Other

Vancouver Airport Fuel Facilities Corporation - Complaint Regarding Jet Fuel Line Abandonment of Service

Completed: 2022

Hearing and Other Documents

Title Document Description
EXHIBIT LIST Updated: July 20, 2022 @ 9:26 am
G-197-22 Final Order July 20, 2022

Exhibits

A Exhibits - BCUC Documents

Date Title Document Description
May 20, 2021 A-1 Letter dated May 20, 2021 – BCUC Order G-154-21 establishing the proceeding and directing PKMJF to return the JFL to service
May 28, 2021 A-2 Letter dated May 28, 2021 – BCUC Order G-167-21 establishing a regulatory timetable
June 01, 2021 A-3 Letter dated June 1, 2021 – BCUC request for submissions on VAFFC request for workshop and potential regulatory timetable
June 03, 2021 A-4 Letter dated June 3, 2021 – BCUC Order G-174-21 amending the regulatory timetable
June 04, 2021 A-5 Letter dated June 4, 2021 – BCUC Information Request No. 1 to PKMJF
June 04, 2021 A-6 Letter dated June 4, 2021 – BCUC Information Request No. 1 to VAFFC
June 04, 2021 A-7 Letter dated June 4, 2021 – BCUC Information Request No. 1 to Shell
June 04, 2021 A-8 CONFIDENTIAL – Letter dated June 4, 2021 – BCUC Confidential Information Request No. 1 to Parkland
June 08, 2021 A-9 Letter dated June 8, 2021 – BCUC providing Workshop and Independent Expert Consultant details and request for submissions on Dynamic Risk as consultant
June 11, 2021 A-10 Letter dated June 11, 2021 – BCUC response regarding proposed independent expert Dynamic Risk
June 11, 2021 A-11 Letter dated June 11, 2021 – BCUC Order G-184-21 further amending the regulatory timetable
June 15, 2021 A-12 Letter dated June 15, 2021 – BCUC detailing Dynamic Risk Assessment Systems Inc. Scope of Work
June 18, 2021 A-13 Letter dated June 18, 2021 – BCUC Order G-188-21 extending the return to service deadline established in Directive 2 of Order G-154-21
June 29, 2021 A-14 Letter dated June 29, 2021 – BCUC Order G-200-21 further amending the regulatory timetable and providing workshop information
July 12, 2021 A-15 Letter dated July 12, 2021 – BCUC staff written questions for Dynamic Risk to address at July 15, 2021 workshop
July 23, 2021 A-16 Letter dated July 23, 2021 – BCUC Request for Submission from Dynamic Risk regarding July 21 Filings
July 29, 2021 A-17 Letter dated July 29, 2021 – BCUC request for submissions on Dynamic Risk’s proposal
July 30, 2021 A-18 Letter dated July 30, 2021 – BCUC Order G-233-21 extending the return to service deadline established in Directive 2 of Order G-154-21 and varied by Order G-188-21
August 17, 2021 A-19 Letter dated August 17, 2021 – BCUC Request for submissions on further process
August 24, 2021 A-20 Letter dated August 24, 2021 – BCUC request for evidentiary update regarding alternatives to the JFL
September 03, 2021 A-21 Letter dated September 3, 2021 – BCUC Order G-261-21 extending the return to service deadline established in Directive 2 of Order G-154-21
November 08, 2021 A-22 Letter dated November 8, 2021 – BCUC Order G-322-21 extending the return to service deadline established in Directive 2 of Order G-154-21, and varied by Orders G-188-21, G-233-21, and G-261-21
November 25, 2021 A-23 Letter dated November 25, 2021 – BCUC request for submissions from parties on the need to return the JFL to service
December 15, 2021 A-24 Letter dated December 15, 2021 – BCUC response to PKMJF request for confirmation or variance of Directive 2 of Order G-154-21 and request for temporary suspension of Reporting Requirements
January 14, 2022 A-25 Letter dated January 14, 2022 – BCUC Order G-10-22 extending the return to service deadline established in Directive 2 of Order G-154-21 and varied by Order G-188-21, G-233-21, G-261-21, and G-322-21
March 10, 2022 A-26 Letter dated March 10, 2022 – BCUC Order G-70-22 extending the return to service deadline established in Directive 2 of Order G-154-21 and varied by Orders G-188-21, G-233-21, G-261-21, G-322-21, and G-10-22
May 02, 2022 A-27 Letter dated May 2, 2022 – BCUC request to PKMJF for further information
May 13, 2022 A-28 Letter dated May 13, 2022 – BCUC Order G-127-22 extending the return to service deadline until June 30, 2022
June 29, 2022 A-29 Letter dated June 29, 2022 – BCUC request for party submissions
May 20, 2021 A2-1 Letter dated May 20, 2021 – BCUC staff submitting Exhibits from Kinder Morgan Canada (Jet Fuel) Inc. 2019 Tariff Application proceeding
May 20, 2021 A2-2 Letter dated May 20, 2021 – BCUC staff submitting Parkland letter dated May 14, 2021 regarding JFL Shutdown
June 30, 2021 A2-3 Letter dated June 30, 2021 – BCUC staff submitting Dynamic Risk report dated June 30, 2021
July 20, 2021 A2-4 Letter dated July 20, 2021 – BCUC staff submitting Dynamic Risk Errata dated July 19, 2021 to Dynamic Risk report dated June 30, 2021
July 28, 2021 A2-5 Letter dated July 28, 2021 – BCUC staff submitting Dynamic Risk Submission regarding July 21 Filings
August 20, 2021 A2-6 Letter dated August 20, 2021 – BCUC staff submitting PKMJF submission, Exhibit B-81 from Kinder Morgan – 2019 Tariff Filing Application proceeding

