Proceedings Filing Deadlines

Page 1 of 1
Due DateUtilities & ProceedingRegulatory ItemOrder/Letter
2020/01/17 BC Hydro F2020-F2021 Revenue Requirements
British Columbia Hydro and Power Authority F2020 to F2021 Revenue Requirements Application ~ Project No. 1598990

Panel: D. Morton (Chair), A. Fung, B. Lockhart and R. Mason

Hearing Location:
Date & Time: @
Location: , ,

BC Hydro Rebuttal Evidence (if any) on AMPC responses to IRs that require input from AMPC’s expertG-312-19
2020/01/17 BC Hydro F2020-F2021 Revenue Requirements
British Columbia Hydro and Power Authority F2020 to F2021 Revenue Requirements Application ~ Project No. 1598990

Panel: D. Morton (Chair), A. Fung, B. Lockhart and R. Mason

Hearing Location:
Date & Time: @
Location: , ,

BC Hydro response to Panel Information Request No. 2Exhibit A-25
2020/01/17 BCUC Indigenous Utilities Regulation Inquiry
British Columbia Utilities Commission Indigenous Utilities Regulation Inquiry ~ Project No. 1598998

Panel: D. Morton (Chair), A. Fung, C. Brewer and B. Lockhart

Hearing Location:
Date & Time: @
Location: , ,

Workshop - Fort St John, Pomeroy Hotel & Conference CentreG-282-19
2020/01/17 PNG and PNGNE Consolidated Resource Plan and ECI Portfolio
Pacific Northern Gas Ltd. and Pacific Northern Gas (N.E.) Ltd. Application for Acceptance of 2019 Consolidated Resource Plan and for Acceptance of Energy Conservation and Innovation (ECI) Portfolio Funding for 2020 to 2022

Panel: A. Fung, Chair C. Brewer, Commissioner R. Mason, Commissioner

Hearing Location:
Date & Time: @
Location: , ,

Intervener RegistrationG-322-19
2020/01/17 FEI Operating Agreement between the City of Vernon and FEI
FortisBC Energy Inc. (FEI) Application for Approval of an Operating Agreement between the Corporation of the City of Vernon and FEI

Panel: R. Mason

Hearing Location:
Date & Time: @
Location: , ,

Intervener registration and letters of comment deadlineG-317-19
2020/01/17 FEI Operating Agreement between the City of Armstrong and FEI
FortisBC Energy Inc. (FEI) Application for Approval of an Operating Agreement between the Corporation of the City of Armstrong and FEI

Panel: R. Mason, Chair B. Magnan, Commissioners

Hearing Location:
Date & Time: @
Location: , ,

Intervener registration and letters of comment deadlineG-319-19
2020/01/20 BC Hydro F2020-F2021 Revenue Requirements
British Columbia Hydro and Power Authority F2020 to F2021 Revenue Requirements Application ~ Project No. 1598990

Panel: D. Morton (Chair), A. Fung, B. Lockhart and R. Mason

Hearing Location:
Date & Time: @
Location: , ,

Oral Hearing - CommencingG-312-19
2020/01/20 Boralex Application for Rates and Terms and Conditions for Service to BC Hydro
Boralex Ocean Falls Limited Partnership Application for Rates and Terms and Conditions for Service to the British Columbia Hydro and Power Authority - July 1, 2019 to December 31, 2022

Panel: B. Magnan (Chair), W. Everett and R. Mason, Commissioners

Hearing Location:
Date & Time: @
Location: , ,

Boralex to submit supplemental informationG-3-20
2020/01/20 BCH FEI and FBC - Evacuation Relief Tariff Amendment Application
British Columbia Hydro and Power Authority, FortisBC Energy Inc. and FortisBC Inc. Evacuation Relief Tariff Amendment Applications

Panel: A. Fung (Chair), T. Loski

Hearing Location:
Date & Time: @
Location: , ,

BC Hydro and FBC to provide Public Notice in print/displayadG-256-19
2020/01/20 ACI and PSPIB Application to Acquire Reviewable Interest in PNG
AltaGas Canada Inc. (ACI) and PSPIB Cycle Investments Inc. (PSPIB) Application for Approval to Acquire a Reviewable Interest in Each of Pacific Northern Gas Ltd. and Pacific Northern Gas (N.E.) Ltd.

Panel: W. Everett, Chair M. Kresivo, Commissioner C. Brewer, Commissioner

Hearing Location:
Date & Time: @
Location: , ,

ACI to Provide Public NoticeG-345-19
2020/01/21 BC Hydro Transmission Service Market Reference-Priced Rates
British Columbia Hydro and Power Authority (BC Hydro) Transmission Service Market Reference-Priced Rates Application

Panel: T. Loski (Chair), A. Fung, B. Lockhart

Hearing Location:
Date & Time: @
Location: , ,

Intervener registrationG-327-19
2020/01/22 Creative Energy 2019–2020 RRA for the Core Steam System and NEFC Service Areas
Creative Energy Vancouver Platforms Inc. 2019–2020 Revenue Requirements Application for the Core Steam System and Northeast False Creek Service Areas

Panel: A. Fung, Chair K. Keilty, Commissioner B. Lockhart, Commissioner

Hearing Location:
Date & Time: @
Location: , ,

Creative Energy notice of ApplicationG-7-20
2020/01/23 BC Hydro Amend Net Metering Service under RS 1289
British Columbia Hydro and Power Authority Application to Amend Net Metering Service under Rate Schedule 1289 ~ Project No. 1599004

