BC Hydro

Public Electric Vehicle Charging Service Rates

Completed: 2024

BC Hydro is seeking BCUC approval of Rate Schedule 4100 for time-based and energy-based public electric vehicle charging rates and the establishment of a separate class of service for the Public Electric Vehicle Charging Service.

Hearing and Other Documents

Title Document Description
EXHIBIT LIST Updated: December 18, 2023 @ 2:31 pm
Decision and G-67-24 Decision and Order G-67-24 March 13, 2024

Arguments/Submissions

Title Document Description
BC Hydro Final Argument Final Argument December 21, 2023
BCSEA-VEVA Final Argument Final Argument January 8, 2024
BCOAPO Final Argument Final Argument January 9, 2024
Flintoff Final Argument Final Argument January 9, 2024
RCIA Final Argument Final Argument January 9, 2024
CEC Final Argument Final Argument January 9, 2024
BC Hydro Reply Argument Reply Argument January 23, 2024

Exhibits

A Exhibits - BCUC Documents

Date Title Document Description
August 08, 2023 A-1 Letter dated August 8, 2023 – Appointing the Panel for the review of BC Hydro Public Electric Vehicle Charging Service Rates Application
August 17, 2023 A-2 Letter dated August 17, 2023 – BCUC Order G-219-23 establishing a regulatory timetable and Public Notice with Reasons for Decision
September 14, 2023 A-3 Letter dated September 14, 2023 – BCUC Information Request No. 1 to BC Hydro
September 20, 2023 A-4 Letter dated September 20, 2023 – BCUC amending the Panel for the review of the application
September 29, 2023 A-5 Letter dated September 29, 2023 – BCUC submitting Streamlined Review Process information
September 29, 2023 A-6 Letter dated September 29, 2023 – BCUC Order G-259-23 amending the regulatory timetable
October 06, 2023 A-7 Letter dated October 6, 2023 – BCUC Order G-263-23 amending the regulatory timetable
November 17, 2023 A-8 Letter dated November 17, 2023 – BCUC providing Streamlined Review Process Information
November 17, 2023 A-9 Letter dated November 17, 2023 – BCUC Panel Information Request No. 1 to BC Hydro
November 24, 2023 A-10 Letter dated November 24, 2023 – BCUC establishing the Streamlined Review Process Scope
December 06, 2023 A-11 Letter dated December 6, 2023 – BCUC providing further Streamlined Review Process Information
December 12, 2023 A-12 Letter dated December 12, 2023 – BCUC adjusting the regulatory timetable
December 14, 2023 A-13 Letter dated December 14, 2023 – BCUC notifying parties of corrections to transcript
December 18, 2023 A-14 Letter dated December 18, 2023 – BCUC Order G-354-23 approving interim rates
September 14, 2023 A2-1 Letter dated September 14, 2023 – BCUC staff submitting Tesla’s article titled Opening the North American Charging Standard, dated November 11, 2022
September 14, 2023 A2-2 Letter dated September 14, 2023 – BCUC staff submitting CleanTechnica.ca article titled What You Need to Know About Fast Charging EVs Now & Over the Next Few Years in USA, dated August 14, 2023
September 14, 2023 A2-3 Letter dated September 14, 2023 – BCUC staff submitting Electrek.co article titled Everything You Need to Know about the North American Charging Standard (NACS), dated June 19, 2023
September 14, 2023 A2-4 Letter dated September 14, 2023 – BCUC staff submitting ElectricAutonomy.ca article titled Tesla Supercharger Network Now Billing Based on kWh in Canada, dated August 4, 2023
December 08, 2023 A2-5 Letter dated December 8, 2023 – BCUC staff submitting Witness Aid for the Streamlined Review Process dated December 11–12, 2023

