BC Hydro

Site C Documentation

In Progress

Hearing and Other Documents

Title Document Description
Site C Progress Report No. 1 Letter dated January 21, 2016 – British Columbia Hydro and Power Authority (BC Hydro) PUBLIC Site C Clean Energy Project – Progress Report No. 1 F2016 – Q2 (July to September 2015)
Site C Progress Report No. 2 Letter dated March 11, 2016 – British Columbia Hydro and Power Authority (BC Hydro) PUBLIC Site C Clean Energy Project – Progress Report No. 2 F2016 – Q3 (October to December 2015)
Site C Progress Report No. 3 Letter dated June 10, 2016 – British Columbia Hydro and Power Authority (BC Hydro) PUBLIC Site C Clean Energy Project – Progress Report No. 3 F2016 – Q4 (January to March 2016)
Site C Progress Report No. 5 Letter dated December 21, 2016 – British Columbia Hydro and Power Authority (BC Hydro) PUBLIC Site C Clean Energy Project – Progress Report No. 5 (July to September 2016)
Site C Annual Progress Report No. 1 Letter dated December 21, 2016 – British Columbia Hydro and Power Authority (BC Hydro) PUBLIC Site C Clean Energy Project – Annual Progress Report No. 1 (July 2015 to September 6, 2016)
Site C Progress Report No. 6 Letter dated March 14, 2017 – British Columbia Hydro and Power Authority (BC Hydro) PUBLIC Site C Clean Energy Project – Progress Report No. 6 (October to December 2016)
Site C Progress Report No. 7 Letter dated June 16, 2017 – British Columbia Hydro and Power Authority (BC Hydro) PUBLIC Site C Clean Energy Project – Progress Report No. 7 (January to March 2017)
Site C Progress Report No. 8 Letter dated September 29, 2017 – British Columbia Hydro and Power Authority (BC Hydro) PUBLIC Site C Clean Energy Project – Progress Report No. 8 (April to June 2017)
Site C Progress Report No. 9 Letter dated December 20, 2017 – British Columbia Hydro and Power Authority (BC Hydro) PUBLIC Site C Clean Energy Project – Progress Report No. 9 F2018 - Q2(July to September 2017)
Site C Progress Report No. 10 Letter dated March 29, 2018 – British Columbia Hydro and Power Authority (BC Hydro) PUBLIC Site C Clean Energy Project – Progress Report No. 10 F2018 - Q3(October to December 2017)
Site C Annual Progress Report No. 2 Letter dated March 29, 2018 – British Columbia Hydro and Power Authority (BC Hydro) PUBLIC Site C Clean Energy Project – Annual Progress Report No. 2 (October to December 2017)
Site C Progress Report No. 11 Letter dated July 11, 2018 – British Columbia Hydro and Power Authority (BC Hydro) PUBLIC Site C Clean Energy Project – Progress Report No. 11 F2018 - Q4(January to March 2018)
Site C Progress Report No. 12 Letter dated September 28, 2018 – British Columbia Hydro and Power Authority (BC Hydro) PUBLIC Site C Clean Energy Project – Progress Report No. 12 F2019 - Q1(April to June 2018)
Site C Progress Report No. 13 Letter dated December 18, 2018 – British Columbia Hydro and Power Authority (BC Hydro) PUBLIC Site C Clean Energy Project – Progress Report No. 13 F2019 - Q2(July to September 2018)
Site C Progress Report No. 14 and Annual Progress Report No. 3 Letter dated March 5, 2019– British Columbia Hydro and Power Authority (BC Hydro) PUBLIC Site C Clean Energy Project – Annual Progress Report No. 3 (Combined with Progress Report No. 14)(January to December 2018)
Site C Progress Report No. 15 Letter dated July 11, 2019 – British Columbia Hydro and Power Authority (BC Hydro) PUBLIC Site C Clean Energy Project – Progress Report No. 15 F2019 Q4(January to March 2019)
Site C Progress Report No. 16 Letter dated October 4, 2019 – British Columbia Hydro and Power Authority (BC Hydro) PUBLIC Site C Clean Energy Project – Progress Report No. 16 (April to June 2019)
Site C Progress Report No. 17 Letter dated January 15, 2020 – British Columbia Hydro and Power Authority (BC Hydro) PUBLIC Site C Clean Energy Project – Progress Report No. 17 (July to September 2019)
Site C COVID-19 Report No. 1 Letter dated April 21, 2020 – British Columbia Hydro and Power Authority (BC Hydro) Impact and Risk Mitigation Bi-Weekly Report No. 1