Panel: D. Cote (Chair), R. Mason and R. Revel

Hearing Location:
Date & Time: @
Location: , ,

BCUC and Intervener IRs on BC Hydro Rebuttal Evidence - With Rebuttal EvidenceG-293-19
2020/01/23 BC Hydro Transmission Service Market Reference-Priced Rates
British Columbia Hydro and Power Authority (BC Hydro) Transmission Service Market Reference-Priced Rates Application

Panel: T. Loski (Chair), A. Fung, B. Lockhart

Hearing Location:
Date & Time: @
Location: , ,

BCUC Information Request (IR) No. 1 to BC HydroG-327-19
2020/01/23 PNG and PNGNE Consolidated Resource Plan and ECI Portfolio
Pacific Northern Gas Ltd. and Pacific Northern Gas (N.E.) Ltd. Application for Acceptance of 2019 Consolidated Resource Plan and for Acceptance of Energy Conservation and Innovation (ECI) Portfolio Funding for 2020 to 2022

Panel: A. Fung, Chair C. Brewer, Commissioner R. Mason, Commissioner

Hearing Location:
Date & Time: @
Location: , ,

BCUC Information Request (IR) No. 1G-322-19
2020/01/24 BC Hydro Fleet Electrification Rate
British Columbia Hydro and Power Authority Fleet Electrification Rate Application ~ Project No. 1599032

T. Loski (Chair), A. Fung

Hearing Location:
Date & Time: @
Location: , ,

BC Hydro Written Reply ArgumentG-314-19
2020/01/24 Creative Energy TES for Cooling at the Vancouver House Development CPCN
Creative Energy Vancouver Platforms Inc. Application for a Certificate of Public Convenience and Necessity to Acquire and Operate a Thermal Energy System for Cooling at the Vancouver House Development

Panel: T. Loski (Chair), R. Mason and B. Lockhart

Hearing Location:
Date & Time: @
Location: , ,

Intervener Final ArgumentG-339-19
2020/01/29 Kinder Morgan 2019 Tariff Filing ~ ADJOURNED
Kinder Morgan Canada (Jet Fuel) Inc. 2019 Tariff Filing Application ~ Project No. 1598984

Panel: B. Magnan (Chair), T. Loski and C. Brewer

Hearing Location:
Date & Time: @
Location: , ,

KMJF responses to BCUC IR No. 3 and Intervener IR No. 2 - With Intervener EvidenceP-12-19
2020/01/29 Kinder Morgan 2019 Tariff Filing ~ ADJOURNED
Kinder Morgan Canada (Jet Fuel) Inc. 2019 Tariff Filing Application ~ Project No. 1598984

Panel: B. Magnan (Chair), T. Loski and C. Brewer

Hearing Location:
Date & Time: @
Location: , ,

KMJF responses to BCUC IR No. 3 and Intervener IR No. 2 - Without Intervener EvidenceP-12-19
2020/01/29 BCH FEI and FBC - Evacuation Relief Tariff Amendment Application
British Columbia Hydro and Power Authority, FortisBC Energy Inc. and FortisBC Inc. Evacuation Relief Tariff Amendment Applications

Panel: A. Fung (Chair), T. Loski

Hearing Location:
Date & Time: @
Location: , ,

BCUC Information Request (IR) No. 1 to BC Hydro and FBCG-256-19
2020/01/29 BCH FEI and FBC - Evacuation Relief Tariff Amendment Application
British Columbia Hydro and Power Authority, FortisBC Energy Inc. and FortisBC Inc. Evacuation Relief Tariff Amendment Applications

Panel: A. Fung (Chair), T. Loski

Hearing Location:
Date & Time: @
Location: , ,

Intervener RegistrationG-256-19
2020/01/29 SSL Stream A Registration - Westhills
Sustainable Services Ltd. (SSL) - Stream A Registration for the Westhills Thermal Energy System

Panel: D. Morton, Chair B. Magnan, Commissioner R. Revel, Commissioner

Hearing Location:
Date & Time: @
Location: , ,

BCUC and Intervener Information Request (IR) No. 1G-318-19
2020/01/29 FEI – Complaint filed by Cascadia Energy, Direct Energy and Access Gas
FortisBC Energy Inc. Complaint filed by Cascadia Energy Ltd., Direct Energy Marketing Ltd and Access Gas Services Inc.

Panel: T. Loski B. Magnan

Hearing Location:
Date & Time: @
Location: , ,

BCGMC Reply Comments to FEI responseG-340-19
2020/01/30 BC Hydro Amend Net Metering Service under RS 1289
British Columbia Hydro and Power Authority Application to Amend Net Metering Service under Rate Schedule 1289 ~ Project No. 1599004

Panel: D. Cote (Chair), R. Mason and R. Revel

Hearing Location:
Date & Time: @
Location: , ,

Interveners Final Argument - Without Rebuttal EvidenceG-293-19
2020/01/30 CB Powerline Ltd. Exemption Application
CB Powerline Ltd. Application for an Exemption from Part 3 of the Utilities Commission Act, pursuant to section 88(3) ~ Project No. 1599020

Panel: T. Loski, Chair, W. Everett, Commissioner and C. Brewer, Commissioner

Hearing Location:
Date & Time: @
Location: , ,

CBP Written Final ArgumentG-315-19
2020/01/30 BC Hydro Transmission Service Market Reference-Priced Rates
British Columbia Hydro and Power Authority (BC Hydro) Transmission Service Market Reference-Priced Rates Application

Panel: T. Loski (Chair), A. Fung, B. Lockhart

Hearing Location:
Date & Time: @
Location: , ,

Intervener IR No. 1 to BC HydroG-327-19
2020/01/31 Creative Energy TES for Cooling at the Vancouver House Development CPCN
Creative Energy Vancouver Platforms Inc. Application for a Certificate of Public Convenience and Necessity to Acquire and Operate a Thermal Energy System for Cooling at the Vancouver House Development

Panel: T. Loski (Chair), R. Mason and B. Lockhart

Hearing Location:
Date & Time: @
Location: , ,

Creative Energy Reply ArgumentG-339-19
2020/01/31 FEI Biomethane Purchase Agreements between FEI and Tidal Energy
FortisBC Energy Inc. Application for Acceptance of Biomethane Purchase Agreements between FortisBC Energy Inc. and Tidal Energy Marketing Inc.

