gover to attend Workshop and the Procedural Conference |
April 07, 2009 |
C25-1 |
Shíshálh Nation VIA EMAIL LETTER Dated April 06, 2009
filing request by Jasmine Paul to participate in the workshop and procedural conference
|
April 07, 2009 |
C26-1 |
BCOAPO VIA EMAIL LETTER Dated April 07, 2009 filing request by Eugene Kung for Intervenor Status |
June 12, 2009 |
C26-2 |
Letter Dated June 11, 2009 comments on scope in response to the Commission Staff Discussion Paper |
July 27, 2009 |
C26-3 |
Letter Dated July 24, 2009 - VIA EMAIL BCOAPO submission regarding duty to consult with First Nations |
April 08, 2009 |
C27-1 |
ALTA ENERGY VIA EMAIL Letter Dated April 07, 2009 filing request by Stephen L. Kukucha to participate |
April 08, 2009 |
C28-1 |
ASSOCIATION FOR MINERAL EXPLORATION OF BRITISH COLUMBIA (AME BC) AND NORTH WEST POWER LINE COALITION - VIA EMAIL Letter Dated April 07, 2009 filing request by Byng Giraud to participate |
June 11, 2009 |
C28-2 |
Letter Dated June 10, 2009 comments on Staff Discussion Draft on Scope of the Inquiry |
July 28, 2009 |
C28-3 |
Letter Dated July 28, 2009 AME BC submission on duty to consult with and accommodate First Nations |
August 18, 2009 |
C28-4 |
Letter Dated August 12, 2009 comments on BCTC Scenario Workshop |
April 08, 2009 |
C29-1 |
GREENWING ENERGY MANAGEMENT LTD. VIA EMAIL Letter Dated April 07, 2009 filing request by Stephanie Henin to participate in Workshop and Procedural Conference |
April 08, 2009 |
C30-1 |
HARD CREEK NICKEL CORPORATION- VIA EMAIL Letter Dated April 07, 2009 filing request by and for Ed Beswick and Neil Froc to participate in Workshop and Procedural Conference |
April 08, 2009 |
C31-1 |
CANADIAN HYDRO DEVELOPERS INC. VIA EMAIL Letter Dated April 08, 2009 filing request by Matt Kennedy to participate in Workshop |
April 08, 2009 |
C32-1 |
TRANS CANADA ENERGY (TCE) - VIA EMAIL Letter Dated April 08, 2009 filing request by Frank Karabetsos to participate and for two representatives to attend the Workshop and Procedural Conference |
June 11, 2009 |
C32-2 |
Letter Dated June 11, 2009 Comments on Staff discussion draft on scope |
April 08, 2009 |
C33-1 |
SYNTARIS POWER- VIA EMAIL Letter Dated April 08, 2009 filing request by and for Brendon Joe to participate in Workshop and Procedural Conference |
April 08, 2009 |
C34-1 |
SUNSHINE COAST REGIONAL DISTRICT - VIA EMAIL Letter Dated April 08, 2009 filing request by and for David Rafael to participate in Workshop and Procedural Conference |
April 08, 2009 |
C35-1 |
TERRY BROWN- VIA PHONE CALL Date April 08, 2009 filing request to participate |
June 15, 2009 |
C35-2 |
Letter Dated June 12, 2009 VIA EMAIL Terry Brown requesting to withdraw |
May 21, 2009 |
C35-2 |
LETTER VIA EMAIL Dated May 20, 2009 withdrawing registration |
April 08, 2009 |
C36-1 |
WARREN BRAZIER- VIA EMAIL Letter Dated April 08, 2009 filing request to participate in Workshop and Procedural Conference |
April 08, 2009 |
C37-1 |
PREMIER RENEWABLE ENERGY VIA EMAIL Letter Dated April 08, 2009 filing request by Pim de Ridder to participate in the Procedural Conference |
April 08, 2009 |
C38-1 |