Site C COVID-19 Report No. 2 Letter dated May 6, 2020 – British Columbia Hydro and Power Authority (BC Hydro) Impact and Risk Mitigation Bi-Weekly Report No. 2
Site C COVID-19 Report No. 3 Letter dated May 19, 2020 – British Columbia Hydro and Power Authority (BC Hydro) Impact and Risk Mitigation Bi-Weekly Report No. 3
Site C COVID-19 Report No. 4 Letter dated June 3, 2020 – British Columbia Hydro and Power Authority (BC Hydro) Impact and Risk Mitigation Bi-Weekly Report No. 4
Site C Progress Report No. 17 - Errata Letter dated June 5, 2020 – British Columbia Hydro and Power Authority (BC Hydro) PUBLIC Site C Clean Energy Project – Progress Report No. 17 (July to September 2019) - Errata
Site C Progress Report No. 17 - Errata No. 1 Letter dated June 5, 2020 – British Columbia Hydro and Power Authority (BC Hydro) PUBLIC Site C Clean Energy Project – Progress Report No. 17 (July to September 2019) Errata No. 1
Site C COVID-19 Report No. 5 Letter dated June 16, 2020 – British Columbia Hydro and Power Authority (BC Hydro) Impact and Risk Mitigation Bi-Weekly Report No. 5
Site C COVID-19 Report No. 6 Letter dated June 29, 2020 – British Columbia Hydro and Power Authority (BC Hydro) Impact and Risk Mitigation Bi-Weekly Report No. 6
Site C COVID-19 Report No. 7 Letter dated July 14, 2020 – British Columbia Hydro and Power Authority (BC Hydro) Impact and Risk Mitigation Bi-Weekly Report No. 7
Site C COVID-19 Report No. 8 Letter dated July 28, 2020 – British Columbia Hydro and Power Authority (BC Hydro) Impact and Risk Mitigation Bi-Weekly Report No. 8
Site C Progress Report No. 19 Letter dated July 31, 2020 – British Columbia Hydro and Power Authority (BC Hydro) PUBLIC Site C Clean Energy Project – Progress Report No. 19 (January to March 2020)
Site C Progress Report No. 18 and Annual Progress Report No. 4 Letter dated July 31, 2019– British Columbia Hydro and Power Authority (BC Hydro) PUBLIC Site C Clean Energy Project – Annual Progress Report No. 4 (Combined with Progress Report No. 18)(January to December 2019)
Site C COVID-19 Report No. 9 Letter dated August 11, 2020 – British Columbia Hydro and Power Authority (BC Hydro) Impact and Risk Mitigation Bi-Weekly Report No. 9
Site C COVID-19 Report No. 10 Letter dated August 25, 2020 – BC Hydro submitting Impact and Risk Mitigation Bi-Weekly Report No. 10
Site C COVID-19 Report No. 11 Letter dated September 9, 2020 - BC Hydro Submitting Impact and Risk Mitigation Bi-Weekly Report No. 11
Site C COVID-19 Report No. 12 Letter dated September 22, 2020 - BC Hydro Submitting Impact and Risk Mitigation Bi-Weekly Report No. 12
Site C COVID-19 Report No. 13 Letter dated October 6, 2020 - BC Hydro Submitting Impact and Risk Mitigation Bi-Weekly Report No. 13
Site C COVID-19 Report No. 14 Letter dated October 20, 2020 - BC Hydro Submitting Impact and Risk Mitigation Bi-Weekly Report No. 14
Site C COVID-19 Report No. 15 Letter dated November 5, 2020 - BC Hydro Submitting Impact and Risk Mitigation Bi-Weekly Report No. 15
Site C COVID-19 Report No. 16 Letter dated November 20, 2020 - BC Hydro Submitting Impact and Risk Mitigation Bi-Weekly Report No. 16
Site C COVID-19 Report No. 17 Letter dated December 1, 2020 – British Columbia Hydro and Power Authority (BC Hydro) Impact and Risk Mitigation Bi-Weekly Report No. 17
Site C COVID-19 Report No. 18 Letter dated December 15, 2020 – British Columbia Hydro and Power Authority (BC Hydro) Impact and Risk Mitigation Bi-Weekly Report No. 18
Site C COVID-19 Report No. 19 Letter dated January 4, 2021 – British Columbia Hydro and Power Authority (BC Hydro) Impact and Risk Mitigation Bi-Weekly Report No. 19
Site C COVID-19 Report No. 20 Letter dated January 13, 2021 – British Columbia Hydro and Power Authority (BC Hydro) Impact and Risk Mitigation Bi-Weekly Report No. 20
Site C COVID-19 Report No. 21 Letter dated January 26, 2021 – British Columbia Hydro and Power Authority (BC Hydro) Impact and Risk Mitigation Bi-Weekly Report No. 21
