Due DateUtilities & ProceedingRegulatory ItemOrder/Letter
  BC Hydro Net Metering Service Amendment Application
British Columbia Hydro and Power Authority Application to Amend Net Metering Service under Rate Schedule 1289 ~ Project No. 1599004

Panel: D. Cote (Chair), R. Mason and R. Revel

Hearing Location:
Date & Time: @
Location: , ,

BC Hydro rebuttal evidence - Without Rebuttal EvidenceG-217-19A
  BC Hydro Net Metering Service Amendment Application
British Columbia Hydro and Power Authority Application to Amend Net Metering Service under Rate Schedule 1289 ~ Project No. 1599004

Panel: D. Cote (Chair), R. Mason and R. Revel

Hearing Location:
Date & Time: @
Location: , ,

BCUC and Intervener IR on BC Hydro rebuttal evidence - Without Rebuttal EvidenceG-217-19A
  BC Hydro Net Metering Service Amendment Application
British Columbia Hydro and Power Authority Application to Amend Net Metering Service under Rate Schedule 1289 ~ Project No. 1599004

Panel: D. Cote (Chair), R. Mason and R. Revel

Hearing Location:
Date & Time: @
Location: , ,

BC Hydro response to IRs on BC Hydro rebuttal evidence - Without Rebuttal EvidenG-217-19A
2019/10/15 Ravens Landing Exemption Application
Ravens Landing Industrial Park Ltd. Application for an Exemption from Part 3 of the Utilities Commission Act

R. Mason (chair), B. Everett

Hearing Location:
Date & Time: @
Location: , ,

Intervener Final ArgumentG-206-19
2019/10/16 City of Coquitlam Reconsideration and Variance of Order G-80-19
City of Coquitlam Application for Reconsideration and Variance of Order G-80-19 in the matter of the FortisBC Energy Inc. Application for Use of Lands under Sections 32 and 33 of the Utilities Commission Act in the City of Coquitlam for the Lower Mainland Intermediate Pressure System Upgrade Projects ~ Project No. 1599008

Panel: R. Mason (Chair) and W. Everett

Hearing Location:
Date & Time: @
Location: , ,

City Final ArgumentG-234-19
2019/10/17 CB Powerline Ltd. Exemption Application
CB Powerline Ltd. Application for an Exemption from Part 3 of the Utilities Commission Act, pursuant to section 88(3) ~ Project No. 1599020

Panel: T. Loski, Chair, W. Everett, Commissioner and C. Brewer, Commissioner

Hearing Location:
Date & Time: @
Location: , ,

CBP and Intervener submissions on further processG-151-19
2019/10/17 PNG RECAP and Large Volume Industrial Transportation Rate
Pacific Northern Gas Ltd. Application Regarding Process for Allocation of Reactivated Capacity and Approval of Large Volume Industrial Transportation Rate

Panel: T. Loski (Chair), C. Brewer and M. Kresivo

Hearing Location:
Date & Time: @
Location: , ,

PNG Response to IRs No. 1G-191-19
2019/10/17 BCUC Municipal Energy Utilities Inquiry
British Columbia Utilities Commission An Inquiry into the Regulation of Municipal Energy Utilities ~ Project No. 1599027

Panel: T. Loski (Chair), C. Brewer, W. Everett & B. Magnan

Hearing Location:
Date & Time: @
Location: , ,

LEC and LIEC response regarding representation and intervener statusExhibit A-3
2019/10/17 FortisBC Irrigation Rates Compliance Filing
FortisBC Inc. Compliance Filing Regarding Irrigation Rates In Accordance with Order G-40-19 ~ Project No. 1599025

Panel: C. Brewer

Hearing Location:
Date & Time: @
Location: , ,

Comments from Irrigation CustomersExhibit A-2
2019/10/18 BC Hydro F2020-F2021 Revenue Requirements
British Columbia Hydro and Power Authority F2020 to F2021 Revenue Requirements Application ~ Project No. 1598990

Panel: D. Morton (Chair), A. Fung, B. Lockhart and R. Mason

Hearing Location:
Date & Time: @
Location: , ,

Public Release of COE Evidentiary UpdateG-218-19
2019/10/18 FEI Biomethane Purchase Agreements between FEI and Tidal Energy
FortisBC Energy Inc. Application for Acceptance of Biomethane Purchase Agreements between FortisBC Energy Inc. and Tidal Energy Marketing Inc.