B Exhibits - Applicant Documents

Date Title Document Description
May 31, 2021 B-1 VANCOUVER AIRPORT FUEL FACILITIES CORPORATION (VAFFC) – Letter dated May 31, 2021 submitting request for Workshop and Appointment of Independent Expert
June 02, 2021 B-2 Letter dated June 2, 2021 – VAFFC submitting response regarding Regulatory Timetable and Request for Documents
June 03, 2021 B-5 Letter dated June 3, 2021 - VAFFC submitting additional Confidentiality Declaration and Undertaking
June 03, 2021 B-3 Letter dated June 3, 2021 - VAFFC submitting Confidentiality Declaration and Undertakings
June 03, 2021 B-4 Letter dated June 3, 2021 - VAFFC submitting additional Confidentiality Declaration and Undertakings
June 04, 2021 B-6 Letter dated June 4, 2021 – VAFFC submitting Information Request No. 1 to PKMJF
June 04, 2021 B-7 CONFIDENTIAL - Letter dated June 4, 2021 – VAFFC submitting confidential Information Request No. 1 to PKMJF
June 08, 2021 B-8 Letter dated June 8, 2021 – VAFFC submitting reply to PKMJF regarding Independent Expert
June 09, 2021 B-9 Letter dated June 9, 2021 – VAFFC submission regarding the Retainer of Dynamic Risk Assessment Systems Inc. (Dynamic Risk)
June 10, 2021 B-10 Letter dated June 10, 2021 – VAFFC submitting Additional Confidential Declaration and Undertakings
June 10, 2021 B-11 Letter dated June 10, 2021 – VAFFC submitting responses to BCUC Information Request No. 1
June 22, 2021 B-12 Letter dated June 22, 2021 - VAFFC submitting additional Confidentiality Declaration and Undertakings
June 28, 2021 B-13 Letter dated June 28, 2021 - VAFFC submitting request for copies of records from BCOGC
June 28, 2021 B-14 Letter dated June 28, 2021 – VAFFC submitting Additional Confidential Declaration and Undertakings
June 29, 2021 B-7-1 Letter dated June 29, 2021 – VAFFC submitting redacted confidential Information Request No. 1 to PKMJF
July 21, 2021 B-15 Letter dated July 21, 2021 – VAFFC submitting response on Dynamic Risk Report
August 03, 2021 B-16 Letter dated August 3, 2021 – VAFFC submitting response to Dynamic Risk’s proposal
August 23, 2021 B-17 Letter dated August 23, 2021 – VAFFC submission regarding Further Process
August 31, 2021 B-18 Letter dated August 31, 2021 – VAFFC submitting Evidentiary Update
October 21, 2021 B-19 Letter dated October 21, 2021 - VAFFC submitting Confidentiality Declaration and Undertakings
December 02, 2021 B-20 Letter dated December 2, 2021 – VAFFC submission on return to service
July 06, 2022 B-21 Letter dated July 6, 2022 – VAFFC submission on proceeding closure
July 15, 2022 B-22 Letter dated July 15, 2022 – VAFFC submitting no objection on proceeding closure