Panel: R. Mason (Chair), Commissioners R. Revel and W. Everett

Hearing Location:
Date & Time: @
Location: , ,

FEI response to Panel Information Request No. 1Exhibit A-6
2020/01/31 BCUC Review of Thermal Energy Systems Regulatory Framework Guidelines
British Columbia Utilities Commission Review of Thermal Energy Systems Regulatory Framework Guidelines ~ Project No. 1599043

Panel: R. Mason, Chair, W. Everett and T. Loski, Commissoners

Hearing Location:
Date & Time: @
Location: , ,

Intervener registrationG-341-19
2020/01/31 PNG West 2020-2021 Revenue Requirements
Pacific Northern Gas Ltd. (West Division) - 2020-2021 Revenue Requirements Application

Panel: A. Fung, Chair C. Brewer, Commissioner M. Kresivo, Commissioner

Hearing Location:
Date & Time: @
Location: , ,

Intervener RegistrationG-330-19A
2020/01/31 PNG NE 2020-2021 Revenue Requirements
Pacific Northern Gas Ltd. (N.E.) - 2020-2021 Revenue Requirements Application

Panel: A. Fung, Chair C. Brewer, Commissioner M. Kresivo, Commissioner

Hearing Location:
Date & Time: @
Location: , ,

Intervener registrationG-331-19
2020/01/31 FEI Operating Agreement between City of Trail and FEI
FortisBC Energy Inc. Application for Approval of an Operating Agreement between the Corporation of the City of Trail and FortisBC Energy Inc.

Panel: R. Mason, Chair B. Magnan, Commissioner

Hearing Location:
Date & Time: @
Location: , ,

FEI notice to the City of Trail customersG-4-20
2020/02/03 Boralex Application for Rates and Terms and Conditions for Service to BC Hydro
Boralex Ocean Falls Limited Partnership Application for Rates and Terms and Conditions for Service to the British Columbia Hydro and Power Authority - July 1, 2019 to December 31, 2022

Panel: B. Magnan (Chair), W. Everett and R. Mason, Commissioners

Hearing Location:
Date & Time: @
Location: , ,

BCUC and Intervener Information Request No.1 to BoralexG-3-20
2020/02/03 ACI and PSPIB Application to Acquire Reviewable Interest in PNG
AltaGas Canada Inc. (ACI) and PSPIB Cycle Investments Inc. (PSPIB) Application for Approval to Acquire a Reviewable Interest in Each of Pacific Northern Gas Ltd. and Pacific Northern Gas (N.E.) Ltd.

Panel: W. Everett, Chair M. Kresivo, Commissioner C. Brewer, Commissioner

Hearing Location:
Date & Time: @
Location: , ,

Intervener RegistrationG-345-19
2020/02/03 ACI and PSPIB Application to Acquire Reviewable Interest in PNG
AltaGas Canada Inc. (ACI) and PSPIB Cycle Investments Inc. (PSPIB) Application for Approval to Acquire a Reviewable Interest in Each of Pacific Northern Gas Ltd. and Pacific Northern Gas (N.E.) Ltd.

Panel: W. Everett, Chair M. Kresivo, Commissioner C. Brewer, Commissioner

Hearing Location:
Date & Time: @
Location: , ,

BCUC Information Request (IR) No. 1 to ACI and PSPIB and related entitiesG-345-19
2020/02/05 BCH FEI and FBC - Evacuation Relief Tariff Amendment Application
British Columbia Hydro and Power Authority, FortisBC Energy Inc. and FortisBC Inc. Evacuation Relief Tariff Amendment Applications

Panel: A. Fung (Chair), T. Loski

Hearing Location:
Date & Time: @
Location: , ,

Intervener IR No. 1 to BC Hydro and FBCG-256-19
2020/02/05 FEI – Complaint filed by Cascadia Energy, Direct Energy and Access Gas
FortisBC Energy Inc. Complaint filed by Cascadia Energy Ltd., Direct Energy Marketing Ltd and Access Gas Services Inc.

Panel: T. Loski B. Magnan

Hearing Location:
Date & Time: @
Location: , ,

FEI Sur-Reply Comments (if required)G-340-19
2020/02/06 CB Powerline Ltd. Exemption Application
CB Powerline Ltd. Application for an Exemption from Part 3 of the Utilities Commission Act, pursuant to section 88(3) ~ Project No. 1599020

Panel: T. Loski, Chair, W. Everett, Commissioner and C. Brewer, Commissioner

Hearing Location:
Date & Time: @
Location: , ,

Intervener Written Final ArgumentG-315-19
2020/02/06 PNG and PNGNE Consolidated Resource Plan and ECI Portfolio
Pacific Northern Gas Ltd. and Pacific Northern Gas (N.E.) Ltd. Application for Acceptance of 2019 Consolidated Resource Plan and for Acceptance of Energy Conservation and Innovation (ECI) Portfolio Funding for 2020 to 2022

Panel: A. Fung, Chair C. Brewer, Commissioner R. Mason, Commissioner

Hearing Location:
Date & Time: @
Location: , ,

Intervener IR No. 1G-322-19
2020/02/07 FortisBC Multi-Year Rate Plan Application for 2020 to 2024
FortisBC Energy Inc. and FortisBC Inc. (collectively FortisBC) Multi-Year Rate Plan Application for 2020 to 2024 ~ Project No. 1598996

Panel: D. Cote (Chair), K. Keilty, B. Lockhart and A. Fung

Hearing Location:
Date & Time: @
Location: , ,

Intervener Final ArgumentG-272-19
2020/02/07 ACI and PSPIB Application to Acquire Reviewable Interest in PNG
AltaGas Canada Inc. (ACI) and PSPIB Cycle Investments Inc. (PSPIB) Application for Approval to Acquire a Reviewable Interest in Each of Pacific Northern Gas Ltd. and Pacific Northern Gas (N.E.) Ltd.

