Due DateUtilities & ProceedingRegulatory ItemOrder/Letter
2020/02/21 FEI Biomethane Purchase Agreements between FEI and Tidal Energy
FortisBC Energy Inc. Application for Acceptance of Biomethane Purchase Agreements between FortisBC Energy Inc. and Tidal Energy Marketing Inc.

Panel: R. Mason (Chair), Commissioners R. Revel and W. Everett

Hearing Location: BCUC Hearing Room
Date & Time: Feb 27, 2020 @ 09:00 AM
Location: 12th Floor 1125 Howe Street, Vancouver, BC

Intervener email confirmation of attendance for Oral SubmissionsExhibit A-8
2020/02/21 ACI and PSPIB Application to Acquire Reviewable Interest in PNG
AltaGas Canada Inc. (ACI) and PSPIB Cycle Investments Inc. (PSPIB) Application for Approval to Acquire a Reviewable Interest in Each of Pacific Northern Gas Ltd. and Pacific Northern Gas (N.E.) Ltd.

Panel: W. Everett, Chair M. Kresivo, Commissioner C. Brewer, Commissioner

Hearing Location:
Date & Time: @
Location: , ,

ACI and PSPIB Reponses to BCUC IR No. 1 and Intervener IR No. 1G-345-19
2020/02/21 Creative Energy 2019–2020 RRA for the Core Steam System and NEFC Service Areas
Creative Energy Vancouver Platforms Inc. 2019–2020 Revenue Requirements Application for the Core Steam System and Northeast False Creek Service Areas

Panel: A. Fung, Chair K. Keilty, Commissioner B. Lockhart, Commissioner

Hearing Location:
Date & Time: @
Location: , ,

Creative Energy filing of Evidentiary UpdateG-29-20
2020/02/24 Boralex Application for Rates and Terms and Conditions for Service to BC Hydro
Boralex Ocean Falls Limited Partnership Application for Rates and Terms and Conditions for Service to the British Columbia Hydro and Power Authority - July 1, 2019 to December 31, 2022

Panel: B. Magnan (Chair), W. Everett and R. Mason, Commissioners

Hearing Location:
Date & Time: @
Location: , ,

Boralex responses to BCUC and Intervener IR No. 1G-3-20
2020/02/24 BC Hydro TSR Customer Baseline Loads F2019-F2020 and TS 74 Amendments
British Columbia Hydro and Power Authority (BC Hydro) - Transmission Service Rate (TSR) Customer Baseline Loads (CBL) F2019 and F2020 and Amendments to Tariff Supplement No. 74 Application dated January 10, 2020

Panel: B. Magnan

Hearing Location:
Date & Time: @
Location: , ,

BC Hydro to provide notice G-28-20
2020/02/27 BC Hydro Amend Net Metering Service under RS 1289
British Columbia Hydro and Power Authority Application to Amend Net Metering Service under Rate Schedule 1289 ~ Project No. 1599004

Panel: D. Cote (Chair), R. Mason and R. Revel

Hearing Location:
Date & Time: @
Location: , ,

BC Hydro Final Argument - With Rebuttal EvidenceG-293-19
2020/02/27 FEI RS46 Permanent Rates and Revised Tariff Pages
FortisBC Energy Inc. Application for Approval for Permanent Rates and Revised Tariff Pages - Rate Schedule 46 – Liquefied Natural Gas Sales, Dispensing Liquefied Natural Gas Transportation Service, Effective January 1, 2020



Hearing Location:
Date & Time: @
Location: , ,

FEI responses to BCUC IR No. 1G-20-20
2020/02/28 BCUC Indigenous Utilities Regulation Inquiry
British Columbia Utilities Commission Indigenous Utilities Regulation Inquiry ~ Project No. 1598998

Panel: D. Morton (Chair), A. Fung, C. Brewer and B. Lockhart

Hearing Location:
Date & Time: @
Location: , ,

BC Hydro and FortisBC response to Panel IRG-26-20
2020/02/28 BCUC Review of BC Hydro’s PBR Report
British Columbia Utilities Commission Review of British Columbia Hydro and Power Authority’s Performance Based Regulation Report