PLUTONIC POWER CORPORATION Letter Dated April 08, 2009 filing request by Rupert Legge to participate |
April 09, 2009 |
C39-1 |
KERR WOOD LEIDAL CONSULTING ENGINEERS - VIA EMAIL Letter Dated April 08, 2009 filing request by Ron Monk to participate in Workshop and Procedural Conference |
April 09, 2009 |
C40-1 |
ENCANA POWER AND PROCESSING - VIA EMAIL Letter Dated April 09, 2009 filing request by and for Rod Crockford and Dan Brown to participate in Workshop and Procedural Conference |
April 09, 2009 |
C41-1 |
ENERGETIC CONCEPTS Letter Dated April 08, 2009 filing request by David Oshoway to participate |
April 09, 2009 |
C42-1 |
FORTIS BC Letter Dated April 08, 2009 filing request by and for Dennis Swanson, Doug Ruse and Paul Chernikhowsky to participate in Workshop and Procedural Conference |
April 23, 2009 |
C42-2 |
ONLINE REGISTRATION Dated April 22, 2009 filing request by Robert McDonell to participate |
April 09, 2009 |
C43-1 |
WILLIS ENERGY SERVICES - VIA EMAIL Letter Dated April 09, 2009 filing request by Penny Cochrane to participate in the Workshop and Procedural Conference |
April 09, 2009 |
C44-1 |
COMMERCIAL ENERGY CONSUMERS ASSOCIATION OF BRITISH COLUMBIA (CEC) - VIA EMAIL Letter Dated April 09, 2009 filing request by Christopher Weafer to participate in the Workshop and Procedural Conference |
June 11, 2009 |
C44-2 |
Letter Dated June 11, 2009 comments on the Commission's staff discussion draft paper on scope |
July 27, 2009 |
C44-3 |
Letter Dated July 24, 2009 - VIA EMAIL CEC submission regarding duty to consult with First Nations |
April 09, 2009 |
C45-1 |
RUN OF RIVER POWER INC - VIA EMAIL Letter Dated April 09, 2009 filing request by Michael Sweatman to participate |
April 09, 2009 |
C46-1 |
RON ZEILSTRA - VIA EMAIL Letter Dated April 09, 2009 filing request to participate in the Workshop and Procedural Conference |
April 09, 2009 |
C47-1 |
WESTERN BIOMASS POWER CORP Letter Dated April 10, 2009 (Received April 09, 2009) filing request by Jeffrey Paquin to participate |
April 09, 2009 |
C48-1 |
BC BIOENERGY NETWORK ONLINE REGISTRATION Dated April 09, 2009 filing request by Michael Weedon to participate |
April 09, 2009 |
C49-1 |
ANDRITZ AUTOMATION ONLINE REGISTRATION Dated April 09, 2009 filing request by Scott Taylor to participate |
June 10, 2009 |
C49-2 |
Letter dated June 09, 2009 Contribution to the Scope of the Inquiry on the Need and Benefit of an HVDC Highway |
April 09, 2009 |
C50-1 |
CITY OF NEW WESTMINSTER-ELECTRIC UTILITY COMMISSION - VIA EMAIL Letter Dated April 09, 2009 filing request by R.E. Carle to participate by receiving correspondence and final report. |
April 09, 2009 |
C51-1 |
CORPORATION OF THE CITY OF NELSON - VIA EMAIL Letter Dated April 09, 2009 filing request by Karl Gustafson to participate |
April 09, 2009 |
C52-1 |
JETSON CONSULTING ENGINEERS LTD LETTER Dated April 09, 2009 filing request by Elroy Switlishoff to participate the Workshop and Procedural Conference |
April 09, 2009 |
C53-1 |
SEA BREEZE ENERGY INC. ONLINE REGISTRATION Dated April 09, 2009 filing request by Dmitri Kotliarov to participate |
April 09, 2009 |
C54-1 |