Panel: W. Everett, Chair M. Kresivo, Commissioner C. Brewer, Commissioner

Hearing Location:
Date & Time: @
Location: , ,

Intervener IR No. 1 to ACI and PSPIB and related entitiesG-345-19
2020/02/12 SSL Stream A Registration - Westhills
Sustainable Services Ltd. (SSL) - Stream A Registration for the Westhills Thermal Energy System

Panel: D. Morton, Chair B. Magnan, Commissioner R. Revel, Commissioner

Hearing Location:
Date & Time: @
Location: , ,

SSL responses to BCUC and Intervener IR No. 1G-318-19
2020/02/12 Creative Energy 2019–2020 RRA for the Core Steam System and NEFC Service Areas
Creative Energy Vancouver Platforms Inc. 2019–2020 Revenue Requirements Application for the Core Steam System and Northeast False Creek Service Areas

Panel: A. Fung, Chair K. Keilty, Commissioner B. Lockhart, Commissioner

Hearing Location:
Date & Time: @
Location: , ,

Intervener RegistrationG-7-20
2020/02/13 BC Hydro Amend Net Metering Service under RS 1289
British Columbia Hydro and Power Authority Application to Amend Net Metering Service under Rate Schedule 1289 ~ Project No. 1599004

Panel: D. Cote (Chair), R. Mason and R. Revel

Hearing Location:
Date & Time: @
Location: , ,

BC Hydro response to BCUC and Intervener IRs on BC Hydro Rebuttal Evidence - With Rebuttal EvidenceG-293-19
2020/02/13 BC Hydro Amend Net Metering Service under RS 1289
British Columbia Hydro and Power Authority Application to Amend Net Metering Service under Rate Schedule 1289 ~ Project No. 1599004

Panel: D. Cote (Chair), R. Mason and R. Revel

Hearing Location:
Date & Time: @
Location: , ,

BC Hydro Reply Argument - Without Rebuttal EvidenceG-293-19
2020/02/13 CB Powerline Ltd. Exemption Application
CB Powerline Ltd. Application for an Exemption from Part 3 of the Utilities Commission Act, pursuant to section 88(3) ~ Project No. 1599020

Panel: T. Loski, Chair, W. Everett, Commissioner and C. Brewer, Commissioner

Hearing Location:
Date & Time: @
Location: , ,

CBP Reply ArgumentG-315-19
2020/02/14 Kinder Morgan 2019 Tariff Filing ~ ADJOURNED
Kinder Morgan Canada (Jet Fuel) Inc. 2019 Tariff Filing Application ~ Project No. 1598984

Panel: B. Magnan (Chair), T. Loski and C. Brewer

Hearing Location:
Date & Time: @
Location: , ,

Intervener Evidence (if any) - With Intervener EvidenceP-12-19
2020/02/14 BCUC Review of Thermal Energy Systems Regulatory Framework Guidelines
British Columbia Utilities Commission Review of Thermal Energy Systems Regulatory Framework Guidelines ~ Project No. 1599043

Panel: R. Mason, Chair, W. Everett and T. Loski, Commissoners

Hearing Location:
Date & Time: @
Location: , ,

Intervener written submissions on the draft Terms of ReferenceG-341-19
2020/02/14 BCUC Review of Thermal Energy Systems Regulatory Framework Guidelines
British Columbia Utilities Commission Review of Thermal Energy Systems Regulatory Framework Guidelines ~ Project No. 1599043

Panel: R. Mason, Chair, W. Everett and T. Loski, Commissoners

Hearing Location:
Date & Time: @
Location: , ,

Letters of comment on the draft Terms of ReferenceG-341-19
2020/02/14 FEI Operating Agreement between City of Trail and FEI
FortisBC Energy Inc. Application for Approval of an Operating Agreement between the Corporation of the City of Trail and FortisBC Energy Inc.

Panel: R. Mason, Chair B. Magnan, Commissioner

Hearing Location:
Date & Time: @
Location: , ,

Intervener registration deadlineG-4-20
2020/02/14 FEI Operating Agreement between City of Trail and FEI
FortisBC Energy Inc. Application for Approval of an Operating Agreement between the Corporation of the City of Trail and FortisBC Energy Inc.

Panel: R. Mason, Chair B. Magnan, Commissioner

Hearing Location:
Date & Time: @
Location: , ,

Letters of comment deadlineG-4-20
2020/02/19 BCH FEI and FBC - Evacuation Relief Tariff Amendment Application
British Columbia Hydro and Power Authority, FortisBC Energy Inc. and FortisBC Inc. Evacuation Relief Tariff Amendment Applications

Panel: A. Fung (Chair), T. Loski

Hearing Location:
Date & Time: @
Location: , ,

BC Hydro and FBC Responses to BCUC and Intervener IR No. 1G-256-19
2020/02/20 BC Hydro Transmission Service Market Reference-Priced Rates
British Columbia Hydro and Power Authority (BC Hydro) Transmission Service Market Reference-Priced Rates Application