Panel: D. Morton, Chair A. Fung, B. Lockhart and R. Mason, Commissioners

Hearing Location:
Date & Time: @
Location: , ,

BCUC Staff Consultant ReportG-326-19
2020/02/28 PNG West 2020-2021 Revenue Requirements
Pacific Northern Gas Ltd. (West Division) - 2020-2021 Revenue Requirements Application

Panel: A. Fung, Chair C. Brewer, Commissioner M. Kresivo, Commissioner

Hearing Location:
Date & Time: @
Location: , ,

PNG to file Amended ApplicationG-330-19A
2020/02/28 PNG NE 2020-2021 Revenue Requirements
Pacific Northern Gas Ltd. (N.E.) - 2020-2021 Revenue Requirements Application

Panel: A. Fung, Chair C. Brewer, Commissioner M. Kresivo, Commissioner

Hearing Location:
Date & Time: @
Location: , ,

PNG(NE) to file Amended ApplicationG-331-19
2020/02/28 Creative Energy 2019–2020 RRA for the Core Steam System and NEFC Service Areas
Creative Energy Vancouver Platforms Inc. 2019–2020 Revenue Requirements Application for the Core Steam System and Northeast False Creek Service Areas

Panel: A. Fung, Chair K. Keilty, Commissioner B. Lockhart, Commissioner

Hearing Location:
Date & Time: @
Location: , ,

Creative Energy filing Fuel Switch Study and LTRP Deferral Account ProposalG-29-20
2020/03/02 FortisBC Multi-Year Rate Plan Application for 2020 to 2024
FortisBC Energy Inc. and FortisBC Inc. (collectively FortisBC) Multi-Year Rate Plan Application for 2020 to 2024 ~ Project No. 1598996

Panel: D. Cote (Chair), K. Keilty, B. Lockhart and A. Fung

Hearing Location:
Date & Time: @
Location: , ,

FortisBC Reply ArgumentExhibit A-18
2020/03/05 FEI Revelstoke Propane Portfolio Cost Amalgamation Application
FortisBC Energy Inc. Revelstoke Propane Portfolio Cost Amalgamation Application ~ Project No. 1599033

T. Loski (Chair), B. Magnan and R. Revel

Hearing Location:
Date & Time: @
Location: , ,

Information Requests (IRs) on IntervenerG-13-20
2020/03/05 BC Hydro General Service E-Plus Amendments
British Columbia Hydro and Power Authority (BC Hydro) General Service Rate Schedules 1205, 1206 and 1207 Amendments Application (General Service E-Plus)

Panel: B. Magnan, Chair B. Lockhart, Commissioner C. Brewer, Commissioner

Hearing Location:
Date & Time: @
Location: , ,

Deadline for General Service E-Plus customer comments on the ApplicationG-17-20
2020/03/05 Creative Energy 2019–2020 RRA for the Core Steam System and NEFC Service Areas
Creative Energy Vancouver Platforms Inc. 2019–2020 Revenue Requirements Application for the Core Steam System and Northeast False Creek Service Areas

Panel: A. Fung, Chair K. Keilty, Commissioner B. Lockhart, Commissioner

Hearing Location:
Date & Time: @
Location: , ,

BCUC Information Request (IR) No. 1 to Creative EnergyG-29-20
2020/03/05 FEI RS46 Permanent Rates and Revised Tariff Pages
FortisBC Energy Inc. Application for Approval for Permanent Rates and Revised Tariff Pages - Rate Schedule 46 – Liquefied Natural Gas Sales, Dispensing Liquefied Natural Gas Transportation Service, Effective January 1, 2020



Hearing Location:
Date & Time: @
Location: , ,

Deadline to submit Letters of CommentG-20-20
2020/03/06 BCUC Indigenous Utilities Regulation Inquiry
British Columbia Utilities Commission Indigenous Utilities Regulation Inquiry ~ Project No. 1598998