Panel: R. Mason

Hearing Location:
Date & Time: @
Location: , ,

Intervener IR No. 1G-213-19
2019/10/24 BC Hydro Net Metering Service Amendment Application
British Columbia Hydro and Power Authority Application to Amend Net Metering Service under Rate Schedule 1289 ~ Project No. 1599004

Panel: D. Cote (Chair), R. Mason and R. Revel

Hearing Location:
Date & Time: @
Location: , ,

BC Hydro response to BCUC and Intervener IR No. 2G-217-19A
2019/10/24 BCUC Municipal Energy Utilities Inquiry
British Columbia Utilities Commission An Inquiry into the Regulation of Municipal Energy Utilities ~ Project No. 1599027

Panel: T. Loski (Chair), C. Brewer, W. Everett & B. Magnan

Hearing Location:
Date & Time: @
Location: , ,

Intervener written submissions and letters of commentG-177-19
2019/10/24 FEI Revelstoke Propane Portfolio Cost Amalgamation Application
FortisBC Energy Inc. Revelstoke Propane Portfolio Cost Amalgamation Application ~ Project No. 1599033

T. Loski (Chair), B. Magnan and R. Revel

Hearing Location:
Date & Time: @
Location: , ,

FEI Responses to BCUC and Intervener IRs No. 1G-201-19
2019/10/24 PNG Kitimat Regulating Stn LDS No2 CPCN
Pacific Northern Gas Ltd. Application for a Certificate of Public Convenience and Necessity for the Construction of Kitimat Regulating Station LDS No2



Hearing Location:
Date & Time: @
Location: , ,

PNG to provide public noticeC-3-19
2019/10/24 Creative Energy TES for Cooling at the Vancouver House Development CPCN
Creative Energy Vancouver Platforms Inc. Application for a Certificate of Public Convenience and Necessity to Acquire and Operate a Thermal Energy System for Cooling at the Vancouver House Development

Panel: T. Loski (Chair), R. Mason and B. Lockhart

Hearing Location:
Date & Time: @
Location: , ,

Intervener IR No. 1G-222-19
2019/10/24 Creative Energy TES for Cooling at the Vancouver House Development CPCN
Creative Energy Vancouver Platforms Inc. Application for a Certificate of Public Convenience and Necessity to Acquire and Operate a Thermal Energy System for Cooling at the Vancouver House Development

Panel: T. Loski (Chair), R. Mason and B. Lockhart

Hearing Location:
Date & Time: @
Location: , ,

Creative Energy Responses to BCUC IR No. 1G-222-19
2019/10/24 BC Hydro 2019 Letter Agreement with Powerex
British Columbia Hydro and Power Authority Application for 2019 Letter Agreement with Powerex Corp. ~ Project No. 1599038



Hearing Location:
Date & Time: @
Location: , ,

BC Hydro responses to BCUC and Intervener IR No. 1G-243-19
2019/10/25 FEI CPCN Application for the IGU Project
FortisBC Energy Inc. Certificate of Public Convenience and Necessity Application for the Inland Gas Upgrade Project ~ Project No. 1598988

Panel: A. Fung (Chair), T. Loski, R. Revel and B. Lockhart

Hearing Location:
Date & Time: @
Location: , ,

FEI written reply argumentG-219-19
2019/10/25 FEI Operating Agreement between Enderby and FEI
FortisBC Energy Inc. Application for Approval of an Operating Agreement between the Corporation of the City of Enderby and FEI ~ Project No. 1599039