C Exhibits - Intervener Documents



Date Title Document Description
May 25, 2021 C1-1 PEMBINA KINDER MORGAN CANADA (JET FUEL) INC. (PKMJF) – Letter dated May 25, 2021 submitting Update Regarding Return to Service
May 27, 2021 C1-2 Letter dated May 27, 2021 – PMKJF submitting Return to Service Plan
May 31, 2021 C1-3 Letter dated May 31, 2021 – PMKJF submitting confirmation of Notice of Order and Regulatory Timetable
May 31, 2021 C2-1 PARKLAND REFINING (B.C.) LTD. (PARKLAND) – Letter dated May 31, 2021 response regarding VAFFC request for Workshop and Appointment of Independent Expert
June 01, 2021 C1-4 Letter dated June 1, 2021 – PMKJF submitting Return to Service Update
June 02, 2021 C3-1 SHELL CANADA PRODUCTS (SHELL) – Letter dated June 2, 2021 Request to Intervene by Paul Kaethler
June 02, 2021 C1-5 Letter dated June 2, 2021 – PMKJF submission on proposed amended regulatory timetable
June 02, 2021 C2-3 Letter dated June 2, 2021 - Parkland submitting Confidentiality Declaration and Undertakings
June 02, 2021 C2-2 Letter dated June 2, 2021 – Parkland submitting response regarding Return to Service Technical Reports
June 03, 2021 C4-1 VANCOUVER AIRPORT AUTHORITY (VAA) – Letter dated June 3, 2021 Request to Intervene by Dorothy Wong
June 03, 2021 C2-4 Letter dated June 3, 2021 - Parkland submitting additional Confidentiality Declaration and Undertakings
June 03, 2021 C1-6 CONFIDENTIAL - Letter dated June 3, 2021 – PMKJF submitting Confidential Return to Service Reports
June 03, 2021 C1-6-1 CONFIDENTIAL - Letter dated June 3, 2021 – PKMJF submitting Engineering Assessment for Jet Fuel Pipelines performed by IRISNDT
June 03, 2021 C1-6-2 CONFIDENTIAL - Letter dated June 3, 2021 – PKMJF submitting Dent Strain Analysis performed by T.D. Williamson
June 03, 2021 C1-6-2-1 CONFIDENTIAL - Letter dated June 3, 2021 – PKMJF submitting Dent Strain Results performed by T.D. Williamson
June 03, 2021 C1-6-3 CONFIDENTIAL - Letter dated June 3, 2021 – PKMJF submitting Fatigue Life Assessment performed by BMT Canada Ltd.
June 03, 2021 C1-6-4 CONFIDENTIAL - Letter dated June 3, 2021 – PKMJF submitting Axial Crack In-Line Inspection Assessment performed by DNV Energy Systems
June 04, 2021 C5-1 TRANS MOUNTAIN PIPELINE LP, AS GENERAL PARTNER TO TRANS MOUNTAIN PIPELINE ULC (COLLECTIVELY, TRANS MOUNTAIN) – Letter dated June 4, 2021 Request to Intervene by Sander Duncanson
June 04, 2021 C2-5 Letter dated June 4, 2021 - Parkland submitting additional Confidentiality Declaration and Undertakings
June 04, 2021 C2-6 Letter dated June 4, 2021 – Parkland submitting Information Request No. 1 to PKMJF
June 04, 2021 C3-2 Letter dated June 4, 2021 – Shell submitting response regarding Return to Service Technical Reports
June 04, 2021 C4-2 Letter dated June 4, 2021 – VAA submitting Information Request No. 1 to PKMJF
June 08, 2021 C1-7 CONFIDENTIAL - Letter dated June 8, 2021 – PMKJF submitting Confidential Return to Service Reports Update
June 08, 2021 C1-7-1 CONFIDENTIAL - Letter dated June 8, 2021 – PMKJF submitting Confidential Dent Fatigue Life Assessment performed by BMT Canada Ltd. Update
June 08, 2021 C1-7-2 CONFIDENTIAL - Letter dated June 8, 2021 – PMKJF submitting Confidential Axial Crack In-Line Inspection Assessment performed by DNV Energy Systems Update
June 08, 2021 C1-9 Letter dated June 8, 2021 - PKMJF submitting Update on Pipeline Return to Service
June 08, 2021 C1-8 Letter dated June 8, 2021 - PKMJF submitting Confidentiality Declaration and Undertakings
June 10, 2021 C2-7 CONFIDENTIAL - Letter dated June 10, 2021 – Parkland submitting responses to BCUC Confidential Information Request No. 1 - Public
June 10, 2021 C2-7-1 CONFIDENTIAL - Letter dated June 10, 2021 – Parkland submitting responses to BCUC Confidential Information Request No. 1