Panel: D. Morton (Chair), A. Fung, C. Brewer and B. Lockhart

Hearing Location:
Date & Time: @
Location: , ,

Written comments on the draft reportG-26-20
2020/03/06 PNG and PNGNE Consolidated Resource Plan and ECI Portfolio
Pacific Northern Gas Ltd. and Pacific Northern Gas (N.E.) Ltd. Application for Acceptance of 2019 Consolidated Resource Plan and for Acceptance of Energy Conservation and Innovation (ECI) Portfolio Funding for 2020 to 2022

Panel: A. Fung, Chair C. Brewer, Commissioner R. Mason, Commissioner

Hearing Location:
Date & Time: @
Location: , ,

PNG Response to BCUC and Intervener IR No. 1G-24-20
2020/03/06 BC Hydro TSR Customer Baseline Loads F2019-F2020 and TS 74 Amendments
British Columbia Hydro and Power Authority (BC Hydro) - Transmission Service Rate (TSR) Customer Baseline Loads (CBL) F2019 and F2020 and Amendments to Tariff Supplement No. 74 Application dated January 10, 2020

Panel: B. Magnan

Hearing Location:
Date & Time: @
Location: , ,

Deadline to submit Letters of Comment G-28-20
2020/03/10 BC Hydro General Service E-Plus Amendments
British Columbia Hydro and Power Authority (BC Hydro) General Service Rate Schedules 1205, 1206 and 1207 Amendments Application (General Service E-Plus)

Panel: B. Magnan, Chair B. Lockhart, Commissioner C. Brewer, Commissioner

Hearing Location:
Date & Time: @
Location: , ,

BC Hydro responses to BCUC IR No. 1G-17-20
2020/03/11 BCUC Review of Thermal Energy Systems Regulatory Framework Guidelines
British Columbia Utilities Commission Review of Thermal Energy Systems Regulatory Framework Guidelines ~ Project No. 1599043

Panel: R. Mason, Chair, W. Everett and T. Loski, Commissoners

Hearing Location:
Date & Time: @
Location: , ,

BCUC issues final Terms of ReferenceG-341-19
2020/03/12 BC Hydro Amend Net Metering Service under RS 1289
British Columbia Hydro and Power Authority Application to Amend Net Metering Service under Rate Schedule 1289 ~ Project No. 1599004

Panel: D. Cote (Chair), R. Mason and R. Revel

Hearing Location:
Date & Time: @
Location: , ,

Interveners Final Argument - With Rebuttal EvidenceG-293-19
2020/03/12 Creative Energy 2019–2020 RRA for the Core Steam System and NEFC Service Areas
Creative Energy Vancouver Platforms Inc. 2019–2020 Revenue Requirements Application for the Core Steam System and Northeast False Creek Service Areas

Panel: A. Fung, Chair K. Keilty, Commissioner B. Lockhart, Commissioner

Hearing Location:
Date & Time: @
Location: , ,

Intervener IR No. 1 to Creative EnergyG-29-20
2020/03/12 Creative Energy 2019–2020 RRA for the Core Steam System and NEFC Service Areas
Creative Energy Vancouver Platforms Inc. 2019–2020 Revenue Requirements Application for the Core Steam System and Northeast False Creek Service Areas

Panel: A. Fung, Chair K. Keilty, Commissioner B. Lockhart, Commissioner

Hearing Location:
Date & Time: @
Location: , ,

BCUC IR No. 1 on Fuel Switch Study and LTRP Deferral Account Proposal to Creative EnergyG-29-20
2020/03/12 FEI RS46 Permanent Rates and Revised Tariff Pages
FortisBC Energy Inc. Application for Approval for Permanent Rates and Revised Tariff Pages - Rate Schedule 46 – Liquefied Natural Gas Sales, Dispensing Liquefied Natural Gas Transportation Service, Effective January 1, 2020