Hearing Location:
Date & Time: @
Location: , ,

Intervener registration and deadline for letters of commentG-228-19
2019/10/25 FEI 2019-2022 DSM Industrial Expenditure Budget Transfer
FortisBC Energy Inc. 2019-2022 Demand Side Management Industrial Expenditure Budget Transfer

Panel: A. Fung

Hearing Location:
Date & Time: @
Location: , ,

FEI 2019-2022 DSM Expenditures Plan participants Letters of CommentExhibit A-2
2019/10/28 FortisBC Multi-Year Rate Plan Application for 2020 to 2024
FortisBC Energy Inc. and FortisBC Inc. (collectively FortisBC) Multi-Year Rate Plan Application for 2020 to 2024 ~ Project No. 1598996

Panel: D. Cote (Chair), K. Keilty, B. Lockhart and A. Fung

Hearing Location:
Date & Time: @
Location: , ,

Parties IRs on Intervener EvidenceG-241-19
2019/10/29 Ravens Landing Exemption Application
Ravens Landing Industrial Park Ltd. Application for an Exemption from Part 3 of the Utilities Commission Act

R. Mason (chair), B. Everett

Hearing Location:
Date & Time: @
Location: , ,

RLIP Reply ArgumentG-206-19
2019/10/30 BC Hydro F2020-F2021 Revenue Requirements
British Columbia Hydro and Power Authority F2020 to F2021 Revenue Requirements Application ~ Project No. 1598990

Panel: D. Morton (Chair), A. Fung, B. Lockhart and R. Mason

Hearing Location:
Date & Time: @
Location: , ,

BCUC and Intervener IRs on 20-Year Load ForecastG-218-19
2019/10/30 BC Hydro F2020-F2021 Revenue Requirements
British Columbia Hydro and Power Authority F2020 to F2021 Revenue Requirements Application ~ Project No. 1598990

Panel: D. Morton (Chair), A. Fung, B. Lockhart and R. Mason

Hearing Location:
Date & Time: @
Location: , ,

Intervener IRs on COE Evidentiary UpdateG-218-19
2019/10/30 BC Hydro Fleet Electrification Rate
British Columbia Hydro and Power Authority Fleet Electrification Rate Application ~ Project No. 1599032

T. Loski (Chair), A. Fung

Hearing Location:
Date & Time: @
Location: , ,

BC Hydro responses to BCUC and Intervener IR No. 1 and IRs on Supplemental InformationG-198-19 / A-3
2019/10/31 FortisBC Multi-Year Rate Plan Application for 2020 to 2024
FortisBC Energy Inc. and FortisBC Inc. (collectively FortisBC) Multi-Year Rate Plan Application for 2020 to 2024 ~ Project No. 1598996

Panel: D. Cote (Chair), K. Keilty, B. Lockhart and A. Fung

Hearing Location:
Date & Time: @
Location: , ,

Procedural Conference* to Determine Further ProcessG-241-19
2019/10/31 FortisBC Irrigation Rates Compliance Filing
FortisBC Inc. Compliance Filing Regarding Irrigation Rates In Accordance with Order G-40-19 ~ Project No. 1599025

Panel: C. Brewer

Hearing Location:
Date & Time: @
Location: , ,

Reply Comments from FBCExhibit A-2
2019/11/01 BCUC Indigenous Utilities Regulation Inquiry
British Columbia Utilities Commission Indigenous Utilities Regulation Inquiry ~ Project No. 1598998

Panel: D. Morton (Chair), A. Fung, C. Brewer and B. Lockhart

Hearing Location:
Date & Time: @
Location: , ,

Draft report issued for commentG-214-19
2019/11/01 FEI Biomethane Purchase Agreements between FEI and Tidal Energy
FortisBC Energy Inc. Application for Acceptance of Biomethane Purchase Agreements between FortisBC Energy Inc. and Tidal Energy Marketing Inc.