SEA BREEZE PACIFIC REGIONAL TRANSMISSION SYSTEM INC. ONLINE REGISTRATION Dated April 09, 2009 filing request by Dmitri Kotliarov to participate |
April 14, 2009 |
C55-1 |
TERRY VULCANO VIA EMAIL Letter Dated April 14, 2009 filing request to participate in the Procedural Conference |
May 01, 2009 |
C55-2 |
Letter Dated April 14, 2009 VIA EMAIL comment on schedule for second session |
May 07, 2009 |
C55-3 |
Letter Dated May 7, 2009 comments on Meaningful Participation Workshop |
November 23, 2009 |
C55-4 |
Letter Dated November 21, 2009 – Presentation links on Long Term Tranmission Line Hearings from Alberta |
December 17, 2009 |
C55-6 |
Letter dated December 15, 2009 Via Email – T. Vulcano Information Request No. 1 to BC Hydro |
April 09, 2009 |
C56-1 |
ERIC GRAHAM - VIA EMAIL Letter Dated April 09, 2009 filing request to participate in the Workshop and Procedural Conference |
April 09, 2009 |
C57-1 |
TERASEN GAS DISTRIBUTION COMPANIES- TERASEN UTILITIES VIA ONLINE Letter Dated April 09, 2009 filing request by Tom Loski to participate in the Workshop and Procedural Conference |
June 11, 2009 |
C57-2 |
Letter Dated June 11, 2009 Comments on Staff Discussion Draft on Scope of Inquiry |
April 14, 2009 |
C58-1 |
LUDO BERTSCH - REPRESENTING ENERGY SOLUTIONS FOR VANCOUVER ISLAND SOCIETY (ESVI), OKANAGAN ENVIROMENTS INDUSTRY ALLIANCE (OEIA), ISLANDTRANSFORMATION.ORG (ITO) AND RENTAL OWNERS AND MANAGERS SOCIETY OF BC (ROMS BC) - VIA EMAIL Letter Dated April 09, 2009 filing request to participate |
June 12, 2009 |
C58-2 |
Letter Dated June 11, 2009 Comments relating to defining the scope |
August 24, 2009 |
C58-3 |
Letter Dated August 14, 2009 Comments on Resource Options to BC Hydro |
August 24, 2009 |
C58-4 |
Letter Dated August 12, 2009 Comments on Scenarios to BCTC |
September 17, 2009 |
C58-5 |
Letter Dated September 17, 2009 Comments on BCTC request for extension to file initial evidence |
September 25, 2009 |
C58-6 |
Letter Dated September 25, 2009 Comments on further time extensions for BCTC and BC Hydro Initial Evidence |
April 14, 2009 |
C59-1 |
INDEPENDENT POWER PRODUCERS ASSOCIATION OF BRITISH COLUMBIA (IPPBC) VIA EMAIL Letter Dated April 09, 2009 filing request by David Austin to participate in the Workshop and Procedural Conference |
April 15, 2009 |
C59-2 |
Letter Dated April 15, 2009 VIA EMAIL filing request by James Weimer to participate in the Workshop |
June 12, 2009 |
C59-3 |
Letter Dated June 11, 2009 Comments on Staff Discussion Draft on Scope of the Inquiry |
July 27, 2009 |
C59-4 |
Letter dated July 24, 2009 submission regarding duty to consult with First Nations |
April 14, 2009 |
C60-1 |
MINISTRY OF ENERGY, MINES AND PETROLEUM RESOURCES (MEMPR) VIA EMAIL Letter Dated April 09, 2009 filing request by Oswald Dias to participate in the Workshop and Procedural Conference |
July 27, 2009 |
C60-2 |
Letter Dated July 24, 2009 VIA FAX - submission regarding duty to consult with First Nations |
April 14, 2009 |
C61-1 |
WEST MOBERLY FIRST NATIONS (WMFN) - VIA EMAIL Letter Dated April 09, 2009 filing request by Verena Hofmann to participate in the Workshop |
April 14, 2009 |
C62-1 |