Hearing Location:
Date & Time: @
Location: , ,

FEI responses to Letters of CommentG-20-20
2020/03/16 PNG and PNGNE Consolidated Resource Plan and ECI Portfolio
Pacific Northern Gas Ltd. and Pacific Northern Gas (N.E.) Ltd. Application for Acceptance of 2019 Consolidated Resource Plan and for Acceptance of Energy Conservation and Innovation (ECI) Portfolio Funding for 2020 to 2022

Panel: A. Fung, Chair C. Brewer, Commissioner R. Mason, Commissioner

Hearing Location:
Date & Time: @
Location: , ,

Submissions on Further ProcessG-24-20
2020/03/17 BCUC Review of BC Hydro’s PBR Report
British Columbia Utilities Commission Review of British Columbia Hydro and Power Authority’s Performance Based Regulation Report

Panel: D. Morton, Chair A. Fung, B. Lockhart and R. Mason, Commissioners

Hearing Location:
Date & Time: @
Location: , ,

Parties submit written clarifying questions or high level topics to BCUC Staff ConsultantG-326-19
2020/03/17 BC Hydro Transmission Service Market Reference-Priced Rates
British Columbia Hydro and Power Authority (BC Hydro) Transmission Service Market Reference-Priced Rates Application

Panel: T. Loski (Chair), A. Fung, B. Lockhart

Hearing Location:
Date & Time: @
Location: , ,

Streamlined Review Process (placeholder)G-327-19
2020/03/19 FEI Revelstoke Propane Portfolio Cost Amalgamation Application
FortisBC Energy Inc. Revelstoke Propane Portfolio Cost Amalgamation Application ~ Project No. 1599033

T. Loski (Chair), B. Magnan and R. Revel

Hearing Location:
Date & Time: @
Location: , ,

FEI Notice of Intention to File Rebuttal EvidenceG-13-20
2020/03/19 BC Hydro General Service E-Plus Amendments
British Columbia Hydro and Power Authority (BC Hydro) General Service Rate Schedules 1205, 1206 and 1207 Amendments Application (General Service E-Plus)

Panel: B. Magnan, Chair B. Lockhart, Commissioner C. Brewer, Commissioner

Hearing Location:
Date & Time: @
Location: , ,

BC Hydro reply comments, if anyG-17-20
2020/03/19 Creative Energy 2019–2020 RRA for the Core Steam System and NEFC Service Areas
Creative Energy Vancouver Platforms Inc. 2019–2020 Revenue Requirements Application for the Core Steam System and Northeast False Creek Service Areas

Panel: A. Fung, Chair K. Keilty, Commissioner B. Lockhart, Commissioner

Hearing Location:
Date & Time: @
Location: , ,

Intervener IR No. 1 on Fuel Switch Study and LTRP Deferral Account Proposal to Creative EnergyG-29-20
2020/03/23 PNG West 2020-2021 Revenue Requirements
Pacific Northern Gas Ltd. (West Division) - 2020-2021 Revenue Requirements Application

Panel: A. Fung, Chair C. Brewer, Commissioner M. Kresivo, Commissioner

Hearing Location:
Date & Time: @
Location: , ,

BCUC Information Request (IR) No. 1 to PNGG-330-19A
2020/03/26 BC Hydro Amend Net Metering Service under RS 1289
British Columbia Hydro and Power Authority Application to Amend Net Metering Service under Rate Schedule 1289 ~ Project No. 1599004

Panel: D. Cote (Chair), R. Mason and R. Revel

Hearing Location:
Date & Time: @
Location: , ,

BC Hydro Reply Argument - With Rebuttal EvidenceG-293-19
2020/03/26 FEI Revelstoke Propane Portfolio Cost Amalgamation Application
FortisBC Energy Inc. Revelstoke Propane Portfolio Cost Amalgamation Application ~ Project No. 1599033