Panel: R. Mason

Hearing Location:
Date & Time: @
Location: , ,

FEI’s Responses to BCUC and Intervener IR No.1G-213-19
2019/11/05 PNG Kitimat Regulating Stn LDS No2 CPCN
Pacific Northern Gas Ltd. Application for a Certificate of Public Convenience and Necessity for the Construction of Kitimat Regulating Station LDS No2



Hearing Location:
Date & Time: @
Location: , ,

Deadline for Letters of Comment regarding depreciation rate C-3-19
2019/11/05 PNG CPCN for Watson Island Customer Tie-in
Pacific Northern Gas Ltd. Certificate of Public Convenience and Necessity (CPCN) Application for Construction of Watson Island Customer Tie-in

Panel: R. Mason, Chair T. Loski, Commissioner

Hearing Location:
Date & Time: @
Location: , ,

PNG to publish Public NoticeC-4-19
2019/11/06 City of Coquitlam Reconsideration and Variance of Order G-80-19
City of Coquitlam Application for Reconsideration and Variance of Order G-80-19 in the matter of the FortisBC Energy Inc. Application for Use of Lands under Sections 32 and 33 of the Utilities Commission Act in the City of Coquitlam for the Lower Mainland Intermediate Pressure System Upgrade Projects ~ Project No. 1599008

Panel: R. Mason (Chair) and W. Everett

Hearing Location:
Date & Time: @
Location: , ,

Intervener Final ArgumentG-234-19
2019/11/07 BC Hydro Net Metering Service Amendment Application
British Columbia Hydro and Power Authority Application to Amend Net Metering Service under Rate Schedule 1289 ~ Project No. 1599004

Panel: D. Cote (Chair), R. Mason and R. Revel

Hearing Location:
Date & Time: @
Location: , ,

Intervener EvidenceG-217-19A
2019/11/07 Creative Energy TES for Cooling at the Vancouver House Development CPCN
Creative Energy Vancouver Platforms Inc. Application for a Certificate of Public Convenience and Necessity to Acquire and Operate a Thermal Energy System for Cooling at the Vancouver House Development

Panel: T. Loski (Chair), R. Mason and B. Lockhart

Hearing Location:
Date & Time: @
Location: , ,

Creative Energy Responses to Intervener IR No. 1G-222-19
2019/11/07 PNG CPCN for Watson Island Customer Tie-in
Pacific Northern Gas Ltd. Certificate of Public Convenience and Necessity (CPCN) Application for Construction of Watson Island Customer Tie-in

Panel: R. Mason, Chair T. Loski, Commissioner

Hearing Location:
Date & Time: @
Location: , ,

BCUC Information Request (IR) No. 1 to PNGC-4-19
2019/11/08 FEI Biomethane Purchase Agreements between FEI and Tidal Energy
FortisBC Energy Inc. Application for Acceptance of Biomethane Purchase Agreements between FortisBC Energy Inc. and Tidal Energy Marketing Inc.

Panel: R. Mason

Hearing Location:
Date & Time: @
Location: , ,

Submissions on Further ProcessG-213-19
2019/11/14 BC Hydro F2020-F2021 Revenue Requirements
British Columbia Hydro and Power Authority F2020 to F2021 Revenue Requirements Application ~ Project No. 1598990

Panel: D. Morton (Chair), A. Fung, B. Lockhart and R. Mason

Hearing Location:
Date & Time: @
Location: , ,

BC Hydro responses to BCUC and Intervener IRs on 20-Year Load ForecastG-218-19
2019/11/14 BC Hydro F2020-F2021 Revenue Requirements
British Columbia Hydro and Power Authority F2020 to F2021 Revenue Requirements Application ~ Project No. 1598990