FRED. OLSEN RENEWABLES (CANADA) LTD. ONLINE REGISTRATION Dated April 14, 2009 filing request by David Kusnierczyk to participate |
April 14, 2009 |
C63-1 |
SIERRA GEOTHERMAL POWER CORP (SGP) - VIA EMAIL Letter Dated April 14, 2009 filing request by Curtis Marr to participate in the Workshop |
April 15, 2009 |
C64-1 |
CST CONSULTING Letter Dated April 09, 2009 filing request by Shawn Thomas to participate in the Workshop and Procedural Conference |
April 15, 2009 |
C65-1 |
SPLATS’IN FIRST NATIONS - VIA EMAIL Letter Dated April 14, 2009 filing request by Elizabeth Brown- Loretta Eustache, Raymond Cormier, Stuart Lee to participate in the Workshop |
April 16, 2009 |
C66-1 |
NORTH COLUMBIA ENVIRONMENTAL SOCIETY (NCES) - VIA EMAIL Letter Dated April 15, 2009 filing request by Sarah Newton to participate |
April 16, 2009 |
C67-1 |
SKYPOWER CORPORATION - VIA EMAIL Letter Dated April 15, 2009 filing request by Daris LaPoint to participate in the Workshop |
April 16, 2009 |
C68-1 |
ALBERTA ELECTRIC SYSTEM OPERATOR (AESO) - VIA EMAIL Letter Dated April 15, 2009 filing request by Kris Aksomitis to participate |
April 16, 2009 |
C69-1 |
COAST FOREST PRODUCTS ASSOCIATION (CFPA) - VIA EMAIL Letter Dated April 16, 2009 filing request by Heather Mink to participate in the Workshop and Procedural Conference |
June 12, 2009 |
C69-2 |
Letter Dated June 11, 2009 comments on Staff Discussion Draft on Scope |
April 21, 2009 |
C70-1 |
REGIONAL DISTRICT CENTRAL KOOTNENAY - VIA EMAIL Letter Dated April 21, 2009 filing request by Andy Shadrack to participate |
May 12, 2009 |
C70-2 |
Letter Dated May 12, 2009 - VIA EMAIL Comments and Response to Mr. Terry Vulcano on process schedule |
July 06, 2009 |
C70-3 |
Letter Dated July 2, 2009 - VIA EMAIL Comments on observation regarding citizens in the West Kootenay |
July 07, 2009 |
C70-4 |
Letter Dated July 6, 2009 - VIA EMAIL Comment supporting Mr Vulcano’s recent submission |
April 27, 2009 |
C71-1 |
POWERUP CANADA - ONLINE REGISTRATION Dated April 23, 2009 filing request by Tzeporah Berman to participate |
April 28, 2009 |
C72-1 |
STÓ:LO TRIBAL COUNCIL - VIA EMAIL Letter Dated April 21, 2009 filing request by Robyn Heaslip and Otis Jasper to participate |
June 11, 2009 |
C72-2 |
Letter Dated May 29, 2009 comments on Staff Discussion Draft on Scope of the Inquiry |
June 24, 2009 |
C72-3 |
Letter Dated June 23, 2009 Amended comments on the Staff Discussion Draft on Scope of the Inquiry |
July 27, 2009 |
C72-4 |
Letter Dated July 24, 2009 submission on duty of consultation First Nations |
October 06, 2009 |
C72-5 |
Letter Dated October 5, 2009 Notice of Council addition |
October 07, 2009 |
C72-6 |
Letter Dated October 5, 2009 Comments on First Nations Phase and Request Amendment of Dates |
October 15, 2009 |
C72-7 |
Letter Dated October 15, 2009 –Via Email Submission on support of the First Nation Advisory Panel |
April 30, 2009 |
C73-1 |
CANADIAN GEOTHERMAL ENERGY ASSOCIATION (CGEA) - ONLINE REGISTRATION Dated April 30, 2009 filing request by Alison Thompson to participate |
June 11, 2009 |
C73-2 |
Letter Dated June 11, 2009 comments on commission staff’s discussion draft on scope |
May 01, 2009 |
C74-1 |