T. Loski (Chair), B. Magnan and R. Revel

Hearing Location:
Date & Time: @
Location: , ,

Intervener Response to IRs on IntervenerG-13-20
2020/03/30 PNG West 2020-2021 Revenue Requirements
Pacific Northern Gas Ltd. (West Division) - 2020-2021 Revenue Requirements Application

Panel: A. Fung, Chair C. Brewer, Commissioner M. Kresivo, Commissioner

Hearing Location:
Date & Time: @
Location: , ,

Intervener IR No. 1 to PNGG-330-19A
2020/03/31 BCUC Indigenous Utilities Regulation Inquiry
British Columbia Utilities Commission Indigenous Utilities Regulation Inquiry ~ Project No. 1598998

Panel: D. Morton (Chair), A. Fung, C. Brewer and B. Lockhart

Hearing Location:
Date & Time: @
Location: , ,

Written reply to comments from other participants on draft reportG-26-20
2020/03/31 BCUC Review of BC Hydro’s PBR Report
British Columbia Utilities Commission Review of British Columbia Hydro and Power Authority’s Performance Based Regulation Report

Panel: D. Morton, Chair A. Fung, B. Lockhart and R. Mason, Commissioners

Hearing Location:
Date & Time: @
Location: , ,

BCUC-Facilitated PBR WorkshopG-326-19
2020/04/01 BCUC Review of Thermal Energy Systems Regulatory Framework Guidelines
British Columbia Utilities Commission Review of Thermal Energy Systems Regulatory Framework Guidelines ~ Project No. 1599043

Panel: R. Mason, Chair, W. Everett and T. Loski, Commissoners

Hearing Location:
Date & Time: @
Location: , ,

Transcribed Workshop – Day 1* Commencing at 9:00 a.mG-341-19
2020/04/02 BCUC Municipal Energy Utilities Inquiry
British Columbia Utilities Commission An Inquiry into the Regulation of Municipal Energy Utilities ~ Project No. 1599027

Panel: T. Loski (Chair), C. Brewer, W. Everett & B. Magnan

Hearing Location:
Date & Time: @
Location: , ,

Intervener evidenceG-14-20
2020/04/02 BCUC Review of Thermal Energy Systems Regulatory Framework Guidelines
British Columbia Utilities Commission Review of Thermal Energy Systems Regulatory Framework Guidelines ~ Project No. 1599043

Panel: R. Mason, Chair, W. Everett and T. Loski, Commissoners

Hearing Location:
Date & Time: @
Location: , ,

Transcribed Workshop – Day 2* (if required) Commencing at 9:00 a.m.G-341-19
2020/04/02 Creative Energy 2019–2020 RRA for the Core Steam System and NEFC Service Areas
Creative Energy Vancouver Platforms Inc. 2019–2020 Revenue Requirements Application for the Core Steam System and Northeast False Creek Service Areas

Panel: A. Fung, Chair K. Keilty, Commissioner B. Lockhart, Commissioner

Hearing Location:
Date & Time: @
Location: , ,

Creative Energy responses to BCUC and Intervener IR No. 1G-29-20
2020/04/06 PNG NE 2020-2021 Revenue Requirements
Pacific Northern Gas Ltd. (N.E.) - 2020-2021 Revenue Requirements Application

Panel: A. Fung, Chair C. Brewer, Commissioner M. Kresivo, Commissioner

Hearing Location:
Date & Time: @
Location: , ,

BCUC Information Request (IR) No. 1 to PNG(NE)G-331-19
2020/04/09 FEI Revelstoke Propane Portfolio Cost Amalgamation Application
FortisBC Energy Inc. Revelstoke Propane Portfolio Cost Amalgamation Application ~ Project No. 1599033

T. Loski (Chair), B. Magnan and R. Revel

Hearing Location:
Date & Time: @
Location: , ,

FEI Rebuttal Evidence (if any)G-13-20
2020/04/09 BCUC Review of Thermal Energy Systems Regulatory Framework Guidelines
British Columbia Utilities Commission Review of Thermal Energy Systems Regulatory Framework Guidelines ~ Project No. 1599043