Site C COVID-19 Report No. 22 Letter dated February 9, 2021 – British Columbia Hydro and Power Authority (BC Hydro) Impact and Risk Mitigation Bi-Weekly Report No. 22
Site C COVID-19 Report No. 23 Letter dated February 23, 2021 – British Columbia Hydro and Power Authority (BC Hydro) Impact and Risk Mitigation Bi-Weekly Report No. 23
Site C COVID-19 Report No. 24 Letter dated March 9, 2021 – British Columbia Hydro and Power Authority (BC Hydro) Impact and Risk Mitigation Bi-Weekly Report No. 24
Site C Progress Report No. 20 and Annual Report No. 5 Letter dated March 18, 2021– British Columbia Hydro and Power Authority (BC Hydro) PUBLIC Site C Clean Energy Project – Annual Progress Report No. 5(Combined with Progress Report No. 20 (January to December 2020)
Site C Annual Progress Report No. 4 Progress Report No. 19 - BC Hydro Response to BCUC Staff Information Request No. 1 Letter dated March March 18, 2021 - BC Hydro PUBLIC Site C Clean Energy Project – Annual Progress Report No. 4 (Combined with Progress Report No. 19) - BC Hydro Responses to BCUC Staff Information Request No. 1
Site C COVID-19 Report No. 25 Letter dated March 23, 2021 – British Columbia Hydro and Power Authority (BC Hydro) Impact and Risk Mitigation Bi-Weekly Report No. 25
Site C COVID-19 Report No. 26 Letter dated April 6, 2021 – British Columbia Hydro and Power Authority (BC Hydro) Impact and Risk Mitigation Bi-Weekly Report No. 26
Site C COVID-19 Report No. 27 Letter dated April 20, 2021 – British Columbia Hydro and Power Authority (BC Hydro) Impact and Risk Mitigation Bi-Weekly Report No. 27
Site C COVID-19 Report No. 28 Letter dated May 4, 2021 – British Columbia Hydro and Power Authority (BC Hydro) Impact and Risk Mitigation Bi-Weekly Report No. 28
Site C COVID-19 Report No. 29 Letter dated May 18, 2021 – British Columbia Hydro and Power Authority (BC Hydro) Impact and Risk Mitigation Bi-Weekly Report No. 29
Site C COVID-19 Report No. 30 Letter dated June 2, 2021 – British Columbia Hydro and Power Authority (BC Hydro) Impact and Risk Mitigation Bi-Weekly Report No. 30
Site C COVID-19 Report No. 31 Letter dated June 15, 2021 – British Columbia Hydro and Power Authority (BC Hydro) Impact and Risk Mitigation Bi-Weekly Report No. 31
Site C Progress Report No. 21 Letter dated June 29, 2021 – British Columbia Hydro and Power Authority (BC Hydro) PUBLIC Site C Clean Energy Project – Progress Report No. 21 (January 1 to March 31 2021)
Site C COVID-19 Report No. 32 Letter dated June 29, 2021 – British Columbia Hydro and Power Authority (BC Hydro) Impact and Risk Mitigation Bi-Weekly Report No. 32
Site C COVID-19 Report No. 33 Letter dated July 13, 2021 – British Columbia Hydro and Power Authority (BC Hydro) Impact and Risk Mitigation Bi-Weekly Report No. 33
Site C Progress Report No. 22 Letter dated September 29, 2021 – British Columbia Hydro and Power Authority (BC Hydro) PUBLIC Site C Clean Energy Project – Progress Report No. 22 (April 1 to June 2021)
Site C Progress Report No. 21 and 22 and Annual Progress Report No. 5 Letter dated November 24, 2021 - BC Hydro Site C Clean Energy Project – Annual Progress Report No. 5 (Combined with Quarterly Progress Report Nos. 21 and 22) - BC Hydro Extension Request to file Responses to BCUC Staff Information Request No. 1
Site C Progress Report No. 23 Letter dated December 16, 2021 – British Columbia Hydro and Power Authority (BC Hydro) PUBLIC Site C Clean Energy Project – Progress Report No. 23 (July 1 to September 30, 2021)
Site C Annual Progress Report No. 5 Progress Report Nos. 21 and 22 - BC Hydro Response to BCUC Staff Information Request No. 1 Letter dated January17, 2022 - BC Hydro PUBLIC Site C Clean Energy Project – Annual Progress Report No. 5 (Combined with Progress Report Nos. 21 and 22) - BC Hydro Responses to BCUC Staff Information Request No. 1