CITY OF ABBOTSFORD - VIA EMAIL Letter Dated April 21, 2009 filing request by James Yardley to participate |
May 01, 2009 |
C75-1 |
CHESLATTA CARRIER NATION - VIA EMAIL Letter Dated May 01, 2009 filing request by Mike Robertson to participate |
May 01, 2009 |
C76-1 |
BURNS LAKE CHAMBER OF COMMERCE (BLCOC) - VIA EMAIL Letter Dated May 01, 2009 filing request by Gregory Wacholtz to participate |
May 05, 2009 |
C77-1 |
NISGA'A LISIMS GOVERNMENT - VIA FAX Letter Dated May 05, 2009 filing request by Frederic Tolmie to participate |
July 24, 2009 |
C77-2 |
Letter Dated July 23, 2009 - VIA FAX filing written submissions of the
Nisga’a Nation
|
May 06, 2009 |
C78-1 |
Removed |
May 06, 2009 |
C79-1 |
SHUSWAP-ARROW LAKES DIVISION - VIA EMAIL Letter Dated May 06, 2009 filing request by Sunny LeBourdais to participate |
June 15, 2009 |
C79-2 |
Letter Dated June 11, 2009 Lakes Division Scope Submission |
July 27, 2009 |
C79-3-1 |
Letter Dated July 24, 2009 Lakes Division submission First Nations consultation Issues |
July 27, 2009 |
C79-3-2 |
Letter Dated July 24, 2009 SEXQÉLTKEMC submission on on Tult (Transformation of Energy into Matter) - First Nations consultation Issues |
October 27, 2009 |
C79-4 |
Letter Dated October 27, 2009 Notice of Barbara Harvey, Janes Freedman Kyle Law Corporation to register as legal counsel for Shuswap-Arrows Lake Division and Lakes Division |
November 12, 2009 |
C79-5 |
Letter Dated November 12, 2009 filing endorsement of Terms of Reference by Barbara Harvey, Janes Freedman Kyle Law Corporation |
May 07, 2009 |
C80-1 |
REGIONAL DISTRICT OF MOUNT WADDINGTON (RDMW) Letter Dated May 06, 2009 filing request by Greg Fletcher to participate |
May 11, 2009 |
C81-1 |
WESTPAC LNG CORPORATION (WPLNG) - VIA EMAIL Letter Dated May 11, 2009 filing request by Robert Green to participate |
May 19, 2009 |
C82-1 |
SHAWWASH, ZIAD – VIA EMAIL Dated May 16, 2009 filing request to participant in this Inquiry |
May 20, 2009 |
C83-1 |
HAISLA NATION (HN) - ONLINE REGISTRATION Dated May 20, 2009 filing by Jennifer Griffith request to participant in this Inquiry |
June 11, 2009 |
C83-2 |
Letter Dated June 10, 2009 comments on commission staff’s discussion draft on scope |
July 27, 2009 |
C83-3 |
Letter Dated July 24, 2009 - VIA EMAIL submission on First Nations consultation Issues |
July 29, 2009 |
C83-4 |
Letter Dated July 29, 2009 – VIA EMAIL Haisla and We Wai Kai joint submission Book of Authorities |
July 31, 2009 |
C83-5 |
Letter Dated July 31, 2009 – VIA EMAIL joint reply submissions of the Haisla Nation and We Wai Kai Nation with respect to First Nation Consultation issues |
October 07, 2009 |
C83-6 |
Letter Dated October 5, 2009 Comments on First Nations Phase and Request Amendment of Dates |
October 07, 2009 |
C83-7 |
Letter Dated October 7, 2009 Comments on First Nations Phase and the engagement of a First Nations consultant or consultants |
May 20, 2009 |
C84-1 |
CAPE MUDGE INDIAN BAND (CMIB) - ONLINE REGISTRATION Dated May 20, 2009 filing by Jennifer Griffith request to participant in this Inquiry |
June 10, 2009 |
C84-2 |
Letter Dated June 9, 2009 We Wai Kai Nation (Cape Mudge Indian Band) comments on the Commission Staff's Discussion Draft on Scope |