Panel: R. Mason, Chair, W. Everett and T. Loski, Commissoners

Hearing Location:
Date & Time: @
Location: , ,

Intervener written submissions within scope of Terms of Reference (if desired)G-241-19
2020/04/15 PNG West 2020-2021 Revenue Requirements
Pacific Northern Gas Ltd. (West Division) - 2020-2021 Revenue Requirements Application

Panel: A. Fung, Chair C. Brewer, Commissioner M. Kresivo, Commissioner

Hearing Location:
Date & Time: @
Location: , ,

PNG responses to BCUC and Intervener IR No. 1G-330-19A
2020/04/15 PNG NE 2020-2021 Revenue Requirements
Pacific Northern Gas Ltd. (N.E.) - 2020-2021 Revenue Requirements Application

Panel: A. Fung, Chair C. Brewer, Commissioner M. Kresivo, Commissioner

Hearing Location:
Date & Time: @
Location: , ,

Intervener IR No. 1 to PNG(NE)G-331-19
2020/04/21 Creative Energy 2019–2020 RRA for the Core Steam System and NEFC Service Areas
Creative Energy Vancouver Platforms Inc. 2019–2020 Revenue Requirements Application for the Core Steam System and Northeast False Creek Service Areas

Panel: A. Fung, Chair K. Keilty, Commissioner B. Lockhart, Commissioner

Hearing Location:
Date & Time: @
Location: , ,

BCUC IR and Intervener No. 2 to Creative EnergyG-29-20
2020/04/23 BCUC Review of Thermal Energy Systems Regulatory Framework Guidelines
British Columbia Utilities Commission Review of Thermal Energy Systems Regulatory Framework Guidelines ~ Project No. 1599043

Panel: R. Mason, Chair, W. Everett and T. Loski, Commissoners

Hearing Location:
Date & Time: @
Location: , ,

Intervener submissions on further processG-341-19
2020/04/23 BCUC Review of Thermal Energy Systems Regulatory Framework Guidelines
British Columbia Utilities Commission Review of Thermal Energy Systems Regulatory Framework Guidelines ~ Project No. 1599043

Panel: R. Mason, Chair, W. Everett and T. Loski, Commissoners

Hearing Location:
Date & Time: @
Location: , ,

Notification of intent to file Intervener evidence**G-341-19
2020/04/29 PNG NE 2020-2021 Revenue Requirements
Pacific Northern Gas Ltd. (N.E.) - 2020-2021 Revenue Requirements Application

Panel: A. Fung, Chair C. Brewer, Commissioner M. Kresivo, Commissioner

Hearing Location:
Date & Time: @
Location: , ,

PNG(NE) responses to BCUC and Intervener IR No. 1G-331-19
2020/04/30 BCUC Indigenous Utilities Regulation Inquiry
British Columbia Utilities Commission Indigenous Utilities Regulation Inquiry ~ Project No. 1598998

Panel: D. Morton (Chair), A. Fung, C. Brewer and B. Lockhart

Hearing Location:
Date & Time: @
Location: , ,

Final Report issued to minister responsible for the Hydro and Power Authority ActG-26-20
2020/04/30 BCUC Municipal Energy Utilities Inquiry
British Columbia Utilities Commission An Inquiry into the Regulation of Municipal Energy Utilities ~ Project No. 1599027

Panel: T. Loski (Chair), C. Brewer, W. Everett & B. Magnan

Hearing Location:
Date & Time: @
Location: , ,

BCUC information requests (IRs) on intervener evidence and submissionsG-14-20
2020/05/01 PNG West 2020-2021 Revenue Requirements
Pacific Northern Gas Ltd. (West Division) - 2020-2021 Revenue Requirements Application

