British Columbia Transmission Corporation - Certificate of Public Convenience and Necessity Application for the Vancouver Island Transmission Reinforcement ~ Project No. 3698395 Sea Breeze Pacific Regional Transmission System, Inc. for a Certificate of Public Convenience and Necessity for Vancouver Island Cable Project

Completed: 2005

Hearing and Other Documents

Title Document Description
* Exhibit List Updated: May 26, 2006 @ 3:25 pm
* Distribution List Updated: March 13, 2006 @ 3:27 pm
* E-mail/Fax/Mail list Updated: March 13, 2006 @ 3:28 pm
*_Order of Speakers (Saltspring)
*_Order of Speakers (Tsawwassen)
Sea Breeze Reply to Change in Argument Dates
IRAHVOL Comments re: Change in Argument Filing Dates Response to Exhibit A-74
BCTC Response to Seabreeze - April 6 006
SeaBreeze Response to BCTC - April 6
BCTC Followup Argument Filing Dates - April 6 2006
BCH Comments Argument Filing Deadlines - April 7 2006
VITR - Final Submission Errata - April 12 2006 Submitted electronically April 12, 2006
BCTC- Submarine Cable Base Bid - April 27 2006 BCTC filing results fo the submarine cable bid
CEC - Reply to Intervenor Argument Errata - April 28 2006
Sea Breeze - Cable Tender Submission - May 11 2006
IRAHVOL - Response to BCTC Cable Tender - May 11 2006
TRAVHOL - Reply Submission re Section 25 complaint- May 12 2006
TRAHVOL - Reply Submission - May 12 2006
BCTC - Reply Submissions on Cable Tender - May 16 2006
Delta School District - Notice to Reopen - May 29 2006 Request from Delta School District to re-open the record to include two letters
IRAHVOL - Notice of Motion - May 29 2006
SDSS-PAC - Motion re new evidence - May 29 2006
TRAHVOL - Notice of Motion & Submissions - May 29 2006
City of Delta - Notice of Motion - May 29 2006
Hulquminum Treaty Group - Reply Submission - May 29 2006
*July 7 2006 VITR Decision & Order No. C-4-06
ANFINSON, Harley - Reconsideration Request - July 26 2006
SUTHERLAND, et al - Reconsideration Request - August 11 2006
10-05-06_BCTC-VITR Revised P90 and P50

Arguments/Submissions

Title Document Description
BCTC - Final Argument - April 5 & 12 2006
Island Trust - Final Argument - April 19 2006 Final Submissions of the Islands Trust
BC Hydro - Argument - April 19 2006
JIESC - Argument - April 19 2006
CAMPBELL, Bradley - Argument - April 19 2006
HOLMSEN, Karsten - Argument - April 19 2006
SDSS PAC - Argument - April 19 2006
BCOAPO - Argument - April 19 2006
Corp of Delta - Argument - April 19 2006
Bazzard-Maracaibo - Argument - April 19 2006
CEC - Argument - April 19 2006
Hul'qumi'num Treaty Group - Argument - April 19 2006
IRAHVOL - Final Argument - April 19 2006
NAM K.H. - Final Argument - April 19, 2006
Sea Breeze - Final Argument - April 19 2006
TRAHVOL - Final Argument - April 20 2006
BC Hydro - Errata to Argument - April 21 2006 Letter to BCUC providing errata to Argument filed on behalf of BC Hydro on April 19, 2006.
SDSS PAC - Reply to Intervenors Argument - April 26 2006
BCOAPO - Reply to Intervenor Argument - April 26 2006
TRAHVOL - Reply to Intervenor Argument - April 26 2006
BC Hydro - Reply to Intervenor Argument - April 26 2006
JIESC - Reply to Intervenor Argument - April 26 2006
K Holmsen - Reply to Intervenor Argument - April 26 2006
CAMPBELL Bradley - Reply to Intervenor Arguement - April 26 2006
SeaBreeze - Reply to Intervenor Arguments - April 26 2006
HTG - Reply to Intervenor Argument - April 26 2006
IRAHVOL - Reply to Intervenor Argument - April 26 2006
Corp of Delta - Authority to Final Argument - May 2 2006
BCTC Reply Argument dated May 5, 2006
BCTC - Reply Argument Errata - May 19 2006

Exhibits

A Exhibits - BCUC Documents

Date Title Document Description
July 13, 2005 A-1 Commission letter dated July 12, 2005 and Order No. G-70-05 establishing the Procedural Conference
July 26, 2005 A-2 Letter dated July 25, 2005 denying the TRAHVOL request for a delay of the Procedural Conference and advising that registrations for Intervenor and Interested Party status will be accepted until September 16, 2005 (Exhibit C3-4)
August 03, 2005 A-3 Letter dated August 3, 2004 to Gary Holman, Salt Spring Regional District regarding Exhibits submitted under BCTC’s Transmission System Capital Plan proceeding
August 05, 2005 A-4 Letter and Commission Information Request No. 1 dated August 5, 2005
August 09, 2005 A-5 Letter dated August 8, 2005 to TRAHVOL regarding submission of Information Requests
August 09, 2005 A-6 Letter dated August 9, 2005 and Order No. G-72-05 establishing a Pre-hearing Conference and Regulatory Timetable
August 11, 2005 A-7 Letter dated August 11, 2005 responding to TRAHVOL’s invitation to view a portion of the Tsawwassen corridor (Exhibit C3-10)
August 25, 2005 A-8 Letter dated August 22, 2005 responding to Pamela Sutherland’s invitation to view a portion of the Tswwassen corridor (Exhibit C36-2)
August 25, 2005 A-9 Letter dated August 22, 2005 responding to Charles Bazzard’s invitation to view a portion of the Tswwassen corridor (Exhibit C25-2)
August 25, 2005 A-10 Letter dated August 22, 2005 responding to Julie Berks’ invitation to view a portion of the Tsawwassen corridor (Exhibit C21-2)
August 30, 2005 A-11 Letter dated August 29, 2005 commenting on the process for consideration of TRAHVOL’s request that the zero rating of the HVDC system for planning purposes be included within the scope of the proceeding (Exhibit C3-12), and to identify the implications of the request for the regulatory process steps that are scheduled to occur prior to a decision regarding the TRAHVOL request
September 02, 2005 A-12 Letter dated September 1, 2005 listing the proposed dates and locations for the Town Hall Meetings
September 07, 2005 A-13 Letter and Commission Information Request No. 2 dated September 7, 2005
September 09, 2005 A-14 Letter dated September 9, 2005 requesting submissions on the Commission Panel’s proposed plan for corridor inspections
September 20, 2005 A-15 Letter dated September 20, 2005 to Karsten Holmsen - Request for extension denied
October 05, 2005 A-16 Letter dated October 4, 2005 and Order No. G-96-05 issuing an amended Regulatory Timetable
October 12, 2005 A-17 Letter No. L-87-05 dated October 12, 2005 amending a Revised Regulatory Timetable
October 19, 2005 A-18 Letter dated October 18, 2005 denying Sea Breeze’s request that the Commission require BCTC and any other participants who may wish to oppose the consolidation of the proceedings to review the VITR Application and the Vancouver Island Cable Project Application to file written argument (Exhibit C31-4)
October 19, 2005 A-19 Letter dated October 19, 2005 issuing the Agenda for the Pre-hearing Conference
October 27, 2005 A-20 Letter dated October 26,2005 – Information Request No. 1 to BC Hydro
October 27, 2005 A-21 Letter dated October 26,2005 – Information Request No. 1 to IRAHVOL
October 27, 2005 A-22 Letter dated October 26,2005 – Information Request No. 1 to Karsten Holmsen
October 27, 2005 A-23 Letter dated October 26,2005 – Information Request No. 1 to South Delta Secondary School Parent Advisory Council
October 27, 2005 A-24 Letter dated October 26,2005 – Information Request No. 1 to Islands Trust
October 27, 2005 A-25 Letter dated October 26,2005 – Information Request No. 1 to Sea Breeze Pacific Regional Transmission System, Inc.
October 27, 2005 A-26 Letter dated October 26,2005 – Information Request No. 1 to Corporation of Delta
October 27, 2005 A-27 Letter dated October 26,2005 – Information Request No. 1 to TRAHVOL
October 27, 2005 A-28 Letter and Order G-109-05 dated October 27, 2005 – Revised Regulatory Timetable
November 03, 2005 A-29 Letter dated November 3, 2005 to the Hul’qumi’num Treaty Group establishing a written comment process for the HTG requests and other submissions as set out in Exhibits C27-3, C27-5 and C27-7
November 09, 2005 A-30 Letter dated November 9, 2005 – 2 Issues at Pre-Hearing Conference
November 15, 2005 A-31 Letter dated November 15, 2005 – Submission of Commission Counsel to Hul’qumi’num Treaty Group Submissions
November 18, 2005 A-32 Letter dated November 15, 2005 – Consolidation of BCTC-VITR and Sea Breeze VIC Proceedings
November 21, 2005 A-33 Letter dated October 6, 2005 enclosing Order No. G-97-05 and Notice of Pre-hearing Conference ~ *Previously A-1 in Sea Breeze VIC proceeding
November 21, 2005 A-34 Letter dated October 17, 2005 - Information Request No. 1 to Sea Breeze ~ *Previously A-2 in Sea Breeze VIC proceeding
November 21, 2005 A-35 Letter dated November 18, 2005 – Information Request No. 2 to Sea Breeze
November 24, 2005 A-36 Letter dated November 18, 2005 to BCTC and Sea Breeze – Commission Panel scope decision addressing the TRAHVOL Complaint (C3-21) discussed at the Pre-hearing Conference
November 25, 2005 A-37 Commission Counsel letter dated November 25, 2005 re: Mikisew Cree First Nation Court of Appeal Decision
November 25, 2005 A-38 Letter dated November 25, 2005 to the Hul’qumi’num Treaty Group granting an extension of time for HTG to file a further reply submission addressing the BC Hydro Submission (Exhibit C6-5)
November 25, 2005 A-39 Letter No. L-102-05 dated November 25, 2005 – Notice of Town Hall Meetings
December 02, 2005 A-40 Letter No. L-103-05 dated December 1, 2005 - Commission Panel Decision regarding HTG’s request for Advance Orders and other submissions as set out in Exhibits C27-3, C27-5, and C27-7 and issues a revised Regulatory Timetable
December 08, 2005 A-41 Letter dated December 8, 2005 providing procedural information on the public hearing process to Participants
December 08, 2005 A-42 Letter dated December 8, 2005 accepting Bonneville Power Administration request for Interested Party status and reassigning Exhibit E-19 as Exhibit D-71
December 09, 2005 A-43 Letter dated December 9, 2005 approving BCTC’s request for an extension to the filing date for Intervenor Evidence
December 14, 2005 A-44 Letter dated December 14, 2005 to Karsten Holmsen and John Cross responding to their requests for an extension to the time limit for presentations at the Town Hall Meetings
December 19, 2005 A-45 Letter dated December 16, 2005 requesting Participants to comment on the proposed draft Revised Regulatory Timetable and notice that Exhibits B2-9 and B2-10 are withdrawn
December 20, 2005 A-46 Letter dated December 20, 2005 responding to Karsten Holmsen’s December 18, 2005 letter (Exhibit C1-20) requesting an opportunity for Intervenors to make presentations at Town Hall Meetings as well as in the Oral Hearing, in part, to provide supplemental information to the public that BCTC has not addressed
December 22, 2005 A-47 Letter dated December 22, 2005 and Order No. G-141-05 issuing a Revised Regulatory Timetable and a revised Notice of Town Hall Meetings
January 06, 2006 A-48 Letter dated January 5, 2006 to Maureen Broadfoot providing clarification of the purpose of the Town Hall Meetings
January 06, 2006 A-49 Letter dated January 5, 2006 to Valerie Roddick providing clarification of the purpose of the Town Hall Meetings
January 06, 2006 A-50 Letter dated January 5, 2006 to Daria Zovi, IRAHVOL, clarifying the purpose of presentations at the Town Hall Meetings
January 06, 2006 A-51 Letter dated January 5, 2006 to Hans Karow, CORE, advising that the deadline for filing evidence had passed and that the book noted in Exhibit C46-8 would not be accepted as evidence
January 10, 2006 A-52 Letter dated January 9, 2006 issuing Commission Information Request No. 1 to the City of White Rock
January 10, 2006 A-53 Letter dated January 9, 2006 issuing Commission Information Request No. 3 to British Columbia Transmission Corporation
January 10, 2006 A-54 Letter dated January 9, 2006 issuing Commission Information Request No. 3 to IRAHVOL
January 10, 2006 A-55 Letter dated January 9, 2006 issuing Commission Information Request No. 1 to Islands Trust
January 19, 2006 A-56 Letter dated January 19, 2006 Commission Information Request No. 4 to British Columbia Transmission Corporation
January 19, 2006 A-57 Letter to Hans Karow regarding emails to Chair and Panel Members
January 24, 2006 A-58 Letter to Intervenors confirming the details of the Opening Oral Submissions, the Proponent Consolidation of the Hearing Issues List and the Date and Location of Oral Hearing
January 24, 2006 A-59 Letter dated January 19, 2006 Commission Information Request No. 3 to Sea Breeze Victoria Converter Corporation
January 24, 2006 A-60 Letter dated January 20, 2006 asking Sea Breeze to respond to a customer inquiry from Lynne Schroder (Exhibit E-73)
January 25, 2006 A-61 Letter dated January 24, 2006 responding to Mr. Holmsen’s questions regarding the hearing process (Exhibit C1-22)
January 25, 2006 A-62 Letter dated January 24, 2006 to Participants enclosing the Order of Appearances for the Opening Oral Submissions session scheduled for January 30, 2006 and requesting Participants to advise Commission Counsel of their intention to make an Opening Statement
January 26, 2006 A-63 Letter dated January 25, 2006 to the City of White Rock granting Leave to file the Council Resolution as evidence with respect to the Sea Breeze VIC (Exhibit 57-4)
January 27, 2006 A-64 Letter dated January 26, 2006 and Commission Staff Issues List
January 27, 2006 A-65 Letter dated January 27, 2006 advising participants that the Commission Panel will release a Hearing Issues List based on the issues raised during the Oral Submissions on January 30, 2006
February 02, 2006 A-66 Letter dated February 1, 2006 on the Orders of Cross-examination for BCTC Panels 1, 2, and 3
February 02, 2006 A-67 Letter dated February 1, 2006 to BCTC with Commission Information Request No. 5
February 03, 2006 A-68 Letter dated February 2, 2006 from BCUC’s Counsel responding to K. Holmsen inquiries on the Order of Cross-Examination for BCTC’s Witness Panels (Exhibit C1-32)
February 03, 2006 A-69 Letter dated February 3, 2006 with Commission Information Request No. 6 to BCTC regarding Exhibit B1-44 to BCUC IR 3.179.1
February 03, 2006 A-70 Letter dated February 3, 2006 enclosing the Hearing Issues List for the VITR-VIC Public Hearing
March 21, 2006 A-71 Submission at Public Hearing – Revised Hearing Issues List
March 27, 2006 A-72 Letter dated March 27, 2006 responding to Christopher Bystrom of Fasken Martineau DuMoulin regarding his request to strike Evidence from the Record
April 04, 2006 A-73 Letter dated April 3, 2006 to Seabreeze requesting response to BC Hydro’s request (Exhibit C6-28) no later than noon, April 4, 2006
April 04, 2006 A-74 Letter dated April 4, 2006 to participants requesting responses to BCTC’s request to change the Argument filing schedule
April 04, 2006 A-75 Letter dated April 4, 2006 approving BC Hydro's request (Exhibit C31-57) to strike a portion of Sea Breeze's Response to Undertakings to BC Hydro at Transcript Volume 33, pages 6261-6262
April 07, 2006 A-76 Letter dated April 7, 2006 to participants amending the Argument filing dates and Evidentiary schedule
May 24, 2006 A-77 Letter dated May 24, 2006 confirming Oral Phase of Argument to take place on May 30, 2006
May 26, 2006 A-78 Letter dated May 26, 2005 issuing the Oral Argument Issues List
February 13, 2006 A2-1 Report and Recommendations of the Public Inquiry in the Matter of Complaints against British Columbia Hydro and Power Authority and its proposed 230 kV transmission Line from Dunsmuir to Gold River, dated July 26, 1989
February 13, 2006 A2-2 Inquiry Report Commission Decision and Exhibit A-22 on the Inquiry relating to the Undergrounding of the Overhead Transmission Lines along Boundary Road in the City of Vancouver dated May 26, 1995
February 13, 2006 A2-3 Inquiry Report in the Matter of West Kootenay Power Limited and the Routing of Line Number 49 in the Vicinity of Penticton, B dated January 14, 1998
February 13, 2006 A2-4 Commission Decision in the Matter of West Kootenay Power Limited Certificate of Public Convenience and Necessity for Line Number 44, dated August 5th, 1998
February 13, 2006 A2-5 British Columbia Utilities Commission Decision in the Matter of West Kootenay Power Limited, Certificate of Public Convenience and Necessity for the Kootenay 230 kV System Development Project dated June 5, 2000
February 13, 2006 A2-6 Commission Letter No. L-31-01 with attached Reasons for Decision dated October 25, 2001 relating to the Complaint on the Routing of the 230 kV Transmission Lines through the Ootschenia area
February 13, 2006 A2-7 Commission Letter No. L-34-02 dated September 6, 2002 in the matter of the Aquila Networks Canada (British Columbia) Ltd. and the Application for Reconsideration of Commission Decision and Order No. G-46-01
February 14, 2006 A2-8 Extracts from Special Direction, HC-1 and HC-2
February 22, 2006 A2-9 Submission at Public Hearing -Excerpt, Headed “1.4 The Nature of Commission Approvals”, Page 2
March 16, 2006 A2-10 Submission at Public Hearing – Principles of Corporate Finance, the First Canadian Edition
March 21, 2006 A2-11 Submission at Public Hearing – Page from Spreadsheet in Exhibit B1-44