Panel: T. Loski (Chair), A. Fung, B. Lockhart

Hearing Location:
Date & Time: @
Location: , ,

BC Hydro responses to BCUC and Intervener IRs No. 1G-327-19
2020/02/21 Kinder Morgan 2019 Tariff Filing ~ ADJOURNED
Kinder Morgan Canada (Jet Fuel) Inc. 2019 Tariff Filing Application ~ Project No. 1598984

Panel: B. Magnan (Chair), T. Loski and C. Brewer

Hearing Location:
Date & Time: @
Location: , ,

KMJF Final Submissions - Without Intervener EvidenceP-12-19
2020/02/21 ACI and PSPIB Application to Acquire Reviewable Interest in PNG
AltaGas Canada Inc. (ACI) and PSPIB Cycle Investments Inc. (PSPIB) Application for Approval to Acquire a Reviewable Interest in Each of Pacific Northern Gas Ltd. and Pacific Northern Gas (N.E.) Ltd.

Panel: W. Everett, Chair M. Kresivo, Commissioner C. Brewer, Commissioner

Hearing Location:
Date & Time: @
Location: , ,

ACI and PSPIB Reponses to BCUC IR No. 1 and Intervener IR No. 1G-345-19
2020/02/21 Creative Energy 2019–2020 RRA for the Core Steam System and NEFC Service Areas
Creative Energy Vancouver Platforms Inc. 2019–2020 Revenue Requirements Application for the Core Steam System and Northeast False Creek Service Areas

Panel: A. Fung, Chair K. Keilty, Commissioner B. Lockhart, Commissioner

Hearing Location:
Date & Time: @
Location: , ,

Creative Energy filing of Evidentiary UpdateG-7-20
2020/02/24 Boralex Application for Rates and Terms and Conditions for Service to BC Hydro
Boralex Ocean Falls Limited Partnership Application for Rates and Terms and Conditions for Service to the British Columbia Hydro and Power Authority - July 1, 2019 to December 31, 2022

Panel: B. Magnan (Chair), W. Everett and R. Mason, Commissioners

Hearing Location:
Date & Time: @
Location: , ,

Boralex responses to BCUC and Intervener IR No. 1G-3-20
2020/02/25 PNG and PNGNE Consolidated Resource Plan and ECI Portfolio
Pacific Northern Gas Ltd. and Pacific Northern Gas (N.E.) Ltd. Application for Acceptance of 2019 Consolidated Resource Plan and for Acceptance of Energy Conservation and Innovation (ECI) Portfolio Funding for 2020 to 2022

Panel: A. Fung, Chair C. Brewer, Commissioner R. Mason, Commissioner

Hearing Location:
Date & Time: @
Location: , ,

PNG Response to BCUC and Intervener IR No. 1G-322-19
2020/02/27 BC Hydro Amend Net Metering Service under RS 1289
British Columbia Hydro and Power Authority Application to Amend Net Metering Service under Rate Schedule 1289 ~ Project No. 1599004

Panel: D. Cote (Chair), R. Mason and R. Revel

Hearing Location:
Date & Time: @
Location: , ,

BC Hydro Final Argument - With Rebuttal EvidenceG-293-19
2020/02/28 Kinder Morgan 2019 Tariff Filing ~ ADJOURNED
Kinder Morgan Canada (Jet Fuel) Inc. 2019 Tariff Filing Application ~ Project No. 1598984

Panel: B. Magnan (Chair), T. Loski and C. Brewer

Hearing Location:
Date & Time: @
Location: , ,

Intervener Final Submissions - Without Intervener EvidenceP-12-19
2020/02/28 Kinder Morgan 2019 Tariff Filing ~ ADJOURNED
Kinder Morgan Canada (Jet Fuel) Inc. 2019 Tariff Filing Application ~ Project No. 1598984

Panel: B. Magnan (Chair), T. Loski and C. Brewer

Hearing Location:
Date & Time: @
Location: , ,

IRs on Intervener Evidence - With Intervener EvidenceP-12-19
2020/02/28 FortisBC Multi-Year Rate Plan Application for 2020 to 2024
FortisBC Energy Inc. and FortisBC Inc. (collectively FortisBC) Multi-Year Rate Plan Application for 2020 to 2024 ~ Project No. 1598996

Panel: D. Cote (Chair), K. Keilty, B. Lockhart and A. Fung

Hearing Location:
Date & Time: @
Location: , ,

FortisBC Reply ArgumentG-272-19
2020/02/28 BCUC Review of BC Hydro’s PBR Report
British Columbia Utilities Commission Review of British Columbia Hydro and Power Authority’s Performance Based Regulation Report

Panel: D. Morton, Chair A. Fung, B. Lockhart and R. Mason, Commissioners

Hearing Location:
Date & Time: @
Location: , ,

BCUC Staff Consultant ReportG-326-19
2020/02/28 PNG West 2020-2021 Revenue Requirements
Pacific Northern Gas Ltd. (West Division) - 2020-2021 Revenue Requirements Application

Panel: A. Fung, Chair C. Brewer, Commissioner M. Kresivo, Commissioner

Hearing Location:
Date & Time: @
Location: , ,

PNG to file Amended ApplicationG-330-19A
2020/02/28 PNG NE 2020-2021 Revenue Requirements
Pacific Northern Gas Ltd. (N.E.) - 2020-2021 Revenue Requirements Application

Panel: A. Fung, Chair C. Brewer, Commissioner M. Kresivo, Commissioner

Hearing Location:
Date & Time: @
Location: , ,

PNG(NE) to file Amended ApplicationG-331-19
2020/03/02 BCUC Indigenous Utilities Regulation Inquiry
British Columbia Utilities Commission Indigenous Utilities Regulation Inquiry ~ Project No. 1598998