Panel: A. Fung, Chair C. Brewer, Commissioner M. Kresivo, Commissioner

Hearing Location:
Date & Time: @
Location: , ,

BCUC and Intervener IR No. 2 to PNGG-330-19A
2020/05/05 Creative Energy 2019–2020 RRA for the Core Steam System and NEFC Service Areas
Creative Energy Vancouver Platforms Inc. 2019–2020 Revenue Requirements Application for the Core Steam System and Northeast False Creek Service Areas

Panel: A. Fung, Chair K. Keilty, Commissioner B. Lockhart, Commissioner

Hearing Location:
Date & Time: @
Location: , ,

Creative Energy responses to BCUC and Intervener IR No. 2G-29-20
2020/05/12 Creative Energy 2019–2020 RRA for the Core Steam System and NEFC Service Areas
Creative Energy Vancouver Platforms Inc. 2019–2020 Revenue Requirements Application for the Core Steam System and Northeast False Creek Service Areas

Panel: A. Fung, Chair K. Keilty, Commissioner B. Lockhart, Commissioner

Hearing Location:
Date & Time: @
Location: , ,

Creative Energy Final ArgumentG-29-20
2020/05/15 PNG NE 2020-2021 Revenue Requirements
Pacific Northern Gas Ltd. (N.E.) - 2020-2021 Revenue Requirements Application

Panel: A. Fung, Chair C. Brewer, Commissioner M. Kresivo, Commissioner

Hearing Location:
Date & Time: @
Location: , ,

BCUC and Intervener IR No. 2 to PNG(NE)G-331-19
2020/05/20 PNG West 2020-2021 Revenue Requirements
Pacific Northern Gas Ltd. (West Division) - 2020-2021 Revenue Requirements Application

Panel: A. Fung, Chair C. Brewer, Commissioner M. Kresivo, Commissioner

Hearing Location:
Date & Time: @
Location: , ,

PNG responses to BCUC and Intervener IR No. 2G-330-19A
2020/05/21 Creative Energy 2019–2020 RRA for the Core Steam System and NEFC Service Areas
Creative Energy Vancouver Platforms Inc. 2019–2020 Revenue Requirements Application for the Core Steam System and Northeast False Creek Service Areas

Panel: A. Fung, Chair K. Keilty, Commissioner B. Lockhart, Commissioner

Hearing Location:
Date & Time: @
Location: , ,

Intervener Final ArgumentG-29-20
2020/05/28 Creative Energy 2019–2020 RRA for the Core Steam System and NEFC Service Areas
Creative Energy Vancouver Platforms Inc. 2019–2020 Revenue Requirements Application for the Core Steam System and Northeast False Creek Service Areas

Panel: A. Fung, Chair K. Keilty, Commissioner B. Lockhart, Commissioner

Hearing Location:
Date & Time: @
Location: , ,

Creative Energy Reply ArgumentG-29-20
2020/06/03 PNG NE 2020-2021 Revenue Requirements
Pacific Northern Gas Ltd. (N.E.) - 2020-2021 Revenue Requirements Application

Panel: A. Fung, Chair C. Brewer, Commissioner M. Kresivo, Commissioner

Hearing Location:
Date & Time: @
Location: , ,

PNG(NE) responses to BCUC and Intervener IR No. 2G-331-19
2020/06/25 BCUC Municipal Energy Utilities Inquiry
British Columbia Utilities Commission An Inquiry into the Regulation of Municipal Energy Utilities ~ Project No. 1599027

Panel: T. Loski (Chair), C. Brewer, W. Everett & B. Magnan

Hearing Location:
Date & Time: @
Location: , ,

Intervener IRs on intervener evidence and submissionsG-14-20
2020/08/20 BCUC Municipal Energy Utilities Inquiry
British Columbia Utilities Commission An Inquiry into the Regulation of Municipal Energy Utilities ~ Project No. 1599027

Panel: T. Loski (Chair), C. Brewer, W. Everett & B. Magnan

Hearing Location:
Date & Time: @
Location: , ,

Intervener response to BCUC and intervener IRsG-14-20