Site C Progress Report No. 24 and Annual Progress Report No. 6 Letter dated March 31, 2022– British Columbia Hydro and Power Authority (BC Hydro) PUBLIC Site C Clean Energy Project – Annual Progress Report No. 6 (Combined with Quarterly Progress Report No. 24) January 2021 to December 2021
Site C Progress Report No. 25 Letter dated June 23, 2022– British Columbia Hydro and Power Authority (BC Hydro) PUBLIC Site C Clean Energy Project – Progress Report No. 25 January 1, 2022 to March 31, 2022
Site C Progress Report No. 26 Letter dated September 22, 2022 – British Columbia Hydro and Power Authority (BC Hydro) PUBLIC Site C Clean Energy Project – Progress Report No. 26 (April 1, 2022 to June 30, 2022)
Site C Progress Report No. 27 Letter dated December 20, 2022 – British Columbia Hydro and Power Authority (BC Hydro) PUBLIC Site C Clean Energy Project – Progress Report No. 27 (July 1, 2022 to September 30, 2022)
BCH Quarterly Progress Report No. 27 - Extension Request Letter dated March 21, 2023 – British Columbia Hydro and Power Authority (BC Hydro) Progress Report No. 27 Extension Request to BCUC Staff Questions No. 1
Site C Progress Report No. 28 and Annual Progress Report No. 7 Letter dated March 30, 2023– British Columbia Hydro and Power Authority (BC Hydro) PUBLIC Site C Clean Energy Project – Annual Progress Report No. 7 (Combined with Progress Report No. 28)(January to December 2022)
Site C Progress Report No. 27 - BC Hydro Response to Staff Information Request No. 1 Letter dated April 28, 2023 - BC Hydro Response to Staff Information Request No. 1 regarding Site C Progress Report No. 27
Site C Progress Report No. 29 Letter dated June 22, 2023 – British Columbia Hydro and Power Authority (BC Hydro) PUBLIC Site C Clean Energy Project – Progress Report No. 29 (January 1, 2023 to March 31, 2023)
Site C Annual Progress Report No. 7 Quarterly Reports No. 28 and 29 - BC Hydro Response to BCUC Staff Information Request No. 1 Extension Request Letter dated August 17, 2023 - Site C Clean Energy Project – Annual Progress Report No. 7 Quarterly Reports No. 28 and 29 - BC Hydro Response to BCUC Staff Information Request No. 1 Extension Request
Site C Progress Report No. 30 Letter dated September 28, 2023 – British Columbia Hydro and Power Authority (BC Hydro) PUBLIC Site C Clean Energy Project – Progress Report No. 30 (April 1, 2023 to June 30, 2023)
Site C Annual Progress Report No. 7 Quarterly Reports No. 28 and 29 - BC Hydro Response to BCUC Staff Information Request No. 1 Letter dated September 26, 2023 - BC Hydro PUBLIC Site C Clean Energy Project – Annual Progress Report No. 7 (Combined with Quarterly Reports No. 28 and 29) - BC Hydro Responses to BCUC Staff Information Request No. 1
Site C Progress Report No. 31 Letter dated December 22, 2023 – British Columbia Hydro and Power Authority (BC Hydro) PUBLIC Site C Clean Energy Project – Progress Report No. 31 (July 1, 2023 to September 30, 2023)
Site C Progress Report No. 32 Letter dated March 21, 2024 – British Columbia Hydro and Power Authority (BC Hydro) PUBLIC Site C Clean Energy Project – Progress Report No. 32 (October 1, 2023 to December 31, 2023)
Site C Annual and Quarterly Progress Reports Update Letter dated March 25, 2024 – British Columbia Hydro and Power Authority (BC Hydro) PUBLIC Site C Clean Energy Project – Annual and Quarterly Progress Reports will be consolidated going forward
Site C Progress Report No. 32 - Errata No. 1 Letter dated June 20, 2024 – British Columbia Hydro and Power Authority (BC Hydro) PUBLIC Site C Clean Energy Project – Progress Report No. 32 (October 1, 2023 to December 31, 2023) - Errata No. 1
Site C Progress Report No. 33 Letter dated June 20, 2024 – British Columbia Hydro and Power Authority (BC Hydro) PUBLIC Site C Clean Energy Project – Progress Report No. 33 (January 1, 2024 to March 31, 2024)
Site C Progress Report No. 34 Letter dated September 19, 2024 – British Columbia Hydro and Power Authority (BC Hydro) PUBLIC Site C Clean Energy Project – Progress Report No. 34 (April 1, 2024 to June 30, 2024)