Panel: D. Morton (Chair), A. Fung, B. Lockhart and R. Mason

Hearing Location:
Date & Time: @
Location: , ,

BC Hydro responses to Intervener IRs on COE Evidentiary UpdateG-218-19
2019/11/18 BCUC Indigenous Utilities Regulation Inquiry
British Columbia Utilities Commission Indigenous Utilities Regulation Inquiry ~ Project No. 1598998

Panel: D. Morton (Chair), A. Fung, C. Brewer and B. Lockhart

Hearing Location:
Date & Time: @
Location: , ,

Workshop – Prince GeorgeG-214-19
2019/11/18 BC Hydro CCF Pilot – Year One Evaluation Report
British Columbia Hydro and Power Authority Customer Crisis Fund (CCF) Pilot Program – Year One Evaluation Report ~ Project No. 1599030

Panel: W. Everett (Chair), K. Keilty and D. Cote

Hearing Location:
Date & Time: @
Location: , ,

Intervener registration G-195-19
2019/11/19 FortisBC Multi-Year Rate Plan Application for 2020 to 2024
FortisBC Energy Inc. and FortisBC Inc. (collectively FortisBC) Multi-Year Rate Plan Application for 2020 to 2024 ~ Project No. 1598996

Panel: D. Cote (Chair), K. Keilty, B. Lockhart and A. Fung

Hearing Location:
Date & Time: @
Location: , ,

Intervener Responses to IRs on EvidenceG-241-19
2019/11/21 BCUC Indigenous Utilities Regulation Inquiry
British Columbia Utilities Commission Indigenous Utilities Regulation Inquiry ~ Project No. 1598998

Panel: D. Morton (Chair), A. Fung, C. Brewer and B. Lockhart

Hearing Location:
Date & Time: @
Location: , ,

Workshop – KelownaG-214-19
2019/11/21 BC Hydro Net Metering Service Amendment Application
British Columbia Hydro and Power Authority Application to Amend Net Metering Service under Rate Schedule 1289 ~ Project No. 1599004

Panel: D. Cote (Chair), R. Mason and R. Revel

Hearing Location:
Date & Time: @
Location: , ,

BCUC, BC Hydro and Intervener IR on Intervener EvidenceG-217-19A
2019/11/21 PNG CPCN for Watson Island Customer Tie-in
Pacific Northern Gas Ltd. Certificate of Public Convenience and Necessity (CPCN) Application for Construction of Watson Island Customer Tie-in

Panel: R. Mason, Chair T. Loski, Commissioner

Hearing Location:
Date & Time: @
Location: , ,

PNG responses to BCUC IR No. 1C-4-19
2019/11/22 BC Hydro F2020-F2021 Revenue Requirements
British Columbia Hydro and Power Authority F2020 to F2021 Revenue Requirements Application ~ Project No. 1598990

Panel: D. Morton (Chair), A. Fung, B. Lockhart and R. Mason

Hearing Location:
Date & Time: @
Location: , ,

Procedural ConferenceG-218-19
2019/11/22 BC Hydro Review of PBR Report
British Columbia Hydro and Power Authority Review of the Performance Based Regulation Report

Panel: D. Morton, Chair A. Fung, B. Lockhart and R. Mason, Commissioners

Hearing Location: BCUC Hearing Room
Date & Time: Nov 22, 2019 @ 12:00 AM
Location: 12th Floor 1125 Howe Street, Vancouver, BC, ,

Procedural ConferenceG-246-19
2019/11/26 FortisBC Multi-Year Rate Plan Application for 2020 to 2024
FortisBC Energy Inc. and FortisBC Inc. (collectively FortisBC) Multi-Year Rate Plan Application for 2020 to 2024 ~ Project No. 1598996

Panel: D. Cote (Chair), K. Keilty, B. Lockhart and A. Fung

Hearing Location:
Date & Time: @
Location: , ,

FortisBC Rebuttal Evidence (if any)G-241-19
2019/11/27 BCUC Indigenous Utilities Regulation Inquiry
British Columbia Utilities Commission Indigenous Utilities Regulation Inquiry ~ Project No. 1598998