June 10, 2021 C2-8 Letter dated June 10, 2021 - Parkland submitting additional Confidentiality Declaration and Undertakings
June 10, 2021 C3-3 Letter dated June 10, 2021 – Shell submitting response to BCUC Information Request No. 1
June 10, 2021 C3-3-1 CONFIDENTIAL - Letter dated June 10, 2021 – Shell submitting response to BCUC Information Request No. 1
June 10, 2021 C1-10 Letter dated June 10, 2021 - PKMJF submitting responses to BCUC Information Request No. 1
June 10, 2021 C1-11 Letter dated June 10, 2021 - PKMJF submitting responses to VAA Information Request No. 1
June 10, 2021 C1-12 Letter dated June 10, 2021 - PKMJF submitting responses to VAFFC Information Request No. 1
June 10, 2021 C1-12-1 CONFIDENTIAL - Letter dated June 10, 2021 - PKMJF submitting responses to VAFFC Confidential Information Request No. 1
June 10, 2021 C1-13 Letter dated June 10, 2021 - PKMJF submitting responses to Parkland Information Request No. 1
June 10, 2021 C1-13-1 CONFIDENTIAL - Letter dated June 10, 2021 - PKMJF submitting responses to Parkland Confidential Information Request No. 1
June 10, 2021 C4-3 Letter dated June 10, 2021 - VAA submitting additional Confidentiality Declaration and Undertakings
June 11, 2021 C1-14 Letter dated June 11, 2021 - PKMJF submitting correspondence from BC Oil and Gas Commission dated June 11, 2021
June 11, 2021 C1-15 Letter dated June 11, 2021 - PKMJF submitting Workshop Presentation
June 14, 2021 C1-16 Letter dated June 14, 2021 - PKMJF submitting Confidentiality Declaration and Undertakings
June 15, 2021 C1-17 Letter dated June 15, 2021 - PKMJF submitting Additional Confidentiality Declaration and Undertakings
June 15, 2021 C1-18 Letter dated June 15, 2021 - PKMJF submitting Update Regarding Return to Service
June 15, 2021 C1-19 Letter dated June 15, 2021 - PKMJF submitting responses to Workshop Information Requests
June 17, 2021 C1-20 Letter dated June 17, 2021 - PKMJF submitting response regarding Return to Service deadline
June 21, 2021 C1-21 CONFIDENTIAL - Letter dated June 21, 2021 - PKMJF submitting responses to Confidential Information Requests from Web-Based Workshop
June 21, 2021 C1-21-1 CONFIDENTIAL - Letter dated June 21, 2021 - PKMJF submitting Confidential attachments to responses to Confidential Information Requests from Web-Based Workshop
June 22, 2021 C1-22 Letter dated June 22, 2021 - PKMJF submitting Update Regarding Return to Service deadline
June 24, 2021 C1-21-2 CONFIDENTIAL - Letter dated June 21, 2021 - PKMJF submitting Revised responses to Confidential Information Requests from Web-Based Workshop
June 24, 2021 C1-21-3 CONFIDENTIAL - Letter dated June 24, 2021 - PKMJF submitting Revised Confidential attachments to responses to Confidential Information Requests from Web-Based Workshop
June 25, 2021 C1-21-2-1 Letter dated June 25, 2021 - PKMJF submitting redacted revised confidential attachments to responses to Confidential Information Requests from Web-Based Workshop
June 25, 2021 C1-21-4 CONFIDENTIAL - Letter dated June 25, 2021 - PKMJF submitting further Confidential responses to Confidential Information Requests from Web-Based Workshop
June 28, 2021 C1-21-4-1 Letter dated June 28, 2021 - PKMJF submitting further redacted responses to Confidential Information Requests from Web-Based Workshop
June 29, 2021 C1-23 Letter dated June 29, 2021 - PKMJF submitting Update Regarding Return to Service deadline
June 29, 2021 C1-23-1 CONFIDENTIAL - Letter dated June 29, 2021 - PKMJF submitting Confidential Attachments for the Update Regarding Return to Service deadline
June 30, 2021 C1-24 Letter dated June 30, 2021 – PKMJF submission regarding rescheduling conference call scheduled for July 8th to July 7th, 2021
June 30, 2021 C1-25 CONFIDENTIAL - Letter dated June 30, 2021 – PKMJF submitting corrections to Confidential Transcript Volume 1A