Exhibits

A Exhibits - BCUC Documents

Date Title Document Description
April 02, 2019 A-1 Letter dated April 2, 2019 - BCUC Staff Questions No. 1 concerning Site C Clean Energy Project Public Quarterly Progress Report No. 14 - October to December 2018
June 10, 2020 A-2 Letter dated June 10, 2020 – BCUC request to BC Hydro regarding the filing of the Site C Clean Energy Project Quarterly Progress Report No. 18
July 21, 2020 A-3 Letter dated July 21, 2020 – BCUC request to file the Site C Clean Energy Project Quarterly Progress Report No. 18
October 23, 2020 A-4 Letter dated October 23, 2020 – BCUC staff questions on Site C Annual Progress Report No. 4 and Quarterly Progress Report No. 19
October 23, 2020 A-4-1 CONFIDENTIAL - Letter dated October 23, 2020 – BCUC staff confidential questions on Site C Annual Progress Report No. 4 and Quarterly Progress Report No. 19
February 01, 2021 A-5 Letter dated February 1, 2021 – BCUC follow-up regarding BC Hydro Update on Progress Quarterly Progress Reports and Staff Information Requests
November 12, 2021 A-6 Letter dated November 12, 2021 – BCUC Staff Questions on Site C Clean Energy Project Annual Progress Report No. 5 and Quarterly Progress Reports No. 21 and No. 22
December 02, 2021 A-7 Letter dated December 2, 2021 – BCUC response to BC Hydro extension request to file responses to BCUC Staff Questions on Site C Clean Energy Project Annual Progress Report No. 5 and Quarterly Progress Reports No. 21 and No. 22
August 09, 2023 A-8 Letter dated August 9, 2023 – BCUC Staff Questions No. 1 to BC Hydro on Site C Clean Energy Project Annual Progress Report No. 7 and Quarterly Progress Reports No. 28 and No. 29
August 17, 2023 A-9 Letter dated August 17, 2023 – BCUC response to BC Hydro extension request to file responses to BCUC Staff Questions on Site C Clean Energy Project Annual Progress Report No. 7 and Quarterly Progress Reports No. 28 and No. 29

B Exhibits - Applicant Documents

Date Title Document Description
April 23, 2019 B-1 Letter dated April 23, 2019 - British Columbia Hydro and Power Authority (BC Hydro) Site C Public Quarterly Progress Report No. 14 January 2018 to December 2018 (Report) Response to BCUC Staff Question No. 1
June 17, 2020 B-2 Letter dated June 17, 2020 – BC Hydro submitting response to the BCUC regarding the filing of the Quarterly Progress Report No. 18
July 23, 2020 B-3 Letter dated July 23, 2020 – BC Hydro submitting response to BCUC regarding anticipated timing for filing of the Quarterly Progress Report No. 18
November 09, 2020 B-4 Letter dated November 9, 2020 – BC Hydro submitting extension request for the Quarterly Progress Report No. 19, Annual Progress Report No. 4 and BCUC Information Request
February 08, 2021 B-5 Letter dated February 8, 2021 - BC Hydro Update on Quarterly Progress Report and BCUC Staff Information Requests

Receive Web Notifications

Subscribe to a proceeding to receive email notifications when public documents are added to this proceeding.

Subscribe here