Panel: D. Morton (Chair), A. Fung, C. Brewer and B. Lockhart

Hearing Location:
Date & Time: @
Location: , ,

Written comments on the draft reportG-282-19
2020/03/05 PNG and PNGNE Consolidated Resource Plan and ECI Portfolio
Pacific Northern Gas Ltd. and Pacific Northern Gas (N.E.) Ltd. Application for Acceptance of 2019 Consolidated Resource Plan and for Acceptance of Energy Conservation and Innovation (ECI) Portfolio Funding for 2020 to 2022

Panel: A. Fung, Chair C. Brewer, Commissioner R. Mason, Commissioner

Hearing Location:
Date & Time: @
Location: , ,

Submissions on Further ProcessG-322-19
2020/03/05 Creative Energy 2019–2020 RRA for the Core Steam System and NEFC Service Areas
Creative Energy Vancouver Platforms Inc. 2019–2020 Revenue Requirements Application for the Core Steam System and Northeast False Creek Service Areas

Panel: A. Fung, Chair K. Keilty, Commissioner B. Lockhart, Commissioner

Hearing Location:
Date & Time: @
Location: , ,

BCUC Information Request (IR) No. 1 to Creative EnergyG-7-20
2020/03/06 Kinder Morgan 2019 Tariff Filing ~ ADJOURNED
Kinder Morgan Canada (Jet Fuel) Inc. 2019 Tariff Filing Application ~ Project No. 1598984

Panel: B. Magnan (Chair), T. Loski and C. Brewer

Hearing Location:
Date & Time: @
Location: , ,

KMJF Reply Submissions - Without Intervener EvidenceP-12-19
2020/03/06 Kinder Morgan 2019 Tariff Filing ~ ADJOURNED
Kinder Morgan Canada (Jet Fuel) Inc. 2019 Tariff Filing Application ~ Project No. 1598984

Panel: B. Magnan (Chair), T. Loski and C. Brewer

Hearing Location:
Date & Time: @
Location: , ,

Intervener Response to IR on Intervener Evidence - With Intervner EvidenceP-12-19
2020/03/11 BCUC Review of Thermal Energy Systems Regulatory Framework Guidelines
British Columbia Utilities Commission Review of Thermal Energy Systems Regulatory Framework Guidelines ~ Project No. 1599043

Panel: R. Mason, Chair, W. Everett and T. Loski, Commissoners

Hearing Location:
Date & Time: @
Location: , ,

BCUC issues final Terms of ReferenceG-341-19
2020/03/12 BC Hydro Amend Net Metering Service under RS 1289
British Columbia Hydro and Power Authority Application to Amend Net Metering Service under Rate Schedule 1289 ~ Project No. 1599004

Panel: D. Cote (Chair), R. Mason and R. Revel

Hearing Location:
Date & Time: @
Location: , ,

Interveners Final Argument - With Rebuttal EvidenceG-293-19
2020/03/12 Creative Energy 2019–2020 RRA for the Core Steam System and NEFC Service Areas
Creative Energy Vancouver Platforms Inc. 2019–2020 Revenue Requirements Application for the Core Steam System and Northeast False Creek Service Areas

Panel: A. Fung, Chair K. Keilty, Commissioner B. Lockhart, Commissioner

Hearing Location:
Date & Time: @
Location: , ,

Intervener IR No. 1 to Creative EnergyG-7-20
2020/03/17 BCUC Review of BC Hydro’s PBR Report
British Columbia Utilities Commission Review of British Columbia Hydro and Power Authority’s Performance Based Regulation Report

Panel: D. Morton, Chair A. Fung, B. Lockhart and R. Mason, Commissioners

Hearing Location:
Date & Time: @
Location: , ,

Parties submit written clarifying questions or high level topics to BCUC Staff ConsultantG-326-19
2020/03/17 BC Hydro Transmission Service Market Reference-Priced Rates
British Columbia Hydro and Power Authority (BC Hydro) Transmission Service Market Reference-Priced Rates Application

Panel: T. Loski (Chair), A. Fung, B. Lockhart

Hearing Location:
Date & Time: @
Location: , ,

Streamlined Review Process (placeholder)G-327-19
2020/03/20 Kinder Morgan 2019 Tariff Filing ~ ADJOURNED
Kinder Morgan Canada (Jet Fuel) Inc. 2019 Tariff Filing Application ~ Project No. 1598984

Panel: B. Magnan (Chair), T. Loski and C. Brewer

Hearing Location:
Date & Time: @
Location: , ,

KMJF Rebuttal Evidence - With Interenver EvidenceP-12-19
2020/03/23 PNG West 2020-2021 Revenue Requirements
Pacific Northern Gas Ltd. (West Division) - 2020-2021 Revenue Requirements Application

Panel: A. Fung, Chair C. Brewer, Commissioner M. Kresivo, Commissioner

Hearing Location:
Date & Time: @
Location: , ,

BCUC Information Request (IR) No. 1 to PNGG-330-19A
2020/03/26 BC Hydro Amend Net Metering Service under RS 1289
British Columbia Hydro and Power Authority Application to Amend Net Metering Service under Rate Schedule 1289 ~ Project No. 1599004

Panel: D. Cote (Chair), R. Mason and R. Revel

Hearing Location:
Date & Time: @
Location: , ,

BC Hydro Reply Argument - With Rebuttal EvidenceG-293-19
2020/03/30 PNG West 2020-2021 Revenue Requirements
Pacific Northern Gas Ltd. (West Division) - 2020-2021 Revenue Requirements Application

Panel: A. Fung, Chair C. Brewer, Commissioner M. Kresivo, Commissioner

Hearing Location:
Date & Time: @
Location: , ,

Intervener IR No. 1 to PNGG-330-19A
2020/03/31 BCUC Indigenous Utilities Regulation Inquiry
British Columbia Utilities Commission Indigenous Utilities Regulation Inquiry ~ Project No. 1598998