Panel: D. Morton (Chair), A. Fung, C. Brewer and B. Lockhart

Hearing Location:
Date & Time: @
Location: , ,

Workshop – VancouverG-214-19
2019/11/27 City of Coquitlam Reconsideration and Variance of Order G-80-19
City of Coquitlam Application for Reconsideration and Variance of Order G-80-19 in the matter of the FortisBC Energy Inc. Application for Use of Lands under Sections 32 and 33 of the Utilities Commission Act in the City of Coquitlam for the Lower Mainland Intermediate Pressure System Upgrade Projects ~ Project No. 1599008

Panel: R. Mason (Chair) and W. Everett

Hearing Location:
Date & Time: @
Location: , ,

City Reply ArgumentG-234-19
2019/11/28 BCUC Indigenous Utilities Regulation Inquiry
British Columbia Utilities Commission Indigenous Utilities Regulation Inquiry ~ Project No. 1598998

Panel: D. Morton (Chair), A. Fung, C. Brewer and B. Lockhart

Hearing Location:
Date & Time: @
Location: , ,

Workshop – NanaimoG-214-19
2019/11/28 BC Hydro CCF Pilot – Year One Evaluation Report
British Columbia Hydro and Power Authority Customer Crisis Fund (CCF) Pilot Program – Year One Evaluation Report ~ Project No. 1599030

Panel: W. Everett (Chair), K. Keilty and D. Cote

Hearing Location:
Date & Time: @
Location: , ,

Submissions from BC Hydro and Registered Interveners on timing, regulatory process, and scopeG-195-19
2019/11/29 BCUC Indigenous Utilities Regulation Inquiry
British Columbia Utilities Commission Indigenous Utilities Regulation Inquiry ~ Project No. 1598998

Panel: D. Morton (Chair), A. Fung, C. Brewer and B. Lockhart

Hearing Location:
Date & Time: @
Location: , ,

Workshop – VictoriaG-240-19
2019/12/02 PNG CPCN for Watson Island Customer Tie-in
Pacific Northern Gas Ltd. Certificate of Public Convenience and Necessity (CPCN) Application for Construction of Watson Island Customer Tie-in

Panel: R. Mason, Chair T. Loski, Commissioner

Hearing Location:
Date & Time: @
Location: , ,

Deadline on Letters of Comment regarding depreciation ratesC-4-19
2019/12/03 BC Hydro F2020-F2021 Revenue Requirements
British Columbia Hydro and Power Authority F2020 to F2021 Revenue Requirements Application ~ Project No. 1598990

Panel: D. Morton (Chair), A. Fung, B. Lockhart and R. Mason

Hearing Location:
Date & Time: @
Location: , ,

Intervener EvidenceG-218-19
2019/12/05 BC Hydro Net Metering Service Amendment Application
British Columbia Hydro and Power Authority Application to Amend Net Metering Service under Rate Schedule 1289 ~ Project No. 1599004

Panel: D. Cote (Chair), R. Mason and R. Revel

Hearing Location:
Date & Time: @
Location: , ,

Intervener response to BCUC, BC Hydro and Intervener IR on Intervener EvidenceG-217-19A
2019/12/09 BCUC Indigenous Utilities Regulation Inquiry
British Columbia Utilities Commission Indigenous Utilities Regulation Inquiry ~ Project No. 1598998

Panel: D. Morton (Chair), A. Fung, C. Brewer and B. Lockhart

Hearing Location:
Date & Time: @
Location: , ,

Workshop – SmithersG-240-19
2019/12/10 BC Hydro Net Metering Service Amendment Application
British Columbia Hydro and Power Authority Application to Amend Net Metering Service under Rate Schedule 1289 ~ Project No. 1599004