June 30, 2021 C1-27 Letter dated June 30, 2021 – PKMJF submitting corrections to Transcript Volume 1
June 30, 2021 C1-26 Letter dated June 30, 2021 – PKMJF submitting Redacted Confidential Transcript Volume 1A
July 05, 2021 C1-28 Letter dated July 5, 2021 – PKMJF submitting Additional Confidentiality Declaration and Undertaking
July 06, 2021 C1-29 Letter dated July 6, 2021 – PKMJF submitting Update regarding Return to Service
July 09, 2021 C4-4 Letter dated July 9, 2021 - VAA submitting additional Confidentiality Declaration and Undertaking
July 13, 2021 C1-30 Letter dated July 13, 2021 – PKMJF submitting Update regarding Return to Service
July 13, 2021 C1-30-1 CONFIDENTIAL - Letter dated July 13, 2021 – PKMJF submitting Update regarding Return to Service Confidential Attachment
July 20, 2021 C1-31 Letter dated July 20, 2021 – PKMJF submitting Update regarding Return to Service
July 21, 2021 C3-4 Letter dated July 21, 2021 – Shell submitting response on Dynamic Risk Report
July 21, 2021 C1-32 Letter dated July 21, 2021 – PKMJF submitting Rebuttal Evidence
July 21, 2021 C2-9 Letter dated July 21, 2021 – Parkland redacted submission on Dynamic Risk Report
July 21, 2021 C2-9-1 CONFIDENTIAL - Letter dated July 21, 2021 – Parkland confidential submission on Dynamic Risk Report
July 27, 2021 C1-33 Letter dated July 27, 2021 - PKMJF submitting Update regarding Return to Service
July 29, 2021 C1-34 Letter dated July 29, 2021 - PKMJF submission requesting relief from Order G-188-21 regarding Return to Service Deadline
July 30, 2021 C4-5 Letter dated July 30, 2021 - VAA submitting additional Confidentiality Declaration and Undertaking
August 03, 2021 C4-6 Letter dated August 3, 2021 – VAA submitting response to Dynamic Risk’s proposal
August 03, 2021 C1-36 Letter dated August 3, 2021 – PKMJF submitting response to Dynamic Risk’s proposal
August 03, 2021 C3-5 Letter dated August 3, 2021 – Shell submitting response to Dynamic Risk’s proposal
August 03, 2021 C2-10 Letter dated August 3, 2021 – Parkland submitting response to Dynamic Risk’s proposal
August 03, 2021 C1-35 Letter dated August 3, 2021 - PKMJF submitting Update regarding Return to Service
August 10, 2021 C1-37 Letter dated August 10, 2021 - PKMJF submitting Update regarding Return to Service
August 17, 2021 C1-38 Letter dated August 17, 2021 - PKMJF submitting Update regarding Return to Service
August 17, 2021 C1-39 CONFIDENTIAL - Letter dated August 17, 2021 - PKMJF submitting Confidential PIR Incident Report
August 20, 2021 C3-6 Letter dated August 20, 2021 – Shell submitting response to Exhibit A-19
August 23, 2021 C1-40 Letter dated August 23, 2021 – PKMJF submission regarding Further Process
August 23, 2021 C4-7 Letter dated August 23, 2021 – VAA submission regarding Further Process
August 23, 2021 C2-11 Letter dated August 23, 2021 – Parkland submission regarding Further Process
August 24, 2021 C1-41 Letter dated August 24, 2021 - PKMJF submitting Update regarding Return to Service
August 31, 2021 C4-8 Letter dated August 31, 2021 – VAA submitting update regarding contacts
August 31, 2021 C1-42 Letter dated August 31, 2021 – PKMJF submitting Evidentiary Update
August 31, 2021 C4-9 Letter dated August 31, 2021 – VAA submitting Evidentiary Update
August 31, 2021 C3-7 PUBLIC - Letter dated August 31, 2021 – Shell submitting Evidentiary Update
August 31, 2021 C3-7-1 CONFIDENTIAL - Letter dated August 31, 2021 – Shell submitting Confidential Evidentiary Update
August 31, 2021 C2-12 PUBLIC - Letter dated August 31, 2021 – Parkland submitting Evidentiary Update
August 31, 2021 C1-43 Letter dated August 31, 2021 - PKMJF submitting Update regarding Return to Service
August 31, 2021 C2-12-1 CONFIDENTIAL - Letter dated August 31, 2021 – Parkland submitting Confidential Evidentiary Update