Panel: D. Morton (Chair), A. Fung, C. Brewer and B. Lockhart

Hearing Location:
Date & Time: @
Location: , ,

Written reply to comments from other participants on draft reportG-282-19
2020/03/31 BCUC Review of BC Hydro’s PBR Report
British Columbia Utilities Commission Review of British Columbia Hydro and Power Authority’s Performance Based Regulation Report

Panel: D. Morton, Chair A. Fung, B. Lockhart and R. Mason, Commissioners

Hearing Location:
Date & Time: @
Location: , ,

BCUC-Facilitated PBR WorkshopG-326-19
2020/04/01 BCUC Review of Thermal Energy Systems Regulatory Framework Guidelines
British Columbia Utilities Commission Review of Thermal Energy Systems Regulatory Framework Guidelines ~ Project No. 1599043

Panel: R. Mason, Chair, W. Everett and T. Loski, Commissoners

Hearing Location:
Date & Time: @
Location: , ,

Transcribed Workshop – Day 1* Commencing at 9:00 a.mG-341-19
2020/04/02 BCUC Review of Thermal Energy Systems Regulatory Framework Guidelines
British Columbia Utilities Commission Review of Thermal Energy Systems Regulatory Framework Guidelines ~ Project No. 1599043

Panel: R. Mason, Chair, W. Everett and T. Loski, Commissoners

Hearing Location:
Date & Time: @
Location: , ,

Transcribed Workshop – Day 2* (if required) Commencing at 9:00 a.m.G-341-19
2020/04/02 Creative Energy 2019–2020 RRA for the Core Steam System and NEFC Service Areas
Creative Energy Vancouver Platforms Inc. 2019–2020 Revenue Requirements Application for the Core Steam System and Northeast False Creek Service Areas

Panel: A. Fung, Chair K. Keilty, Commissioner B. Lockhart, Commissioner

Hearing Location:
Date & Time: @
Location: , ,

Creative Energy responses to BCUC and Intervener IR No. 1G-7-20
2020/04/03 Kinder Morgan 2019 Tariff Filing ~ ADJOURNED
Kinder Morgan Canada (Jet Fuel) Inc. 2019 Tariff Filing Application ~ Project No. 1598984

Panel: B. Magnan (Chair), T. Loski and C. Brewer

Hearing Location:
Date & Time: @
Location: , ,

IRs on Rebuttal Evidence - With Intervner EvidenceP-12-19
2020/04/06 PNG NE 2020-2021 Revenue Requirements
Pacific Northern Gas Ltd. (N.E.) - 2020-2021 Revenue Requirements Application

Panel: A. Fung, Chair C. Brewer, Commissioner M. Kresivo, Commissioner

Hearing Location:
Date & Time: @
Location: , ,

BCUC Information Request (IR) No. 1 to PNG(NE)G-331-19
2020/04/09 BCUC Review of Thermal Energy Systems Regulatory Framework Guidelines
British Columbia Utilities Commission Review of Thermal Energy Systems Regulatory Framework Guidelines ~ Project No. 1599043

Panel: R. Mason, Chair, W. Everett and T. Loski, Commissoners

Hearing Location:
Date & Time: @
Location: , ,

Intervener written submissions within scope of Terms of Reference (if desired)G-241-19
2020/04/10 Kinder Morgan 2019 Tariff Filing ~ ADJOURNED
Kinder Morgan Canada (Jet Fuel) Inc. 2019 Tariff Filing Application ~ Project No. 1598984

Panel: B. Magnan (Chair), T. Loski and C. Brewer

Hearing Location:
Date & Time: @
Location: , ,

KMJF response to IR on Rebuttal Evidence - With Intervener EvidenceP-12-19
2020/04/15 PNG West 2020-2021 Revenue Requirements
Pacific Northern Gas Ltd. (West Division) - 2020-2021 Revenue Requirements Application

Panel: A. Fung, Chair C. Brewer, Commissioner M. Kresivo, Commissioner

Hearing Location:
Date & Time: @
Location: , ,

PNG responses to BCUC and Intervener IR No. 1G-330-19A
2020/04/15 PNG NE 2020-2021 Revenue Requirements
Pacific Northern Gas Ltd. (N.E.) - 2020-2021 Revenue Requirements Application

Panel: A. Fung, Chair C. Brewer, Commissioner M. Kresivo, Commissioner

Hearing Location:
Date & Time: @
Location: , ,

Intervener IR No. 1 to PNG(NE)G-331-19
2020/04/17 Kinder Morgan 2019 Tariff Filing ~ ADJOURNED
Kinder Morgan Canada (Jet Fuel) Inc. 2019 Tariff Filing Application ~ Project No. 1598984

Panel: B. Magnan (Chair), T. Loski and C. Brewer

Hearing Location:
Date & Time: @
Location: , ,

KMJF Final Submissions - With Intervener EvidenceP-12-19
2020/04/21 Creative Energy 2019–2020 RRA for the Core Steam System and NEFC Service Areas
Creative Energy Vancouver Platforms Inc. 2019–2020 Revenue Requirements Application for the Core Steam System and Northeast False Creek Service Areas

Panel: A. Fung, Chair K. Keilty, Commissioner B. Lockhart, Commissioner

Hearing Location:
Date & Time: @
Location: , ,

BCUC IR and Intervener No. 2 to Creative EnergyG-7-20
2020/04/23 BCUC Review of Thermal Energy Systems Regulatory Framework Guidelines
British Columbia Utilities Commission Review of Thermal Energy Systems Regulatory Framework Guidelines ~ Project No. 1599043