B Exhibits - Applicant Documents

Date Title Document Description
July 07, 2005 B1-1 (Part 1 of 2) British Columbia Transmission Corporation letter dated July 7, 2005 and Certificate of Public Convenience and Necessity Application for the Vancouver Island Transmission Reinforcement Project - ( NOTE: Due to the size of this file, Exhibit B-1 is being posted in two parts )
July 07, 2005 B1-1 (part 2 of 2)
July 12, 2005 B1-2 Letter dated July 12, 2005 providing amendments to the July 7, 2005 CPCN application for the Vancouver Island Transmission Reinforcement Project
July 26, 2005 B1-3 Letter dated July 26, 2005 responding to the TRAHVOL letter of July 23, 2005 (Exhibit C3-4)
August 03, 2005 B1-4 Letter dated July 29, 2005 advising that BCTC will address the Salt Spring Regional District’s Transmission System Capital Plan (VITR Exhibits C2-2 and C2-3) during the VITR proceeding
August 22, 2005 B1-5 Letter dated August 18, 2005 to Neil Atchinson and Cecil Dunn, TRAHVOL, regarding Minister Neufeld's letter of July 29 and responding to questions raised by TRAHVOL regarding the Vancouver Island Transmission Reinforcement Project
August 26, 2005 B1-6 Letter dated August 29, 2005 filing Responses (Volumes 1, 2 and 3) to Commission Information Request No. 1
August 30, 2005 B1-6A Excel Spreadsheets pertaining to BCUC IR-1, Question 1.19.5 (5MB zipped file)
August 31, 2005 B1-7 Letter dated August 31, 2005 filing amendments to the July 7, 2005 Certificate of Public Convenience and Necessity Application for the Vancouver Island Transmission Reinforcement Project
September 13, 2005 B1-8 Letter dated September 13, 2005 response regarding proposed inspection
September 22, 2005 B1-9 Response dated September 22, 2005 regarding Karsten Holmsen’s late Information Request
September 27, 2005 B1-10 Letter dated September 27, 2005 unable to file IR Responses today
September 27, 2005 B1-11 Letter dated September 27, 2005 – Partial set of Responses to BCUC IR No. 2 and Intervenor IR No. 1
September 28, 2005 B1-12 Letter dated September 28, 2005 – Revised response to BCUC IR No. 1.110.1
September 28, 2005 B1-13 Letter dated September 28, 2005 – Revised Tables in IR’s
September 30, 2005 B1-14 Letter dated September 30, 2005 – Information Request Extension Clarification
October 05, 2005 B1-15 E-mail dated October 4, 2005 to Karsten Holmsen regarding the distribution of the IR-2 resonses
October 07, 2005 B1-16 Letter dated October 7, 2005 responding to Exhibits A-6, A-11 and B-15
October 12, 2005 B1-17 Letter dated October 11, 2005 filing second installment of Information Responses to Commission IR-2 and Intervenor IRs-1
October 14, 2005 B1-18 Letter dated October 14, 2005 filing the final installment of Information Responses to Commission IR-2 and Intervenor IRs-1
October 24, 2005 B1-19 Letter dated October 21, 2005 filing responses to Late Information Requests from Maureen Broadfoot; Glen Page; and Karsten Holmsen
October 27, 2005 B1-20 Letter dated October 26, 2005 – Information Request to Corporation of the City of Delta
October 27, 2005 B1-21 Letter dated October 26, 2005 – Information Request to IRAHVOL
October 27, 2005 B1-22 Letter dated October 26, 2005 – Information Request to Karsten Holmsen
October 27, 2005 B1-23 Letter dated October 26, 2005 – Information Request to Pam Sutherland
October 27, 2005 B1-24 Letter dated October 26, 2005 – Information Request to SDSSPAC
October 27, 2005 B1-25 Letter dated October 26, 2005 – Information Request to Maracaibo Estates Ltd.
October 27, 2005 B1-26 Letter dated October 26, 2005 – Information Request to TRAHVOL
October 27, 2005 B1-27 Letter dated October 26, 2005 – Information Request to Sea Breeze
October 27, 2005 B1-28 Letter dated October 26, 2005 – Information Request to J. Truscott
October 28, 2005 B1-29 Letter dated October 26, 2005 – Information Request to Islands Trust
November 08, 2005 B1-30 Letter dated November 8, 2005 – Amendment to Application
November 17, 2005 B1-31 Letter dated November 15, 2005 – Response to Hul’qumi’num Treaty Group Information Request
November 21, 2005 B1-32 BRITISH COLUMBIA TRANSMISSION CORPORATION – Letter dated October 18, 2005 requesting Intervenor Status ~ Previously C9-1 in Sea Breeze VIC proceeding
November 21, 2005 B1-33 Information Request No. 1 dated November 18, 2005 to Sea Breeze regarding the Vancouver Island Cable Project
November 21, 2005 B1-34 Revised Information Request Questions 45 & 46 dated November 21, 2005 to Sea Breeze regarding the Vancouver Island Cable Project
December 09, 2005 B1-35 Facsimile dated December 9, 2005 – Regarding filing of Intervenor Evidence
December 15, 2005 B1-36 Letter dated December 15, 2005 requesting a further extension to the filing of Intervenor Evidence
December 16, 2005 B1-37 Letter dated December 16, 2005 filing a report on the potential effect on property values of the VITR Project prepared by Larry Dybvig of Grover, Elliot & Co. Ltd. and the response of Dr. Linda Erdreich of Exponent to the evidence of Dr. Havas on the health effects associated with electromagnetic fields
December 20, 2005 B1-38 Letter dated December 20, 2005 commenting on the draft revised proceeding timetable
December 21, 2005 B1-39 Letter dated December 21, 2005 filing BCTC’s Intervenor Evidence regarding Sea Breeze’s VIC
January 04, 2006 B1-40 Letter dated January 3, 2006 filing supporting documentation to the Rebuttal Evidence of Linda Erdreich contained in Exhibit B1-37 (11.3 MB zipped files)
January 09, 2006 B1-41 Information Request No. 1 to the City of White Rock dated January 9, 2006 regarding the VIC
January 11, 2006 B1-42 Letter dated January 10, 2006 from the Environmental Assessment Office (on behalf of BCTC) filing a copy of the environmental assessment procedural order for the VITR project
January 18, 2006 B1-43 Letter dated January 18, 2006 from Marcel Reghelini filing BCTC’s witness panels
January 23, 2006 B1-44 Letter dated January 23, 2006 filing partial responses to information requests on Exhibit B1-39 (BCTC Intervenor Evidence on VIC)
January 25, 2006 B1-45 Letter dated January 24, 2006 responding to Maureen Broadfoot’s concerns regarding the project description document on BCTC’s website
January 25, 2006 B1-46 Letter dated January 26, 2006 responding to Karsten Holmsen’s request and BCTC’s decision that Mr. Gallagher will not appear as a witness
January 26, 2006 B1-47 Letter dated January 25, 2006 filing remainder of responses to information requests on Exhibit B1-39 (BCTC Intervenor Evidence on VIC) - Part 2
January 26, 2006 B1-48 Letter dated January 26, 2006 advising that the EMF Witness Panel may not be able to proceed until later in the hearing due to the availability of Mr. Dybvig and Mr. Havas
January 29, 2006 B1-49 Letter dated January 29, 2006 filing remainder of responses to Information Requests on Exhibit B1-39 (BCTC Intervenor Evidence on VIC) – Part 3
January 31, 2006 B1-50 Opening Statement of Mr. Carpenter. Document submitted at the Opening Oral Hearing.
January 31, 2006 B1-51 Letter dated January 27, 2006 responding to Karsten Holmsen’s request and BCTC’s decision that Ms. Peverett will not appear as a witness
January 31, 2006 B1-52 Letter dated January 31, 2006 filing BCTC’s Information Request to Karsten Holmsen’s regarding Exhibit C1-25
February 01, 2006 B1-53 Letter dated February 1, 2006 filing BCTC’s consolidated issues list presented to the Commission Panel on February 1, 2006
February 01, 2006 B1-54 Letter dated February 1, 2006 response to BCUC Information Request No. 4 plus a guideline that identifies the Exhibit in which each of the BCTC IR’s responses was filed
February 03, 2006 B1-55 Letter dated February 3, 2006 with Witness Panel Qualifications with correction to titles of witnesses attached re: Exhibit B1-43
February 03, 2006 B1-56 Letter dated February 3, 2006 filing revisions to the following BCUC and Sea Breeze Information Responses • BCUC IR 1.3.7 • BCUC IR 1.36.1 • BCUC IR 1.91.1 • BCUC IR 3.178.5 • BCUC IR 3.181.4 • BCUC IR 3.184.3 • BCUC IR 3.191.1 • Sea Breeze IR 2.4.1 • Sea Breeze IR 2.13.2 • Sea Breeze IR 2.65.1
February 03, 2006 B1-57 British Columbia Transmission Corporation filing of Archaeological Assessments, Test Hole Data, and Transcript of Tsawwassen Information Session, dated February 6, 2006
February 14, 2006 B1-58 Direct Evidence of Don Gamble
February 14, 2006 B1-59 Group of Revised Information Requests
February 14, 2006 B1-60 Response to Undertaking at Transcript Volume 8, Page 1162 Line 24 to Page 1163 Line 9
February 14, 2006 B1-61 Response to BCUC’s Information Request No. 5.205.1, 5.205.2, 5.205.3 and 6.206.0
February 14, 2006 B1-62 Transcript Errata for the Community Information Session on Tuesday, May 31, 2005
February 15, 2006 B1-63 “Vancouver Island 230 KV Transmission Reinforcement Project, Hwy #17 to English Bluff Area Restoration Cost Assessment”
February 15, 2006 B1-64 “VITR Incentive / Penalty Mechanism”
February 15, 2006 B1-65 Expected Energy Not Served (EENS) Study For Vancouver Island Transmission Reinforcement Project (Part IV) - Dated January 9, 2006
February 15, 2006 B1-66 Revised “Non-Natural Marine Hazards Assessment – February 14, 2006
February 22, 2006 B1-67 Submission at Public Hearing - Vancouver Island Transmission Reinforcement (VITR) Project, Comparison of Suggested Route Alternatives at Tsawwassen – Revised February 14, 2006
February 22, 2006 B1-68 Submission at Public Hearing - “Non-Financial Ranking of Project Alternatives – Tsawwassen” BCUC Information Request 4.204.0, Revised Response Issued February 15, 2006
February 22, 2006 B1-69 Submission at Public Hearing – Undertaking of Mr. Barrett, BCTC to Mr. Austin, IRAHVOL
February 22, 2006 B1-70 Submission at Public Hearing – Memorandum from Christopher Bystrom of Fasken Martineau
February 22, 2006 B1-71 Submission at Public Hearing – Response to Information Request, Volume 17, Pages 2895-2896 and 2898-2899
February 22, 2006 B1-72 Submission at Public Hearing – VI Transmission Reinforcement Project team organization chart
February 22, 2006 B1-73 Submission at Public Hearing – Undertaking of Mr. Dunne, BCTC to Mr. Holmsen
February 22, 2006 B1-74 Submission at Public Hearing – Undertaking of Mr. MacPhail, BCTC, to Mr. Landy, Sea Breeze
February 22, 2006 B1-74A Submission at Public Hearing – Transcript, Vol. 18, Page 3238, Line 12 to Page 3239, Line 9
February 22, 2006 B1-75 Submission at Public Hearing – Draft Report on Geotechnical Stability Assessment
February 22, 2006 B1-76 Submission at Public Hearing – Documents received from Mr. Carpenter
February 22, 2006 B1-77 Submission at Public Hearing – Graph, EMF Levels measured at ground level
February 22, 2006 B1-78 Submission at Public Hearing – NERC Standard
February 22, 2006 B1-79 Submission at Public Hearing – Revised Monte Carlo Analysis Summary Table
February 22, 2006 B1-80 Submission at Public Hearing – Seismic Review of Galiano Island, Parker Island and Salt Spring Island Cable Terminal Sites
February 24, 2006 B1-81 Submission at Public Hearing – Official Community Plan of Salt Spring Island
February 27, 2006 B1-82 Submission at Public Hearing – Group of documents from the Corporation of Delta
February 27, 2006 B1-83 Submission at Public Hearing – Undertaking of BCTC to Ms. Kudzin
February 27, 2006 B1-84 Submission at Public Hearing – Undertaking of Mr. Barrett to Mr. Arvay
February 27, 2006 B1-85 Submission at Public Hearing – Probability distribution in figure-related conceptual form
February 27, 2006 B1-86 Submission at Public Hearing – 1958 aerial photograph of Delta
February 28, 2006 B1-89 Submission at Public Hearing – Tsawwassen First Nation Agreement in principle
March 01, 2006 B1-90 Submission at Public Hearing – Corporation of Delta, Minutes of Regular Meeting of July 10, 2001
March 01, 2006 B1-91 Submission at Public Hearing – Document headed “May 16, 2001 – Risk of Undersea Slides Threaten Delta’s Foreshore”, to Mayor and Council from the Environmental Advisory Committee
March 01, 2006 B1-92 Submission at Public Hearing – “Volume 15, No. 2, 2004, Documents of the NRPB, Advise on Limiting Exposure to Electromagnetic Fields (0-300 GHZ)
March 01, 2006 B1-93 Submission at Public Hearing – Printout from World Health Organization website, “Electromagnetic Fields (EMF)”
March 01, 2006 B1-94 Submission at Public Hearing – Response to Information Request at Volume 20, Page 3849
March 01, 2006 B1-95 Submission at Public Hearing – Response to Information Request at Volume 20, Page 3634
March 01, 2006 B1-96 Submission at Public Hearing – Material from TRAHVOL’s website
March 01, 2006 B1-97 Submission at Public Hearing – Undertaking of BCTC to Mr. Herbert, Sea Breeze
March 03, 2006 B1-98 Undertaking of BCTC to Commissioner Hobbs at Transcipt Volume 21, Page 3856, Lines 14 to 19
March 03, 2006 B1-99 Undertaking of Mr. Barrett, BCTC to Commissioner Nicholls at Transcipt Volume 19, Page 3477. Line 22, to Page 3478, line 2
March 03, 2006 B1-100 Undertaking of Mr. McPhail, BCTC to Mr. Fulton, BCUC Counsel at Transcipt Volume 19, Page 3429, Lines 10 to 17
March 06, 2006 B1-101 Submission at Public Hearing – Undertaking of BCTC to Commissioner O’Hara
March 06, 2006 B1-102 Submission at Public Hearing – Letter from Chair of Manitoba Clean Environment Commission dated September 21, 2001
March 06, 2006 B1-103 Submission at Public Hearing – National Energy Board’s Environmental Screening Report on the Sumas 2 Hearing, with the Boards’ comments on the EMF issue
March 06, 2006 B1-104 Submission at Public Hearing – Letter from United States Environmental Protection Agency dated January 29th, 1992 with respect to potential carcinogenicity of Electromagnetic Fields