September 02, 2021 C1-44 Letter dated September 2, 2021 - PKMJF submitting request for relief regarding Update Return to Service
September 07, 2021 C4-10 Letter dated September 7, 2021 - VAA submitting additional Confidentiality Declaration and Undertaking
September 07, 2021 C1-45 Letter dated September 7, 2021 - PKMJF submitting Update regarding Return to Service
September 14, 2021 C1-46 Letter dated September 14, 2021 - PKMJF submitting Update regarding Return to Service
September 21, 2021 C1-47 Letter dated September 21, 2021 - PKMJF submitting Update regarding Return to Service
September 21, 2021 C1-47-1 CONFIDENTIAL - Letter dated September 21, 2021 - PKMJF submitting Update regarding Return to Service Confidential Attachment B
September 28, 2021 C1-48 Letter dated September 28, 2021 - PKMJF submitting Update regarding Return to Service
October 05, 2021 C1-49 Letter dated October 5, 2021 - PKMJF submitting Update regarding Return to Service
October 12, 2021 C1-50 Letter dated October 12, 2021 - PKMJF submitting Update regarding Return to Service
October 14, 2021 C4-11 Letter dated October 14, 2021 - VAA submitting Karen Chang, Legal Counsel by Jana McLean, Iris Legal
October 19, 2021 C1-47-2 CONFIDENTIAL - Letter dated October 19, 2021 - PKMJF submitting Update regarding Return to Service Confidential Attachment B
October 19, 2021 C1-51 Letter dated October 19, 2021 - PKMJF submitting Update regarding Return to Service
October 26, 2021 C1-47-3 CONFIDENTIAL - Letter dated October 26, 2021 - PKMJF submitting Update regarding Return to Service Confidential Attachment B
October 26, 2021 C1-52 Letter dated October 26, 2021 - PKMJF submitting Update regarding Return to Service
November 02, 2021 C1-30-2 CONFIDENTIAL - Letter dated November 2, 2021 – PKMJF submitting Update regarding Return to Service Confidential Attachment C
November 02, 2021 C1-47-4 CONFIDENTIAL - Letter dated November 2, 2021 - PKMJF submitting Update regarding Return to Service Confidential Attachment B
November 02, 2021 C1-53 Letter dated November 2, 2021 - PKMJF submitting Update regarding Return to Service
November 05, 2021 C1-54 Letter dated November 5, 2021 - PKMJF submitting request for relief regarding Return to Service deadline
November 09, 2021 C1-55 Letter dated November 9, 2021 - PKMJF submitting Update regarding Return to Service
November 16, 2021 C1-56 Letter dated November 16, 2021 - PKMJF submitting Update regarding Return to Service
November 23, 2021 C1-57 Letter dated November 23, 2021 - PKMJF submitting Update regarding Return to Service
November 23, 2021 C1-57-1 CONFIDENTIAL - Letter dated November 23, 2021 - PKMJF submitting unredacted Update regarding Return to Service confidential Attachment C
November 30, 2021 C1-58 Letter dated November 30, 2021 - PKMJF submitting Update regarding Return to Service
November 30, 2021 C1-58-1 CONFIDENTIAL - Letter dated November 30, 2021 - PKMJF submitting Update regarding Return to Service Confidential Attachments
December 02, 2021 C2-13 Letter dated December 2, 2021 - Parkland submitting additional Confidentiality Declaration and Undertakings
December 02, 2021 C2-14 Letter dated December 2, 2021 – Parkland submission on return to service
December 02, 2021 C3-8 Letter dated December 2, 2021 – Shell submission on return to service
December 02, 2021 C4-12 Letter dated December 2, 2021 – VAA submission on return to service
December 07, 2021 C1-59 Letter dated December 7, 2021 - PKMJF submitting Update regarding Return to Service
December 09, 2021 C1-60 Letter dated December 9, 2021 - PKMJF submitting response to submissions regarding Updated Return to Service
December 14, 2021 C1-61 Letter dated December 14, 2021 - PKMJF submitting request to temporarily suspend requirements regarding Updated Return to Service
December 14, 2021 C1-62 Letter dated December 14, 2021 - PKMJF submitting Update regarding Return to Service