July 29, 2009 |
C84-3 |
Letter Dated July 24, 2009 – VIA EMAIL We Wai Kai and Haisla joint submission on First Nations consultation Issues |
July 29, 2009 |
C84-4 |
Letter Dated July 29, 2009 – VIA EMAIL We Wai Kai and Haisla joint submission Book of Authorities |
July 31, 2009 |
C84-5 |
Letter Dated July 31, 2009 – VIA EMAIL joint reply submissions of the We Wai Kai Nation and Haisla Nation with respect to First Nation Consultation issues |
September 21, 2009 |
C84-6 |
Letter Dated September 21, 2009 Comments on Nanaimo Regional Session |
October 07, 2009 |
C84-7 |
Letter Dated October 5, 2009 Comments on First Nations Phase and Request Amendment of Dates |
October 08, 2009 |
C84-8 |
Letter Dated October 7, 2009 Comments on First Nations Phase and the engagement of a First Nations consultant or consultants |
October 15, 2009 |
C84-9 |
Letter Dated October 14, 2009 – VIA EMAIL We Wai Kai Nation Submission on support of the First Nation Advisory Panel |
May 20, 2009 |
C85-1 |
DJF CONSULTING (DJFC)- ONLINE REGISTRATION Dated May 20, 2009 filing by Dennis Fitzgerald request to participant in this Inquiry |
May 21, 2009 |
C86-1 |
BURKE MOUNTAIN NATURALISTS (BMN) - ONLINE REGISTRATION Dated May 21, 2009 filing by Elaine Golds request to participant in this Inquiry |
June 12, 2009 |
C86-2 |
Letter Dated June 11, 2009 comments on Commission Staff Discussion Draft on Scope |
May 21, 2009 |
C87-1 |
BRITISH COLUMBIA WILDLIFE FEDERATION (BCWF) – VIA EMAIL Letter Dated May 21, 2009 filing request by Ed Mankelow to participate |
May 21, 2009 |
C88-1 |
INSTITUTE FOR THE HISTORY OF SCIENCE (HIS) – VIA EMAIL Letter Dated May 21, 2009 filing request by Karen Wonders to participate |
May 21, 2009 |
C89-1 |
HWLITSUM FIRST NATION– VIA EMAIL Letter Dated May 21, 2009 filing request by Magdalena Muir to participate |
June 23, 2009 |
C89-2 |
Letter Dated June 23, 2009 two of three additional legal decisions that the Hwlitsum First Nation will be relying on at the June 24, 2009 procedural conference to support their oral submissions |
June 30, 2009 |
C89-3 |
Letter Dated June 24, 2009 - Hand delivered at the Procedural Conference - Hwlitsum First Nation's Brief re the Section 5 Inquiry's independent duty to consult First Nations with covering letter dated June 24, 2009. |
July 27, 2009 |
C89-4 |
Letter Dated July 24, 2009 – VIA EMAIL submission regarding duty to consult with First Nations |
August 04, 2009 |
C89-5 |
Letter Dated July 31, 2009 – VIA EMAIL Reply submission regarding duty to consult with First Nations |
September 03, 2009 |
C89-6 |
Letter dated September 3, 2009 Revised civic and mailing address for the Hwlitsum First Nation |
October 07, 2009 |
C89-7 |
Letter Dated October 5, 2009 Comments on First Nations Phase and Request Amendment of Dates |
October 08, 2009 |
C89-8 |
Letter Dated October 7, 2009 Comments on First Nations Phase and the engagement of a First Nations consultant or consultants |
October 15, 2009 |
C89-9 |
Letter Dated October 14, 2009 – Via Email Hwlitsum First Nation Submission on support of the First Nation Advisory Panel |
May 22, 2009 |
C90-1 |