B Exhibits - Applicant Documents

Date Title Document Description
July 28, 2023 B-1 BRITISH COLUMBIA HYDRO AND POWER AUTHORITY (BC HYDRO) – Public Electric Vehicle Charging Service Rates Application dated July 28, 2023
July 28, 2023 B-1-1 CONFIDENTIAL – Letter dated July 28, 2023 – BC Hydro submitting Public Electric Vehicle Charging Service Rates Application
July 28, 2023 B-1-1-1 Letter dated July 28, 2023 – BC Hydro submitting public Excel Model supporting the Application
July 28, 2023 B-1-1-2 CONFIDENTIAL – Letter dated July 28, 2023 – BC Hydro submitting confidential Excel Model supporting the Application
November 20, 2023 B-1-1-3 CONFIDENTIAL – Letter dated November 17, 2023 – BC Hydro submitting confidential Application Errata No. 1
November 20, 2023 B-1-2 PUBLIC – Letter dated November 17, 2023 – BC Hydro submitting Application Errata No. 1
August 25, 2023 B-2 Letter dated August 25, 2023 – BC Hydro submitting confirmation of public notice in compliance with G-219-23
September 08, 2023 B-3 Letter dated September 8, 2023 – BC Hydro submitting confirmation of public notice in compliance with G-219-23
October 05, 2023 B-4 Letter dated October 5, 2023 – BC Hydro submitting extension request for filing response to Information Request No. 1
November 09, 2023 B-5 PUBLIC - Letter dated November 9, 2023 – BC Hydro submitting response to BCUC Information Request No. 1
November 09, 2023 B-5-1 CONFIDENTIAL - Letter dated November 9, 2023 – BC Hydro submitting confidential response to BCUC Information Request No. 1
December 15, 2023 B-5-2 PUBLIC - Letter dated December 15, 2023 – BC Hydro submitting revised public responses to BCUC Information Request No. 1
November 09, 2023 B-6 PUBLIC - Letter dated November 9, 2023 – BC Hydro submitting responses to Interveners Information Requests No. 1
November 09, 2023 B-6-1 CONFIDENTIAL - Letter dated November 9, 2023 – BC Hydro submitting confidential responses to Interveners Information Requests No. 1
November 15, 2023 B-7 Letter dated November 15, 2023 – BC Hydro submission on SRP Scope
November 21, 2023 B-8 Letter dated November 21, 2023 – BC Hydro submitting responses to BCUC Panel Information Request No. 1
December 07, 2023 B-9 PUBLIC - Letter dated December 7, 2023 – BC Hydro submitting public SRP Presentation and Sensitivity Analysis
December 07, 2023 B-9-1 CONFIDENTIAL - Letter dated December 7, 2023 – BC Hydro submitting confidential SRP Presentation and Sensitivity Analysis
December 15, 2023 B-10 Letter dated December 15, 2023 – BC Hydro submitting errata to SRP Transcripts Volumes 1 and 2
December 15, 2023 B-11 PUBLIC - Letter dated December 15, 2023 – BC Hydro submitting public responses to SRP Undertakings
December 15, 2023 B-11-1 CONFIDENTIAL - Letter dated December 15, 2023 – BC Hydro submitting confidential responses to SRP Undertakings

C Exhibits - Intervener Documents



Date Title Document Description
August 17, 2023 C1-1 FLINTOFF, DONALD (FLINTOFF) - Letter dated August 17, 2023 submitting request to intervene
September 21, 2023 C1-2 Letter dated September 21, 2023 – Flintoff submitting Information Request No. 1 to BC Hydro
November 01, 2023 C1-3 Letter dated November 1, 2023 – Flintoff submitting no intervener evidence