March 06, 2006 B1-105 Submission at Public Hearing – Article entitled “Electromagnetic Hypersensitivity, A Systematic Review of Provocation Studies” by Dr. James Rubin and two co-authors
March 06, 2006 B1-106 Submission at Public Hearing – World Health Organization Fact Sheet dated December 2005, headed “Electromagnetic Fields and Public Health, Electromagnetic Hypersensitivity”
March 06, 2006 B1-107 Submission at Public Hearing – Study from UK Health Protection Agency Entitled “Power Frequency Electromagnetic Fields, Melatonin and the risk of Breast Cancer, Report of an Independent Advisory Group on Non-ionizing Radiation”
March 06, 2006 B1-108 Submission at Public Hearing – Paper entitled “Childhood Cancer in Relation to Distance from High Voltage Power Lines in England and Wales: A Case-Controlled Study” by Draper et al
March 06, 2006 B1-109 Submission at Public Hearing – Document entitled “Framework Guiding Public Health Policy, Options and Areas of Scientific Uncertainty Dealing with EMF”, dated June 2005
March 06, 2006 B1-110 Submission at Public Hearing – Undertaking of Mr. Gabel, BCTC, to Commissioner Hobbs
March 06, 2006 B1-111 Submission at Public Hearing – Undertaking of Mr. Barrett, BCTC to Commissioner O’Hara
March 09, 2006 B1-112 Submission at Public Hearing – Undertaking of Mr. Barrett, BCTC, to Mr. Yarley, Delta
March 09, 2006 B1-113 Submission at Public Hearing – Spreadsheet with planning level estimates highlighted
March 10, 2006 B1-114 Submission at Public Hearing – Undertaking of Mr. Gabel, BCTC, to Commissioner Hobbs
March 10, 2006 B1-115 Submission at Public Hearing – BCTC Sea Breeze Panel 1 documents
March 10, 2006 B1-116 Submission at Public Hearing – Sea Breeze’s responses to NEB’s first round of Information Requests in NEB Hearing
March 10, 2006 B1-117R Submission at Public Hearing – Letter from Sea Breeze to Rob Pellatt of BCTC dated November 25, 2004
March 10, 2006 B1-118 Submission at Public Hearing – Sea Breeze Power Corp. News Release dated September 16, 2005
March 10, 2006 B1-119 Submission at Public Hearing – Undertaking of Mr. Gabel, BCTC to Commissioner Hobbs
March 10, 2006 B1-120 Submission at Public Hearing – Undertaking of BCTC to Mr. Austin, IRAHVOL
March 10, 2006 B1-121 Submission at Public Hearing – Undertaking of Mr. Barnett, BCTC to Mr. Landy, Sea Breeze
March 15, 2006 B1-122 Submission at Public Hearing – BCTC Transmission Corporation Results for VITR Voltage Studies
March 15, 2006 B1-123 Submission at Public Hearing – Letter identifying BCTC’s Witness Panel
March 15, 2006 B1-124 Submission at Public Hearing – Undertaking of BCTC to Mr. Herbert, Sea Breeze
March 15, 2006 B1-125 Submission at Public Hearing – Undertaking of BCTC to Karsten Holmsen
March 15, 2006 B1-126 Submission at Public Hearing – Undertaking of BCTC to Karsten Holmsen
March 15, 2006 B1-127 Submission at Public Hearing – Letter from Esquimalt First Nation to National Energy Board dated March 13, 2006
March 16, 2006 B1-128 Submission at Public Hearing – Letter from MacLeod Dixon dated December 20, 2002, with attached Report from Jacques Whitford & Associates
March 17, 2006 B1-129 Submission at Public Hearing – Figure 4A, Boomer Seismic Profiles across the southern Roberts Bank Delta Front
March 17, 2006 B1-130 Submission at Public Hearing – Two pages re: BC Hydro 230 KV Corridor Southern Straight of Georgia, Stage 1 Marine Geologic Hazards
March 17, 2006 B1-131 Submission at Public Hearing – “The Columbia River Treaty Entity Agreement, Aspects of the Delivery of the Canadian Entitlement”
March 17, 2006 B1-132 Submission at Public Hearing – Letter to Board of Governors, California Independent System Operator dated September 1, 2006
March 23, 2006 B1-133 Submission at Public Hearing – Geotechnical Input to the Seismic Vulnerability Assessment of the City of Surrey Sanitary Sewer System
April 12, 2006 B1-134 Letter dated April 12, 2006 filing response to outstanding Undertakings
May 04, 2006 B1-135 Letter dated May 4, 2006 filing a report described by Mr. Nelson at Transcript 37, pages 7238-7246, given during the evidentiary phase
November 21, 2005 B2-1 September 30, 2005 Letter and Application for Vancouver Island Cable Project ~ Previously B-1 in Sea Breeze VIC proceeding
November 21, 2005 B2-2 Letter dated October 12, 2005 – Confirmation of filing requirements by P. John Landry, Davis & Company ~ *Previously B-2 in Sea Breeze VIC proceeding
November 21, 2005 B2-3 Letter dated October 14, 2005 – Notice of Assignment ~ *Previously B-3 in Sea Breeze VIC proceeding
November 21, 2005 B2-4 Letter dated October 17, 2005 – Detailed Written Submission to be filed October 18, 2005 ~ *Previously B-4 in Sea Breeze VIC proceeding
November 21, 2005 B2-5 Letter dated October 18, 2005 – Consolidation Application and Proposed Timetable ~ *Previously B-5 in Sea Breeze VIC proceeding
November 21, 2005 B2-6 Letter dated October 20, 2005 – Authorities referred to in Exhibit B-5 ~ *Previously B-6 in Sea Breeze VIC proceeding
November 21, 2005 B2-7 Letter dated October 20, 2005 – Draft Terms of Reference ~ *Previously B-7 in Sea Breeze VIC proceeding
November 21, 2005 B2-8 E-mail dated November 7, 2005 – Response to Commission Information Request No. 1 ~ *Previously B-8 in Sea Breeze VIC proceeding
November 21, 2005 B2-9 CONFIDENTIAL -- Letter dated November 7, 2005 – Confidential Response to Commission Information Request ~ *Previously B-9 in Sea Breeze VIC proceeding
November 21, 2005 B2-10 CONFIDENTIAL -- Facsimile dated November 9, 2005 – Response to Commission Information Request No. 1.8.2 ~ *Previously B-10 in Sea Breeze VIC proceeding
November 21, 2005 B2-11 Letter dated November 17, 2005 – Responses to BCTC Information Request No. 1
November 21, 2005 B2-12 Letter dated November 18, 2005 – Outstanding responses to Commission Information Request No. 1 regarding VIC
November 23, 2005 B2-13 Letter dated November 18, 2005 filing outstanding responses to Commission Information Request No. 1 regarding the Sea Breeze Intervenor Evidence on VITR (2nd installment)
November 29, 2005 B2-14 Letter dated November 29, 2005 – Response to Commission Information Request No. 1.7.2
November 29, 2005 B2-15 Letter dated November 29, 2005 – Revised response to Commission Information Request No. 1.76.2
December 07, 2005 B2-16 Letter dated December 6, 2005 – Dispute Exhibit E-19 Letter of Comment
December 07, 2005 B2-17 Letter dated December 6, 2005 – Response to Commission Information Request No. 2
December 07, 2005 B2-18 Letter dated December 6, 2005 – Supplemental Information to Commission Information Requests No. 1.17.1 and 1.25.1
December 08, 2005 B2-19 Letter dated December 7, 2005 – Response to BC Hydro Information Request No. 1
December 08, 2005 B2-20 Letter dated December 7, 2005 – Responses to BCTC Information Request No. 1
December 09, 2005 B2-21 Letter dated December 8, 2005 – Additional responses to BCTC Information Request No. 1
December 12, 2005 B2-22 Letter dated December 9, 2005 commenting on BCTC’s request for an extension of time for the filing of Intervenor Evidence related to the VIC
December 12, 2005 B2-23 Letter dated December 9, 2005 enclosing a copy of the Sea Breeze response to BCTC’s December 8, 2005 request for a copy of the VIC studies
December 12, 2005 B2-24 Letter dated December 9, 2005 filing outstanding responses to BCTC IR-1 regarding the VIC
December 12, 2005 B2-25 Letter dated December 12, 2005 filing outstanding responses to Commission Information Request No. 2 regarding the VIC
December 12, 2005 B2-26 Letter dated December 12, 2005 filing outstanding responses to BCTC IR-1 regarding Sea Breeze Intervenor Evidence on VITR
December 12, 2005 B2-27 Letter dated December 12, 2005 filing outstanding responses to BC Hydro IR-1 regarding the VIC
December 13, 2005 B2-28 Letter dated December 12, 2005 filing outstanding responses (3rd installment) to BCTC IR-1 regarding the VIC
December 13, 2005 B2-29 Letter dated December 13, 2005 filing outstanding responses (4th installment) to BCTC IR-1 regarding the VIC
December 13, 2005 B2-30 Letter dated December 13, 2005 filing outstanding response to BCUC IR 1.56.1
December 14, 2005 B2-31 Letter dated December 14, 2005 filing outstanding responses (5th installment) to BCTC IR-1 regarding the VIC
December 14, 2005 B2-32 Letter dated December 14, 2005 filing outstanding responses (Final installment) to BCTC IR-1 regarding Intervenor Evidence relating to the VITR
December 15, 2005 B2-33 Letter dated December 15, 2005 filing outstanding responses (Final installment) to BCTC IR-1 regarding the VIC
December 15, 2005 B2-34 Letter dated December 15, 2005 responding to BCTC’s request for a further extension to the filing date for Intervenor Evidence (Exhibit B1-36)
December 16, 2005 B2-35 Letter dated December 16, 2005 filing outstanding responses (Final installment) to BCUC IR-2 regarding the VIC
December 21, 2005 B2-36 Letter dated December 20, 2005 supporting the draft Revised Regulatory Timetable
January 04, 2006 B2-37 Letter dated January 4, 2006 filing responses to BCTC IRs 1.21.2, 1.21.3, 1.24.9 and 1.24.11 regarding Sea Breeze’s Intervenor Evidence with respect to the VITR Application that were inadvertently omitted from the responses to BCTC IR No. 1 (VITR) that were filed with the Commission in Exhibits B2-11, B2-20, B2-26 and B2-32
January 10, 2006 B2-38 Letter dated January 9, 2006 issuing Information Request No. 1 to BCTC regarding its Intervenor Evidence on the VIC
January 11, 2006 B2-39 Letter dated January 11, 2006 listing corrections to Sea Breeze’s Information Request No. 1 to the British Columbia Transmission Corporation regarding its Intervenor Evidence in the VIC (Exhibit B2-38)
January 15, 2006 B2-40 Email response dated January 9, 2006 to Letter of Comment dated January 8, 2006 from Derek & Karen Lorimer
January 25, 2006 B2-41 Letter dated January 25, 2006 to the Fraser River Estuary Management Program (FREMP) requesting they clarify the role they expect to play in the review by the Environmental Assessment Office
January 25, 2006 B2-42 Letter dated January 25, 2006 proposing an amendment to the Order of Testimony of BCTC’s Witness Panels (Exhibit A-41)
January 25, 2006 B2-43 Letter dated January 25, 2006 responding to an Letter of Comment from Lynne Schroder’s concern on two property lots being affected and requesting clarification (Exhibit E-73)
January 27, 2006 B2-44 Letter dated January 26, 2006 responding to a Letter of Comment from Gordon Hammond, Chair of the White Rock Ratepayers Association (Exhibit E-46)
January 31, 2006 B2-45 Sea Breeze Opening Statement
January 31, 2006 B2-46 Letter dated January 31, 2006 from Davis & Company responding to comments made during Opening Oral Submissions (Transcript Vol. 6, pp. 782-788) regarding VITR Related Issues identified by Sea Breeze
February 01, 2006 B2-47 Letter dated February 1, 2006 from Davis & Company referring to Exhibit B2-46 and enclosing Sea Breeze’s consolidation of the hearing issues list to the VIC Application
February 02, 2006 B2-48 Letter dated February 1, 2006 responding to BCUC’s Information Request No. 3 (Exhibit A-59) re: VIC-VITR Financial Analysis and spreadsheet
February 02, 2006 B2-49 Letter dated February 1, 2006 responding to BCUC’s Information Request No. 3 (Exhibit A-59) re: Guide to Sea Breeze VCC’s Response to Information Requests
February 04, 2006 B2-50 Letter dated February 3, 2006 filing supplemental responses to BCTC Information Requests
February 04, 2006 B2-51 Letter dated February 3, 2006 filing a list of witnesses, witness panels and CVs for each witness
February 14, 2006 B2-52 Exhibits for Cross-Examiniation of BCTC Panel 1
February 14, 2006 B2-53 Copy of Dr. Rashwan’s Business Card
February 14, 2006 B2-54 Submission at Public Hearing – Copy of two page letter from Mr. Manson to Ms. Peverett, Dated January 5, 2006
February 14, 2006 B2-55 Submission at Public Hearing - Email Between Ms. Peverett and Mr. Manson
February 14, 2006 B2-56 Submission at Public Hearing – Extract from BCUC Information Request 140.1
February 22, 2006 B2-57 Submission at Public Hearing – Request for Information, Vancouver Island 230- KVAC Supply Submarine Cable System
February 22, 2006 B2-58 Submission at Public Hearing – Volume 1 of 3, Tender Document, January 2006, Contract No. 300094
February 22, 2006 B2-58A Exhibit B2-58 Remarked as Exhibit B2-58A
February 22, 2006 B2-58B Submission at Public Hearing – Volume 1 of 3, Tender Document, January 2006, Contract No. 300094
February 22, 2006 B2-58C Submission at Public Hearing – Volume 3 of Tender documents
February 22, 2006 B2-59 Submission at Public Hearing – Page 9i from Part 9, Appendix A
February 23, 2006 B2-60 Submission at Public Hearing – Documents received from Mr. Landry
February 23, 2006 B2-61 Submission at Public Hearing – Map relating to Lower Mainland and seismic sensitivity
February 23, 2006 B2-62 Submission at Public Hearing – Sea Breeze Rebuttal Evidence
February 23, 2006 B2-63 Submission at Public Hearing – Evidence “Reasons Why Sea Breeze Believes Bids Under…”
February 27, 2006 B2-64 Submission at Public Hearing – Sea Breeze Omnibus document
February 27, 2006 B2-65 Submission at Public Hearing – Excerpt from an article Re: Cone Penetration in Geotechnical Practice
February 27, 2006 B2-66 Submission at Public Hearing – Article by Robertson and Write on evaluating cyclic liquefaction potential using the cone penetration test
March 01, 2006 B2-67 Submission at Public Hearing – Responses to Information Requests from BC Hydro
March 09, 2006 B2-68 Submission at Public Hearing – Direct Evidence of Sea Breeze Panel 1
March 10, 2006 B2-69 Submission at Public Hearing – Opening Statement of Sea Breeze Corporate Policy / Management Panel