Panel: R. Mason, Chair, W. Everett and T. Loski, Commissoners

Hearing Location:
Date & Time: @
Location: , ,

Intervener submissions on further processG-341-19
2020/04/23 BCUC Review of Thermal Energy Systems Regulatory Framework Guidelines
British Columbia Utilities Commission Review of Thermal Energy Systems Regulatory Framework Guidelines ~ Project No. 1599043

Panel: R. Mason, Chair, W. Everett and T. Loski, Commissoners

Hearing Location:
Date & Time: @
Location: , ,

Notification of intent to file Intervener evidence**G-341-19
2020/04/24 Kinder Morgan 2019 Tariff Filing ~ ADJOURNED
Kinder Morgan Canada (Jet Fuel) Inc. 2019 Tariff Filing Application ~ Project No. 1598984

Panel: B. Magnan (Chair), T. Loski and C. Brewer

Hearing Location:
Date & Time: @
Location: , ,

Intervener Final Submissions - With Intervener EvidenceP-12-19
2020/04/29 PNG NE 2020-2021 Revenue Requirements
Pacific Northern Gas Ltd. (N.E.) - 2020-2021 Revenue Requirements Application

Panel: A. Fung, Chair C. Brewer, Commissioner M. Kresivo, Commissioner

Hearing Location:
Date & Time: @
Location: , ,

PNG(NE) responses to BCUC and Intervener IR No. 1G-331-19
2020/04/30 BCUC Indigenous Utilities Regulation Inquiry
British Columbia Utilities Commission Indigenous Utilities Regulation Inquiry ~ Project No. 1598998

Panel: D. Morton (Chair), A. Fung, C. Brewer and B. Lockhart

Hearing Location:
Date & Time: @
Location: , ,

Final Report issued to minister responsible for the Hydro and Power Authority ActG-282-19
2020/05/01 Kinder Morgan 2019 Tariff Filing ~ ADJOURNED
Kinder Morgan Canada (Jet Fuel) Inc. 2019 Tariff Filing Application ~ Project No. 1598984

Panel: B. Magnan (Chair), T. Loski and C. Brewer

Hearing Location:
Date & Time: @
Location: , ,

KMJF Reply Submissions - With Intervener EvidenceP-12-19
2020/05/01 PNG West 2020-2021 Revenue Requirements
Pacific Northern Gas Ltd. (West Division) - 2020-2021 Revenue Requirements Application

Panel: A. Fung, Chair C. Brewer, Commissioner M. Kresivo, Commissioner

Hearing Location:
Date & Time: @
Location: , ,

BCUC and Intervener IR No. 2 to PNGG-330-19A
2020/05/05 Creative Energy 2019–2020 RRA for the Core Steam System and NEFC Service Areas
Creative Energy Vancouver Platforms Inc. 2019–2020 Revenue Requirements Application for the Core Steam System and Northeast False Creek Service Areas

Panel: A. Fung, Chair K. Keilty, Commissioner B. Lockhart, Commissioner

Hearing Location:
Date & Time: @
Location: , ,

Creative Energy responses to BCUC and Intervener IR No. 2G-7-20
2020/05/12 Creative Energy 2019–2020 RRA for the Core Steam System and NEFC Service Areas
Creative Energy Vancouver Platforms Inc. 2019–2020 Revenue Requirements Application for the Core Steam System and Northeast False Creek Service Areas

Panel: A. Fung, Chair K. Keilty, Commissioner B. Lockhart, Commissioner

Hearing Location:
Date & Time: @
Location: , ,

Creative Energy Final ArgumentG-7-20
2020/05/15 PNG NE 2020-2021 Revenue Requirements
Pacific Northern Gas Ltd. (N.E.) - 2020-2021 Revenue Requirements Application

Panel: A. Fung, Chair C. Brewer, Commissioner M. Kresivo, Commissioner

Hearing Location:
Date & Time: @
Location: , ,

BCUC and Intervener IR No. 2 to PNG(NE)G-331-19
2020/05/20 PNG West 2020-2021 Revenue Requirements
Pacific Northern Gas Ltd. (West Division) - 2020-2021 Revenue Requirements Application

Panel: A. Fung, Chair C. Brewer, Commissioner M. Kresivo, Commissioner

Hearing Location:
Date & Time: @
Location: , ,

PNG responses to BCUC and Intervener IR No. 2G-330-19A
2020/05/21 Creative Energy 2019–2020 RRA for the Core Steam System and NEFC Service Areas
Creative Energy Vancouver Platforms Inc. 2019–2020 Revenue Requirements Application for the Core Steam System and Northeast False Creek Service Areas

Panel: A. Fung, Chair K. Keilty, Commissioner B. Lockhart, Commissioner

Hearing Location:
Date & Time: @
Location: , ,

Intervener Final ArgumentG-7-20
2020/05/28 Creative Energy 2019–2020 RRA for the Core Steam System and NEFC Service Areas
Creative Energy Vancouver Platforms Inc. 2019–2020 Revenue Requirements Application for the Core Steam System and Northeast False Creek Service Areas

Panel: A. Fung, Chair K. Keilty, Commissioner B. Lockhart, Commissioner

Hearing Location:
Date & Time: @
Location: , ,

Creative Energy Reply ArgumentG-7-20
2020/06/03 PNG NE 2020-2021 Revenue Requirements
Pacific Northern Gas Ltd. (N.E.) - 2020-2021 Revenue Requirements Application

Panel: A. Fung, Chair C. Brewer, Commissioner M. Kresivo, Commissioner

Hearing Location:
Date & Time: @
Location: , ,

PNG(NE) responses to BCUC and Intervener IR No. 2G-331-19