November 06, 2023 C1-4 Letter dated November 6, 2023 – Flintoff submission on SRP scope
August 17, 2023 C2-1 GUTHRIE, GARY (GUTHRIE) - Letter dated August 17, 2023 submitting request to intervene
September 22, 2023 C2-2 Letter dated September 21, 2023 – Guthrie submitting Information Request No. 1 to BC Hydro
August 19, 2023 C3-1 BC SUSTAINABLE ENERGY ASSOCIATION AND VANCOUVER ELECTRIC VEHICLE ASSOCIATION (BCSEA VEVA) - Letter dated August 19, 2023 submitting request to intervene by T. Hackney
September 21, 2023 C3-2 Letter dated September 21, 2023 – BCSEA-VEVA submitting Information Request No. 1 to BC Hydro
October 05, 2023 C3-3 Letter dated October 5, 2023 – BCSEA-VEVA submission on further process
November 01, 2023 C3-4 Letter dated November 1, 2023 – BCSEA-VEVA submitting no intervener evidence
November 15, 2023 C3-5 Letter dated November 15, 2023 – BCSEA-VEVA submission on SRP Scope
August 21, 2023 C4-1 FORTISBC INC. (FBC) - Letter dated August 21, 2023 submitting request to intervene by S. Walsh
September 06, 2023 C5-1 RESIDENTIAL CONSUMER INTERVENER ASSOCIATION (RCIA) - Letter dated September 6, 2023 submitting request to intervene by A. Abomazid
September 12, 2023 C5-2 Letter dated September 12, 2023 – RCIA submitting Confidentiality Declaration and Undertaking Forms
September 22, 2023 C5-3 Letter dated September 21, 2023 – RCIA submitting Information Request No. 1 to BC Hydro
November 15, 2023 C5-4 Letter dated November 15, 2023 – RCIA submission on SRP Scope
November 15, 2023 C5-5 Letter dated November 15, 2023 – RCIA confirming no submission on Information Request No. 1
December 10, 2023 C5-6 Letter dated December 10, 2023 – RCIA submitting Witness Aid for the Streamlined Review Process
September 07, 2023 C6-1 BC OLD AGE PENSIONERS’ ORGANIZATION, COUNCIL OF SENIOR CITIZENS’ ORGANIZATIONS OF BC, ACTIVE SUPPORT AGAINST POVERTY, DISABILITY ALLIANCE BC, TENANTS RESOURCE AND ADVISORY CENTRE, AND TOGETHER AGAINST POVERTY SOCIETY (BCOAPO) - Letter dated September 7, 2023 submitting request to intervene by I. Mis
September 18, 2023 C6-2 Letter dated September 18, 2023 – BCOAPO submitting Confidentiality Declaration and Undertaking Forms
September 22, 2023 C6-3 Letter dated September 21, 2023 – BCOAPO submitting Information Request No. 1 to BC Hydro
November 15, 2023 C6-4 Letter dated November 15, 2023 – BCOAPO submission on SRP Scope
September 07, 2023 C7-1 COMMERCIAL ENERGY CONSUMERS ASSOCIATION OF BC (CEC) - Letter dated September 7, 2023 submitting request to intervene by D. Craig
September 22, 2023 C7-2 Letter dated September 21, 2023 – CEC submitting Information Request No. 1 to BC Hydro
November 15, 2023 C7-3 Letter dated November 15, 2023 – CEC submission on SRP Scope
December 10, 2023 C7-4 Letter dated December 10, 2023 – CEC submitting Witness Aid for the Streamlined Review Process
September 07, 2023 C8-1 SUNCOR - Letter dated September 7, 2023 submitting request to intervene by A. Henry
August 30, 2023 C9-1 CARMICHAEL, KELLY (CARMICHAEL) - Letter dated August 30, 2023 submitting request to intervene
September 21, 2023 C9-2 Letter dated September 21, 2023 – Carmichael submitting Information Request No. 1 to BC Hydro