FINAVERA RENEWABLES – VIA EMAIL dated May 22, 2009 filing request to participate on behalf of Michael Thompson |
May 26, 2009 |
C91-1 |
TERRACE ECONOMIC DEVELOPMENT AUTHORITY (TEDA) Letter Dated May 15, 2009 filing request by Sam Harling to participate |
May 26, 2009 |
C92-1 |
WILDERNESS COMMITTEE (WC) - VIA EMAIL Letter Dated May 26, 2009 filing request by Eric Doherty to participate |
June 12, 2009 |
C92-2 |
Letter Dated June 11, 2009 Comments on staff discussion paper on scope |
August 12, 2009 |
C92-3 |
Letter Dated August 11, 2009 Comments on August 5, 2009 BC Transmission Corporation/ BCUC Scenario Workshop |
May 28, 2009 |
C93-1 |
UNION OF BC MUNICIPALITIES - ONLINE REGISTRATION Dated May 27, 2009 filing request by Marie Crawford to participate |
June 10, 2009 |
C94-1 |
THE PEMBINA INSTITUTE (PI) - VIA EMAIL Letter Dated June 8, 2009 filing request by Matt Horne to participate |
June 10, 2009 |
C95-1 |
RIO TINTO ALCAN (RTA) - VIA EMAIL Letter Dated June 9, 2009 filing request by Benoit Pepin to participate |
June 11, 2009 |
C96-1 |
DOGWOOD INITIATIVE (DI) Letter Dated June 9, 2009 filing request by Will Horter to participate - authorizes William Andrews as legal council |
June 12, 2009 |
C97-1 |
NLAKA’PAMUX NATION TRIBAL COUNCIL (NNTC) OKANAGAN NATION ALLIANCE (ONA) TAHLTAN CENTRAL COUNCIL (TTC) filing request by Mandell Pinder to participate |
June 12, 2009 |
C97-2 |
Letter Dated June 11, 2009 Comments on Terms of reference – Initial Scoping Issues |
July 27, 2009 |
C97-3 |
Letter Dated July 24, 2009 – VIA EMAIL submission regarding duty to consult with First Nations |
August 04, 2009 |
C97-4 |
Letter regarding Joint reply submission regarding duty to consult with First Nations |
August 12, 2009 |
C97-5 |
Letter Dated August 12, 2009 joint submission comments regarding BC Hydro Workshop |
October 07, 2009 |
C97-6 |
Letter Dated October 5, 2009 Comments on First Nations Phase and Request Amendment of dates |
October 15, 2009 |
C97-7 |
Letter Dated October 14, 2009 Comments on Crown obligations and concerns |
June 23, 2009 |
C98-1 |
SQUAMISH NATION - ONLINE REGISTRATION Dated June 23, 2009 filing request by Bill Williams to participate |
July 27, 2009 |
C98-2 |
Letter Dated July 24, 2009 submission of Squamish Nation, Lax Kw’Alaams Indian Band and Carrier Sekani Tribal Council regarding Aboriginal consultation |
October 07, 2009 |
C98-3 |
Letter Dated October 5, 2009 Comments on First Nations Phase and Request Amendment of dates |
June 24, 2009 |
C99-1 |
CARRIER SEKANI TRIBAL COUNCIL - ONLINE REGISTRATION Dated June 24, 2009 filing request by Gregory McDade to participate |
October 07, 2009 |
C99-2 |
Letter Dated October 5, 2009 Comments on First Nations Phase and Request Amendment of dates |
June 24, 2009 |
C100-1 |
DISTRICT OF KITIMAT (DOK) – VIA EMAIL Letter Dated June 24, 2009 filing request by Trafford Hall to participate |
June 29, 2009 |
C101-1 |
POWELL RIVER REGIONAL DISTRICT – VIA EMAIL Letter Dated June 26, 2009 filing request for Colin Palmer to participate |
July 15, 2009 |
C102-1 |
CANADIAN PARKS AND WILDERNESS SOCIETY – BRITISH COLUMBIA CHAPTER (CPAWS-BC) – VIA EMAIL Letter Dated July 15, 2009 filing request to participate |