C Exhibits - Intervener Documents

KARSTEN HOLMSEN – Notice of Intervention dated May 15, 2005
SALT SPRING REGIONAL DISTRICT – Notice of Intervention dated May 18, 2005 from Gary Holman, CRD Director
J. CECIL DUNN - Notice of Intervention dated June 21, 2005
BRADLEY W. CAMPBELL - Notice of Intervention dated July 11, 2005
BRITISH COLUMBIA HYDRO AND POWER AUTHORITY - Notice of Intervention dated July 13, 2005
CORPORATION OF DELTA - Notice of Intervention dated February 15, 2005 and confirmation letter dated July 15, 2005 from James G. Yardley, Murdy & McAllister
JOINT INDUSTRY ELECTRICITY STEERING COMMITTEE - Notice of Intervention dated July 13, 2005
NEIL ATCHISON - Notice of Intervention dated July 19, 2005
JOHN R. BULLOCH - Notice of Intervention dated July 19, 2005
ISLANDS TRUST - Notice of Intervention dated July 19, 2005 from Linda Adams
DARRYL & GEETA SCHALLIG - Notice of Intervention dated July 19, 2005
LYNETTE OLFERT - Notice of Intervention dated July 21, 2005
TRANSCANADA ENERGY LTD. - Notice of Intervention dated July 21, 2005 from Alan Ross
RANDY BOUSFIELD - Notice of Intervention dated July 21, 2005
WILLIAM A. SHARKEY - Notice of Intervention dated July 22, 2005
JOHN CROSS - Notice of Intervention dated July 25, 2005
NORSKECANADA - Notice of Intervention dated July 25, 2005 from Dennis Fitzgerald
LES BRIDSON - Notice of Intervention dated July 23, 2005
NICK ARDANAZ - Notice of Intervention received July 25, 2005
DON & IRENE HORN - Notice of Intervention received July 25, 2005
JULIE BERKS - Notice of Intervention dated July 18, 2005
DR. & MRS. DAWSON - Notice of Intervention dated July 20, 2005
VINCENT STROTHER - Notice of Intervention dated July 21, 2005
OWNERS OF STRATA PLAN 905 AND SHAREHOLDERS OF MARACAIBO ESTATES LTD. - Notice of Intervention dated July 26, 2005 from Charles L.A. Bazzard
THE BC OLD AGE PENSIONERS ORGANIZATION ET AL. (BCOAPO) - Notice of Intervention dated July 25, 2005 from Richard Gathercole of the BC Public Interest Advocacy Centre on behalf of the BCOAPO
HUL’QUMI’NUM TREATY GROUP - Notice of Intervention dated July 25, 2005 from Robert Morales
PRISTINE POWER INC. - Notice of Intervention dated July 26, 2005 from Loyola G. Keough, Bennett Jones LLP
COMMERCIAL ENERGY CONSUMERS ASSOCIATION OF BRITISH COLUMBIA - Notice of Intervention dated July 29, 2005 from Christopher Weafer
MCLENNAN, MAIRI – Web registration and e-mail dated July 29, 2005
SEA BREEZE PACIFIC REGIONAL TRANSMISSION SYSTEM, INC.– Notice of Intervention dated July 29, 2005 from Paul B. Manson
ELK VALLEY CORPORATION – Notice of Intervention dated July 27, 2005 from J. David Newlands
TERASEN GAS INC. – Web Registration received August 3, 2005 from Scott Thomson
ISLAND RESIDENTS AGAINST HIGH VOLTAGE OVERHEAD LINES (IRAHVOL)– Notice of Intervention dated August 3, 2005 from David Austin and Daria Zovi
TRUSCOTT, DOUGLAS AND JACKIE– Notice of Intervention dated July 29, 2005 on behalf of the Oakspring Strata VIS 2431
LES MALZENICZKY - Notice of Intervention dated July 23, 2005
SUTHERLAND, PAM– Notice of Intervention dated August 8, 2005
BAKER, LORRAINE– Notice of Intervention received August 8, 2005
BOYCE, SHARI– Notice of Intervention received August 16, 2005
SENCOT’EN ALLIANCE – Notice of Intervention dated July 28, 2005 (received August 18, 2005) from Eric Pelkey and Susan Anderson Behn
BROADFOOT, Maureen – Notice of Intervention dated August 16, 2005 on behalf of a committee of concerned parents at South Delta Secondary High School
SOUTH DELTA SECONDARY SCHOOL PARENT ADVISORY COUNCIL – Notice of Intervention dated August 22, 2005 from Janice Ristow
BOLIRINNO, JOEQYNA – Notice of Intervention dated August 23, 2005
PAGET, N.R.G. – Notice of Intervention dated August 23, 2005
BOLUS, LEONARD G. – Notice of Intervention and Information request received August 24, 2005
DELTA SCHOOL DISTRICT – Notice of Intervention dated September 8, 2005 from Grant McRadu
COALITION TO REDUCE ELECTROPOLLUTION – Notice of Intervention received September 13, 2005 from Hans Karow
RODDICK, VALERIE MLA – Notice of Intervention received September 13, 2005
GSX CONCERNED CITIZENS COALITION (GSXCCC) – Notice of Intervention dated September 16, 2005
Clean Energy Foundation – Notice of Intervention dated September 17, 2005 from Milt Bowling
Susan and Cliff Plumpton – Notice of Late Intervention dated September 22, 2005
NAM, KYONG H. – Notice of Intervention dated October 11, 2005
TOWN OF VIEW ROYAL – E-mail dated October 17, 2005 from Emmet McCusker requesting Intervenor Status ~ *Previously C3-1 in Sea Breeze VIC proceeding
HOLMAN, GARY – E-mail dated October 18, 2005 requesting Intervenor Status ~ *Previously C13-1 in Sea Breeze VIC proceeding
GSX CONCERNED CITIZENS COALITION – Notice of Intervention dated October 19, 2005 from Arthur Caldicott ~ *Previously C16-1 in Sea Breeze VIC proceeding
HARVIE, George– Notice of Intervention dated October 18, 2005 (The Corporation of Delta) ~ *Previously C17-1 in Sea Breeze VIC proceeding
SALT SPRING ISLAND LOCAL TRUST COMMITTEE – Notice of Intervention dated October 18, 2005 from Kimberly Lineger ~ *Previously C18-1 in Sea Breeze VIC proceeding
CITY OF WHITE ROCK – Notice of Intervention dated October 25, 2005 from Mayor Judy L. Forster ~ *Previously C19-1 in Sea Breeze VIC proceeding
SONGHEES FIRST NATION – Notice of Intervention dated October 27, 2005 from Chief Robert Sam ~ *Previously C20-1 in Sea Breeze VIC proceeding
CITY OF SURREY – Notice of Intervention dated January 25, 2006 from Dianne L. Watts, Mayor