Panel: D. Cote (Chair), R. Mason and R. Revel

Hearing Location:
Date & Time: @
Location: , ,

BC Hydro rebuttal evidence - With Rebuttal EvidenceG-217-19A
2019/12/12 BC Hydro CCF Pilot – Year One Evaluation Report
British Columbia Hydro and Power Authority Customer Crisis Fund (CCF) Pilot Program – Year One Evaluation Report ~ Project No. 1599030

Panel: W. Everett (Chair), K. Keilty and D. Cote

Hearing Location:
Date & Time: @
Location: , ,

Reply submissions from BC Hydro and Registered Interveners G-195-19
2019/12/16 FortisBC Multi-Year Rate Plan Application for 2020 to 2024
FortisBC Energy Inc. and FortisBC Inc. (collectively FortisBC) Multi-Year Rate Plan Application for 2020 to 2024 ~ Project No. 1598996

Panel: D. Cote (Chair), K. Keilty, B. Lockhart and A. Fung

Hearing Location:
Date & Time: @
Location: , ,

Placeholder for Potential Oral Public ProcessG-241-19
2019/12/17 BC Hydro F2020-F2021 Revenue Requirements
British Columbia Hydro and Power Authority F2020 to F2021 Revenue Requirements Application ~ Project No. 1598990

Panel: D. Morton (Chair), A. Fung, B. Lockhart and R. Mason

Hearing Location:
Date & Time: @
Location: , ,

IRs on Intervener EvidenceG-218-19
2019/12/19 BC Hydro Net Metering Service Amendment Application
British Columbia Hydro and Power Authority Application to Amend Net Metering Service under Rate Schedule 1289 ~ Project No. 1599004

Panel: D. Cote (Chair), R. Mason and R. Revel

Hearing Location:
Date & Time: @
Location: , ,

BC Hydro Final Argument - Without Rebuttal EvidenceG-217-19A
2019/12/24 BC Hydro Net Metering Service Amendment Application
British Columbia Hydro and Power Authority Application to Amend Net Metering Service under Rate Schedule 1289 ~ Project No. 1599004

Panel: D. Cote (Chair), R. Mason and R. Revel

Hearing Location:
Date & Time: @
Location: , ,

BCUC and Intervener IR on BC Hydro rebuttal - With Rebuttal EvidenceG-217-19A
2019/12/31 BCUC Indigenous Utilities Regulation Inquiry
British Columbia Utilities Commission Indigenous Utilities Regulation Inquiry ~ Project No. 1598998

Panel: D. Morton (Chair), A. Fung, C. Brewer and B. Lockhart

Hearing Location:
Date & Time: @
Location: , ,

Participant comments on draft reportG-240-19
2019/12/31 BCUC Indigenous Utilities Regulation Inquiry
British Columbia Utilities Commission Indigenous Utilities Regulation Inquiry ~ Project No. 1598998

Panel: D. Morton (Chair), A. Fung, C. Brewer and B. Lockhart

Hearing Location:
Date & Time: @
Location: , ,

Interim Report Issued to Minister Responsible for the Hydro and Power Authority ActG-214-19
2020/01/10 BC Hydro F2020-F2021 Revenue Requirements
British Columbia Hydro and Power Authority F2020 to F2021 Revenue Requirements Application ~ Project No. 1598990

Panel: D. Morton (Chair), A. Fung, B. Lockhart and R. Mason

Hearing Location:
Date & Time: @
Location: , ,

Responses to IRs on Intervener EvidenceG-218-19
2020/01/15 BC Hydro F2020-F2021 Revenue Requirements
British Columbia Hydro and Power Authority F2020 to F2021 Revenue Requirements Application ~ Project No. 1598990