D Exhibits - Letters of Comment

Date Title Document Description
August 10, 2023 D-1 BUTZELAAR, R. (BUTZELAAR) – Letter of Comment dated August 10, 2023
August 09, 2023 D-2 CAMPOS, K. (CAMPOS) – Letter of Comment dated August 9, 2023
August 10, 2023 D-3 BRUDY, S. (BRUDY) – Letter of Comment dated August 10, 2023
August 10, 2023 D-4 LACTIN, J. (LACTIN) – Letter of Comment dated August 10, 2023
August 10, 2023 D-5 LEMCKE, W. (LEMCKE) – Letter of Comment dated August 10, 2023
August 11, 2023 D-6 NORIE, S. (NORIE) – Letter of Comment dated August 11, 2023
August 12, 2023 D-7 YOUNG, S. (YOUNG) – Letter of Comment dated August 12, 2023
August 12, 2023 D-8 WENDLAND, L. (WENDLAND) – Letter of Comment dated August 12, 2023
August 12, 2023 D-9 HYNES, C. (HYNES) – Letter of Comment dated August 12, 2023
August 12, 2023 D-10 COLLIER, M. (COLLIER) – Letter of Comment dated August 12, 2023
August 12, 2023 D-11 THIR, S. (THIR) – Letter of Comment dated August 12, 2023
August 12, 2023 D-12 INSELBERG, A. (INSELBERG) – Letter of Comment dated August 12, 2023
August 12, 2023 D-13 JOHNSON, C. (JOHNSON) – Letter of Comment dated August 12, 2023
August 12, 2023 D-14 LANDROCK, K. (LANDROCK) – Letter of Comment dated August 12, 2023
August 12, 2023 D-15 BOLDING, C. (BOLDING) – Letter of Comment dated August 12, 2023
August 12, 2023 D-16 MCGIFFIN, T. (MCGIFFIN) – Letter of Comment dated August 12, 2023
August 12, 2023 D-17 SIRULNIKOFF, A. (SIRULNIKOFF) – Letter of Comment dated August 12, 2023
August 12, 2023 D-17-1 SIRULNIKOFF – Additional Letter of Comment dated August 12, 2023
August 12, 2023 D-18 JORDAN, J. (JORDAN) – Letter of Comment dated August 12, 2023
August 12, 2023 D-19 VALENTINE, N. (VALENTINE) – Letter of Comment dated August 12, 2023
August 12, 2023 D-20 ALEXANDER, M. (ALEXANDER) – Letter of Comment dated August 12, 2023
August 12, 2023 D-21 SAVISKOFF, P. (SAVISKOFF) – Letter of Comment dated August 12, 2023
August 12, 2023 D-22 VENNARD, N. (VENNARD) – Letter of Comment dated August 12, 2023
August 13, 2023 D-23 NASH, L. (NASH) – Letter of Comment dated August 13, 2023
August 13, 2023 D-24 COLEMAN, B. (COLEMAN) – Letter of Comment dated August 13, 2023
August 13, 2023 D-25 WALBERG, R. (WALBERG) – Letter of Comment dated August 13, 2023
August 13, 2023 D-26 CHATTON, R. (CHATTON) – Letter of Comment dated August 13, 2023
August 13, 2023 D-27 MCKAY, C. (MCKAY) – Letter of Comment dated August 13, 2023
August 13, 2023 D-28 TWEEDY, T. (TWEEDY) – Letter of Comment dated August 13, 2023
August 13, 2023 D-29 POW, A. (POW) – Letter of Comment dated August 13, 2023
August 13, 2023 D-30 JOHNSON, M. (JOHNSON) – Letter of Comment dated August 13, 2023
August 13, 2023 D-31 CAREY, M. (CAREY) – Letter of Comment dated August 13, 2023
August 13, 2023 D-32 RADKE, T. (RADKE) – Letter of Comment dated August 13, 2023
August 13, 2023 D-33 HOLMAN, B. (HOLMAN) – Letter of Comment dated August 13, 2023
August 13, 2023 D-34 MOEN, V. (MOEN) – Letter of Comment dated August 13, 2023
August 13, 2023 D-35 CAMPBELL, C. (CAMPBELL) – Letter of Comment dated August 13, 2023
August 13, 2023 D-36 LUKOVICH, D. (LUKOVICH) – Letter of Comment dated August 13, 2023
August 13, 2023 D-37 THIESSEN, F. (THIESSEN) – Letter of Comment dated August 13, 2023
August 13, 2023 D-38 GREWAL, A. (GREWAL) – Letter of Comment dated August 13, 2023
August 13, 2023 D-39 JONES, R. (JONES) – Letter of Comment dated August 13, 2023
August 13, 2023 D-40 CHUI, V. (CHUI) – Letter of Comment dated August 13, 2023
August 13, 2023 D-41 MUNRO, D. (MUNRO) – Letter of Comment dated August 13, 2023
August 13, 2023 D-42 EVERETT, N. (EVERETT) – Letter of Comment dated August 13, 2023
August 13, 2023 D-43 FAIRBANK, T. (FAIRBANK) – Letter of Comment dated August 13, 2023
August 14, 2023 D-44 LANTAIGNE, D. (LANTAIGNE) – Letter of Comment dated August 14, 2023
August 14, 2023 D-45 PECK, B. (PECK) – Letter of Comment dated August 14, 2023
August 14, 2023 D-46 CUNNINGHAM, M. (CUNNINGHAM) – Letter of Comment dated August 14, 2023
August 14, 2023 D-47 MOONEY, F. (MOONEY) – Letter of Comment dated August 14, 2023
August 14, 2023 D-48 GO, B. (GO) – Letter of Comment dated August 14, 2023
August 14, 2023 D-49 SMITH, C. (SMITH) – Letter of Comment dated August 14, 2023
August 14, 2023 D-50 AGAR, D. (AGAR) – Letter of Comment dated August 14, 2023