Date Title Document Description
July 08, 2005 C1-1 KARSTEN HOLMSEN – Notice of Intervention dated May 15, 2005
July 27, 2005 C1-2 Letter dated July 27, 2005 outlining intervention issues for K Holmsen
August 22, 2005 C1-3 E-mail dated August 18, 2005 regarding the proposed site visits and requesting that the Panel remember to familiarize themselves with some of the alternative routes proposed to bypass the residential areas of Ladner and South Delta
September 07, 2005 C1-4 Letter and Information Request No. 1 dated September 7, 2005
September 12, 2005 C1-5 E-mail dated September 10, 2005 support inspection
September 15, 2005 C1-6 E-Mail dated September 15, 2005 requesting Procedure Clarification
September 21, 2005 C1-7 E-mail dated September 20, 2005 confirming Procedure Clarifiation
September 22, 2005 C1-8 E-mail dated September 21, 2005 – Supplemental Information Request
September 23, 2005 C1-9 E-mail dated September 23, 2005 – Supplemental Information Request No. 2
September 26, 2005 C1-10 E-mail dated September 24, 2005 – Supplemental Information Request No. 3
September 29, 2005 C1-11 E-mail dated September 28, 2005 – Outstanding Questions in BCTC IR Responses
October 04, 2005 C1-12 Letter dated October 3, 2005 regarding BCTC’s CD Rom containing information responding to Information Requests
October 21, 2005 C1-13 Letter dated October 19, 2005 – Intervenor Evidence
October 26, 2005 C1-14 Letter dated October 20, 2005 – Request Panel to reconsider viewing of ROW’s
October 26, 2005 C1-15 Letter dated October 26, 2005 – Corrections to Exhibit C1-14
November 10, 2005 C1-16 E-mail dated November 10, 2005 – Response to Commission Information Request No. 1
November 10, 2005 C1-17 E-mail dated November 10, 2005 – Response to BCTC Information Request No. 1
December 05, 2005 C1-18 Letter dated December 4, 2005 stating concerns regarding BCTC’s Terms of Reference
December 12, 2005 C1-19 Letter dated December 11, 2005 commenting on the time limit for presentations to be given at the Town Hall meetings
December 19, 2005 C1-20 Letter dated December 18, 2005 responding to the Commission’s letter of December 14, 2005 (Exhibit A-44) and requesting the Commission Chair to retract the changes to Exhibit A-41, indicated in Exhibit A-44, and allow Intervenor presentations at the Town Hall meetings as well as in the Oral Public Hearing processes
January 13, 2006 C1-21 Letter dated January 13, 2006 withdrawing his request to make a presentation at the January 14, 2005 Town Hall Meeting in Tsawwassen
January 23, 2006 C1-22 Letter dated January 22, 2006 requesting clarification on Oral Public Hearing Process
January 25, 2006 C1-23 Letter dated January 24, 2006 requesting BCTC to include Mr. Richard Gallagher, Epidemiologist, Department Head, BC Cancer Research Centre, on the BCTC Witness Panel No. 4 and enclosing an excerpt from the 1998 West Kootenay Power CPCN Transcript
January 27, 2006 C1-24 Letter dated January 24, 2006 requesting BCUC to include Ms. Jane Peverett, President and CEO on BCTC’s Witness Panel # 1 or # 2, and be called to testify at the BCUC Oral Public Hearings to clarify previous statements with attached transcripts
January 27, 2006 C1-25 Letter dated January 26, 2006 filing supplemental evidence under Exhibit C1-13, Section 1.0 on the effect of property values
January 27, 2006 C1-26 Letter dated January 27, 2006 filing Opening Statement
January 31, 2006 C1-27 Letter dated January 27, 2006 responding to BCTC’s response (Exhibit B1-46) and requesting Mr. Richard Gallagher be served a subpoena to appear as a witness at the Oral Public Hearing
January 31, 2006 C1-28 Letter dated January 27, 2006 responding to BCTC’s response (Exhibit B1-51) and requesting Jane Peverett be served a subpoena to appear as a witness at the Oral Public Hearing
February 01, 2006 C1-29 Letter dated February 1, 2006 with Excel attachments in response to BCTC’s Information Request No. 14 regarding Exhibit C1-25
February 02, 2006 C1-30 Letter dated February 1, 2006 to BCUC requesting a copy of BCTC’s Archaeological Overview Assessment (Exhibit C1-4)
February 02, 2006 C1-31 Letter dated February 2, 2006 responding to BCTC’s response to BCUC’s Information Request No. 4.203.1, 4.203.2 and 4.204.0
February 02, 2006 C1-32 Email dated February 2, 2006 requesting clarification on the Order of Cross-Examination for BCTC’s Witness Panels
February 02, 2006 C1-33 Submission at Public Hearing – Spreadsheet Entitled “Vancouver Island Transmission Reinforcement (VITR) Project – Comparison of Suggested Route Alternatives at Tsawwassen (IR 4.203.2 Jan 2006)”
February 28, 2006 C1-34 Submission at Public Hearing – Email from Ms. Val Roddick, MLA, Dated December 5, 2005
February 28, 2006 C1-35 Submission at Public Hearing – Opening Statement of Karsten Holmsen
March 08, 2006 C1-36 Submission at Public Hearing – Resume of Mr. Gallagher from BC Cancer Research Centre website
March 08, 2006 C1-37 Submission at Public Hearing – Excerpt from 2003 Transcript of National Energy Board Hearings with Mr. Gallagher’s responses to cross-examination
July 08, 2005 C2-1 SALT SPRING REGIONAL DISTRICT – Notice of Intervention dated May 18, 2005 from Gary Holman, CRD Director
July 08, 2005 C2-2 E-mail dated June 3, 2005 with questions regarding this process
July 27, 2005 C2-3 E-mail dated July 26, 2005 with final submission from Salt Spring Regional District
October 05, 2005 C2-4 E-mail dated October 5, 2005 – Support IRAVHOL’s request for extension
October 12, 2005 C2-5 E-mail dated October 12, 2005 – Issues for Pre-hearing Conference Agenda
July 08, 2005 C3-1 J. CECIL DUNN - Notice of Intervention dated June 21, 2005
July 21, 2005 C3-2 Letter to the Honourable Richard Neufeld, Minister of Energy and Mines dated June 9, 2005 regarding BC Transmission Corporation’s recent announcement of a power line route in Tsawwassen
July 21, 2005 C3-3 Letter to the Honourable Richard Neufeld, Minister of Energy and Mines dated July 19, 2005 regarding this application
July 25, 2005 C3-4 Letter dated July 23, 2005 requesting an extension to the July 29, 2005 Intervenor registration deadline and a rescheduling of the Procedural Conference
July 25, 2005 C3-5 Letter dated July 25, 2005 confirming intervention and registering names of TRAHVOL representatives
July 28, 2005 C3-6 E-mail dated July 27, 2005 responding to BC Transmission Corporation letter of July 23, 2005 (Exhibit B-3)
July 29, 2005 C3-7 Letter dated July 29, 2005 to Minister Richard Neufeld, Ministry of Energy and Mines re: the Province’s Commitment regarding Power Lines in Tsawwassen
August 08, 2005 C3-8 E-mail dated August 4, 2005 from Maureen Broadfoot regarding Bruce Barrett’s comments on Global Television’s August 4, 2005 broadcast
August 08, 2005 C3-9 E-mail dated August 6, 2005 from Maureen Broadfoot filing unanswered questions and new information requests
August 10, 2005 C3-10 Letter dated August 10, 2005 offering the Commission Panel, the Applicant and all Intervenors/Interested Parties the opportunity to view a portion of the Tsawwassen corridor
August 18, 2005 C3-11 Letter dated August 17, 2005 to Dennis Maniago regarding his comments on BCTC’s expropriation of Tsawwassen residential property
August 22, 2005 C3-12 Letter dated August 22, 2005 submitting an issue to be included within the scope of the VITR review
September 07, 2005 C3-13 Notice of Counsel Appointments - E-mail dated September 7, 2005
September 07, 2005 C3-14 Letter and Information Request No. 1 dated September 7, 2005
September 12, 2005 C3-15 E-mail dated September 11, 2005 from Maureen Broadfoot regarding unanswered questions and new information requests
September 15, 2005 C3-16 E-mailed dated September 14, 2005 from Mark Underhill, Underhill Faulkner Bois Parker Law Corporation Inc. representing TRAHVOL along with co-counsel Joseph J. Arvay, Q.C., Arvay Finlay
September 20, 2005 C3-17 Letter dated September 20, 2005 from Arvay Finlay in response to BCOAPO letter of September 15, 2005
October 05, 2005 C3-18 Letter dated October 4, 2005 from Arvay Finlay in response to BCTC’s letter of September 30, 2005
October 24, 2005 C3-19A TRAHVOL Evidence - Part 1
October 24, 2005 C3-19B TRAHVOL Evidence - Part 2 - Affidavits
October 27, 2005 C3-20 Letter dated October 27, 2005 providing follow-up comments regarding the proposed corridor inspection by the Commission Panel
November 08, 2005 C3-21 Letter dated November 8, 2005 – Formal complaint regarding Tsawwassen corridor
November 10, 2005 C3-22 E-mail dated November 10, 2005 – Response to Commission Information Request No. 1
November 10, 2005 C3-23 E-mail dated November 10, 2005 – Partial Response to BCTC Information Request No. 1
November 10, 2005 C3-24 E-mail dated November 10, 2005 – Partial Response No. 2 to BCTC Information Request
November 10, 2005 C3-25 E-mail dated November 10, 2005 – Response to BCOAPO Information Request
November 21, 2005 C3-26 TSAWWASSEN RESIDENTS AGAINST HIGH VOLTAGE OVERHEAD LINES SOCIETY - Letter dated October 18, 2005 from Joseph J. Arvay Q.C., Arvay Finlay requesting Intervenor Status ~ *Previously C8-1 in Sea Breeze VIC proceeding
November 24, 2005 C3-27 Letter dated November 22, 2005 filing Partial Response No. 3 to BCTC’s Information Request regarding the Intervenor Evidence of TRAHVOL
December 02, 2005 C3-28 Partial Response No. 4 dated December 1, 2005 to BCTC Information Request
December 05, 2005 C3-29 Addendum to Appendix J to Partial Response No. 4 dated December 1, 2005 to BCTC Information Request (Exhibit C3-28)
December 13, 2005 C3-30 Letter dated December 12, 2005 filing the Affidavit of Cornelia Clennan
December 19, 2005 C3-31 E-mail dated December 16, 2005 from Maureen Broadfoot commenting on the draft Revised Regulatory Timetable (Exhibit A-45)
December 20, 2005 C3-32 Letter dated December 20, 2005 commenting on the draft revised proceeding timetable
December 23, 2005 C3-33 Letter dated December 23, 2005 from TRAHVOL’s Counsel advising that he has a timing conflict with the Revised Regulatory Timetable
January 23, 2006 C3-34 Letter dated January 20, 2006 from Mark Underhill, Underhill Faulkner Bois Parker Law Corporation Inc. filing a reply report from Dr. Magda Favas to Linda Erdreich
January 26, 2006 C3-35 Email dated January 26, 2006 from Joseph Arvay of Arvay Finlay Barristers requesting a modification to the Order of Witness Panels due to availability of their EMF expert witness
February 04, 2006 C3-36 Letter dated February 3, 2006 advising that TRAHVOL will be submitting an additional issue for the Hearing Issues List at the commencement of the Public Hearing
February 14, 2006 C3-37 “Vancouver Island transmission Reinforcement (VITR) – Tsawwassen Route Alternatives Evaluation” prepared by British Columbia Transmission Corporation
February 14, 2006 C3-38 Article from the Vancouver Province dated February 7, 2006 entitled “Sparks Likely to Fly at Power-Line Hearing”
February 14, 2006 C3-39 Submission at Public Hearing – BCTC News Release dated September 7th, 2005
February 28, 2006 C3-40 Submission at Public Hearing – Affidavit of Neil Atchison
February 28, 2006 C3-41 Submission at Public Hearing – Affidavit of Marcia Newman
February 28, 2006 C3-42A Submission at Public Hearing – Neil Atchison’s working notes, pages 1-15
February 28, 2006 C3-42B Submission at Public Hearing – Neil Atchison’s working notes, pages 1-9
February 28, 2006 C3-42C Submission at Public Hearing – Neil Atchison’s working notes, email dated February 1, 2006
February 28, 2006 C3-43 Submission at Public Hearing – Email from Neil Atchison to Marcia Newman dated February 1, 2006
February 28, 2006 C3-44 Submission at Public Hearing – “Tsawwassen’s Endangered Spaces 2006 Calendar
March 01, 2006 C3-45 Submission at Public Hearing – “Opening Statement – TRAHVOL, BCUC VITR/VIC Hearing, February 27, 2006
March 01, 2006 C3-46 Submission at Public Hearing – Editorial from The Delta Optimist dated February 22, 2006
March 06, 2006 C3-47 Submission at Public Hearing – TRAHVOL Powerpoint presentation
March 07, 2006 C3-48 Submission at Public Hearing – List of TRAHVOL meeting dates
March 07, 2006 C3-49 Submission at Public Hearing – Executive Summary of Report of Delpizzo, Neutra and Lee
March 07, 2006 C3-50 Submission at Public Hearing – Decision of the Public Utilities Commission of the State of California in the matter of the Application of Pacific Gas and Electric Company for a Certificate of Public Convenience and Necessity
March 07, 2006 C3-51 Submission at Public Hearing – Decision of the Public Utilities Commission of the State of California, January 26, 2006
March 08, 2006 C3-52 Submission at Public Hearing – Health Effects ABD Exposure Guidelines related to extremely low frequency electric and magnetic fields, an overview
March 08, 2006 C3-53 Submission at Public Hearing – Overall evaluations of carcinogenicity to humans group 2B: Possibly carcinogenic to Humans
March 08, 2006 C3-54 Submission at Public Hearing – Transcript from Larry King Live Show
March 08, 2006 C3-55 Submission at Public Hearing – Excerpt from “EMF Wrappage” booklet from NIEHS
March 08, 2006 C3-56 Submission at Public Hearing – Document showing different possible scenarios of EMF
March 08, 2006 C3-57 Submission at Public Hearing – Draft Report on Relation between power frequency electric and magnetic filed exposure and human cancer
March 08, 2006 C3-58 Submission at Public Hearing – Population-based case-control study of occupational exposure to electromagnetic fields and breast cancer
March 08, 2006 C3-59 Submission at Public Hearing – Pollan Report
March 08, 2006 C3-60 Submission at Public Hearing – Kliukiene Study
March 08, 2006 C3-61 Submission at Public Hearing – Villeneuve Study
April 03, 2006 C3-62 Letter dated March 29, 2006 filing response to Undertaking at Transcript, Volume 23, page 4411
July 11, 2005 C4-1 BRADLEY W. CAMPBELL - Notice of Intervention dated July 11, 2005
November 10, 2005 C4-2 E-mail dated November 10, 2005 – Support TRAHVOl’s complaint with proceedings.
January 31, 2006 C4-3 Opening Statement of Mr. Campbell. Document submitted at the Opening Oral Hearing.
April 13, 2006 C4-4 Submission at Public Hearing - BC Hydro Power Live Easement Summary, 2 pages
July 13, 2005 C5-1 CORPORATION OF DELTA - Notice of Intervention dated February 15, 2005 and confirmation letter dated July 15, 2005 from James G. Yardley, Murdy & McAllister
July 13, 2005 C5-2 Letter dated June 28, 2005 from Mayor Lois E. Jackson regarding BC Transmission Corporation’s proposal to replace the transmission lines between Arnott substation in South Delta and Vancouver Island
September 09, 2005 C5-3 Information Requests dated September 7 & 8, 2005 from James G. Yardley, Murdy & McAllister
September 30, 2005 C5-4 Letter dated September 29, 2005 – Submission from James G. Yardley, Murdy & McAllister
October 05, 2005 C5-5 Facsimile dated October 5, 2005 – Support Intervenors request for extension
October 31, 2005 C5-6 Letter dated October 19, 2005 – Pre-filed Evidence from James G. Yardley, Murdy & McAllister - AMENDED - this exhibit was amended to include Appendices A-F
November 03, 2005 C5-7 Facsimile dated November 3, 2005 – Propose Theatre at South Delta Secondary School for Town Hall Meetings
November 14, 2005 C5-8 Letter dated November 10, 2005 – Responses to Commission Information Requests
November 14, 2005 C5-9 Letter dated November 10, 2005 – Responses to BCOAPO Information Requests
November 14, 2005 C5-10 Letter dated November 10, 2005 – Responses to BCTC Information Requests
November 21, 2005 C5-11 CORPORATION OF DELTA – Facsimile dated October 18, 2005 from James. G. Yardley, Murdy & McAllister requesting Intervenor Status ~ *Previously C7-1 in Sea Breeze VIC proceeding
December 12, 2005 C5-12 Letter dated December 9, 2005 filing outstanding responses to Commission Information Request No. 1
December 13, 2005 C5-13 Letter dated December 7, 2005 filing outstanding response to BCTC IR-1
December 20, 2005 C5-14 E-mail dated December 19, 2005 commenting on the proposed change in date and time for the Tsawwassen Town Hall meeting
January 27, 2006 C5-15 Letter dated January 27, 2006 from James G. Yardley, Murdy & McAllister advising of Dr. Robin Gregory’s unavailability and requesting the Commission to reschedule Delta’s Witness Panel or that Dr. Gregory’s attendance be rescheduled as a separate panel
January 31, 2006 C5-16 Letter dated January 31, 2006 from James G. Yardley, Murdy & McAllister regarding the City of Delta’s response to Transcript Volume 6 pp. 890, Issue No. 5
February 02, 2006 C5-17 Letter dated February 2, 2006 from James G. Yardley, Murdy & McAllister regarding BCUC’s Information Request No. 1.3 (Exhibit B1-6)
February 02, 2006 C5-18 Submission at Public Hearing – Witness Aid with respect to description of BC Hydro Easements in Tsawwassen
March 17, 2006 C5-20 Submission at Public Hearing – Response to Outstanding Undertakings to Corporation of Delta
March 29, 2006 C5-21 Letter dated March 29, 2006 filing response to outstanding Undertakings in Transcript – Public Hearing – Volume 21
July 13, 2005 C6-1 BRITISH COLUMBIA HYDRO AND POWER AUTHORITY - Notice of Intervention dated July 13, 2005
October 19, 2005 C6-2 Letter dated October 19, 2005 – Direct Testimony of Kenneth H. Tiedemann
October 27, 2005 C6-3 Letter dated October 26, 2005 – Information Request to Hul’qumi’num