July 20, 2009 |
C103-1 |
TOQUAHT NATION (TN) - ONLINE REGISTRATION Dated July 20, 2009 filing request by Leah Mack to participate |
July 27, 2009 |
C103-2 |
Letter Dated July 24, 2009 submission regarding First Nations consultation issues |
October 07, 2009 |
C103-4 |
Letter Dated October 5, 2009 Comments on First Nations Phase and Request Amendment of Dates |
October 07, 2009 |
C103-5 |
Letter Dated October 7, 2009 Submission on First Nations Phase and Consultants |
October 15, 2009 |
C103-6 |
Letter Dated October 14, 2009 - Via Email Toquaht Nation Submission on support of the First Nation Advisory Panel |
July 20, 2009 |
C104-1 |
GORD LECHNER - ONLINE REGISTRATION Dated July 20, 2009 filing request to participate |
July 21, 2009 |
C105-1 |
TREATY 8 TRIBAL ASSOCIATION - ONLINE REGISTRATION Dated July 21, 2009 filing request by Christopher Delvin and Allisun Rana to participate |
July 27, 2009 |
C105-2 |
Letter Dated July 24, 2009 submission regarding Third Procedural conference |
July 27, 2009 |
C105-3 |
Letter Dated July 24, 2009 submission regarding Third Procedural conference Appendices |
July 28, 2009 |
C105-4 |
Letter Dated July 28, 2009 Book of Authorities submission |
July 31, 2009 |
C105-5 |
REVISED COPY of Letter Dated July 31, 2009 reply submissions for the Third Procedural Conference |
August 17, 2009 |
C105-6 |
Letter from Treaty 8 Tribal Association comments on the BC Hydro Resource Options Questionnaire |
August 17, 2009 |
C105-7 |
Letter from Treaty 8 Tribal Association comments on BCTC Scenario Workshop |
October 07, 2009 |
C105-8 |
Letter Dated October 5, 2009 Comments on First Nations Phase and Request Amendment of Dates |
October 15, 2009 |
C105-9 |
Letter Dated October 14, 2009 Treaty 8 Tribal Association Submission on support of the First Nation Advisory Panel |
September 24, 2009 |
C106-1 |
CAW LOCAL 2301 (CAW) - ONLINE REGISTRATION Dated September 24, 2009 filing request by Gary Warren to participate |
October 01, 2009 |
C107-1 |
CITY OF TERRACE (CT) – VIA EMAIL Dated October 1, 2009 filing request by Alisa Thompson to participate |
October 02, 2009 |
C108-1 |
KITIMAT TERRACE INDUSTRIAL DEVELOPMENT SOCIETY (KTIDS) - ONLINE REGISTRATIONS from Austin Byrne, Bill Eynon, and Robin Lapointe requesting Intervener status |
October 07, 2009 |
C109-1 |
LAX KW’ALAAMS INDIAN BAND – VIA EMAIL Letter Dated October 7, 2009 from Gregory McDade requesting to participate |
October 15, 2009 |
C110-1 |
TSAWOUT FIRST NATION – ONLINE REGISTRATION Dated October 15, 2009 from Leah Mack, Woodward and Company legal counsel, filing request for Registered Intervenor |
October 23, 2009 |
C111-1 |
COWICHAN TRIBES – VIA EMAIL Letter Dated October 22, 2009 request for Registered Intervenor status from David M. Robbins, Woodward and Company, legal counsel |
November 06, 2009 |
C112-1 |
LIARD FIRST NATION – Web Registration dated November 5, 2009 from Drew Mildon, Woodward & Company legal counsel, filing request for Intervenor status
|
December 22, 2009 |
C113-1 |
BOIS, CHARLES – Web Registration dated December 21, 2009 requesting Intervenor status |