August 15, 2023 D-51 BROWN, W. (BROWN) – Letter of Comment dated August 15, 2023
August 15, 2023 D-52 LO, K. (LO) – Letter of Comment dated August 15, 2023
August 14, 2023 D-53 REEKIE, M. (REEKIE) – Letter of Comment dated August 14, 2023
August 15, 2023 D-54 VANPEENAN, P. (VANPEENEN) – Letter of Comment dated August 15, 2023
August 14, 2023 D-55 WONG, S. (WONG) – Letter of Comment dated August 14, 2023
August 15, 2023 D-56 BAXTER, M. (BAXTER) – Letter of Comment dated August 15, 2023
August 15, 2023 D-57 BROOKS, T. (BROOKS) – Letter of Comment dated August 15, 2023
August 16, 2023 D-58 BROWNRIDGE, J. (BROWNRIDGE) – Letter of Comment dated August 16, 2023
August 16, 2023 D-59 VARTY, D. (VARTY) – Letter of Comment dated August 16, 2023
August 16, 2023 D-60 WILLIAMS, G. (WILLIAMS) – Letter of Comment dated August 16, 2023
August 16, 2023 D-61 HACKETT, H. AND E. (HACKETT) – Letter of Comment dated August 16, 2023
August 16, 2023 D-62 JAFFAR, A. (JAFFAR) – Letter of Comment dated August 16, 2023
August 17, 2023 D-63 RICE, S. (RICE) – Letter of Comment dated August 17, 2023
August 16, 2023 D-64 EVANS, P. (EVANS) – Letter of Comment dated August 16, 2023
August 17, 2023 D-65 LITTLE, D. (LITTLE) – Letter of Comment dated August 17, 2023
August 17, 2023 D-66 HEALEY, M. (HEALEY) – Letter of Comment dated August 17, 2023
August 17, 2023 D-67 NELSON, L. (NELSON) – Letter of Comment dated August 17, 2023
August 17, 2023 D-68 ETHIER, J. (ETHIER) – Letter of Comment dated August 17, 2023
August 17, 2023 D-69 SMITH, K. (SMITH) – Letter of Comment dated August 17, 2023
August 17, 2023 D-70 SILVA, T. (SILVA) – Letter of Comment dated August 17, 2023
August 17, 2023 D-71 TAYLOR, P. (TAYLOR) – Letter of Comment dated August 17, 2023
August 17, 2023 D-72 SHARMAN, R. (SHARMAN) – Letter of Comment dated August 17, 2023
August 17, 2023 D-73 SAWADA-TSE, H. (SAWADA-TSE) – Letter of Comment dated August 17, 2023
August 17, 2023 D-74 PHIPPS, D. (PHIPPS) – Letter of Comment dated August 17, 2023
August 17, 2023 D-75 PAGE, R. (PAGE) – Letter of Comment dated August 17, 2023
August 18, 2023 D-76 BAUER, B. (BAUER) – Letter of Comment dated August 18, 2023
August 18, 2023 D-77 BROWN, I. (BROWN) – Letter of Comment dated August 18, 2023
August 18, 2023 D-78 PALMER, F. (PALMER) – Letter of Comment dated August 18, 2023
August 18, 2023 D-79 DAIROBI, P. (DAIROBI) – Letter of Comment dated August 18, 2023
August 18, 2023 D-80 LUTZ, B. (LUTZ) – Letter of Comment dated August 18, 2023
August 19, 2023 D-81 VILLALTA, O (VILLALTA) – Letter of Comment dated August 19, 2023
August 19, 2023 D-82 MEUTER, H. (MEUTER) – Letter of Comment dated August 19, 2023
August 19, 2023 D-83 SHUNTER, M. (SHUNTER) – Letter of Comment dated August 19, 2023
August 20, 2023 D-84 COLLIN, K. (COLLIN) – Letter of Comment dated August 20, 2023
August 21, 2023 D-85 THOMPSON, I. (THOMPSON) – Letter of Comment dated August 21, 2023
August 21, 2023 D-86 THOMAS, G. (THOMAS) – Letter of Comment dated August 21, 2023
August 22, 2023 D-87 LUCKING, T. (LUCKING) – Letter of Comment dated August 22, 2023
August 23, 2023 D-88 JOHANNESSEN, D. (JOHANNESSEN) – Letter of Comment dated August 23, 2023
August 23, 2023 D-89 DEMERSE, T. (DEMERSE) – Letter of Comment dated August 23, 2023
August 25, 2023 D-90 EWART, D. (EWART) – Letter of Comment dated August 25, 2023
August 29, 2023 D-91 MODO CO-OPERATIVE (MODO) – Letter of Comment dated August 29, 2023
September 06, 2023 D-92 BECKETT, D. (BECKETT) – Letter of Comment dated September 6, 2023
September 20, 2023 D-93 WILSON, T. (WILSON) – Letter of Comment dated September 20, 2023
September 25, 2023 D-94 DOWNIE, D. (DOWNIE) – Letter of Comment dated September 22, 2023
December 13, 2023 D-95 ALLEN, D. (ALLEN) – Letter of Comment dated December 13, 2023
December 15, 2023 D-96 STEVENTON, D. (STEVENTON) – Letter of Comment dated December 15, 2023

Transcripts

Date Title Document Description
December 11, 2023 Transcript Volume 1 - Revised Streamlined Review Process December 11, 2023
December 12, 2023 Transcript Volume 2 - Revised Streamlined Review Process December 12, 2023

Our Review Process

Learn more about how we review applications, which are submitted to us by the entities we regulate. You'll see the types of reviews we conduct and how you can get involved in the process.

Learn more