November 10, 2005 C6-4 Letter dated November 10, 2005 – Response to Commission Information Request No. 1
November 15, 2005 C6-5 Letter dated November 15, 2005 – Response to Hul’qumi’num Treaty Group Submissions
November 18, 2005 C6-6 BRITISH COLUMBIA HYDRO AND POWER AUTHORITY – Web registration dated October 6, 2005 requesting Intervenor Status ~ *Previously C1-1 in Sea Breeze VIC proceeding
November 18, 2005 C6-7 Letter dated November 18, 2005 filing Information Request No. 1 to Sea Breeze re: VIC Application
December 12, 2005 C6-8 Letter dated December 12, 2005 filing the Direct Testimony of James Edward Fralick
December 20, 2005 C6-9 Letter dated December 20, 2005 commenting on the draft revised proceeding timetable
December 29, 2005 C6-10 Letter dated December 29, 2005 responding to TRAHVOL’s counsel letter of December 23, 2005 (Exhibit C3-33)
February 14, 2006 C6-11 Letter dated February 7, 2006 to Commission regarding James Edward Fralick’s qualifications and his Curriculum Vitae
February 28, 2006 C6-12 Submission at Public Hearing – Letter from Mr. Sanderson to Mr. Landry
February 28, 2006 C6-13 Submission at Public Hearing – Two page cover letter
March 03, 2006 C6-14 Direct Testimony of Tony Morris, Manager, Enterprise Strategy and Investment with British Columbia Hydro and Power Authority
March 09, 2006 C6-15 Submission at Public Hearing – Witness Aid: Revised Proposal: Roles and Responsibilities
March 09, 2006 C6-16 Submission at Public Hearing – Sea Breeze Power Corp 20FR12G filing on July 7, 2005 for the year ended December 31, 2004
March 09, 2006 C6-17 Submission at Public Hearing – Exhibit 4.18, Limited Partnership Agreement of Sea Breeze Pacific Juan De Fuca Cable LP
March 09, 2006 C6-18 Submission at Public Hearing – Exhibit 4.19, Development Loan Agreement
March 09, 2006 C6-19 Submission at Public Hearing – Extract from Schedule 1.3 of the Development Loan Agreement regarding the Juan De Fuca Project
March 13, 2006 C6-18 Submission at Public Hearing – Exhibit 4.19, Development Loan Agreement
March 13, 2006 C6-19 Submission at Public Hearing – Extract from Schedule 1.3 of the Development Loan Agreement regarding the Juan De Fuca Project
March 17, 2006 C6-20 Submission at Public Hearing – GANTT Chart filed with NEB
March 17, 2006 C6-21 Submission at Public Hearing – Filing with NEB Re: corporate experience of Sea Breeze Group of Companies
March 17, 2006 C6-22 Submission at Public Hearing – Response to BC Hydro Information Request 18.0 Called Appendix 18.3 and 18.4
March 17, 2006 C6-23 Submission at Public Hearing – National Energy Board response to BC Hydro
March 17, 2006 C6-24 Submission at Public Hearing – Response to BCTC Question 1
March 17, 2006 C6-25 Submission at Public Hearing – Excerpt, Page 8 & 9, NEB
March 23, 2006 C6-26 Submission at Public Hearing – Commission Order Letter No. L-104-05 dated December 2, 2005 establishing the 2006 Return on Common Equity for a Low-Risk Benchmark Utility
March 29, 2006 C6-27 Letter dated March 29, 2006 filing response to various Undertakings in Transcript – Public Hearing - Volume 35
April 03, 2006 C6-28 Letter dated April 3, 2006 from Lawson Lundell requesting removal of response to the undertakings filed by Sea Breeze on March 29, 2006 as part of Exhibit C31-57
July 14, 2005 C7-1 JOINT INDUSTRY ELECTRICITY STEERING COMMITTEE - Notice of Intervention dated July 13, 2005
November 21, 2005 C7-2 JOINT INDUSTRY ELECTRICITY STEERING COMMITTEE – Letter dated October 17, 2005 from R. Brian Wallace, Bull Housser & Tupper requesting Intervenor Status also including Lloyd Guenther, LSM Consulting ~ *Previously C5-1 in Sea Breeze VIC proceeding
December 21, 2005 C7-3 Letter dated December 20, 2005 commenting on BC Hydro’s submission regarding the possibility of a delay in the January public hearing (Exhibit C6-9)
February 10, 2006 C7-4 Opening Statement of Joint Industry Steering Committee
July 19, 2005 C8-1 NEIL ATCHISON - Notice of Intervention dated July 19, 2005
July 19, 2005 C9-1 JOHN R. BULLOCH - Notice of Intervention dated July 19, 2005
August 25, 2005 C9-2 Letter dated August 25, 2005 requesting that an on site in situ ground inspection take place
February 10, 2006 C9-3 Submission at Tsawwassen Town Hall Meeting
July 19, 2005 C10-1 ISLANDS TRUST - Notice of Intervention dated July 19, 2005 from Linda Adams
July 20, 2005 C10-2 Letter dated July 19, 2005 confirming Islands Trust intervention
August 18, 2005 C10-3 Letter dated August 18, 2005 requesting rescheduling of Town Hall meeting on November 19 due to Local General Elections on the same date
October 19, 2005 C10-4 Letter dated October 12, 2005 regarding proposed locations and times for Town Hall Meetings
October 19, 2005 C10-5 Letter dated October 19, 2005 submitting Intervenor Evidence
November 10, 2005 C10-6 Letter dated November 10, 2005 – Response to Commission Information Request No. 1
November 10, 2005 C10-7 Letter dated November 10, 2005 – Response to BCTC Information Request
December 22, 2005 C10-8 Letter dated December 21, 2005 filing Evidence from Islands Trust (attachments were not part of original electronic filing)
January 23, 2006 C10-9 Letter dated January 23, 2006 from Linda Adams responding to Commission’s Information Request No. 1
July 19, 2005 C11-1 DARRYL & GEETA SCHALLIG - Notice of Intervention dated July 19, 2005
July 22, 2005 C11-2 Letter dated July 20, 2005 with reasons for intervention
May 23, 2006 C11-3 Submission at Tsawwassen Town Hall Meeting from Daryl Schallig - Original presentation unavailable, copy of transcript provided instead - Transcript Volume 5, Page 716 line 15 to Page 725 line 24
July 21, 2005 C12-1 LYNETTE OLFERT - Notice of Intervention dated July 21, 2005
August 16, 2005 C12-2 Intervention Withdrawn – See Interested Party D-36
July 21, 2005 C13-1 TRANSCANADA ENERGY LTD. - Notice of Intervention dated July 21, 2005 from Alan Ross
July 22, 2005 C14-1 RANDY BOUSFIELD - Notice of Intervention dated July 21, 2005
July 22, 2005 C15-1 WILLIAM A. SHARKEY - Notice of Intervention dated July 22, 2005
April 19, 2006 C15-2 Submission at Tsawwassen Town Hall Meeting
July 25, 2005 C16-1 JOHN CROSS - Notice of Intervention dated July 25, 2005
September 07, 2005 C16-2 Information Request No. 1 dated September 7, 2005
December 12, 2005 C16-3 E-mail dated December 11, 2005 giving notice of a Town Hall presentation on behalf of the Tsawwassen Homeowners Association
January 09, 2006 C16-4 E-mail dated January 8, 2006 advising the Commission that a presentation will not be made at the Tsawwassen Town Hall Meeting on January 14, 2006
January 31, 2006 C16-5 Letter dated January 29, 2006 requesting a change in status to Interested Party
July 25, 2005 C17-1 NORSKECANADA - Notice of Intervention dated July 25, 2005 from Dennis Fitzgerald
July 27, 2005 C17-2 Letter dated July 27, 2005 regarding reasons for intervention and support of the application
July 25, 2005 C18-1 LES BRIDSON - Notice of Intervention dated July 23, 2005
August 18, 2005 C18-2 Intervention Withdrawn – see Exhibit D-42
July 25, 2005 C19-1 NICK ARDANAZ - Notice of Intervention received July 25, 2005
July 25, 2005 C20-1 DON & IRENE HORN - Notice of Intervention received July 25, 2005
August 22, 2005 C20-2 Letter received August 19, 2005 requesting a change in status to Interested Pary (See Exhibit D-43)
July 25, 2005 C21-1 JULIE BERKS - Notice of Intervention dated July 18, 2005
August 23, 2005 C21-2 Email dated August 23, 2005 inviting the Commission Panel members to view the right of way from her Shannon Way home
September 16, 2005 C21-3 Letter dated September 16, 2005 responding to the Commission Panel’s proposed inspection of the transmission line route
October 27, 2005 C21-4 Letter dated October 26, 2005 providing follow-up comments regarding the proposed corridor inspection by the Commission Panel
April 19, 2006 C21-5 Submission at Tsawwassen Town Hall Meeting
July 25, 2005 C22-1 LES MALZENICZKY - Notice of Intervention dated July 23, 2005
July 25, 2005 C23-1 DR. & MRS. DAWSON - Notice of Intervention dated July 20, 2005
July 25, 2005 C24-1 VINCENT STROTHER - Notice of Intervention dated July 21, 2005
August 31, 2005 C24-2 Letter of Comment dated August 24, 2005
July 26, 2005 C25-1 OWNERS OF STRATA PLAN 905 AND SHAREHOLDERS OF MARACAIBO ESTATES LTD. - Notice of Intervention dated July 26, 2005 from Charles L.A. Bazzard
September 12, 2005 C25-2 Letter of Comment dated August 12, 2005 regarding the Procedural Conference and proposed process
October 18, 2005 C25-3 Letter dated October 18, 2005 - Evidence
October 20, 2005 C25-4 E-mail dated October 19, 2005 – Recommend consolidation of BCTC VITR and Sea Breeze VIC project, submission also included
November 10, 2005 C25-5 E-mail dated November 9, 2005 – Comment regarding Pre-Hearing Conference
November 10, 2005 C25-6 E-mail dated November 9, 2005 – Response to BCTC Information Request
November 21, 2005 C25-7 MARACAIBO ESTATES LTD. AND THE OWNERS OF STRATA PLAN 905 – E-mail dated October 18, 2005 requesting Intervenor Status from Charles Bazzard ~ *Previously C15-1 in Sea Breeze VIC proceeding
January 03, 2006 C25-8 Letter dated December 31, 2005 responding to BCTC’s Rebuttal Evidence dated December 16, 2005
January 03, 2006 C25-9 Submission at Salt Spring Town Hall Meeting – Atlas “Islands in the Salish Sea”
January 03, 2006 C25-10 Submission at Salt Spring Town Hall Meeting – Overhead Transmission Lines Powerpoint presentation
January 25, 2006 C25-11 Email dated January 24, 2006 responding to Exhibit A-62 advising of Mr. Bazzard’s intention to make an Opening Statement on behalf of Maracaibo Estates Ltd and the Owners of Strata Plan 905
January 27, 2006 C25-12 Email dated January 26, 2006 Requesting Leave to make an Opening Statement
January 31, 2006 C25-13 Letter dated January 29, 2006 submitting Opening Statement of Mr. Bazzard
July 26, 2005 C26-1 THE BC OLD AGE PENSIONERS ORGANIZATION ET AL. (BCOAPO) - Notice of Intervention dated July 25, 2005 from Richard Gathercole of the BC Public Interest Advocacy Centre on behalf of the BCOAPO
August 25, 2005 C26-2 Letter dated August 24, 2005 commenting on the invitations to the Panel to view the proposed Tsawwassen Corridor
September 07, 2005 C26-3 Information Request No. 1 dated September 7, 2005
September 16, 2005 C26-4 Letter dated September 15, 2005 commenting on the Panel’s proposed inspection of the proposed transmission line corridor
October 27, 2005 C26-5 Letter dated October 26, 2005 – Information Request to Corporation of the City of Delta
October 27, 2005 C26-6 Letter dated October 26, 2005 – Information Request to TRAHVOL
November 21, 2005 C26-7 BC Old Age Pensioners’ Organization – E-mail registration dated October 7, 2005 requesting Intervenor Status represented by The British Columbia Public Interest Advocacy Centre ~ *Previously C2-1 in Sea Breeze VIC proceeding
December 19, 2005 C26-8 Letter dated December 19, 2005 commenting on the draft revised Regulatory Timetable
March 13, 2006 C26-9 Submission at Public Hearing – Salt Spring IRAHVOL petition
July 27, 2005 C27-1 HUL’QUMI’NUM TREATY GROUP - Notice of Intervention dated July 25, 2005 from Robert Morales
October 05, 2005 C27-2 Facsimile dated October 4, 2005 – Support request for extension
October 13, 2005 C27-3 Facsimile dated October 12, 2005 – Submit issues for consideration at upcoming Hearing
October 20, 2005 C27-4 Facsimile dated October 17, 2005 - Evidentiary submission from Kathleen Johnnie Withdrawn
October 20, 2005 C27-5 Facsimile dated October 19, 2005 – Official Evidentiary submission from Kathleen Johnnie
October 31, 2005 C27-6 Letter dated October 28, 2005 confirming HTG’s interest in accepting the offer of the Commission for additional time to suppod our various Order requests included its our Odober 19, 2005 submission
November 02, 2005 C27-7 Supplemental Submission dated November 2, 2005
November 18, 2005 C27-8 HUL’QUMI’NUM TREATY GROUP - Web registration dated October 17, 2005 from Kathleen Johnnie requesting Intervenor Status ~ *Previously C4-1 in Sea Breeze VIC proceeding
November 18, 2005 C27-9 E-mail dated November 18, 2005 – Response to BC Hydro Information Request No. 1 (Exhibit C6-3)
November 23, 2005 C27-10 Letter dated November 21, 2005 submitting questions to the Environmental Assessment Office regarding the BCTC Vancouver Island Transmission Project and the Sea Breeze Vancouver Island Cable Project
November 25, 2005 C27-11 HTG’s Reply Submissions dated November 22, 2005
November 25, 2005 C27-12 Letter dated November 23, 2005 requesting an extension of time to allow HTG to respond to BC Hydro’s Reply Submission (Exhibit C6-5)
January 09, 2006 C27-13 Letter dated January 6, 2006 notifying the Applicants and the Commission of their duty to consult with the Hul’qumi’num Treat Group and the Hul’qumi’num Mustimuhw
July 27, 2005 C28-1 PRISTINE POWER INC. - Notice of Intervention dated July 26, 2005 from Loyola G. Keough, Bennett Jones LLP
July 29, 2005 C29-1 COMMERCIAL ENERGY CONSUMERS ASSOCIATION OF BRITISH COLUMBIA - Notice of Intervention dated July 29, 2005 from Christopher Weafer
March 16, 2006 C29-2 Submission at Public Hearing – Excerpt from BC Hydro’s Annual Report entitled Management Report
March 21, 2006 C29-3 Submission at Public Hearing – Extracts from five historical BC Hydro Annual Reports “Consolidate Financial Statements
July 29, 2005 C30-1 MCLENNAN, MAIRI – Web registration and e-mail dated July 29, 2005
December 21, 2005 C30-2 Letter dated December 20, 2005 commenting on the draft Revised Regulatory Timetable
July 29, 2005 C31-1 SEA BREEZE PACIFIC REGIONAL TRANSMISSION SYSTEM, INC.– Notice of Intervention dated July 29, 2005 from Paul B. Manson
September 07, 2005 C31-2 Letter and Information Request No. 1 dated September 7, 2005
October 18, 2005 C31-3 Letter dated October 14, 2005 – Notice of Assignment
October 18, 2005 C31-4 Letter dated October 17, 2005 – Submission from P. John Landry, Davis & Company
October 19, 2005 C31-5 Letter dated October 18, 2005 – Submission regarding consolidation application from P. John Landry, Davis & Company
October 20, 2005 C31-6 Web submission dated October 19, 2005 – Intervenor Evidence
October 20, 2005 C31-7 Letter dated October 20, 2005 – Copies of authorities referred to in Exhibit C31-5
October 20, 2005 C31-8 Duplicate of Exhibit C31-6
October 21, 2005 C31-9 E-mail dated October 20, 2005 – Draft Terms of Reference (Version 1) regarding the Vancouver Island Cable Project
November 15, 2005 C31-10 E-mail dated November 14, 2005 – Responses to Commission Information Request No. 1
November 15, 2005 C31-11 Submission at Public Hearing – Letter from J.P. Landry, Davis & Company, dated March 2, 2006, with attached revised Witness Panel List
November 15, 2005 C31-12 Submission at Public Hearing – Revised Version of Exhibit C31-11
March 08, 2006 C31-13 Submission at Public Hearing – Letter from Sea Breeze Victoria Converter Corporation to Mr. David Pollack, City of White Rock, with attachment
March 09, 2006 C31-14 Submission at Public Hearing – Revised Opening Statement of Sea Breeze
March 09, 2006 C31-15 Submission at Public Hearing – Response to two Information Requests by Mr. Fulton
March 09, 2006 C31-16 Submission at Public Hearing – Supplementary response to BCTC and request of Mr. Carpenter re: GANTT Chart
March 09, 2006 C31-17 Submission at Public Hearing – Revision to Sea Breeze Response to BCTC Information Request 1.39.2
March 09, 2006 C31-18 Submission at Public Hearing – Correction to Sea Breeze’s response to Information Request No. 12
March 09, 2006 C31-19 Submission at Public Hearing – Response to request for information arising out of rebuttal evidence
March 09, 2006 C31-20 Submission at Public Hearing – Direct Testimony of Sea Breeze Panel C
March 09, 2006 C31-21 Submission at Public Hearing – Requests by Ms. Hansen and the Chairperson for a revised description of the Orders sought by Sea Breeze
March 15, 2006 C31-22 Submission at Public Hearing – Correction to Response to Commission’s Information Request No. 1.31.2 in Exhibit B2-11
March 15, 2006 C31-24 Submission at Public Hearing – Direct Evidence for Panel B
March 15, 2006 C31-25 Submission at Public Hearing – Status Reports up to February 10, 2006
March 15, 2006 C31-27 Submission at Public Hearing – Review of ABB HVBDC Cable Transmission Projects
March 15, 2006 C31-28 Submission at Public Hearing – Response to Information Request at Transcript Volume 31, pages 6118 to 6120
March 15, 2006 C31-29 Submission at Public Hearing – Attachment to Exhibit B2-20
March 15, 2006 C31-30 Submission at Public Hearing – Direct Evidence for Sea Breeze Panel D
March 15, 2006 C31-32 Submission at Public Hearing – Document from original data re: VITR 2026/17 Winter Peak 2650 MW
March 15, 2006 C31-34 Submission at Public Hearing – Undertaking to a request of Mr. Carpenter at PP 5747-5749
March 15, 2006 C31-35 Submission at Public Hearing – Contractual status of key management personnel
March 15, 2006 C31-36 Submission at Public Hearing – Confirmation regarding clause 711 of Development Loan Agreement Relating to Confidentiality
March 15, 2006 C31-33 Submission at Public Hearing – Undertaking at Transcript Volume 31, pages 6122 to 6123
March 15, 2006 C31-31 Submission at Public Hearing – Photographs of different IGBT Modules