December 21, 2021 C1-63 Letter dated December 21, 2021 - PKMJF submitting Update regarding Return to Service
January 04, 2022 C1-64 Letter dated January 4, 2022 - PKMJF submitting Update regarding Return to Service
January 07, 2022 C1-65 Letter dated January 7, 2022 – PKMJF submitting update regarding Agreement in Principle
January 11, 2022 C1-66 Letter dated January 11, 2022 - PKMJF submitting Update regarding Return to Service
January 13, 2022 C1-67 Letter dated January 13, 2022 - PKMJF submitting request for relief from the timeline compliance for return to service
January 18, 2022 C1-68 Letter dated January 18, 2022 - PKMJF submitting Update regarding Return to Service
January 21, 2022 C4-13 Letter dated January 21, 2021 - VAA submitting Confidentiality Declaration and Undertaking
January 25, 2022 C1-69 Letter dated January 25, 2022 - PKMJF submitting Update regarding Return to Service
February 01, 2022 C1-70 Letter dated February 1, 2022 - PKMJF submitting Update regarding Return to Service
February 08, 2022 C1-71 Letter dated February 8, 2022 - PKMJF submitting Update regarding Return to Service
February 15, 2022 C1-72 Letter dated February 15, 2022 - PKMJF submitting Update regarding Return to Service
February 22, 2022 C1-73 Letter dated February 22, 2022 - PKMJF submitting Update regarding Return to Service
March 01, 2022 C1-74 Letter dated March 1, 2022 - PKMJF submitting Update regarding Return to Service
March 08, 2022 C1-75 Letter dated March 8, 2022 - PKMJF submitting Update regarding Return to Service
March 10, 2022 C1-76 Letter dated March 10, 2022 - PKMJF submitting request for relief from the Return to Service compliance
March 15, 2022 C1-77 Letter dated March 15, 2022 - PKMJF submitting Update regarding Return to Service
March 22, 2022 C1-78 Letter dated March 22, 2022 - PKMJF submitting Update regarding Return to Service
March 29, 2022 C1-79 Letter dated March 29, 2022 - PKMJF submitting Update regarding Return to Service
April 05, 2022 C1-80 Letter dated April 5, 2022 - PKMJF submitting Update regarding Return to Service
April 12, 2022 C1-81 Letter dated April 12, 2022 - PKMJF submitting Update regarding Return to Service
April 19, 2022 C1-82 Letter dated April 19, 2022 - PKMJF submitting Update regarding Return to Service
April 26, 2022 C1-83 Letter dated April 26, 2022 - PKMJF submitting Update regarding Return to Service
May 03, 2022 C1-84 Letter dated May 3, 2022 - PKMJF submitting Update regarding Return to Service
May 10, 2022 C1-85 Letter dated May 10, 2022 - PKMJF submitting Update regarding Return to Service
May 12, 2022 C1-86 Letter dated May 12, 2022 - PKMJF submitting request for relief from the Return to Service compliance
May 17, 2022 C1-87 Letter dated May 17, 2022 - PKMJF submitting Update regarding Return to Service
May 24, 2022 C1-88 Letter dated May 24, 2022 - PKMJF submitting Update regarding Return to Service
May 31, 2022 C1-89 Letter dated May 31, 2022 - PKMJF submitting Update regarding Return to Service
June 07, 2022 C1-90 Letter dated June 7, 2022 - PKMJF submitting Update regarding Return to Service
June 14, 2022 C1-91 Letter dated June 14, 2022 - PKMJF submitting Update regarding Return to Service
June 21, 2022 C1-92 Letter dated June 21, 2022 - PKMJF submitting Update regarding Return to Service
June 28, 2022 C1-93 Letter dated June 28, 2022 - PKMJF submitting Update regarding Return to Service
July 05, 2022 C1-94 Letter dated July 5, 2022 - PKMJF submitting Return to Service completed
July 06, 2022 C2-15 Letter dated July 6, 2022 – Parkland submission on proceeding closure
July 12, 2022 C1-95 Letter dated July 12, 2022 - PKMJF submitting update to Return to Service Orders
July 19, 2022 C1-96 Letter dated July 19, 2022 - PKMJF submitting update to Return to Service Orders