Panel: D. Morton (Chair), A. Fung, B. Lockhart and R. Mason

Hearing Location:
Date & Time: @
Location: , ,

BC Hydro Rebuttal Evidence (if any)G-218-19
2020/01/15 City of Coquitlam Reconsideration and Variance of Order G-80-19
City of Coquitlam Application for Reconsideration and Variance of Order G-80-19 in the matter of the FortisBC Energy Inc. Application for Use of Lands under Sections 32 and 33 of the Utilities Commission Act in the City of Coquitlam for the Lower Mainland Intermediate Pressure System Upgrade Projects ~ Project No. 1599008

Panel: R. Mason (Chair) and W. Everett

Hearing Location:
Date & Time: @
Location: , ,

Oral hearing (if required*) 9 am, 12th Floor 1125 Howe Street, VancouverG-234-19
2020/01/16 BC Hydro Net Metering Service Amendment Application
British Columbia Hydro and Power Authority Application to Amend Net Metering Service under Rate Schedule 1289 ~ Project No. 1599004

Panel: D. Cote (Chair), R. Mason and R. Revel

Hearing Location:
Date & Time: @
Location: , ,

BC Hydro response to BCUC and Intervener IR on BC Hydro rebuttal evidence - With Rebuttal EvidenceG-217-19A
2020/01/16 BC Hydro Net Metering Service Amendment Application
British Columbia Hydro and Power Authority Application to Amend Net Metering Service under Rate Schedule 1289 ~ Project No. 1599004

Panel: D. Cote (Chair), R. Mason and R. Revel

Hearing Location:
Date & Time: @
Location: , ,

Interveners Final Argument - Without Rebuttal EvidenceG-217-19A
2020/01/20 BC Hydro F2020-F2021 Revenue Requirements
British Columbia Hydro and Power Authority F2020 to F2021 Revenue Requirements Application ~ Project No. 1598990

Panel: D. Morton (Chair), A. Fung, B. Lockhart and R. Mason

Hearing Location:
Date & Time: @
Location: , ,

Oral HearingG-218-19
2020/01/30 BC Hydro Net Metering Service Amendment Application
British Columbia Hydro and Power Authority Application to Amend Net Metering Service under Rate Schedule 1289 ~ Project No. 1599004

Panel: D. Cote (Chair), R. Mason and R. Revel

Hearing Location:
Date & Time: @
Location: , ,

BC Hydro Reply Argument - Without Rebuttal EvidenceG-217-19A
2020/01/31 BCUC Indigenous Utilities Regulation Inquiry
British Columbia Utilities Commission Indigenous Utilities Regulation Inquiry ~ Project No. 1598998

Panel: D. Morton (Chair), A. Fung, C. Brewer and B. Lockhart

Hearing Location:
Date & Time: @
Location: , ,

Final Report Issued to Minister Responsible for the Hydro and Power Authority ActG-214-19
2020/02/04 BC Hydro Net Metering Service Amendment Application
British Columbia Hydro and Power Authority Application to Amend Net Metering Service under Rate Schedule 1289 ~ Project No. 1599004

Panel: D. Cote (Chair), R. Mason and R. Revel

Hearing Location:
Date & Time: @
Location: , ,

BC Hydro Final Argument - With Rebuttal EvidenceG-217-19A
2020/02/18 BC Hydro Net Metering Service Amendment Application
British Columbia Hydro and Power Authority Application to Amend Net Metering Service under Rate Schedule 1289 ~ Project No. 1599004

Panel: D. Cote (Chair), R. Mason and R. Revel

Hearing Location:
Date & Time: @
Location: , ,

Interveners Final Argument - With Rebuttal EvidenceG-217-19A
2020/03/03 BC Hydro Net Metering Service Amendment Application
British Columbia Hydro and Power Authority Application to Amend Net Metering Service under Rate Schedule 1289 ~ Project No. 1599004

Panel: D. Cote (Chair), R. Mason and R. Revel

Hearing Location:
Date & Time: @
Location: , ,

BC Hydro Reply Argument - With Rebuttal EvidenceG-217-19A