March 15, 2006 C31-37 Submission at Public Hearing – Group of responses regarding HVDC light cables
March 15, 2006 C31-23 Submission at Public Hearing – Sea Breeze Reply Evidence to Exhibit 6-14
March 15, 2006 C31-38 Submission at Public Hearing – List of Milestones achieved in Evidence
March 16, 2006 C31-39 Submission at Public Hearing – Response to Undertaking by Ms. Kane Re: Amendment to Status Reports
March 16, 2006 C31-40 Submission at Public Hearing – Geological Survey of Canada Slope Map
March 16, 2006 C31-41 Submission at Public Hearing – Extract from Commission’s Ruling re: Vancouver Island Generation Project, CPCN Application, September 8, 2003
March 16, 2006 C31-42 Submission at Public Hearing – Report from Canadian Electricity Association, March 2006, “The Integrated North American Electricity Market Et Al”
March 16, 2006 C31-43 Submission at Public Hearing – Response to Undertaking at Transcript Volume 33, Page 6241
March 16, 2006 C31-44 Submission at Public Hearing – Response to Undertaking Transcript Volume 33, Page 6298
March 16, 2006 C31-45 Submission at Public Hearing – Response to Undertaking Transcript Volume 32, Page 6032
March 16, 2006 C31-46 Submission at Public Hearing – Response to Undertaking Transcript Volume 32, Page 6034
March 17, 2006 C31-47 Submission at Public Hearing – Sea Breeze response to City of White Rock letter
March 17, 2006 C31-48 Submission at Public Hearing – Correction to the Record arising out of a request by Mr. Carpenter for a more legible copy of Exhibit C31-32
March 17, 2006 C31-26 Submission at Public Hearing – Project Status Report of March 10, 2006
March 21, 2006 C31-49 Submission at Public Hearing – BCTC Standards of Conduct
March 23, 2006 C31-50 Submission at Public Hearing – Redacted Version of Information Request of BCTC to Sea Breeze dated March 16, 2006
March 23, 2006 C31-51 Submission at Public Hearing – Page 4 of Final Marine Route of Proposed 16” GSX Pipeline
March 23, 2006 C31-52 Submission at Public Hearing – Letter from Energy Investors Funds and Attachments of March 14, 2006
March 23, 2006 C31-54 Submission at Public Hearing – E-mail from Mr. Herbert containing an e-mail from Mr. Schroeder to Mr. Landry with answers to various questions
March 23, 2006 C31-53 Submission at Public Hearing – Sea Breeze Response to Information Request form BCTC
March 27, 2006 C31-55 CV of Andrew E. Schroeder
March 28, 2006 C31-56 Submission at Public Hearing – Excerpt from the Peace Arch News, dated March 11, 2006
March 28, 2006 C31-57 Responses to various Undertakings at Transcript Volume 30 through to Volume 40
April 04, 2006 C31-58 Letter dated April 4, 2006 filing response to BC Hydro’s Application to strike a portion of Sea Breeze’s Response to Undertakings to BC Hydro (Exhibit C6-28)
July 29, 2005 C32-1 ELK VALLEY CORPORATION – Notice of Intervention dated July 27, 2005 from J. David Newlands
August 03, 2005 C33-1 TERASEN GAS INC. – Web Registration received August 3, 2005 from Scott Thomson
August 04, 2005 C34-1 ISLAND RESIDENTS AGAINST HIGH VOLTAGE OVERHEAD LINES (IRAHVOL)– Notice of Intervention dated August 3, 2005 from David Austin and Daria Zovi
September 11, 2005 C34-2 Letter and Information Request No. 1 dated September 7, 2005 (original filing)
September 11, 2005 C34-3 Letter and Information Request No. 1 dated September 8, 2005 (Revised)
October 04, 2005 C34-4 Letter dated October 3, 2005 requesting an equivalent extension to October 20, 2005 for the purposes of filing its intervenor evidence
October 11, 2005 C34-5 Letter dated October 7, 2005 requesting that the issue of the scope of the Commission’s review of the VITR Project as it relates to socio-economic and environmental issues, be placed on the October 21, 2005 pre-hearing conference agenda
October 20, 2005 C34-6 Letter dated October 19, 2005 – Submission of policy evidence
November 15, 2005 C34-7 Letter dated November 15, 2005 – Response to Commission Information Request No. 1
November 21, 2005 C34-8 ISLAND RESIDENTS AGAINST HIGH VOLTAGE OVERHEAD LINES – E-mail dated October 18, 2005 from David Austin, Tupper Jonnson and Yeadon requesting Intervenor Status ~ *Previously C6-1 in Sea Breeze VIC proceeding
November 24, 2005 C34-9 IRAHVOL Letter dated November 15, 2005 filing responses to BCTC Information Request No. 1
December 22, 2005 C34-10 Letter dated December 21, 2005 filing IRAHVOL’s Evidence
January 03, 2006 C34-11 Letter dated December 29, 2005 requesting the Commission Panel’s leave to make a presentation at the Town Hall Meeting on Salt Spring Island
January 10, 2006 C34-12 Submission at Salt Spring Town Hall Meeting regarding health hazards for patients with pacemakers
January 10, 2006 C34-13 Letter dated January 9, 2006 issuing Information Request No. 2 to BCTC regarding its December 21, 2005 Rebuttal Evidence
January 15, 2006 C34-14 REVISED - Letter dated January 13, 2006 to the Honourable Barry Penner, Minister of Environement; Wally Oppal, QC, Attorney General and Richard Neufeld, Minister of Energy, Mines & Petroleum Resources regarding the regulatory reviews of the VITR and VIC projects
January 24, 2006 C34-15 Letter dated January 23, 2006 IRAVHOL’s responding to the Commission Information Request No. 1
January 24, 2006 C34-16 Submitted at the Public Hearing Document Headed “4.0 Reference: Application, Tab Introduction, page 11, CPCN Criteria”
January 24, 2006 C34-17 Excerpts from British Columbia Transmission Corporation “Introduction and Context for Baseline Study dated April 2005
January 24, 2006 C34-18 Map “Vancouver Island Region” in relation to 25 kV Supply to Gulf Islands
February 28, 2006 C34-20 Submission at Public Hearing – Archival Materials from Delta Museum Archives
February 28, 2006 C34-21 Submission at Public Hearing – IRAHVOL’s Policy Panel Opening Statement
March 13, 2006 C34-19 Submission at Public Hearing – Web pages from Federal Department of Fisheries & Oceans
March 16, 2006 C34-22 Submission at Public Hearing – BC Hydro’s Service Plan 2006/07 to 2008/09
March 16, 2006 C34-23 Submission at Public Hearing – BCTC Service Plan for Fiscal Years 2006/07 to 2008/09, dated January 2006
March 16, 2006 C34-24 Submission at Public Hearing – Budget and Fiscal Plan, 2006/07 – 2008/09, dated February 21, 2006, BC Ministry of Finance
March 16, 2006 C34-25 Submission at Public Hearing – Extracts from BC Hydro’s Service Plan 2005/06 and 2007/08, Service Plan Update 2005
March 16, 2006 C34-26 Submission at Public Hearing – Press Release Forrest Kerr Project Interconnection Facilities approved by the BCTC
March 21, 2006 C34-28 Submission at Public Hearing – Extract from BC Hydro’s Electric Load Forecast 2003/04 to 2023/24
March 21, 2006 C34-29 Submission at Public Hearing – Extract from the BC Hydro Revenue Requirements Hearing
March 21, 2006 C34-30 Submission at Public Hearing – “A Briefing on BC Hydro’s Transmission Capacity Requirements” Prepared by BC Hydro Executive Operation, September 2002
March 23, 2006 C34-32 Submission at Public Hearing – Letter from E. Livingston, P. Eng dated March 14, 1975 and attachments
April 13, 2006 C34-27 Submission at Public Hearing – BC Hydro’s 1995 Integrated Electricity Plan, Appendix H, Transmission Analysis of the 1995 Integrated Electricity Plan
April 13, 2006 C34-27 Submission at Public Hearing – BC Hydro’s 1995 Integrated Electricity Plan, Appendix H, Transmission Analysis of the 1995 Integrated Electricity Plan
April 13, 2006 C34-31 Submission at Public Hearing – 10th Annual Report, Year ended 31 March 1972, BC Hydro and Power Authority
August 04, 2005 C35-1 TRUSCOTT, DOUGLAS AND JACKIE– Notice of Intervention dated July 29, 2005 on behalf of the Oakspring Strata VIS 2431
November 10, 2005 C35-2 E-mail dated November 10, 2005 – Unable to fulfill obligations as an Intervenor
November 21, 2005 C35-3 DOUGLAS AND JACKIE TRUSCOTT – E-mail dated October 18, 2005 requesting Intervenor Status ~ *Previously C12-1 in Sea Breeze VIC proceeding
November 21, 2005 C35-4 Letter of comment on health hazards from Jackie Truscott submitted at Salt Spring Town Hall Meeting
November 21, 2005 C35-5 Letter of comment on health hazards from Doug Truscott submitted at Salt Spring Town Hall Meeting
August 08, 2005 C36-1 SUTHERLAND, PAM– Notice of Intervention dated August 8, 2005
August 11, 2005 C36-2 E-mail dated August 11, 2005 advising the Panel that should they undertake an inspection of the Tsawwassen corridor, that her property is available for visitation
October 20, 2005 C36-3 Facsimile dated October 18, 2005 – Property Values and Proposed Expropriation
February 28, 2006 C36-4 Submission at Public Hearing – Responses of Ms. Sutherland
March 01, 2006 C36-5 Letter dated February 2, 2006 – Notice to Appear
August 08, 2005 C37-1 BAKER, LORRAINE– Notice of Intervention received August 8, 2005
August 17, 2005 C38-1 BOYCE, SHARI– Notice of Intervention received August 16, 2005
March 21, 2006 C38-2 Submission at Public Hearing – Written Presentation of S. Boyce
August 18, 2005 C39-1 SENCOT’EN ALLIANCE – Notice of Intervention dated July 28, 2005 (received August 18, 2005) from Eric Pelkey and Susan Anderson Behn
November 21, 2005 C39-2 SENCOT’EN ALLIANCE – Facsimile dated October 19, 2005 registering for Intervenor Status ~ *Previously C10-1 in Sea Breeze VIC proceeding
August 22, 2005 C40-1 BROADFOOT, Maureen – Notice of Intervention dated August 16, 2005 on behalf of a committee of concerned parents at South Delta Secondary High School
August 22, 2005 C40-2 Letter dated March 3, 2005 from Maureen Broadfoot to Premier Gordon Campbell requesting that the government intervene in BCTC’s VITR Application and Letter dated March 1, 2005 from Maureen Broadfoot to The Honorable Richard Neufeld, Minister of Energy and Mines requesting that the government intervene in BCTC’s VITR Application
October 17, 2005 C40-3 E-mail dated October 16, 2005 – Submission regarding Information Request Responses
November 01, 2005 C40-4 E-mail dated October 31, 2005 – Submission of News Articles
January 04, 2006 C40-5 E-mail dated January 3, 2006 requesting clarification regarding presentations at the Town Hall Meetings
January 09, 2006 C40-6 E-mail dated January 7, 2006 attaching an article entitled “Discrepancy over figures for lines” by Maureen Gulyas for the Delta Optimist
January 09, 2006 C40-7 E-mail dated January 8, 2006 providing the text of an article from the South Delta Leader entitled “Some Suggestive Scenes”
January 09, 2006 C40-8 E-mail dated January 7, 2006 providing the text of an article by Philip Raphael entitled “Newsmaker of the Year: TRAHVOL”
January 13, 2006 C40-9 E-mail dated January 12, 2006 filing an article from the Delta Optimist entitled “A Matter of Health”
January 23, 2006 C40-10 Email dated January 20, 2006 letter of comment with article from Delta Optimist “Prudent Decision Required”
January 23, 2006 C40-11 Email dated January 20, 2006 letter of comment with article from Delta Optimist “BCUC is urged to reject plan”
February 06, 2006 C40-12 Email dated January 4, 2006 letter of comment enclosing an article from the Delta Optimist entitled “In the Public Interest?”
August 23, 2005 C41-1 SOUTH DELTA SECONDARY SCHOOL PARENT ADVISORY COUNCIL – Notice of Intervention dated August 22, 2005 from Janice Ristow
October 16, 2005 C41-2 Web filing dated October 14, 2005 – Submission
November 10, 2005 C41-3 Letter dated November 10, 2005 – Responses to BCTC Information Request No. 1 and Commission Information Request No. 1
January 31, 2006 C41-4 Opening Statement of Ms. Kudzin for South Delta School Parents' Advisory Council. Document submitted at the Opening Oral Hearing.
March 13, 2006 C41-5 Submission at Public Hearing – Equakealert document
March 13, 2006 C41-6 Submission at Public Hearing – School Emergency Exit Plan
March 13, 2006 C41-7 Submission at Public Hearing – Document “Seven Steps to Electrical Safety”
March 13, 2006 C41-8 Submission at Public Hearing – Question of Mr. Karow to Dr. Ahlbom from BCUC website
March 21, 2006 C41-09 Submission at Public Hearing – Resolution of South Delta Senior Secondary School Parent Advisory Committee
August 24, 2005 C42-1 BOLIRINNO, JOEQYNA – Notice of Intervention dated August 23, 2005
March 09, 2006 C42-2 Submission at Public Hearing – Written text of presentation by Ms. Bolirinno
August 24, 2005 C43-1 PAGET, N.R.G. – Notice of Intervention dated August 23, 2005
August 25, 2005 C44-1 BOLUS, LEONARD G. – Notice of Intervention and Information request received August 24, 2005
September 08, 2005 C45-1 DELTA SCHOOL DISTRICT – Notice of Intervention dated September 8, 2005 from Grant McRadu
October 11, 2005 C45-2 Letter dated May 13, 2005 to Mr. Michael Costello, President and Chief Executive Officer, British Columbia Transmission Corporation
January 31, 2006 C45-3 Statement of the Delta School District
March 09, 2006 C45-4 Submission at Public Hearing – Letter of Comment / Submission from the Delta School District
September 13, 2005 C46-1 COALITION TO REDUCE ELECTROPOLLUTION – Notice of Intervention received September 13, 2005 from Hans Karow
September 28, 2005 C46-2 E-mail dated September 28, 2005 - Submission
October 05, 2005 C46-3 Letter dated October 3, 2005 advising that copies of the proceeding documentation had not yet been provided
October 06, 2005 C46-4 E-mail dated October 5, 2005 – Request for hard copies and clarification of deadline for Information Requests
October 21, 2005 C46-5 E-mail dated October 19, 2005 – Request submission be read at Pre-hearing conference
November 21, 2005 C46-7 COALITION TO REDUCE ELECTROPOLLUTION – E-mail dated October 18, 2005 requesting Intervenor Status from Hans Karow ~ *Previously C14-1 in Sea Breeze VIC proceeding
January 03, 2006 C46-8 Letter dated December 27, 2005 submitting a one page summary/assessment of EMF studies in the Bonneville Power publication “Electrical and Biological Effects of Transmission Lines: A Review”
January 18, 2006 C46-9 E-mail dated January 16, 2006 to Commissioner Hobbs from Hans Karow/CORE asking him if he would live near high voltage transmission lines exposing his family to EMF
September 15, 2005 C47-1 RODDICK, VALERIE MLA – Notice of Intervention received September 13, 2005
January 04, 2006 C47-2 E-mail dated January 3, 2006 requesting clarification regarding presentations made at the Town Hall Meetings
February 10, 2006 C47-3 Submission at Tsawwassen Town Hall Meeting
March 13, 2006 C47-3 Submission at Tsawwassen Town Hall Meeting
September 16, 2005 C48-1 GSX CONCERNED CITIZENS COALITION (GSXCCC) – Notice of Intervention dated September 16, 2005
September 19, 2005 C49-1 Clean Energy Foundation – Notice of Intervention dated September 17, 2005 from Milt Bowling
September 22, 2005 C50-1 Susan and Cliff Plumpton – Notice of Late Intervention dated September 22, 2005
December 23, 2005 C50-2 Letter dated December 20, 2005 submitting Information Request No. 1
October 12, 2005 C51-1 NAM, KYONG H. – Notice of Intervention dated October 11, 2005
October 12, 2005 C51-2 Submission dated October 7, 2005 regarding EMF’s and Health Hazards
January 15, 2006 C51-3 Letter dated January 12, 2006 commenting on the Town Hall Meetings
January 31, 2006 C51-4 Opening Statement by Dr. Kyong Nam
February 03, 2006 C51-5 Letter dated February 2, 2006 requesting information on health hazards and use of professional designation with APEGGA
February 14, 2006 C51-6 Letter dated February 6, 2006 regarding Intervenor Evidence Supplement for Public Hearing on EMF and Health Hazards, provided upon request of Mr. Fulton, Counsel
March 01, 2006 C51-7 Submission at Public Hearing – Series of emails to and from Dr. Nam
November 21, 2005 C52-1 TOWN OF VIEW ROYAL – E-mail dated October 17, 2005 from Emmet McCusker requesting Intervenor Status ~ *Previously C3-1 in Sea Breeze VIC proceeding
November 21, 2005 C53-1 HOLMAN, GARY – E-mail dated October 18, 2005 requesting Intervenor Status ~ *Previously C13-1 in Sea Breeze VIC proceeding
November 21, 2005 C54-1 GSX CONCERNED CITIZENS COALITION – Notice of Intervention dated October 19, 2005 from Arthur Caldicott ~ *Previously C16-1 in Sea Breeze VIC proceeding
November 21, 2005 C55-1 HARVIE, George– Notice of Intervention dated October 18, 2005 (The Corporation of Delta) ~ *Previously C17-1 in Sea Breeze VIC proceeding
November 21, 2005 C56-1 SALT SPRING ISLAND LOCAL TRUST COMMITTEE – Notice of Intervention dated October 18, 2005 from Kimberly Lineger ~ *Previously C18-1 in Sea Breeze VIC proceeding
November 21, 2005 C57-1 CITY OF WHITE ROCK – Notice of Intervention dated October 25, 2005 from Mayor Judy L. Forster ~ *Previously C19-1 in Sea Breeze VIC proceeding
December 21, 2005 C57-2 Letter dated December 21, 2005 filing Evidence from the City of White Rock
January 24, 2006 C57-3 Letter dated January 23, 2006 from the City of White Rock responding to Commission Information Request No. 1
January 24, 2006 C57-4 Letter dated January 23, 2006 filing Evidence from W. David F. Pollock, of the City of White Rock
March 17, 2006 C57-5 Submission at Public Hearing – Letter containing two resolutions passed by the White Rock City Council
November 21, 2005 C58-1 SONGHEES FIRST NATION – Notice of Intervention dated October 27, 2005 from Chief Robert Sam ~ *Previously C20-1 in Sea Breeze VIC proceeding
February 03, 2006 C59-1 CITY OF SURREY – Notice of Intervention dated January 25, 2006 from Dianne L. Watts, Mayor