D Exhibits — Interested Party Documents

Date Title Document Description
June 02, 2021 D-1 BC OIL AND GAS COMMISSION. (BCOGC) – Submission dated June 2, 2021 – Request for Interested Party status by Lauren Krakau
June 14, 2021 D-1-1 Letter dated June 14, 2021 – BCOGC submitting information regarding the historical maximum operating pressure (MOP) of Pipeline Project 1476 as agreed at the Workshop
June 28, 2021 D-2 TRANSPORT CANADA – Submission dated June 28, 2021 – Request for Interested Party status by Jasmine Luk
June 30, 2021 D-1-2 Letter dated June 30, 2021 – BCOGC submitting further information from the Workshop and as requested in Exhibit B-13

E Exhibits - Letters of Comment

Date Title Document Description
June 02, 2021 E-1 VANCOUVER AIRPORT AUTHORITY (VAA) - Letter dated June 2, 2021 – Letter of Comment

Transcripts

Date Title Document Description
June 11, 2021 Transcript Volume 1 Web-Based Workshop June 11, 2021
June 16, 2021 Transcript Volume 1A Confidential Confidential Web-Based Workshop June 16, 2021
June 21, 2021 Transcript Volume 1A Errata Confidential Confidential Web-Based Workshop June 16, 2021
July 15, 2021 Transcript Volume 2A Confidential Confidential Web-Based Workshop July 15, 2021
July 15, 2021 Transcript Volume 2 Web-Based Workshop July 15, 2021