D Exhibits — Interested Party Documents

Date Title Document Description
February 15, 2005 D-58 Removed
July 11, 2005 D-1 Web registration dated July 11, 2005 from Heather Orr, Environmental Assessment Office
July 19, 2005 D-2 Web registration dated July 19, 2005 from Margaret Atchison
July 26, 2005 D-3 Web registration dated July 26, 2005 from Gary Williams
July 26, 2005 D-4 Web registration dated July 26, 2005 from Karen Sweet
July 26, 2005 D-5 Web registration dated July 26, 2005 from Kevin Jamieson
July 27, 2005 D-6 Web registration dated July 27, 2005 from Danny Duch
July 27, 2005 D-7 Web registration dated July 27, 2005 from Patti Purchas
July 27, 2005 D-8 Web registration dated July 27, 2005 from Victor Villeneuve
July 28, 2005 D-9 Web registration dated July 28, 2005 from Joan Purchas
July 28, 2005 D-10 Web registration dated July 28, 2005 from Lorne Purchas
July 28, 2005 D-11 Web registration dated July 28, 2005 from Guenter and Monika Schreiber
July 29, 2005 D-12 Letter dated July 25, 2005 requesting Interested Party status from Myron Osatenko
July 29, 2005 D-13 Letter dated July 19, 2005 requesting Interested Party status from Sheila Harrington
July 29, 2005 D-14 Web registration dated July 29, 2005 from Christine & Alan Tobiason
July 29, 2005 D-15 Web registration dated July 29, 2005 from Bert Schroeter
July 29, 2005 D-16 Web registration dated July 29, 2005 from Greg G. Fahlman
July 29, 2005 D-17 Web registration dated July 29, 2005 from Mark Warwarick August 3, 2005 submission entitled “Direct Current Transmission Lines”
July 29, 2005 D-18 Web registration dated July 29, 2005 from Ray Carter
August 04, 2005 D-19 Web registration dated August 3, 2005 from Darlene Morrison
August 04, 2005 D-20 Web regstration dated August 3, 2005 from Kathy and Scott Mitchell
August 04, 2005 D-21 Web registrations dated August 3, 2005 from Angela and Martin Kind
August 04, 2005 D-22 Letters dated July 25, 2005 from John and Anne Noble
August 08, 2005 D-23 Web registration received August 8, 2005 from Andrew Boyce
August 08, 2005 D-24 Web registration received August 8, 2005 from J.R. Moran
August 08, 2005 D-25 Letter dated July 26, 2005 from Edward Kenmare Letter of Comment received August 10, 2005
August 08, 2005 D-26 Web registration received August 8, 2005 from R.J. Allinson
August 08, 2005 D-27 Web registration received August 8, 2005 from Patricia Ellks
August 08, 2005 D-28 Web registration received August 8, 2005 from K. Whitlum
August 08, 2005 D-29 Web registration received August 8, 2005 from Mark Robinson
August 08, 2005 D-30 Web registration received August 8, 2005 from Pat Lorimy
August 08, 2005 D-31 Web registration received August 8, 2005 from John Bell
August 11, 2005 D-32 Web registration received August 11, 2005 from Toan My To
August 11, 2005 D-33 Letter dated August 11, 2005 from Reg and Gale Dawson
August 12, 2005 D-34 Letter dated August 10, 2005 from Ben and Betty Dunstan
August 12, 2005 D-35 Letter received August 12, 2005 from Carolyn and Don Allen
August 16, 2005 D-36 Web registration received August 15, 2005 from Lynette Olfert requesting change to Interested Party status
August 16, 2005 D-37 Web registration received August 15, 2005 from Mrs. Sung Nam
August 16, 2005 D-38 Web registration received August 15, 2005 from Andre and Maria de Ruijter
August 16, 2005 D-39 Web registration received August 15, 2005 from Mark Timmons
August 16, 2005 D-40 Letter dated August 13, 2005 from Joseph and Bernadette Kudzin
August 17, 2005 D-41 E-mail dated August 17, 2005 from Don and Karen Parry
August 18, 2005 D-41-1 Letter dated January 10, 2006 from Don & Karen Parry regarding property values along the existing right-of-way
August 18, 2005 D-42 Letter dated August 13, 2005 Lis Bridson
August 22, 2005 D-43 Letter received August 19, 2005 requesting a change in status to Interested Pary (See Exhibit C20-2)
August 22, 2005 D-44 Letter dated August 15, 2005 from Les Malzseniczky requesting a change in status to Interested Party
August 23, 2005 D-45 Web registration requesting Interested Party status from Lesley Leake
August 23, 2005 D-46 Web registration requesting Interested Party status from Glen Page
August 24, 2005 D-47 Web registration requesting Interested Party status from Allen and Zara Cody
August 24, 2005 D-48 Letter dated August 12, 2005 requesting Interested Party status from Bob and Wendy Childs
August 25, 2005 D-49 E-mail dated August 24, 2005 requesting Interested Party status from Shelley Willms
September 02, 2005 D-50 E-mail dated September 1, 2005 requesting Interested Party status and enclosing a March 3, 2005 Letter of Comment
September 06, 2005 D-51 E-mail dated September 2, 2005 requesting Interested Party status from Jim & Kelly Gallagher
September 08, 2005 D-52 Web registration dated September 7, 2005 requesting Interested Party status from Lorraine Baker
September 09, 2005 D-53 E-mail dated September 8, 2005 requesting Interested Party status from Jack S. Weddell
September 09, 2005 D-54 Web registration dated September 8, 2005 requesting Interested Party status from Florence Weisser
September 12, 2005 D-55 Web registration dated September 11, 2005 Sukeina Jethabhai and Mohammad Meghjee requesting Interested Party status
September 12, 2005 D-56 Web registration dated September 11, 2005 Peter Thesiger requesting Interested Party status
September 15, 2005 D-57 Web registration dated September 13, 2005 requesting Interested Party Status from Ante Filipovic
September 15, 2005 D-59 Web registration dated September 13, 2005 requesting Interested Party Status from Dini Veldhuis
September 16, 2005 D-60 E-mail dated September 15, 2005 from Jun & Cora Arguelles requesting Interested Party status
September 19, 2005 D-61 Web registration dated September 17, 2005 requesting Interested Party Status from David R. Jones
September 19, 2005 D-62 Web registration dated September 17, 2005 requesting Interested Party Status from Delores Savage
September 19, 2005 D-63 Web registration dated September 17, 2005 requesting Interested Party Status from Mr. M. Anderson Letter of Comment received November 1, 2005
September 19, 2005 D-64 Web registration dated September 17, 2005 requesting Interested Party Status from Phil Ethier
September 19, 2005 D-65 Web registration dated September 17, 2005 requesting Interested Party Status from Rocio Gonzalez
September 19, 2005 D-66 Web registration dated September 17, 2005 requesting Interested Party Status from Vaclav Simek
September 20, 2005 D-67 Web registration dated September 19, 2005 requesting Interested Party Status from Steven Reid
October 19, 2005 D-68 Letter dated September 13, 2005 requesting change from Intervenor to Interested Party Status from Shirley C. and Robert L. Hanken
November 21, 2005 D-69 JOY, Carmel – Web registration dated October 8, 2005 requesting Interested Party status and Letter of Comment dated October 8, 2005 ~ *Previously D-1 in Sea Breeze VIC proceeding
November 21, 2005 D-70 MOYSA, N. – Letter dated October 14, 2005 requesting Interested Party Status ~ *Previously D-2 in Sea Breeze VIC proceeding
December 08, 2005 D-71 Letter of Comment dated December 6, 2005 from the Bonneville Power Administration *formerly Exhibit E-19
December 22, 2005 D-72 Letter of Comment dated December 20, 2005 from the City of Surrey – Paul Ham, P.Eng., General Manager, Engineering Dept
March 01, 2006 D-73 Web registration dated February 28, 2005 requesting Interested Party Status from Janet Williams
March 02, 2006 D-73-1 Letter of Comment received by fax February 28, 2006 from Janet Williams
March 20, 2006 D-19-1 Letter of Comment received March 17, 2006 from Darlene Morrison
March 23, 2006 D-74 Web registration dated March 21, 2006 requesting Interested Party status from Phil Le Good

E Exhibits - Letters of Comment

Date Title Document Description
September 05, 2006 E-28 Submission at Salt Spring Town Hall Meeting from John Wakefield (powerpoint presentation)
April 13, 2006 E-57 Submission at Tsawwassen Town Hall Meeting by Bernadette Kudzin
April 13, 2006 E-57 Submission at Tsawwassen Town Hall Meeting by Bernadette Kudzin
March 23, 2006 E-201 Letter of Comment emailed March 18, 2006 from William K. Tower
March 20, 2006 E-200 Letter of Comment emailed March 17, 2006 from Phil Le Good
March 17, 2006 E-199 Letter of Comment from Marilyn & Ian Holder
March 13, 2006 E-198 Letter of Comment received March 10, 2006 from George Plant
March 10, 2006 E-121-1 Letter of Comment received March 9, 2006 from Jim Diemer
March 09, 2006 E-197 Letter of Comment received March 8, 2006 from Tracy Farden
March 07, 2006 E-196 Petition received March 7, 2006 from Valerie Mair
March 07, 2006 E-197 Letter of Comment dated March 7, 2006 from Delta School District
March 06, 2006 E-195 Letter of Comment dated March 3, 2006 from Kimberlea Murphy
March 06, 2006 E-194 Letter of Comment dated March 3, 2006 from Linda and Tom Spragge
March 06, 2006 E-193 Letter of Comment dated March 3, 2006 from Tenzin White
March 03, 2006 E-192 Letter of Comment dated March 2, 2006 from Darrin Lane, White Rock
March 03, 2006 E-191 Letter of Comment dated March 2, 2006 from Anne Wallace
March 03, 2006 E-190 Letter of Comment received March 1, 2006 from Judith Hampson, White Rock
March 03, 2006 E-189 Letter of Comment dated March 2, 2006 from Leslie Cummings, Surrey
March 02, 2006 E-188 Letter of Comment received March 2, 2006 from Gordon Hogg, MLA, Surrey-White Rock
March 02, 2006 E-187 Letter of Comment received February 28, 2006 from Ministry of Environmental Assessment Office responding to IRAHVOL
March 02, 2006 E-186 Letter of Comment received March 2, 2006 from Robert Lee Taylor and Sonja Taylor
March 01, 2006 E-185 Letter of Comment received March 1, 2006 from Guy Gentner, MLA, North Delta
March 01, 2006 E-183 Letter of Comment emailed February 28, 2006 from Judy Hale
March 01, 2006 E-182 Letter of Comment emailed February 28, 2006 from D. Gibala
March 01, 2006 E-181 Letter of Comment emailed February 28, 2006 from Prof. David MacAlister
March 01, 2006 E-180 Letter of Comment emailed February 28, 2006 from Roger Poissenot and Debbie Norrish
March 01, 2006 E-179 Letter of Comment emailed February 28, 2006 from William K. Tower
February 28, 2006 E-178 Letter of Comment emailed February 28, 2006 from Dr. John D. Welch
February 28, 2006 E-177 Letter of Comment emailed February 28, 2006 from Gillian Caldwell
February 28, 2006 E-176 Letter of Comment emailed February 28, 2006 from Darlene Rodocker
February 28, 2006 E-175 Letter of Comment emailed February 28, 2006 from DJ@telus.net
February 28, 2006 E-174 Letter of Comment emailed February 27, 2006 from Removed from Website
February 28, 2006 E-173 Letter of Comment received February 27, 2006 from R. J. Ralston
February 28, 2006 E-172 Letter of Comment emailed February 25, 2006 from Richard Wiklo and Nancy Walton
February 28, 2006 E-171 Letter of Comment emailed February 26, 2006 from Tom & Lucy Seidelmann
February 28, 2006 E-170 Letter of Comment emailed February 27, 2006 from Betty Jo Gillett
February 28, 2006 E-169 Letter of Comment emailed February 25, 2006 from Diane Bradley
February 28, 2006 E-165-1 Letter of Comment emailed February 27, 2006 from Jeff Hubbick
February 28, 2006 E-159-1 Letter of Comment received February 24, 2006 from William S. Morton
February 24, 2006 E-168 Letter of Comment received February 23, 2006 from Irene L. Olson
February 24, 2006 E-167 PENDING - Letter of Comment received February 23, 2006
February 24, 2006 E-166 Letter of Comment received February 23, 2006 from Christine Kearnes
February 24, 2006 E-165 Letter of Comment received February 23, 2006 from Jeff Hubbick
February 23, 2006 E-164 Letter of Comment received February 22, 2006 from Valerie Mair
February 23, 2006 E-163 Letter of Comment received February 22, 2006 from Cathy Potkins
February 23, 2006 E-162 Letter of Comment received February 22, 2006 from Liz Barak
February 23, 2006 E-161 Letter of Comment received February 22, 2006 from Jan Kristiansen
February 23, 2006 E-160 Letter of Comment received February 22, 2006 from Karen Haugland
February 23, 2006 E-159 Letter of Comment received February 22, 2006 from William S. Morton
February 23, 2006 E-158 Letter of Comment received February 22, 2006 from Seth Wass
February 23, 2006 E-157 Letter of Comment received February 17, 2006 from Maureen Hansen
February 23, 2006 E-156 Letter of Comment received February 21, 2006 from Ingrid Diles
February 23, 2006 E-155 Letter of Comment received February 22, 2006 from Robert and JoAnne Lemieux
February 23, 2006 E-154 Letter of Comment received February 22, 2006 from Robert Anderson
February 23, 2006 E-153 Letter of Comment received February 21, 2006 from Annette Zacher
February 23, 2006 E-152 Letter of Comment received February 21, 2006 from David Souter
February 23, 2006 E-151 Letter of Comment received February 21, 2006 from Greg and Kelly Dombroski
February 23, 2006 E-150 Letter of Comment received February 21, 2006 from Paul Felker
February 23, 2006 E-149 Letter of Comment received February 21, 2006 from Tanesa Kiso
February 21, 2006 E-148 Letter of Comment received February 20, 2006 from Patricia L. (Buchanan) Randall
February 21, 2006 E-147 Letter of Comment received February 20, 2006 from Laura and Russell Kearnes
February 21, 2006 E-146 Letter of Comment received February 20, 2006 from Daphne Buchanan
February 21, 2006 E-145 Letter of Comment received February 18, 2006 from Karen Cunha
February 21, 2006 E-144 Letter of Comment received February 19, 2006 from Tonja Steiner
February 17, 2006 E-143 Letter of Comment received February 16, 2006 from Bruce McLeod
February 17, 2006 E-142 Letter of Comment received February 16, 2006 from Linda Carvajal
February 15, 2006 E-137 Letter of Comment received February 13, 2006 from Debra Swain
February 15, 2006 E-136 Letter of Comment received February 13, 2006 from N. & S. Ghislieri
February 15, 2006 E-134 Letter of Comment received February 13, 2006 from April Rohee
February 15, 2006 E-135 Letter of Comment received February 13, 2006 from Anonymous
February 15, 2006 E-133 Letter of Comment received February 13, 2006 from Rolf and Julie Wagner
February 15, 2006 E-132 Letter of Comment received February 13, 2006 from Maureen & Robin Harrison
February 15, 2006 E-131 Letter of Comment received February 13, 2006 from Scott and Barbara Guest
February 14, 2006 E-130 Letter of Comment received February 14, 2006 from Bhupinder Singh Sidhu
February 10, 2006 E-129 Petition received February 10, 2006 from William Morton and Home Owners/Residents opposed to the proposed HVDC-light, City of White Rock Route
February 10, 2006 E-128 Letter of Comment dated February 8, 2006 from William S. Morton
February 10, 2006 E-127 Letter of Comment received February 10, 2006 from Gladys M. Rai
February 10, 2006 E-125 Letter of Comment from an Anonymous resident received February 9, 2006
February 10, 2006 E-126 Letter of Comment received February 9, 2006 from Gail & Dave Annets
February 10, 2006 E-124 Letter of Comment dated February 6, 2005 from Edith & Helmut Kraemer opposing the 550 Mega Watt Cable planned through South Surrey - White Rock
February 10, 2006 E-123 Letter of Comment dated February 9, 2006 from Peter & Leora Shipley
February 10, 2006 E-122 Letter of Comment dated February 9, 2006 from Ra & Deborah McGuire
February 09, 2006 E-121 Letter of Comment received February 8, 2006 from Jim Diemer
February 09, 2006 E-120 Letter of Comment received February 8, 2006 from A. Lewis
February 09, 2006 E-119 Letter of Comment received February 8, 2006 from Marie-France Hautberg
February 09, 2006 E-118 Letter of Comment received February 8, 2006 from Carl and Sandra Olafson
February 09, 2006 E-117 Letter of Comment received February 8, 2006 from Ezio Cividino
February 09, 2006 E-116 Letter of Comment received February 8, 2006 from Susan and Brian Lamont
February 09, 2006 E-115 Letter of Comment received February 8, 2006 from Joan Coulas
February 09, 2006 E-114 Letter of Comment dated February 8, 2006 from Kristen Sheehan
February 09, 2006 E-113 Letter of Comment received February 7, 2006 from Ben Dirksen
February 09, 2006 E-112 Letter of Comment received February 7, 2006 from Colin & Muriel Mason
February 09, 2006 E-111 Letter of Comment received February 7, 2006 from Beverley Cunningham
February 09, 2006 E-110 Letter of Comment received February 7, 2006 from Sharon & Douglas Muche
February 09, 2006 E-109 Letter of Comment received February 7, 2006 from Keith Stirling
February 09, 2006 E-108 Letter of Comment received February 7, 2006 from Thomas Haworth
February 09, 2006 E-107 Letter of Comment received February 7, 2006 from Jim Davidson and Carmen Froment
February 09, 2006 E-106 Letter of Comment received February 6, 2006 from Eric Schmidt
February 09, 2006 E-105 Letter of Comment received February 6, 2006 from Sarah Blane
February 09, 2006 E-104 Letter of Comment received February 6, 2006 from the Watson Family
February 09, 2006 E-103 Letter of Comment received February 6, 2006 from Jean-Claude Castex
February 09, 2006 E-102 Letter of Comment received February 3, 2006 from Pieter Vlek
February 06, 2006 E-101 Letter of Comment dated February 5, 2006 from Ray Skelly
February 06, 2006 E-100 Letter of Comment dated February 4, 2006 from Peter & Gail Taylor
February 03, 2006 E-99 Letter of Comment received February 3, 2006 from Gabrielle Visone
February 03, 2006 E-98 Letter of Comment received February 3, 2006 from Mr. & Mrs. A. Visone
February 03, 2006 E-97 Letter of Comment received February 3, 2006 from Diane Pauker
February 03, 2006 E-96 Letter of Comment received February 3, 2006 from Mr. & Mrs. E. Duck
February 03, 2006 E-95 Letter of Comment received February 3, 2006 from June and Vern Dubay
February 03, 2006 E-93 Letter of Comment received February 1, 2006 from Lorraine Hand
February 03, 2006 E-94 Letter of Comment received February 1, 2006 from Anonymous
February 03, 2006 E-92 Letter of Comment received February 1, 2006 from Bill Cron
February 03, 2006 E-91 Letter of Comment received February 1, 2006 from Mr. & Mrs. R. Kocher
February 03, 2006